Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17286A2801990-08-27027 August 1990 Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d) ML17286A2671990-08-23023 August 1990 Provides Info on Steps Taken to Minimize Potential Effects of NRC Maint Insp Interface Record, Form on Candor of Supply Sys Personnel When Talking W/Nrc Inspectors ML17286A2641990-08-20020 August 1990 Advises That Tech Spec Rev Re ATWS Recirculation Pump Trip Will Be Submitted by 900928,per Discussions W/ P Eng & H Lee ML17285B4341990-08-20020 August 1990 Withdraws 900302 Request for Amend to Tech Spec 3.8.1.1, AC Sources Reducing Excessive Testing of Diesel Generators. IR 05000397/19900141990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4171990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4041990-08-0202 August 1990 Submits Justification for Continued Operation W/Emergency Diesel Generator 2 Shorted Turns ML17285B3981990-07-30030 July 1990 Advises That Installation of Detector Check Valve in Fire Protection Underground Piping Sys Complete,Per 890911 Ltr. Sys Monitors for Underground Sys Leakage Over Entire Fire Protection Sys ML17285B3991990-07-27027 July 1990 Forwards Justification for Continued Operation Re Emergency Diesel Generator 2 Shorted Turns.Justification Concludes That Diesel Generator Capable of Supporting Present Operability Requirements of Tech Specs ML17285B3711990-07-12012 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Confirms That Items 1,2,3,4 & 5 of Requested Actions of Operating Reactors Completed ML17285B3761990-07-12012 July 1990 Discusses Potential for Surface Entry & Mining Near Plant Sites.Concludes That NRC Need Not Consider Issue as One Requiring Continued Monitoring ML17285B3781990-07-11011 July 1990 Requests Waiver of Compliance from Tech Spec 3.8.1.2 Re Ac Sources - Shutdown.Waiver Will Allow Performance of Rotor Pole Ac Voltage Drop Test to Provide Confirmation That for Extended Run Degradation Condition Will Not Occur ML17285B3841990-07-10010 July 1990 Forwards Util 1990 Emergency Exercise Scenario.W/O Encl ML17285B3661990-07-0505 July 1990 Advises of Listed Organizational & Personnel Changes, Effective 900707.J Burn Will Be New Director of Projects, C Powers Promoted to Director of Engineering & J Baker Promoted to Plant Manager ML17285B3641990-06-29029 June 1990 Advises That All Equipment Identified W/Atws Safety Function Acceptable from Environ Qualification Standpoint. ATWS Equipment Has Been Determined to Be Qualified to Normal Design Environ Conditions Followed by ATWS Accident Environ ML17285B3571990-06-28028 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. ML20055D2391990-06-28028 June 1990 Forwards Response to Re Violations Noted in Insp Rept 50-397/90-12.Response Withheld (Ref 10CFR73.21) ML17285B3501990-06-22022 June 1990 Advises That Mods to Recirculation Pump Trip Sys Implemented During 1990 Spring Refueling Outage.Remaining ATWS Items to Be Resolved as Listed ML17285B3511990-06-20020 June 1990 Forwards WPPSS-FTS-129, BWR Transient Analysis Model, for Review & Approval ML17285B3441990-06-20020 June 1990 Advises That Util Intends to Utilize R-value of 0.13% Delta K/K in Cycle 6 Implementing Procedures.Should R-value Change in Final Startup & Operations Rept,Changed Value Shall Be Used Instead ML17285B3451990-06-19019 June 1990 Forwards Rev 10 to EPIP 13.1.1, Classifying Emergency. Rev Includes New Format of Matrix Charts Intended to Improve Identification of Symptomatic & situation-based Emergency Conditions ML17285B3431990-06-18018 June 1990 Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601 ML17285B3461990-06-15015 June 1990 Responds to NRC Evaluation Findings of Licensed Operator Requalification Program.Quality of Written Exam & Job Performance Measure Question Bank Testing Matls Will Be Improved to Meet Std Prior to Next Program Evaluation Cycle ML17285B3301990-06-12012 June 1990 Forwards Warrant for $50,000 in Response to Order Imposing Civil Monetary Penalty Dtd 900521 ML17285B3251990-06-0707 June 1990 Advises That Calculated Max Control Room Temp Re Station Blackout Will Be Provided by 900701 ML17285B2931990-05-29029 May 1990 Responds to NRC 900426 Ltr Re Violations Noted in Insp Rept 50-397/90-09.Validity of Violation Challenged.Opposes Issuance of Severity Level IV Violation Based on Listed Reasons ML17285B2861990-05-22022 May 1990 Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991 ML17285B2881990-05-11011 May 1990 Forwards Engineering Std EES-4,Rev 0, Setpoint Methodology, as Committed in Util 900329 Ltr.W/O Encl ML17285B2471990-05-0101 May 1990 Advises That No Changes to Tech Specs Required as Stated in 891130 Ltr in Response to Generic Ltr 89-21 Requesting Plant Status on Implementation of USI Re ATWS ML17285B2741990-04-26026 April 1990 Advises That Util Has No Comments on Licensed Operator Annual Requalification Exam During Wks of 900226 & 0305.All Comments Resolved When Exams Administered ML17285B2321990-04-25025 April 1990 Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17 ML17285B2121990-04-19019 April 1990 Responds to Fire Protection Issues Identified in 900201 Notice of Violation.Corrective Actions:Major Hardware Changes Implemented & Independent Consultant Will Be Employed to Review Fire Protection Program ML17285B2221990-04-16016 April 1990 Forwards Status Rept for Commitments Made in 891130 Ltr Re commercial-grade Dedication Process.Resolution of 10 Samples Identified by NRC & 50 Samples Identified by Cynga Completed ML17285B1881990-04-11011 April 1990 Responds to NRC 900312 Ltr Re Violations Noted in Insp Rept 50-397/90-01.Corrective Actions:Complete Job & Task Analysis Completed for Health Physics Technician Training Program & New Program Will Include Training on Fundamentals ML17285B1821990-04-0505 April 1990 Requests Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii) & (IV) to Allow Delayed Submittal of NRC Form-474, Simulation Facility Certification & to Administer Simulation Test as Upgraded,Respectively ML17285B1741990-04-0505 April 1990 Advises That NRC Approved Use of Final Feedwater Temp Reduction in Amend 77 to License NPF-21 ML20012F6141990-04-0404 April 1990 Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML17285B2041990-03-29029 March 1990 Requests Review of Encl Topical Rept WPPSS-FTS-127,Rev 0, Qualification of Core Physics Methods for BWR Design & Analysis. Upon Rept Approval,Tech Spec Changes (Per Generic Ltr 88-16) Scheduled for Jan 1992 ML17285B1421990-03-29029 March 1990 Forwards Revised Schedule for Plant Equipment Setpoint Methodology Program Plan.Methodology Revised to Incorporate Latest ISA Std Draft.Setpoint Program Design Team for FY90 Onsite,Trained & Began Work on 900312 ML17285B1381990-03-29029 March 1990 Forwards Concluding Rept of Results Requested by Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment. Air Quality Testing Performed to Date Reveals Steadily Improving Results ML17285B1131990-03-28028 March 1990 Advises of Release of Subchannel Thermal Hydraulic Computer Code & Requests Review of VIPRE-01 Mod-02 & Issuance of SER for PWR & BWR Applications.Bwr Qualification Analyses Completed & Rept on BWR Applications Encl ML17285B1331990-03-23023 March 1990 Responds to NRC 900221 Ltr Re Violations Noted in Insp Rept 50-397/89-40.Corrective Actions:Plant Procedure 10.25.63, Emergency Lighting Insp in Process of Being Expanded to Provide Instructions & Check Sheets to Ensure Uniform Insps ML17285B1311990-03-21021 March 1990 Forwards Proposed Bases Change Re 891129 Request for Amend to Tech Spec Table 4.3.6.1, Srm/Irm Detector Not-Full-In Functional Test. Bases Change Describes Special Circumstances Re Test Exception ML17285B1291990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in LWRs & Generic Ltr 89-21 Re Status of Implementation of Usis.Tech Specs Adequate to Verify Operability of Overfill Protection Sys ML17285B1171990-03-19019 March 1990 Suppls 900102 Response Re Implementation of fitness-for-duty Program at Facility.All Items Identified as Incomplete as of 900103 Completed at End of Jan 1990 ML17285B1121990-03-15015 March 1990 Provides Level of Property & Liability Insurance Coverage for Facility,Per 10CFR50.54(w)(2) Annual Requirement ML17285B0931990-03-0202 March 1990 Forwards Supplementary Info Re 900214 Application for Amend to License NPF-21,revising Tech Spec 3.3.7.5 to Address Failed Safety/Relief Valve Position Indicators ML17285B0741990-03-0202 March 1990 Responds to NRC 900201 Ltr Re Violations Noted in Insp Rept 50-397/89-30.Corrective Action:Plant Personnel Currently in Process of Making Improvements to Plant Operations Procedure Writers Guide ML17285B0861990-03-0101 March 1990 Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01 ML17285B0581990-02-26026 February 1990 Forwards Washington Nuclear Plant-2 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989 & Amend 7 to Odcm. 1990-08-27
[Table view] |
Text
AC CRT RATED D3 BUTI ON DEMONS ON SYSTEM REGULAT., INFORMPT1ON, DISTRIBUTIOh YSTEM (RIDS)ACCESSION NBR:8808020174 DOC.DATE: 88/07/26 NOTARIZED:
YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to NRC Bulletin 87-002,Suppls 1 6 2 re whether fasteners in stores at facilities met requirements.
DISTRIBUTION CODE: IE57D COPIES RECEIVED:LTR 1 ENCL I SIZE: TITLE: 87-02 a 87-02 Supplement, Fastener Testing to Determine Confor NOTES: I ance w/D RECIPIENT ID CODE/NAME PD5 LA PD5 PD INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR/DEST/ADS 7E NRR/DOEA/GCB 11 NRR/PMAS/ILRB12 OI RES/DSIR/EIB EXTERNAL: EG&G BARNESPB NRC PDR COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR ROSSPT SAMWORTH,R AEOD/DSP NRR/DEST/ADE 8H NRR/DOEA/EAB 11 NRR/DRIS/VIB 9D NUDOCS-ABSTRACT ICKZXCI" RGN5 FILE 01 LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1'1'2 2 1 1 1 1 1 1 1 1 1 1 I h TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 22 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 G02-88-162 July 26, 1988 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:
Subject:
NUCLEAR PLANT NO.2 OPERATING LICENSE NPF"21 RESPONSE TO NRC BULLETIN 87-02, SUPPLEMENTS 1 AND 2
Reference:
2)3)4)5)NRC Bulletin 87-02,"Fastener Testing to Determine Conformance with Applicable Material Specifications", dated November 6, 1987 NRC Bulletin 87-02, Supplement 1, dated April 22, 1988 NRC Bulletin 87-02, Supplement 2, dated June 10, 1988 Letter, G02-88-007, GC Sor ensen to NRC,"WNP-2 Fastener Testing Program", dated January 11, 1988 Letter, G02-88-075, GC Sorensen to NRC,"WNP-2 Fastener Testing Program, Supplemental Repor t", dated March 31, 1988 The subject bulletin (Reference 1)required licensees to review their receipt inspection requirements and internal controls for fasteners and to independently determine, through testing, whether fasteners in stores at their facilities met required mechanical and chemical specification requirements.
The Supply System did this, and provided the responses in References 4 and 5.8808020174 880726 PDR ADOCK 05000397 6 PNU Page Two RESPONSE TO NRC BULLETIN 87-02, SUPPLEMENTS 1 AND 2 Supplement 1 to the subject bulletin (Reference 2)required licensees to provide a list of the suppliers and manufacturers from whom safety related and non safety related fasteners have been purchased, including addresses, and the type of fasteners purchased.
Supplement 2 to the subject bulletin (Reference 3)clari-fied the type of information being required (i.e., limited to ferrous fasteners 1/4 inch in diameter or greater), and further clarified a"best-effort" approach to non safety related fasteners'he purpose of this letter is to provide the information required by Supplements 1 and 2 to the subject bulletin.The Supply System has completed review of its records.Attachment 1 provides the names and addresses of the suppliers and manufacturer s identified from the review from whom we may have obtained safety related fasteners.
If both safety related and non safety related fasteners were obtained from the same supplier, they were included in Attachment 1.The time period for each particular manufacturer is as indicated in the attachments.
Similar information for non safety related fasteners is provided in Attachment 2.Attachment 3 contains the commonly used bolting material specifications utilized at WNP-2, and completes the Supply System's response to Supplements 1 and 2 to the subject bulletin.Very truly yours, G.C.orensen, Ma ger Regulatory Programs HLA/bk cc: JB Martin-NRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A STATE OF WASHINGTON)
)COUNTY OF BENTON)
Subject:
Bulletin 87-02 I, J.W.Shannon, being duly sworn, subscribe to and say that I am the Deputy Managing Director for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.DATE Z6 , 1988 J..S annon De ty Managing Director On this day personally appeared before me J.W.Shannon to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this~day of 1988.otary u ic and forteSAE OF WASHINGTON Residing a' ATTACHMENT 1 ETT RELATED VENDDRS (FASTENEI Page 1 of 5 July 1988 A8G Engineering Co.II 4640 East LaPamle Ave.Anaheim, CA 92806 September 1982-May 1988 Abbot Valve 8 Fitting Co 6090 Cochran Rd Solon, OH 44139 June 1983 Acme Industrial 4322 NW Yeon Ave Portland, OR 97210 November 1977 Aerofast Industrial Products PO Box 15342 Salt Lake City, UT 84115 June 1977-March 1980 Amfac Electric Supply Co.1925 West A Street Pasco, WA 99301 April 1976-November 1982 Anchor/Darling Valve Co PO Box 3428 701 1st Street Wi lliamsport, PA 17701 December 1982-January 1988 Anchor Darling Valve Co Suite 320 One Delmont Avenue Bala Cynwyd, PA 19000 May 1978-January 1980 Anderson Greenwood PO Box 1097 Bellaire, TX 77401 April 1979-November 1983 Automatic Products 1019 Columbia Drive SE Suite 6 Richland, Wa 99352 December 1979 B&G Manufacturing PO Box 260 3067 Unionville Pike Hatfield, PA 19440 Mar ch 1980 Bingham Wil1amette Swan Island Portland, OR July 1974 BIF Industries West Warwick 8 Providence, RI August 1977 Borg Warner Nuclear Valve Div.7500 Tyrone Ave.Van Nuys, CA 91409 November 1979-August 1983 Cardinal Industrial Products, 3873 W.Oquendo Las Vegas, NV 89118 December 1978-May 1988 Cisco (Coarse Industrial Supply)1262 Urban Avenue South Seattle, WA 98168 October 1979-May 1986 Coast Industrial Supply 15750 Salt Lake Ave City of Industry, CA 91745 February 1976-September 1978 Crane-Deming Pump Co Salem, Ohio November 1977-February 1979 Crosby Valve&Gage Co.43 Kendrick St.Wrentham, MA 02093 April 1986 Divesco-NSSS Inc.5000 Hwy 80 East Jackson, MS 39208 February 1987 ATTACHMENT 1 AFETV RELATED VENDORS (FASTENE~Page 2 of 5 July 1988 Dobbens Metal Products January 1977 Dragon Valve 13457 Excelsion Drive PO Box 489 Norwalk, CA 90650 September 1982-November 1987 Dresser Industries PO Box 1487 Burlingame, CA 94010 August 1982 ERG Manufacturing PO Box 260 3067 Unionvi lie Pike Hatville, PA 19440 March 1980 El ectr omoti ve Di v.GM Corp Division of General Motors 181 Main Ave.Sacramento, CA 95838 March 1982-June 1986 Fasteners, Inc PO Box 804 423 N.Oregon Pasco, WA 99302 March 1975-April 1988 General Electric Co.Nuclear Energy Division 175 Curtner Ave San Jose, CA 95125 July 1974-May 1988 General Electric Supply (GESCO)1928 West A Street Pasco, WA 99301 February 1976-October 1985 General Electric Co.2929 NW 29th Portland, OR 97207, December 1982-April 1983 General Electric Co.Wilmington, N.C.July 1974-September 1981 Globe Machinery E 1st 8 Court Des Moines, Iowa Octob'er 1978 Gould, Inc The Commons Bldg, Suite C155 1200 112th NE Bellevue, WA 98004 February 1979 Guyon Alloys 3400 Rogerdale Rd Houston, TX 72042 August 1978-May 1983 Hilti Fastening Co 14500 Doolittle Drive San Leandre, CA-94557 August 1978-April 1980 Hilti Incorporated 1811 S Palouse Street Kennewick, WA 99336 February 1976-October 1982 H.K.Porter Springdale, Ark March 1976-April 1981 Hubb Steel PO Box 125 Tucker, GA 30084 Sept.1982-March 1988 ITT Grinnell Cor p'240 Northwest 29th Ave Portland, OR 97210 September 1978-September 1982 ITT Grinnell Diaphram Valve Div Lancaster, PA December 1982 ITT Grinnel 3101 Ellott Avenue Seattle, WA 98121 June 1980 ATTACHMENT 1 FETY RELATED VENDORS (FASTENEIO Page 3 of 5 July 1988 James C.Hhi te Co.PO Box 5495 Station B Greenvi lie, South Carolina 29606 September 1977 Joy Manufacturing Co.338 South Broadway PO Box 431C New Philadelphia, OH 44663 November 1978-February 1988 John Perine Co.Inc.820 South Adams Seattle, t(A 98108 January 1974-May 1988 Joseph Dyson 8 Sons Inc Dependable Div PO Box 4378 Cl evel and, OH 44137 December 1975 Keystone Tubular Services PO Box 1109 Auburn, WA 98002 April 1978-March 1979 Kaman Instrumentation 1500 Garden of Gods Road Colorado Springs, CO 80933 May 1982-March 1983 Leckenby Structr ual Steel Corp 2745 11th S.ll.Seattle, MA 98134 April 1977 Liberty Equipment 8 Supply Co.620 E.Bruneau Kennewick, MA 99336 October 1979-February 1988 Limitorque Corp c/o Norman Rupp Co.1710 SE Brooklyn Portland, OR 97202 August 1982-June 1983 Limi torque Corp 5114 ttoodall Road PO Box 11318 Lynchbur g, VA 24506 August 1982-September 1987 McCulloch Industrial Inc 1800 Freeway Blvd Minneapolis, MN 55440 June 1978-April 1980 McJunkin Corp PO Box 553 Charelston, Hest Virginia September 1978 M8M Bolt Co.T209 East Ainsworth Pasco, MA 99301 June 1983-May 1988 Murdock, Inc Compton, CA July 1974 North Coast Electric 171 South Jackson Seattle, MA 98108 Mar ch 1976-October 1978 Northwest Bolt 8 Nut Co 4250 Eighth Avenue Northwest Seattle, MA 98107 April 1977-September 1978-Nova Machine Products Corp 18685 Sheldon Road Middleburg Heights, OH 44130 October 1987-May 1988 NPS Industries 1 Harmon Plaza Secaucus, NJ 07094 August 1978-July 1983 NPS Industries 2750 SW Moody Portland, OR 97201 March 1980-June 1984 ATTACHMENT 1 AFETY RELATED VENDORS (FASTENEIW Page 4 of 5 July 1988 Pacific Scientific 1346 S.State College Blvd.Anaheim, CA 92803 April 1983 Portland Bolt 8 Manufacturing 1210 NW Johnson Portland, OR 97209 Mar ch 1976-June 1983 Power 8 Engineered Products Co 157 Helen Street South Plainfield, NJ 07080 March 1980-June 1987 Power Piping 829 Beaver Avenue Pittsburg, PA 15233 December 1979-May 1988 Pybus Steel Orondo Street 8 Columbia River PO Box 678 Wenatchee, WA 98801 August 1978-August 1983 Ray Bristow Inc 1640 NW 14th Ave Portland, OR 97209 April 1976-February 1983 R.E.C.Corp 2 Sheraton Plaza New Rochelle, NY 10801 November 1981 Reliance El ectri c 24701 Euclid AVe.Cleveland, OH 44117 June 1983 Rocky Mountain Nuclear June 1977 Rosemount 12727 NE 20th St.Suite 20 Bellevue, WA 98005 January 1980 Ryerson Steel PO Box 3525 Seattle, WA 98124 August 1978 Seattle Valve E Fitting 13417 NE 20th Street Bellevue, WA 98005 March 1980 Southern Bolt 8 Fastener Corp.PO Box 7196 Shreveport, LA 71107 August 1979-July 1987 Southwestern Research Institute 6220 Culebra Road San Antonio, TX 78284 November 1978 Special T-Metals Co.Inc PO Box 5922 Lenexa, MS 66215 June 1978 Standard Fittings Co PO Box 1266 Opelousa, LA 76570 April 1978 Stoney Electric Co.2780 South Raritan Street Englewood, CO 80110 September 1978-October 1979 Stoneway Electric Co.630 Railroad Street Richland, WA 99352 July 1978-August 1982 Tacoma Screw Products Suite B 2001 Center Street Tacoma.WA 98402 June 1975-July 1987 Technical Controls 12841 NE 14th Place Bellevue, WA 93005 August 1978-May 1982 ATTACHMENT 1 AFETY RELATED VENDORS (FASTENE Page 5 of 5 Teledyne Osco 2966 E 55th Street Cleveland, OH 44127 July 1973-September 1973 Terry Steam Turbine Corp.PO Box 555 Windsor, CT 06095 July 1974-February 1984 The Burhanan-Sharp Co PO Box 3906 Seattle, WA 98124 April 1975 Uni strut 353005 Michigan Ave West Wayne, MI 48184 Apri 1 1982 Unistrut Nor thwest Service Center 18401 Cascade Avenue South Southcenter South Industrial Park Seattle, WA 98188 March 1973-June 1983 Unit Process Company 420 6th Street South Kirkland, WA 98004 U.S.Gypsum Glove Metal products Division Rual Rt.2 Pinckneyville, Ill 62274 October 1977-May 1978 Valley Nut&Bolt 10111 Tilley Road SW Olympia, WA 98502 January 1981-February 1985 Velan Engineering Ltd 2125 Ward Avenue St.Laurent EC H4M IT6 quebec, Canada January 1983-August 1985 Velan Valve Velan Engineering St.Laurent, Montreal Canada March 1978-October 1982 Votaw Precision Tool Co.Santa Fe Springs, CA July 1974-October 1981 Westinghouse PO Box 3938 Seattle, WA 98124 September 1977-April 1982 Westinghouse June 1975-June 1981 (conducting own file search)Westinghouse Electric Co.PO Box 2040 Tri Cities, WA 99302 July 1978 Westron Inc 5101 N Interstate Ave Portland, OR 97217 March 1980 Worchester Gear November 1976 ATTACHMENT 2 SAFETY RELATED VENDORS (FASTE S)Page 1 of 5 July 1988 A8T Supply PO Box 63 Midvale, YT 84047 February 1977-March 1977 Allied Bolt PO Box 80004 Seattle, WA 98108 December 1974-March 1984 Allied Bolt 103 E Kennewick Ave Kennewick, WA 99336 September 1982-March 1985 Allied Bolt 611 West Ainsworth Pasco, WA 9301 February 1987-May 1987 Asea Inc Sweden April 1975-July 1981 Bailey Meter Co 29801 Euclid Ave Wickliffe, OH 44092 June 1979 B IF West Warwick Providence, RI May 1975-May 1978 Supplier-Limitorque Corp 5114 Woodall Rd Lynchburg, VA Branch Instrument Co.5500 4th Ave.S Seattle, WA 98108 February 1980 Bronom Inst.5500 4th Avenue 50 Seattle, WA 98108 August 1978 Compressor Engineering Corp 5440 Alder Houston, TX 77081 March 1987 Consolidated Electr ical Distr.Inc.515 W Entict PO Box 6105 Kennewick, WA 99336 Apr il 1977 Consolidate Supply 900 E Chemical Drive Kennewick, WA 99336 April 1982 Construction Tool Service In.3616 Liberty Avenue Pittsburgh, PA 15201 October 1975-March 1982 Crane Co Demming Pump Div 1453 Allen Road Salem, OH 44460 December 1975-June 1986 Crane Co Chemical Pump Div Harrington Industry ial park War rington, PA 18976 November 1981 Dis-Tran Products Inc.PO Box 7237 Alexandria, LA 71301 July 1977 DeLaval Inc.853 Nottingham Way PO Box 8788 Trenton, NJ 08650 March 1988 DeLaval Turbine, Inc Condenser 5 Filter Div.Front Street Florence, NJ 08518 April 1977-February 1981 DeLaval Tur bine Inc One Penn Plaza, 250 W 34th St New York, NY 10001 September 1974-June 1975 ATTACHMENT 2SAFETY RELATEO VENOORS (FASTEIQS)
Page 2 of 5 July 1988 Ecodyne/Graver Water Div 350 Sherman Ave Newark, NJ 07042 May 1978 Electro-Motive Div.General Motors Corp Parts Sales Dept La Grange, IL 60525 January 1988-June 1988 Esco Corp PO Box 2583 Spokane, WA 99220 August 1981 Fairbanks Morse Pump Div 3601 Fairbanks Ave Kansas City, KS 66110 July 1981-August 1985 Familian Northwest 223 N Benton Kennewick, WA July 1978-November 1982 Fasteners Inc N 720 Fancher Road PO Box 3004 Spokane, WA 99220 December 1975-September 1980 Fasteners Inc.400 W Moore Walla Walla, WA August 1975-January 1976 Globe Metal Products Division U.S.Gypsum Co.Rural Route 2 Pinckneyville, Ill 62274 June 1977 Goulds Pumps Inc 240 Fall St PO Box 330 Seneca Falls, NY 13148 March 1979-June 1986 GE Supply Co.1928 West A Street Pasco, Wa 99302 June'1975-February 1978 General Electric Industrial Sales Division 112 Andover Park East Seattle, WA 98188 November 1975 General Electric Mobile Communications Div Service Parts PO Box 4164 Lynchburg, YA 24502 March 1978-December 1986 Graybar Electric Co.Inc.West 1033 Gar dner Avenue Spokane, WA 99201 July 1975-September 1975 Hayward Tyler Pump Co 1170 Burnett Ave, Suite K Concord, CA 94520 June 1980 H.K.Porter Inc.2437 W.Fulton St.Chicago, ILL 60612 May 1976 H.K.Porter Co.8315 SW Barbur Blvd Portland, OR 97219 June 1978-December 1978 Hilti Fastenings Systems Inc.632 Cedar Richland, WA 99352 September 1975-November 1975 Inland Tool&Supply 223 Rd 24 Pasco, WA 99301 June 1977 ATTACHMENT 2 SAFETY RELATED VENDORS (FASTE S)Page 3 of 5 July 1988 Ingrsoll Rand Co 10400 NW 13th Ave PO Box 1868 Vancouver, WA 98686 December 1985 Ingersoll Rand Co 227 Park Ave New York, NY 10017 August 1976 Ingesoll Rand Co Painted Post, NY June 1978-July 1982 Ingersoll Rand Co Phi lipsburg, NJ July 1975-April 1981 Inland Tool 223 S 24th Pasco, WA 99301 November 1978 ITT Grinnell PO Box 4189 Spokane, WA 99202 August 1982 ITT Grinnel1 E 909 Sprague Spokane, WA 99202 October 1981-February 1982 Kaman Sciences Corp 1500 Garden of the Gods Rd PO Box 7463 Colorado Springs, CO 80933 May 1986 Kansas City Bolt, Nut 8 Screw Co.1324 Hest 12th Street Kansas City, Md 64101 November 1978 Kennewi ck Industrial 113 E Columbia Drive Kennewick, HA 99336 August 1978-January 1979 Limitorque Corp 2600 East Mira Lorna Way Anaheim, CA 92806 June 1982 MCC Powers, Inc.name changed to Landis&Gyr Powers, Inc 1720 124th Ave NE Bellevue, HA 98005 October 1985-October 1987 McMaster Carr Supply Co 9630 Norwalk Blvd PO Box 54960 Santa Fe Springs, CA 90670 October 1976-April 1988 Monarch Machine 410 South Oregon Pasco, HA 99301 September 1975 Midwest Bolt 8 Supply 1685 NE 53rd Des Moines, Iowa July 1978 Milliore Corp 80 Ashby Rd Bedford, MA 01780 April 1984 Nash Engineering Co PO Box 2466 Redmond, HA 98052 December 1986-April 1987 Nevada Nut 8 Bolt Inc 3650 West Russell Road Las Vegas, NV 89102 January 1981-October 1982 Northwest Controls S.26 Napa Str eet Spokane, WA 99202 August 1980 i ATTACHMENT 2 SAFETY RELATED VENDORS (FAST~S)Page 4 of 5 July 1988 Norton Corrosion Limited Ines 22327 89th Ave.Woodinvi lie, WA 98072 September 1972 Pacific Valve 3201 Walnut Avenue Longbeach, Ca 90807 November 1977-July 1982 Platt Electric Supply Inc.8300 Gage Blvd.Kennewick, WA 99336 April 1977-June 1977 Portland Electric&Plumbing 114 S.Auburn Kennewick, WA 99336 September 1981 Ray Bristow Co.1819 SW Court Ave.Pendelton, OR 97801 November 1976-April 1982 Safeway Supply Inc.PO Box 3437 East 1507 Sprague Avenue Spokane, WA 99220 January 1979-February 1979 Sime Construction Co.Box 6184 Kennewick, WA 99336 October 1975 Southwestern Engineers Subsidiary of Tyler Corp PO Box 54940 6111 E Bondini Blvd Las Angeles, CA 90054 May 1986 St.Regi s Supply Minneapolic
&St.Paul Ave.Tacoma, WA 98401 February 1979 Storey Electric Co.2780 S.Raritan Street Englewood, CO 80110 Januar y 1980 The Marley Co PO Box 2912 Mission, KS 66201 April 1981 The Marley Co c/o Olympia Engineered Sales PO Box 549 Bellevue, WA 98109 February 1978-March 1986 Thompson Lighting 901 Sibley Hwy.St.Paul, MN 55118 October 1979 Union Pump Co 87 Capital Ave Battle Creek, MI 49016 November 1984-January 1985 Uni strut 14800 S.Marquar dt Avenue Santa Fe Springs, Ca 90670 August 1977 Uni strut 733 South Fidalgo Seattle, WA 98108 May 1975-August 1981 Unistrut Northwest Service Center 18401 Cascade South Southcenter Industrial Park Seattle, WA 98188 February 1978-October 1983 Wallace&Tiernan Div 300 120th NE Bldg 1, Suite 209 Bellevue, Wa 98005 October 1979-February 1985 Wallace&Treman Div Pennwalt Corp 25 Main Street Bel 1 evil le, NJ 07129 May 1975-February 1985 Wal worth Company PO Box 1009 Paramount, Ca 90723 December 1981-March 1983 ATTACHMENT 2 SAFETY RELATED VENDORS (FASTEIO51 Page 5 of 5 July 1988 Wal worth Company 10190 Harwin Drive PO Box 297243 Houston, Tx 77036 Nay 1987 Walworth Greensburg, PA December 1979-August 1982 Westinghouse 5901 SW Nacadah Ave Portland, OR 97210 June 1980-December 1987 Westinghouse Electric 1019 Columbia Dr.SE Richland, WA 99352 Nay 1982 Worthington Pump Division c/o Mitchell Lewis 8 Staver 801 SE Alder Por tland, OR 97214 February 1988 Yakima Hardware Co.Inc.226 S First Street Yakima, WA 98901 October 1977 Zurn Industrial Inc.Cooling Tower Division Lincoln Center 5401 W Kennedy Blvd Tampa, FL 33609 August 1980 ATTACHMENT 3 COMMONLY USED BOLTING MATERIALS AT WNP-2 SA/A-193 GR 87 GR 88 SA/A-194 GR.2H GR 4 GR 7 GR 8 SA/A-307 GR A GR 8 SA/A-320 GR L7 SA/A-325 (All types)SA/A-354 GR BC SA/A-449 SA/A-490 SA/A-540 (All grades and classes)SA/A-563 (All grades except"0")