ML17334A970

From kanterella
Revision as of 07:33, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Listed Procedures for Alternate Safe Shutdown, Including Rev 0 to 12-OHP 4023.100.001 Re Emergency Remote Shutdown & Rev 0 to 1MHP2140.082.001 Re Maint Procedure for Repowering RHR Pump.Fee Paid
ML17334A970
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/06/1986
From: ALEXICH M P
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DENTON H R
Office of Nuclear Reactor Regulation
Shared Package
ML17324A931 List:
References
AEP:NRC:0692AK, AEP:NRC:692AK, NUDOCS 8606130100
Download: ML17334A970 (4)


Text

IrrREQljlLrA'~

INPORi~'IATION DISTRIBVTIOlMYSTEN llRIDS)>'rrrACCESSION ABR:8606130100 DOC.DATE:86/06/06NOTARIZED:NO'DOCNETFACIL:50-315DonaldC.CookNuclearPowevPlant.Unit1.Indiana50500031550-316DonaldC.CookNucleavPowevPlant.Unit2iIndiana505000316AUTH.NAf'fEAUTHORAFFILIATION ALEXICHif'f.PIndianaSrNichiganElectvicCo.RECIP.NAf'fERECIPIENT AFFILIATION DENTONAH.R.OfficeofNuclearReactorRegulations Directov(post851125

SUBJECT:

Fovwav'dslistedproceduvesforaltevnatesafeshutdownIincluding Rev0to12OHP4023100001veemergency vemoteshutdown8cRev0to1NHP2140.

082.001reNaintproceduve forrepowevingRHRpump.Feepaid.he~~~v-.(a~~eYf~)DISTRIBUTION CODE:ABROADCOPIESRECEIVED:

LTR/ENCL/SIZE:~P+'+TITLE:ORSubmittal:

FiveProtection NOTES:RECIPIENTIDCODE/NAl'lE PfJR-APD4LAgICQINQTON, DCOPIESRECIPIENT LTTRENCLIDCODE/NANE 10PMR-APD4PD01COPIESLTTRENCLINTERNAL:

ADlf/LFffBIENHITNEY,LNRRPAR-ADIRNRRSTANC,a07NRR/DHFTDIRRCN3112"1.ELD/HDS3NRRBNRDIRNRRPMR-BDlRRR=MELAJ06~E'XrWM041I~EXTERNAL:

24XNRCPDR02LPDR,NSIC0305TOTALNUHBEROFCOPIESREQUIRED:

LTTR22ENCL kkI'4!IV~Iktt44k~,kvk,kkI~('h4'FIIV'ivgI'4'kIkviv{lh4II.~'klvk(g!g','(()44t~4kkg~tt"H'I.(CI INDIANA8MICHIGANELECTRICCOMPANYP,O.BOX16631COLUMBUS, OHIO43216DonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74PROCEDURES FORAPPENDIXRTO10'CFR'50'LTERNATE SA'FESHUTDOWNJune6,1986AEP:NRC:0692AK Mr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555

DearMr.Denton:

Thepurposeofthisletteristotransmittheattachedprocedures foralternate safeshutdownofDonaldC.CookNuclearPlantUnitNo.1.Theseprocedures areasfollows:(2)**12-OHP4023.100.001, "Unit1Emergency RemoteShutdown,"

Rev.0.*~1MHP2140.082.001, "Maintenance Procedure forRepowering anRHRPump,"Rev.0.(3)**1MHP2140.082.003, "Maintenance Procedure forRepowering Pressurizer BackupHeaters,"

Rev.0.(4)~*1MHP2140.082.005, "Maintenance Procedure forRepowering Containment Valves,"Rev.0.(5)**1THP6030IMP.304,"Pressurizer PORVCableRepair,"Rev.0.(6)~*1THP6030IMP.305,"Appendix RPost-Fire Repowering ofIn-Containment Valves,"Rev.0.Transmittal oftheseprocedures wasrequiredbytheNovember22,1983NRCSafetyEvaluation Report(SER)onouralternate safeshutdownmethodology.

Inadditiontotheseprocedures, theTechnical Specifications (T/Ss)foralternate safeshutdownwererequiredtobesubmitted.

TheseT/SswerethesubjectofourletterAEP:NRC:0692AJ, datedMay30,1986.Asdiscussed withyourstaff,wearetransmitting onlytheUnit1procedures atthistime.Theprocedures forUnit2arebasically thesame,exceptforunit-specific differences.

Pursuanttotherequirements of10CFR170.12(c),

anapplication feeof$150.00hasbeenenclosed.

8606130100 860606PDRADOCK050003l5F,PDRpOrt Mr.HaroldR.Denton-2-AEP:NR(.692AKThisdocumenthasbeenpreparedfollowing Corporate procedures whichincorporate areasonable setofcontrolstoinsureitsaccuracyandcompleteness priortosignature bytheundersigned.

Verytrulyyours,M.AlexiVicePresident

'l$lPMPA/pmAttachment cc:JohnE.DolanW.G.Smith,Jr.-BridgmanR.C.CallenG.BruchmanG.CharnoffNRCResidentInpector-Bridgman