2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
ML15061A401
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/04/2015
From: Burritt A L
Reactor Projects Branch 2
To: Coyle L
Entergy Nuclear Operations
Burritt A L
References
FOIA/PA-2016-0148 IR 2014001
Download: ML15061A401 (5)


See also: IR 05000247/2014001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713

March 4, 2015

Mr. Larry Coyle

Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND

05000286/2014001)

Dear Mr. Coyle:

On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-

cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The

NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection

results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reacto

r Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform inspection procedure (IP) 60855, "Operation of an Independent Spent Fuel Storage

Installation at Operating Plants," IP 92702, "Follow-up on Corrective Actions for Violations," and Temporary Instruction 2516-001, "Review of License Renewal Activities." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as

soon as possible to dis

cuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not

include security-related inspections, which will be sent via separate, non-publicly available correspondence.

L. Coyle 2

In accordance with Title 10 of the Code of Federal Regulations

, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact

me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/ Arthur L. Burritt, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos. 50-247 and 50-286

License Nos. DPR-26 and DPR-64

Enclosure: Indian Point 2 & 3 Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML15061A401

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer/TCS ABurritt/ALB DATE 02/23/15 03/02/15

Page 1 of 2

03/02/2015

15:16:39Report 22

UnitNumberPlanned Dates

Start EndInspection ActivityTitleNo. of Staff

on SiteIndian PointInspection / Activity Plan

01/01/2015

-06/30/20165/11EXAM-U3 INITIAL OL EXAM

5 3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

U0190804/13/2015

04/17/2015

3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

U0190805/11/2015

05/15/201571124-RETS1 2,3 IPRadiation Monitoring Instrumentation71124.0502/09/2015

02/13/2015

2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/09/2015

02/13/201571124-HP1 3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/02/2015

03/06/2015

3 IPOccupational ALARA Planning and Controls71124.0203/02/2015

03/06/20157111108P-U3 INSERVICE INSPECTION

1 3 IPInservice Inspection Activities - PWR7111108P03/09/2015

03/20/201571152-GROUNDWATER MONITORING

5 2 IPProblem Identification and Resolution7115205/04/2015

05/07/201571124-HP1 2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0105/07/2015

05/13/2015

2,3 IPOccupational ALARA Planning and Controls71124.0205/07/2015

05/13/20157111107T-TRIENNIAL HEAT SINK

1 2,3 IPHeat Sink Performance7111107T07/06/2015

07/10/2015

CDBI-COMPONENT DESIGN BASIS INSPECTION

8 2,3 IPComponent Design Bases Inspection711112107/20/2015

07/24/2015

2,3 IPComponent Design Bases Inspection711112108/03/2015

08/07/2015

2,3 IPComponent Design Bases Inspection711112108/17/2015

08/21/20157111111B-IP3 REQUAL INSP W/ P/F RESULTS

2 3 IPLicensed Operator Requalification Program7111111B09/21/2015

09/25/201571124-HP1 2,3 IPOccupational Dose Assessment71124.0408/10/2015

08/14/2015

2,3 IPRadiation Monitoring Instrumentation71124.0508/10/2015

08/14/2015

2,3 IPPerformance Indicator Verification7115108/10/2015

08/14/2015

EP-EP PROGRAM INSPECTION

1 2,3 IPAlert and Notification System Testing711140208/17/2015

08/21/2015

2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/17/2015

08/21/2015

2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/17/2015

08/21/2015

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

Page 2 of 2

03/02/2015

15:16:39Report 22

UnitNumberPlanned Dates

Start EndInspection ActivityTitleNo. of Staff

on SiteIndian PointInspection / Activity Plan

01/01/2015

-06/30/2016

ISFSI-ISFSI LOADING INSPECTION

2 2,3 IPOperation Of An ISFSI

6085508/17/2015

08/21/2015

2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.108/17/2015

08/21/2015

2516-001-TI 2516-001 U3 LR COMMITMENTS INSPECTION

1 3 IPReview of License Renewal Activities

2516/00111/16/201511/20/201571124.08-RADWASTE1 2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/16/201511/20/201571152B-PI&R - BIENNIAL

4 2,3 IPProblem Identification and Resolution71152B11/30/2015

12/04/2015

2,3 IPProblem Identification and Resolution71152B12/14/2015

12/18/201571124-HP1 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/2016

2 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/2016

ISI-U2 INSERVICE INSPECTION

1 2 IPInservice Inspection Activities - PWR7111108P03/14/2016

03/25/2016

EP-EP EXERCISE EVALUATION

4 2,3 IPExercise Evaluation711140106/27/2016

07/01/2016

TRI FI-TRIENNIAL FIRE PROTECTION

4 2,3 IPFire Protection [Triennial]7111105T05/23/2016

05/27/2016

2,3 IPFire Protection [Triennial]7111105T06/06/2016

06/10/201671124.07-REMP1 2,3 IPRadiological Environmental Monitoring Program71124.0706/20/2016

06/24/2016

This report does not include INPO and OUTAGE activities. This report shows only on-site