ML19319B505

From kanterella
Revision as of 18:11, 11 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Annual Personnel Monitoring Rept 1977
ML19319B505
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/14/1978
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19319B506 List:
References
NUDOCS 8001230629
Download: ML19319B505 (1)


Text

_ _ _

i --

R r--

4cLL h ,',

. *N ,

l

.~ 4,: '

,r

/

l 4

!

TOLEDO EDISON March 14,1978 L78-110 FILE: RR 2 (P-5-77-1)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Cor:=11ssion 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Annual Personnel Monitoring Report For 1977 Davis-Besse Nuclear Pcwer Station Enclosed find one (1) ccpy of the Annual Personnel Monitoring Report for the Davis-Besse Nuclear Power Station for 1977.

Yours truly,

/

${Lo --

I 'Q =$

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Stat on TDM/DWB/ljk Enclosure cc: Executive Director for Cperations Nuclear Regulatory Cor:=11ssion Washington, D. C. 20555 Encl: 1 copy i m 1 7 1978 8 0012 a o (o& p1k >-

THE TOLEDO EDISCN CCMPANY EDISCN PLAZA 300 MADISCN AVENUE TOLECO, CHIO 43652