Responds to NRC 890821 & 0728 Ltrs Re Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-13.Completion Dates Revised.Review of Work Practices Will Be Done by 900201 & single-train Sys Lesson Plans to Be Complete by 891130
ML17285A842
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-202, NUDOCS 8911130295
Download: ML17285A842 (2)


See also: IR 05000397/1989006

Text

ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)ACCESSION NBR:8911130295

DOC.DATE: 89/10/31 NOTARIZED:

NO FACIL:50-397

WPPSS Nuclear Project, Unit 2, Washington

Public Powe AUTH.NAME AUTHOR AFFILIATION

SORENSEN,G.C.

Washington

Public Power'Supply

System RECIP.NAME

RECIPIENT AFFILIATION

Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 890821 6 0728 ltrs re violations

noted in Insp Repts 50-397/89-06

&50-397/89-13.

l DISTRIBUTION

CODE: IE01D COPIES RECEIVED:LTR

ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation Response NOTES: DOCKET 05000397 RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB

DEDRO.NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB

10 NRR/PMAS/ILRB12

OE L N,J G FILE 02 RGN5 LE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME SAMWORTH,R

AEOD AEOD/TPAD NRR SHANKMAN, S NRR/DLPQ/PEB

NRR/DREP/EPB

10 NRR/DRIS/DIR

NUDOCS-ABSTRACT

OGC/HDS2 RES MORI SSEAU 1 D NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL Zb

WASHINGTON

PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George ll'ashington

N'ay~Richland, ll'ashington

99352 October 31, 1989 G02-89-202

U.S.Nuclear Regulatory

Commission

Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:

Subject: NUCLEAR PLANT NO.2 LICENSE NO.NPF-21 NRC INSPECTION

REPORTS 89-06 AND 89-13 Reference:

2)Letter, G02-89-143, GD Bouchey (SS)to NRC"NRC Inspection

Report 89-06", dated August 21, 1989 Letter, G02-89-129, GD Bouchey (SS)to NRC"NRC Inspection

Report 89-13", dated July 28, 1989 The purpose of this let'ter is to provide revised scheduled completion

dates for commitments

made in response to Notices of Violation (NOVs)89-06-09 and 89-13-05.The reason for the revised schedule is that completing

the commitments

has taken longer than was originally

anticipated.

In Reference 1), the Supply System committed to a complete review, of its work practices, including any necessary tr aining required.The action was to be completed in two parts.The review was to be done by November 1, 1989 and the formal programmatic

changes were to be accomplished

by January 1, 1990.These two dates have been changed to December 1, 1989 and February 1, 1990, respec-tively.In Reference 2), the Supply System committed to discuss the application

of 10CFR 50.73(a)(2)(v), as it applies to single-train

systems, during Licensed Operator Requalification

Training (Requalification

Cycle 89-06, September 4-October 6, 1989).Although this was presented as part of reportabi lity/compliance

issue training briefings during Requalification

Cycle 89-05 (July 31-September 2, 1989)', lesson plans have since been prepared and it is now anticipated

that the training will be completed by November 30, 1989.Very truly yours, G.C.Sorensen, Manager Regulatory

Programs JDA/bk cc: JB Martin , NRC RV RB Samworth, NRC NS Reynolds, BCP8R DL Williams, BPA/399 NRC Site Inspector-901A