Informs NRC That post-restart Items Due Prior to Scheduled Restart Have Been Completed on Schedule W/Listed Exceptions
ML17305A889
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/15/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
102-01733-WFC-T, 102-1733-WFC-T, NUDOCS 9006260178
Download: ML17305A889 (6)


Text

ACCELERATED DEMONRATION SYSTEM DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9006260178 DOC DATE: 90/06/15 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFIL'IATION MARTIN,J.B. Region 5, Ofc of the Director

SUBJECT:

Informs NRC that post restart items due prior to scheduled TITLE: General NOTES restart DISTRIBUTION CODE: IEOID (50 have been completed on schedule COPIES RECEIVED:LTR i w/listed exceptions.

ENCL.Q Dkt)-Insp Rept/Notice of Violation Response SIZE:

05000528 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD PETERSON,S.

CHAN,T INTERNAL: ACRS AEOD 1 AEOD/DEIIB AEOD/TPAD 1 DEDRO NRR MORISSEAU'g D 1 NRR SHANKMAN,S NRR/DLPQ/LPEB10 1 NRR/DOEA DIR 11 NRR/DREP/PEPB9D 1 NRR/DRIS/DIR NRR/DST/DIR 8E2 1 NRR/PMAS/ILRB12'E NUDOCS-ABSTRACT 1 OGC/HDS1 1 1 G F 02 RGN5 FILE 01 1 '1 EXTERNAL: LPDR NRC PDR 1 1 NSIC NOTES:

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO'REDUCE WASfE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL

II P, Qg I'I,Ig Q t'F:C REQtotl Y A".zona Pubuc Se~ce P.O.- BOX 53999 ~

C.mph PHOENIX, ARIZONA85072-399gog JUI'1 t F:1 p 36 WILLIAMF. CONWAY EXECUTIVEVICE PRESIDENT 102-01733-WFC/TRB/DAJ NUCLEAR June 15, 1990 Mr. John B. Martin, Regional Administrator Region V U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, CA 94546-5368

References:

a. Letter from J . B. Martin, NRC, to W. F. Conway, APS, dated December 24, 1989.
b. Letter from W. F. Conway, APS, to J. B. Martin, NRC, dated April 12, 1990.

Dear Sir:

Subj ect: Palo Verde Nuclear Generating Station Post Restart Items File: 90-019-417 In accordance with our agreement in the Confirmatory Action Letter dated December 24, 1989 (Reference a), I provided an updated list of Post Restart items on April 12, 1990 (Reference b). This letter is to inform you that all the Post Restart items due prior to the scheduled Unit 1 restart have been completed or will be completed on schedule with the following exceptions:

Record Number Descri tion 20 This item requires an evaluation to determine the actions necessary to provide more reliable valve position indication for Valcon and Target Rock solenoid valves.

~

A more reliable valve position indication has been identified for Valcor solenoid valves. Design change packages have been prepared for implementation.

~

A modification for Target Rock solenoid valves has not been identified. It is expected that the evaluation for a modification'ill be completed by December 31, 1990.

725 This item requires that a sampling inspection program be initiated to determine the effects of moisture and particles in the instrument air subsystem.

The recommendation for a sampling inspection program has been provided by Engineering to the Standards organization. This recommendation is currently under evaluation and is expected to be implemented by August 31, 1990.

90062601TH 90061' PDR ADOCk 05000528 P PDC /c.o I

II Nemo to J. B. Martin Page Two All other Post Restart items are progressing towards the completion schedule provided in Reference b.

Several of the remaining Post Restart items will be completed during scheduled refueling outages. Due dates of June 30, 1990, April 9, 1992, and January 12,,

1993, corresponding, respectively to Unit 2's current refueling outage, Unit 1's third refueling outage and Unit 3's third refueling outage,. 'Due to potential schedule adjustments, these due dates are considered milestone due dates of "prior to mode 2'ntry" during the identified re'fueling outage.

If you have any questions or require additional information, please contact me.

Very truly yours, WFC/TRB/DAJ/dmn cc: D. H. Coe T. L. Chan