ML17333A019

From kanterella
Revision as of 14:47, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Informs That Prefuel Load Emergency Exercise Is Scheduled for Wk of 820913
ML17333A019
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/02/1981
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Cantor F
NRC
References
GO2-81-331, NUDOCS 8110130174
Download: ML17333A019 (4)


Text

ACCESSIOVr NBR!B110130li74 DOC~DATEi: B1/10/02 NOTARIZEDei NO DOCKEiTR 0" FACILr:50'97

'HPPSS Nuclear Pro je'cti.Uni tr 2'E.Nash'ington Public Power 05090397 AUTHr,NANSEI AUTHOR AFFII IATKON BOUCHER',G,Dr, I'lashrlngton Pubil ic Powe'r Suppl y System REC IP 8 VAMEt RECX PIENT AFFILiI AiTIONr C A N T 0 R'g F'8'RC:--No Detaileid Affiliat;ion>>

Given SUBJEC'T'::

Informs thatr prefuelli load emir gency-exer ciser is schedul edi for~wkr of B2p915;DISTRESUTEON CODEI: 80298 COPIES'ECEEVED'.LtTR J'NCL<SIZE':)TrITLEi:r Elnergency

'1 ani Inf orms t i on<NOTE S':.2'op i e s a 1 l m a t 1: PH., 05090397 RECIPIENT'Or CODE"/NANSEI ACTION:: LCCi BR 42'C'OPIES'TTR ENCLr R E C'I P I EN T<IO CODE/NAME)

AULUCKER~04 COPIES Lrl TRt ENCLr INTERNALi:

DIRr, EMER PLr PRO>IE'/EPDBr 12!RAG>>ASST BR, EXTERNAL@INPOUR J~ST'ARNES NS'IC 05i'DRr 02!1>>1 1 1 1 IKEr EG F I LE'PDR V'T'IS 10., 06'1.03" SPIES 4.55 I'P 0 TOiTAL~iVUMBERr OF COPIES'EQU'XRED::

LiTTR ENCL<1 r o l r n Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 October 2, 1981 G02-81-331 Docket No.50-397 Mr.Falk Cantor U.S., Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Cantor:

Subject:

SUPPLY SYSTEM NUCLEAR PROJECT NO.2 To meet the requirements of 10CFR50 Appendi preparedness exercises for nuclear plants, lishing the week of September 13, 1982 for exercise.This exercise will be developed of the Supply System, State of Washington, ties, Federal Emergency Management Agency, Commission.

A meeting will be planned for process of planning for the exercise.x E concerning emergency the Supply System is estab-the WNP-2 prefuel load as a cooperative effort Benton and Franklin Coun-and the Nuclear Regulatory early 1982 to begin the Your cooperation in supporting this schedule will be appreciated.

If problems arise, or if the Supply System can be of further assistance, please contact Vincent Everett, Supervisor, Emergency Preparedness, (509)372-5912.Very truly yours, kr G.D.Bouchey Director, Nuclear Safety cc: WS Chin, BPA AD Toth, NRC Resident NS Reynolds, Debevoise 8 Liberman JC Plunkett, NUS Corp.R Auluck, NRC/DC EF Beckett, NPI I Sii0130174 Sii002 lF'PDR ADQCK 05000397I PDR~

f.II it.