ML20056A416

From kanterella
Jump to navigation Jump to search
Forwards Revised Security Plan Implementing Procedures.Encl Withheld (Ref 10CFR2.790)
ML20056A416
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/31/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
161-03371-WFC-G, 161-3371-WFC-G, NUDOCS 9008070312
Download: ML20056A416 (3)


Text

,

Pod

~

..  : SAFEGUARDS INFORMATl09 ,

, ncCtlVED 6 HRC Arizona Public Service Company REGION y  ;

P O. BOX 53999

  • PHOENIX, ARIZONA 65072-3$?O 15 -2 t)\ II: o a WitU AM F. CONWAY 161-03371-MC/GE extcom4vggtsom July 31, 1990

'i l Docket Nos. STN 50 528/529/530 Mr. L. R. Norderhaug U. S. Nuclear. Regulatory Commission i Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 5368

Dear Mr. Norderhaug:

j

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Security Plan Implementing Procedures File: 90 001 493 Attached please find copies of recently revised PVNGS p ocedures that implement

  • the Security Plan and Security Program. A listing is attached of those procedures included in this transmittal.

Procedures containing. Safeguards Information must be protected against j unauthorized disclosure in accordance with the provisions of 10 CFR 73.21 and are, therefore, to be withheld from public disclosure in accordance with 10 CFR

  • 2.790(d). Please ensure appropriate steps are taken to safeguard their contents.

Please ensure that all superceded procedures are returned with the signed

. acknowledgement of receipt of the new revisions. . Your acknowledgement signatures are to be returned as soon as practical, but no later than 60 days from the date of receipt.

If you have any questions, please contact Gary Clyde at (602) 340 4252. -

Sincerely,

/

WFC/ CEC /jle Attachments v cc: J. B. Martin (all w/o attachments) -

C. M. Trammell S. R. Peterson , p D. H. Coe ,.

p' 1

A. H. Gutterman

^- - *

SA7IG LAR JS UOR V AT ON t 9008070312 900731 PDR F-ADOCK O$000528 WHEN SEPARATED FROM ENCLOSURES. HANDLE TH*

DOCUMENT A8 DECONTROLLEO.

l' 1 5od)\ ,\t PDC

Lj. -1.

. SAFEGUARDS INFORMATION Mr. L. Norderhaug' 161-03371 MT/GI:

U. S. Nuclear. Regulatory Commission Jdly 31 1990 Page 2 '

bec: J. M. Levine (6125) (all w/o attachments)

J. N. Bailey (1966) . '

W. F. Quinn (1502)

P. J. Caudill (6163)

A. C. Rogers (1515)

F. J . Larkin (6135)

T. R. Bradish (6148)

R. A. Bernier (1515).

J . L. Terry (6755)

E. E. Van Brunt (1922)

N. E. Meador (1515) (w/ attachment)

RCTS Analyst (1515)

Source Doc. File (6715)

SA:EGUADS IN 0RV AT ON WHEN SEPARATED FROM ENCLOSURES. HANDLE THl$

DOCUMENT AS DECONTROLLED, i

g, u ,

L S 5. .:'

SA EGL ARJS \ 0RMATIOY hi - Procedures Included in Transmittal n <e ,

??' ';

4 l Procedure .

+ Number,, Tit 1 i Rev/ Pen 20PR-OSK0*: Security Program 02 20CB-OSK05 Control of Safeguards Information 03 j 20SP OSK06~ Fersonnel Badging and Authorization '02  :

20SP OSK07 CAS/SAS Operations Procedure 04 20SP OSK09 Security System Testing 04 i

l t

l

.?

l SAFEGUATOS NFORVKF ON WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED,