Forwards, Conceptual Design for Palo Verde Nuclear Generating Station for Diverse Auxiliary Feedwater Actuation Sys (Dafas) for Review.Schedule of Implementation as Indicated
ML17305A979
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/31/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17305A980 List:
References
NUDOCS 9008070069
Download: ML17305A979 (6)


Text

O'LERATED D TMBUTION DEMONS RATION SYSTEM

~

'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) ar Power R

)

I

SUBJECT:

Forwards, "Conceptual Design for Palo Verde Nucle Generating Station for Diverse AFW Actuation Sys gbAFAS)."

DISTRIBUTION CODE:

AO55D COPIES RECEIVED:LTRi ENCL Q SIZE:

3 + 3 C2 TITLE: OR/Licensing Submittal:

Salem ATWS Events GL-83-28 D

ACCESSION NBR:9008070069 DOC.DATE: 90/07/31 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit. 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co.

(formerly Arizona Nu RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control D

NOTES:Standardized plant.

Standardized plant.

R G

ILE EXTERNAL: LPDR NSIC NOTES:

01 RECIPIENT ID CODE/NAME PD5 LA PETERSON,S.

INTERNAL: ACRS NRR/DLPQ/LPEB10 NRR/DST/SICB 7E COPIES LTTR ENCL 1

0 1

1 6

6 1

0 1

1 1

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD TRAMMELL,C.

NRR/DEST/ESB 8D NRR/DOEA/OGCB11 NRR/DST/SPLB 8D OGC/HDS1 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 3

3 1

1 1

1 1

0 1

0 1

0 1

1 05000529 05000530 A

D D

R D

NOTE TO ALL"RIDS" RECIPIENTS:

A D

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 25 ENCL 19

1'I P

l 4'i

(

I t

l,

Arizona Public Service Company P.O. BOX 53999

~

PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-03369-WFC/RAB/KLMC July 31, 1990 Docket Nos.

STN 50-528/529/530 Document Control Desk U.

S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.

C.

20555

References:

1)

Letter to U.

S.

NRC from J.

G. Haynes,

APS, dated March 13, 1987.

Subject:

PVNGS Schedule for Implementation of the ATWS Rule (161-00074).

2)

Letter to U.

ST NRC from W. F.

Conway, APS, dated August 6, 1989 'ubject:

PVNGS Implementation of the ATWS Rule (161-02181).

3)

Letter to U.

S.

NRC from W. F.

Conway, APS, dated October 31, 1989.

Subject:

Implementation Schedule for the PVNGS Diverse Scram System-10 CFR 50.62 (ATWS Rule)

(161-02561).

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit's 1, 2 and 3

PVNGS Diverse Auxiliary Feedwater Actuation System-Conceptual Design and Implementation Schedule for ATWS Rule, 10 CFR 50.62 File: 90-056-026

Enclosed, for your review, is the conceptual design for the PVNGS Diverse Auxiliary Feedwater Actuation System (DAFAS). Reference 1 provided APS's initial commitment concerning the implementation of the DAFAS as prior to restart from the third refueling outage for PVNGS Units 1, 2,

and 3.

Reference 2 provided a tentative, expedited implementation schedule for Unit 3 as prior to restart from the second refueling outage.

Due to the scope of the modification required for DAFAS, implementation for Unit 3 is now expected to be performed prior to restart from the third refueling outage.

Therefore, the PVNGS DAFAS implement-ation schedule is as follows:

Unit 3

- Prior to nq~

9008070069 900731 PDR ADOCK 05000528 P

PDC I

restart from the third refueling outage.

Unit 1 - Prior to restart from the third refueling outage.

Unit 2 - Prior to restart from the third refueling outage.

geEX

E J

hl

Document Control Desk U.

S. Nuclear Regulatory Commission Page 2

161-63369AM/RAB/KU'C July 31, 1990 In addition, as discussed in Reference 3, Unit 2 Diverse Scram System (DSS) has been installed and is functioning as required.

The DSS implementation schedule for Units 1 and 3 remains as follows:

Unit l - Prior to restart from the third refueling outage.

Unit 3 - Prior to restart from the second refueling outage.

If you have any questions concerning this matter, contact Mr. R. A. Bernier at (602) 340-4295.