Forwards Application for Amend to License NPF-3 Revising Tech Specs Re Safety Sys Instrumentation,Safety Features Actuation Sys Instrumentation & Steam & Feedwater Rupture Control Sys Instrumentation Trip Setpoints.Fee Paid
ML20237A248
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/07/1987
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237A250 List:
References
1414, TAC-66007, NUDOCS 8712140357
Download: ML20237A248 (1)


Text

- - _ _ _ _ _ - - -. .

i Docket No. 50-346-TOLEDO License No. NPF-3 EDISON Serial No. 1414 DONALO C. SHELTON .

Vce Presew34Adeae December 7,'1987 ,

l

{

United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

License Amendment Application to Revise the Steam and Feedwater Rupture Control System Steam Generator Low Level Trip Setpoint (TAC No. 66007)

Gentlemen:

The enclosed application requests that the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix A, Technical Specifica-tions.be revised to reflect the changes attached. The proposed changes involve Section 3/4.3.2, Safety System Instrumentation, Safety Features Actuation System (SFAS) Instrumentation, Table 3.3-12, Steam and Feedwater Rupture Control System (SFRCS) Instrumentation Trip Setpoints.

The proposed changes would reduce the Steam Generator (SG) Low Level SFRCS trip setpoint from greater than or equal to 20 inches to greater than or equal to 16.4 inches, thus n.inimizing the prtential for spurious SFRCS actuhtions during operation at the Integrated Control System (ICS)

SG low level limit. This is consistent with the commitment made in the Davis-Besse Course of Action (C0A) Appendix C.2.2 Item 4, (Serial No. 1202 dated October 31, 1985) co increase the margin between the SFRCS low level trip setpoint and the ICS 1cte level limit. Additionally the change will clarify the datum for measuring the SG 1evel. i Toledo Edison requests that this amendment be issued by July 1, 1988 for i implementation prior to Cycle 6 operation.

Enclosed is a check for $150.00 as required by 10CFR70.12(c) for a License Amendment Application.

)

Very tr y yoars, A ' 8712140357 871207

/ PDR ADOCK 05000346PDR T } l p ,

JSL:SJM:bam D

. Enclosures

\ 6 i' cc: DB-1 NRC Resident Inspector di V

d A. B. Davis, Regional Administrator (2 copies)

State of Ohio A. W. DeAgazio, NRR Davis-Besse Project Manager i