~ i ~

C

)

FOAM W?C INDIAItIA EI MICHIGAIV EIECTDIC CDAIPANY IINALDC. COOK NUCme PLA,NT PROCEDURE COVER SHEET

Reviaion No.

TITLE APPETIT)EX R POST-FIRE REPCNKKtK OF VALVES SCOPE OF REVlSlON C g i cKTt3 MAY g 9)geg Cot~FRP>l,I.D LOCO...

SIGNATURES REVISION NUMBER r P PREPARED BY DEPARTMENT HEAD APPROVAL INTERFACING DEPARTMENT HEAD CONCURRENCE QUALITY ASSURANCE SUPERVISOR APPROVAL 8606130117 86060 PLANT NUCLEAR PDR ADOCK 05000315 F PDR SAFETY COMMITTEE I

PLANT MANAGER APPROVAL APPROVAL DATE EFFECTIVE DATE

l S I **1 THP 6030 IMP.305 l

LIST OF EFFECTIVE PAGES PAGE NUMBER REVISION NUMBER CS NUMBER 5 Page 1 of 18 Revision 0 Page 2 of 18 Revision 0 Page 3 of 18 Revision 0 Page 4 of 18 Revision 0 Page 5 of 18 Revision 0 Page 6 of 18 Revision 0 Page 7 of 18 Revision 0 Page 8 of 18 Revision 0 Page 9 of 18 Revision 0 a V

I l

Page 10 of 18 Revision 0 Page ll of 18 Revision 0 Page 12 o f 18 Revision 0 Page 13 of 18 Revision 0 Page 14 of 18 Revision 0 Page 15 of 18 Revision 0 Page 16 of 18 Revision 0 Page 17 of 18 Revision 0 Page 18 of 18 Revision 0 APPENDIX A Page 1 of 31 Revision 0 Page 2 of 31 Revision 0 Page 3 of 31 Revision 0 Page 4 of 31 Revision 0 Page 5 of 31 Revision 0 Page 1 of 2 Rev. 0

    • 1 THP 6030 IMP.305 PAGE NUMBER REVISION NUMBER CS NUMBER Page 6 of 31 Revision 0 Page 7 of 31 Revision 0 Page 8 of 31 Revision 0 Page 9 of 31 Revision 0 Page 10 of 31 Revision 0 Page ll of 31 Revision 0 Page,12 of 31 Revision 0 Page 13 of 31 Revision 0 Page 14 of 31 Revision 0 Page 15 of 31 Revision 0 Page 16 of 31 Revision 0 Page 17 of 31 Revision 0 Page 18 of 31 Revision 0 Page 19 of 31 Revision 0 Page 20 of 31 Revision 0 Page 21 of 31 Revision 0 Page 22 of 31 Revision 0 Page 23 of 31 Revision 0 Page 24 of 31 Revision 0 Page 25 of 31 Revision 0 Page 26 of 31 Revision 0 Page 27 of 31 Revision 0 Page 28 of 31 Revision 0 Page 29 of 31 Revision 0 Page 30 of 31 Revision 0 Page 31 of'1 Revision 0 Page 2 of 2 Rev. 0
    • 1 THP 6030 IMP.305 INDIANA 6 MICHIGAN ELECTRIC COMPANY DONALD C COOK NUCLEAR PLANT APPENDIX R POST FIRE REPOWERING OF IN-CONTAINMENT VALVES U-1.0 OBJECTIVE 1.1 Provision of a repair procedure for inside containment motor-operated valves requiring post-fire operation in the event of a loss of control from the Unit 1 Control Room. This procedure allows the alternative operation of these valves from outside of the containment and eliminates the need for plant personnel to enter the containment to manually operate these valves.

1.2 DISCUSSION Sequence of events for repair and operation of a containment valve.

1 2~1 Maintenance will disconnect the power source from the motor control center (MCC) containing the motor starter for the valve to be repaired. An alternate power feed from a previously de-energized circuit, will be connected to the MCC by maintenance.

1.2.2 CEI will disconnect the external wiring from the applicable motor starter, and will connect a temporary valve control and indicating panel to the motor starter circuit.

1.2.3 Operations will then turn on the alternate power source, and operate the valve.

1.2.4 Operations turns off alternate power to the MCC.

1 2.5 C&I disconnects the temporary control and indicating panel from the motor starter circuit.

Step 1.2.2 will be repeated for the motor starter in the same MCC, for the next valve to be operated, followed by steps 1.2.3, 1.2.4 and 1.2.5, until all valves powered from the MCC have been operated.

1.2.6 Motor Control Centers may be de-energized and motor starters modified in any convenient order. One,'r any number, of motor starters in an MCC may be modified as deemed necessary.

Page 1 of 18 Rev. 0

    • 1 THP 6030 IMP ~ 305 1..2.7 This post-fire repair procedure is intended to provide the plant operators with an alternative method of aligning the following inside-containment motor-operated valves from their associated motor control centers located in the engineered safety system and MCC Room at elevation 609 Ft. in the Auxiliary Building:

Valve No. Containment Valve Descri tion MCC IMO-110 Accumulator Isolation Valve 1-EZC-C IMO-120 Accumulator Isolation Valve 1-EZC-B IMO-130 Accumulator Isolation Valve 1-EZC-D IMO-140 Accumulator Isolation Valve 1-EZC-A IMO-128 RHR Inlet Isolation Valve 1-EZC-B ICM-129 RHR Inlet Isolation Valve 1-EZC-C NMO-151 Pressurizer PORV Block Valve 1-EZC-A NMO-152 Pressurizer PORV Block Valve 1-EZC-B NMO-153 Pressurizer PORV Block Valve 1-EZC-D ICM-ill RHR Outlet Isolation Valve l<<EZC-C 1.2.8 This procedure is referenced in and should be used to supplement 12 OHP 4023.100.001, "Unit fl Emergency Remote Shutdown" procedure.

1.3 ASSUMPTIONS 1.3.1 A loss of total plant off-site power for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

1.3.2 A fire in any one of the following plant areas:

(a) Control Room, or (b) Control Room Cable Vault, or (c) Auxiliary Cable Vault, or (d) Switchgear Room Cable Vault NOTE: As indicated in the "Objective" section of this procedure, the primary concern is loss of control from thc Control Room. However, not the intent of this procedure to limit it is Control Room usc. This procedure may be used for any fire which occurs outside of the, fire areas containing the valves, motor control centers, electrical penetrations and valve cables (routed from a motor control center to a valve) as specified by this procedure.

Page 2 of 18 Rev 0

    • 1 THP 6030 IMP ~ 305 2~0 REFERENCES
2. 1 10 CFR 50, Appendix R, Section III L.

2.2 PMI-2270, Fire Protection.

2. 3 PMI-2140, Temporary Modifications.

2.4 AEPSC Plant Drawings 1-97331, 1-97332, 1-1316, 1-1315.

2.5 ~*12 OHP 4023.100.001, Unit 41 Emergency Remote Shutdown.

2.6 ~*1 MHP 2140.082.005, Maintenance Procedure for Repowering Containmcnt Valves.

3.0 PRECAUTIONS 3.1 When routing temporary cables, do not obstruct walkways.

Cables shall be routed off to the side or overhead when possible.

3.2 Though the circuits being worked on are de-cncrgizcd, other circuits in close proximity may have voltages present; observe all electrical safety precautions while working on or near energized equipment.

3.3 Ensure that all connections are clean and tight.

3.4 It is'ssumed that the equipment required by this procedure is available. Additionally, usc of equipment required from thc opposite (unaffected) unit should not impair safe continued operation or shutdown of that unit.

4.0 PREREQUISITES 4.1 This proccdurc is to interface with Maintenance Department procedure **1 MHP 2140.082.005, "Maintenance Procedure for Rcpowering Containmcnt Valves", which is the controlling procedure for containmcnt valve repair.

4.2 Striped-tag clearances must bc transferred to C&I from Maintenance Department prior to working on valve motor controls or associated circuitry.

4.2.1 When the temporary valve control panel has been connected, Operations is to be informed that power may be turned on and the valve may be operated.

Page 3 of 18 Rev 0

    • 1 THP 6030 IMP ~ 305 4.3 Verify that all terminals are de-energized prior to lifting or landing wires.

5~0 CONTAINMENT VALVE REPAIR PROCEDURE 5.1 Coordinate with Maintenance Department to determine which MCC has been de-energized and which motor starters will be modified.

5. 1.1 Motor Starters may be modified in any order required, providing the MCC feeding the starters has been de-energized.

5.1.2 Any number, or all, valve motor starters in an MCC may be modified as deemed necessary.

,5 1 3 Verification of lifted wire signatures will document which motor starters are modified.

5.2 Verify that a clearance has been taken on the MCC feeding the selected motor starters, and that the associated circuit breaker is open.

5.3 Open the Breaker compartment front door.

CAUTION: Verify that all terminals are de-energized prior to lifting or landing wires.

5.4 Lift the external wires listed, from their associated terminal pornts. This will disconnect the "low side" of the red and green indicating lights on panel "SIS'r RHR". Independently verify lifted leads.

5.4.1 Verify MCC 1-EZC-A has been de-energized.

MAINT~

CSI'or IMO-140 and/or NMO-151 located in l-EZC-A, disconnect the following external wires:

MCC-1EZC-S TERM POINT WIRE VERIFY LIFTED WIRE VALVE NO. NO. TECH 1 TECH 2 EXT. CABLE NO IMO-140 12 12 9102R-1 13 13 9102R-1 NMO-151 12 12 8676R-1 13 13 8676R-1 Page 4 of 18 Rev. 0

  • ~I THP 6030 1M'05 5;4.2 Verify MCC 1-EZC-B has been de-energized.

MAINT~

C&I For IM0-120, IMO-128 and NMO-152 located in l-EZC-B, disconnect the following external wires:

TERM POINT WIRE VERIFY LIFTED WIRE VALVE NO. NO. TECH 1 TECH 2 EXT. CABLE NO IMO-120 12 12 8870R-1 13 13 8870R-1 IMO-128 8871R-1 NMO-152 12 12 8677R-1 13 13 8677R-1 5.4.3 Verify MCC 1-EZC-C has been de-energized.

MAINT, C&I For IMO-110, ICM-129 and ICM-ill located in l-EZC-C, disconnect the following external wires:

TERM POINT WIRE VERIFY LIFTED WIRE VALVE NO. NO. TECH 1 TECH 2 EKT. CABLE NO IMO-110 12 12 8898G-1 13 13 8898G-1 ICM-129 9082G-1 ICM-ill 9083G-1 5.4.4 Verify MCC 1-EZC-D has been de-energized.

MAINT C&I Page 5 of 18 Rev. 0

A

    • 1 THP 6030 IMP.305 For IMO-130 and IMO-153 located in 1-EZC-D, disconnect. the following external wires:

TEM POINT WIRE VERIFY LIFTED WIRE VALVE NO. NO. TECH 1 TECH 2 EXT. CABLE NO INO-130 12 12 8624G-1 13 13 8624G-1 NNO-153 12 12 8931G-1 13 13 8931G-1 5.5 Connect wiring from the temporary control panel terminal points to MCC terminal points. Independently verify correct connections.

5.5.1 MCC 1-EZC-A Valve INO-140 From Temporary To Breaker Verify Control Panel Verify Terminal 'onnections Terminal Connections Temporary Control Point Nos. TECH 1 TECH 2 Point Not. TECH 1 TECH 2 Panel Function Control Switch - "Low" s contact opening circuit.

Control Switch - "High" contact opening circuit.

10 Control Switch - "High" contact closing circuit.

8A Control Switch - "Low" s contact closing circuit.

13 9 "Low" side of green ligh 12 10 "I.ow" side of red light.

Page 6 of 18 Rev. 0

    • 1 THP 6030 IMP.305 Valve NMO-151 From Temporary To Breaker Verify Control Panel Verify Terminal Connections Terminal Connections Temporary Control Point Nos. TECH I TECH 2 Point Nos. TECH I TECH 2 Panel Function Control Switch - "Low";

contact opening circuit Control Switch - "High" contact opening circuit 10 Control Switch - "High" contact closing circuit 8A Control Switch - "Low":

contact closing circuit 13 "Low" side of green ligI 12 10 "Low" side of red light

5. 5.2 MCC 1-EZC-B Valve IMO-120 From Temporary To Breaker Verify Control Panel Verify Terminal Connections Terminal Connections Temporary Control Point Nos. TECH 1 TECH 2 Point Nos. TECH I TECH 2 Panel Function Control Switch - "Low" .

contact opening circuit.

Control Switch - "High" contact opening circuit.

10 Control Switch - "High" contact closing circuit 8A Control Switch - "Low":

contact closing circuit 13 "Low" side of green ligl 12 10 "Low" side of red light Page 7 of 18 Rev. 0

    • 1 THP 6030 IMP.305 Valve IHO-128 From Temporary To Breaker Verify Control Panel Verify Terminal Connections Terminal Connections Temporary Control Point Nos. TECH 1 TECH 2 Point Nos. TECH 1 TECH 2 Panel Function Control Switch - "Lovst >

contact opening circuit.

2, Control Switch - "High" contact opening circuit.

10 Control Svitch - "High" contact closing circuit.

8A Control Switch - "Lov" s contact closing circuit.

13 "Low" side of green lips 12 10 "Lov" side of red light Valve IMO-152 From Temporary To Breaker "

Verify Control Panel Verify Terminal Connections Terminal Connections Temporary Control Point Nos. TECH 1 TECH 2 Point Nos. TECH 1 TECH 2 Panel Function Control Switch - "Low":

contact opening circuit Control Switch - "High" contact opening circuit.

10 Control Switch - "High" contact closing circuit.

8A Control Svitch << "Lov":

contact closing circuit.

13 "Low" side of green ligl 12 10 "Low" side of red light Page 8 of 18 Rev. 0

    • 1 THP 6030 IMP.305 5.. 5.3 MCC 1-EZC-C Valve IMO-110 From Temporary To Breaker Verify Control Pane I Verify Terminal Connections Terminal Connections Temporary Control Point Nos. TECH 1 TECH 2 Point Nos. TECH 1 TECH 2 Panel Function Control Switch "Low" s contact opening circuit.

Control Switch - "High" contact opening circuit.

10 Control Switch - "High" contact closing circuit.

8A Control Switch - "Low" s contact closing circuit.

13 "Low" side of green ligt 12 10 "Low" side of red light.

Valve ICM-129 From Temporary To Breaker Veri fy Control Pane I Verify Terminal Connections Terminal Connections Temporary Control Point Non. TECH 1 TECH 2 Point Nos. TECH 1 TECH 2 Panel Function Control Switch - "I,ow" s contact opening circuit.

Control Switch "High" contact opening circuit.,

10 Control Switch - "High" contact closing circuit.

8A Control Switch - "Low" s contact closing circuit.

13 "Low" side of green ligh 12 10 "Low" side of red light.

Page 9 of'8 Rev. 0

    • I THP 6030 IMP.305 Valve ICM-ill From Temporary To Breaker Verify Control Panel Verify Terminal Connections Terminal Connections Temporary Control point Nos. TECH 1 TECH 2 Point Nos. TECH 1 TECH 2 Panel Function Control Switch " "Low" <

contact opening circuit.

Control Switch - "High" contact opening circuit.

10 Control Switch - "High" contact closing circuit.

SA Control Switch - "Low" x contact closing circuit.

13 "Low" side of green ligt 12 10 "Low" side of red light.

5.5.4 MCC 1-EZC-D Valve IMO-130 From Temporary To Breaker Verify Control Panel Verify Terminal Connections Terminal Connections Temporary Control Point Nos. TECH 1 TECH 2 Point Nos. TECH 1 TECH 2 Panel Function Control Switch - "Low" s contact opening circuit.

,2 Control Switch - "High" contact opening circuit.

10 Control Switch - "High" contact closing circuit.

SA Control Switch - "Low" s contact closing circuit.

13 "Low" side of green ligh 12 10 "Low" side of red light.

Page 10 of 18 Rev. 0

    • 1 THP 6030 IMP.305 Valve NMO-153 From Temporary To Breaker Verify Control Panel Verify Terminal Connections Terminal Connections Temporary Control Point Nos. TECH 1 TECH 2 Point Nos. TECH 1 TECH 2 Panel Function Control Switch - "Low" s contact opening circuit.

Control Switch " "High" contact opening circuit.

10 Control Switch - "High" contact closing circuit.

8A Control Switch - "Low" s contact closing circuit.

13 "Low" side of green ligh 12 10 "Low" side of red light.

5.6 The following external MCC wiring previously disconnected at the Breaker control wiring terminal points is to be spliced to wires from the temporary control panel:

Page 11 of 18 Rev. 0

  • +1 THP 6030 IMP.305 5..6.1 MCC 1-EZC-A Valve IHO-140 Spliced Wire Connections at the Temporary Brekaer External Wiring Control Verify Correct To Be Spliced- Panel-Terminal Wires Spliced Temporary Control Wire No. Point Nos. TECH 1 TECH 2 Panel Function 4 (Previously dis- Control Switch - "Higt connected from side contact opening Terminal No. 6) circuit 10 (previously dis- Control Switch - "Low'ide connected from contact opening Terminal No. 2) circuit 3A (previously dis- Control Switch - "Higt connected from side contact closing Terminal No. 11) circuit 7 (previously dis- Control Switch - "Iow'ide connected from contact closing Terminal No. 7) circuit 2 (previously dis- Indicating Lights-connected from "High" side Terminal No. 8)

Page 12 of 18 Rev. 0

    • 1 THP 6030 IMP.305 Valve NHO-151 Spliced Wire Connections at the Temporary Breaker External Wiring Control Verify Correct To Be Spliced- Panel-Terminal Wires Spliced Temporary Control Wire Ão. Point Nos. TECH 1 TECH 2 Panel Function 4 (Previously dis- Control Switch - "High connected from side contact opening Terminal No. 6) circuit 10 (previously dis- Control Switch << "Low" connected from side contact opening Terminal No. 2) circuit 3A (previously dis- Control Switch - "High connected from side contact closing Terminal No. 11) circuit 7 (previously dis- Control Switch - "Low" connected from side contact closing Terminal No. 7) circuit 2 (previous,ly dis- Indicating Lights-connected from "High" side Terminal No. 8)

Page 13 of 18 Rev. 0

    • 1 TIP 6030 IMP.305 5.6.2 MCC 1-EZC-B Valve IHO-120 Spliced Wire Connections at the Temporary Breaker External Wiring Control Verify Correct To Be Spliced- Panel-Terminal Wires Spliced Temporary Control Wire No. Point Nos. TECH 1 TECH 2 Panel Function 4 (Previously dis- Control Switch - "Higt connected from side contact opening Terminal No. 6) circuit 10 (previously dis" Control Switch - "Iow'ide connected from contact opening Terminal No. 2) circuit 3A (previously dis- Control Switch - "Higl connected from side contact closing Terminal No. 11) circuit 7 (previously dis- Control Switch - "Low'ide connected from contact closing Terminal No. 7) circuit 2 (previously dis- Indicating Lights-connected from "High" side Terminal No. 8)

Page 14 of 18 Rev. 0

    • 1 THP 6030 IMP.305 Valve INO-128 Spliced Wire Connections at the Temporary Breaker External Wiring Control Verify Correct To Be Spliced- Panel-Terminal Wires Spliced Temporary Control Wire No. Point Nos. l TECH 2 Panel Function 'ECH 4 (Previously dis- Control Switch - "High connected from side contact opening Terminal No. 6) circuit 10 (previous ly dis- Control Switch - "Low" connected from side contact opening Terminal No. 2) circuit 3A (previously dis- Control Switch - "Higb connected from side contact closing Terminal No. 11) circuit 7 (previously dis- Control Switch - "Low" connected from side contact closing Terminal No. 7) circuit 2 (previously dis- Indicating Lights-connected from "High" side Terminal No. 8)

Page 15 of 18 Rev. 0

    • 1 THP 6030 IMP.305 Valve NNO-152 Spliced Wire Connections at the Temporary Breaker External Wiring Control Verify Correct To Be Spliced- Panel-Terminal Wires Spliced Temporary Control Wire No. Point Nos. TECH I TECH 2 Panel Function 4 (Previously dis- Control Switch - "High connected from side contact opening Terminal No. 6) circuit 10 (previously dis- Control Switch - "Low" connected from side contact opening Terminal No. 2) circuit 3A (previously dis- Control Switch 'High connected from side contact closing Terminal No. 11) circuit 7 (previously dis- Control Switch - "Low" connected from side contact closing Terminal No. 7) circuit 2 (previously dis- Indicating I.ights-connected from "High" side Terminal No. 8)

Page 16 of 18 Rev. 0

    • 1 THP 6030 ZNP.305 5.6.3 MCC 1-EZC-D Valve IMO-130 Spliced Wire Connections at the Temporary Breaker External Wiring Control Verify Correct To Be Spliced- Panel-Terminal Wires Spliced Temporary Control Wire No. Point Nos. TECH l TECH 2 Panel Function 4 (Previously dis- Control Switch - "High connected from side contact opening Terminal No. 6) circuit 10 (previously dis- Control Switch - "Low" connected from side contact opening Terminal No. 2) circuit 3A (previously dis- Control Switch - "High connected from side contact closing Terminal No. 11) circuit 7 (previously dis- Control Switch - "I.ow" connected from side contact closing Terminal No. 7) circuit 2 (previously dis- Indicating Lights-connected from "High" side Terminal No. 8)

Page 17 of 18 Rev. 0

    • 1 THP 6030 IMP.305 Valve NMO-153 Spliced Wire Connections at the Temporary Breaker External Wiring Control Verify Correct To Be Spliced Panel-Terminal, Wires Spliced Temporary Control Wire No. Point Nos. TECH 1 TECH 2 Panel Function 4 (Previously dis- Control Switch "High'ide connected from contact opening Terainal No. 6) circuit 10 (previously dis- Control Switch - "Low" connected from side contact opening Terminal No. 2) circuit 3k. (previously dis- Control Switch "High'ide connected from contact closing Terminal No. 11) circuit 7 (previously dis- Control Switch - "Low" connected from side contact closing Terminal No. 7) circuit 2 (previously dis- Indicating Lights connected from "High" side Terainal No. 8) 6.0 When Ooerations has operated a valve by use of the temporary control panel, its MCC may be de-energized.

6.1 After verification-of de-energization, the temporary control panel is disconnected from the compartment.

6.2 The temporary control panel may now be connected into another compartment after it has been de-energized.

6.3 The above sequence, steps 6.1 and 6.2, is repeated until all valves required to be operated have been operated.

6.4 Removal of the temporary control panel's wiring from the compartment does not require verification.

7.0 Restoration 7.1 Restoration of Containment valves will be documented by job orders which restore the valves to their normal operational status, after mitigation of the fire.

7~2 REVIEWED BY DATE Page 18 of 18 Rev. 0

    • 1 THP 6030 IMP.30S APPENDIX A CONTAINMEKT VALVES REPAIR PROCEDURE SIRES TO NE DISCON ECTED AT KC 1-EZC-C I

WIRE NO. TERMINAL CABLE NO. I(COIOR CODE) POINT NQ, 9302G-1 3A(W) 3A 3(BK) ll 4(BK) 4 930 1G-1 5(W) 5 10(GN) 10 8(R) 3 I I 2(BL) 8 WIRES 2, 3A, 4, 7, AND I 3A(RYL) 3h 10 CONTAINED IN CABLE I 8319PG-1 I 4(BK) 6 8319PG-1 MUST BE DIS-I I 7(BKYL) 7 CONNECTED AND THEN I I 10(YL) 2 SPLICED TO h NEW WIRE I I FOR CONNECTION TO THE I I TEMPORARY CONTROL PANEI AT TERMINAL I

I I

I POINTS ll, 5, 1, 7 AND 4 RESPECTIVELY.

I I I

I I

I 2(BI.) 8 I 3(RYL) 11 I I 4(BK) 6 I I 5(GNBK) 5 I I 6(GNYL) 10 I I 8898G-1 7(BKYL) 7 I 8(RBK) 3 I 9(RGN) 8A I 10(YL) 2 I ~

12(GY) 12 I 13(GN) 13 I WIRING TABULATION FOR SI ACCUMULATOR VALVE IMO-110 Page 1 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A TERR]eh'~

Cv 7ZRH le PO(+T NO.

5'tRK HO, lO 3A 31 l3 I IL sZ, 8<

k'1L K

N O'4 t30 Z.6-l ia 'fL 9 0/& I 83i9PC-j g8)RG-j WIRING TO BE DISCONNECTED AT MCC 1-EZC-C VALVE IMO-110 Page 2 of 31 Rev. 0

    • 1 TEP 6030 IMP.305 APPENDIX A TERMI~At ScOCK TfRÃie'h wiR P'OlNT hlO. eD, wP c ZND.

7 g,MPO RARy 7R gumtCRS AN TERYI rAL pO I e r 784WJ hlAL, 4i)>gf Po]HT'o Alo.

S pL<cE (gyp>cA~)

/0 WIRING TO BE CONNECTED S ZieeC -~

VALVE IMO-110 Page 3 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A TSRH ical.

Sc CK 7 jPHjNA 0'/RE NO.

FO]mT NO.

iO

/3 PA 8c KYL.

K 9302'g1 PL 93OI R -I 80 8+PR- l 887o R-]

WIRING TO BE DISCONNECTED AT MCC 1-EZC-B VATVE IMO-120 Page 5 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A 7 fgwiNAL.

BcOC,<

~RWiuri Nil PO>NT h/0. HO.

MP '7g~ po mR Y 7R c END. g~~PCR-Ah/

TERRI N4L POs N7-TERrqi~SL, U)(Rf Po(~T No No.

/O Sr~icE (TYPICAL) t Ry~

6

/0 508+PE-I WIRING TO BE CONNECTED VALVE IMO-120 Page 6 of Ql Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A CONTAINMENT VALVES REPAIR PROCEDURE WIRES TO bE DISCONNECTED AT MCC 1-EZC-D WIRE NO. TERMINAL CABLE NO. l (COLOR CODE) POINT NO.

93046-1 3A(W) 3A 3(BK) ll l I

4(BZ) I 93036-1 5(w) I 10(GN) l 8(R)

I 2(Bl.) 8 WIRES 2, 3A, 4, 7, AND I 3A(RYL) 3A 10 CONTAINED IN CABLE l 8293PG-1 4(BK) 6 8293PG-1 MUST BE DIS- I I 7(BKYL) 7 CONNECTED AND THEN l I 10(YL) 2 I SPLICED TO A NEW WIRE I I FOR CONNECTION TO THE I I TEMPORARY CONTROl, I I PANEL AT TERMINAL l I POINTS 1 1, 5, 1, 7 I I AND 4 RESPECTIVELY.

I 2(BL) 8 I

I l

3(RYL) 4(BK)

I I

l ll 6

I I

I 5(GNBK) I 5 I l 6(GNYL) I 10 I 86246-1 l 7(BKYL) I 7 I I I 8(RBK) I 3 I I l 9(RGN) i 8h I I 10(YL) l 2 I l 12(GY) I 12 I l 13(GN) l 13 I I I I l I WIRING TABULATION FOR SI ACCUMULATOR VALVE IMO<<130 Page 7 of 31 Rev. 0

    • 1 THP 6030 Xm.305 APPENDIX h TgRH iuAL.

8~ t'x TERHlMfl O'IRK HO.

p0]NT NO.

IO i3 I BK NYL.

k'lL.

K N5 't304G 1 0 6-I 8 P.93P&

Z+G MIRING TO BE DISCONNECTED AT NCC 1-EZC-D VALVE IMO-130 Page 8 of 3$

Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A TQRMlruAl SLOCK TfRgi Nh veil PolM NO. eo.

wP 7c~eoMRV R e ZNb.

Kvl&fE.P AN TERRI NAL FO>N7-

'ECHiNR<

CA)sgf PoiNT No No.

/o S~ucE t7veica~)

/0 8 ~'t3 P&-/

VALVE IMO-130 Page 9 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A CONTAINMENT VALVES REPAIR PROCEDURE WIRES TO BE DISCONNECTED AT MCC 1-EZC-h I WIRE NO ~ TERMI NAf CABfE NO. I(COLOR CODE) POINT NO.

9304R-1 3A(W) 3A 3(BK) ll BK 5(W) 9303R-1 10(GN) 8(R)

I 2(BL) 8 WIRES 2, 3A, 4, 7g AND I 3A(RYL) 3A 10 CONTAINED IN CABLE I 4(BK) 6 8471PR-1 NJST BE DIS-8471PR-1 I 7(BKYL) CONNECTED AND THEN I 10(YI.) 2 SPLICED TO A NEW WIRE I FOR CONNECTION TO THE I TEMPORARY CONTROf I PANEL AT TERMINAL I POINTS ll, 5, 1, AND 4 RESPECTIVELY.

7 I

2 (Br.) 8 3 (RYr.) 11 4(BK) .6 5(GNBK) 5 6(GNYL) 10 9102R-1 7(BKYI.) 7 8(RBK) I 3 9(RGN) I 8A 10(YL) I 2 ~

12 (GY) I 13(GN) I . 13 I

WIRING TABULATION FOR SI ACCUMULATOR VALVE IMO-140 Page 10 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A TsRet~~a Bt. Cx 7j'PH )MA %AIRE HO.

PO>e7 NO.

'0

/3 8A 8<

4'fL K

+7IPR-I 0soZ.a- i WIRING TO BE DISCONNECTED AT MCC 1-EZC-A VALVE IMO-140 Page 11 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A TERN 1 NWL BtOCK

~gg INI WIAK Po)NT bio. HO.

MP Tr ~Pe RARV yR t." ZN7).

3 v,mf'c p-Ah/ L TERRI NAL F p]e7-7ERr<iKAL, 4))

Point'o gf'lo.

/o

~P~'cK (<ASPIC~()

8a, bky

/0 Va, 8+7I PR-I WIRING TO BE CONNECTED VALVE IMO-140 Page 12 of 31 Rev. 0

    • 1 THP 6030 IMP 305 APPENDIX A CONTAINMENT VALVES REPAIR PROCEDURE I

WIRES TO BE DISCONNECTED AT MCC 1-EZC-B WIRE NO. TERMINAL CABLE NO. I (COLOR CODE) POINT NO.

WIRES 3, 4p 7 AND 2(BI.) 8 10 CONTAINED IN CABLE I 3 (RYL) 11 8087PR-1 MUST BE DIS-8087PR-1 I 4 (BK) 6 CONNECTED AND THEN I 7(BKYL) 7 SPLICED TO A NEW WIRE I 10(YL) I FOR CONNECTION TO I I THE TEMPORARY CONTROL I I PANEL AT TERMINAL I POINTS 5, 1, 7 AND 4 I RESPECT IVEI Y.

I I 2(BL) 8 I 3(RYL) 11 I 4(BK) 6 I 5(GNBK) 5 I 6(GNYL) 10 I 8871R-1 7(BKYL) 7 I 8(RBK) 3 I 9(RGN) 8A I 10(YL) 2 I 11(GN) 1 WIRING -.ABULATION FOR RHR INLET ISOLATION VALVE IMO-128 WIRING TABULATION FOR RHR INLET ISOLATION VALVE IMO-128 Page 13 of 31 Rev. 0

++1 THP 6030 IMP.305 APPENDIX A TERY]ohl.

8~ CX TCRHiuA W'IRf Ho.

PIN)NT No. CoLoR RWa b SNVL RSN 7 8K'K 5'B K

/0 .YL SoS eR;I 871 MIRING TO BE DISCONNECTED AT MCC 1-EZC-B VALVE IMO-128 Page 14 of 31 Rev. 0

)- KC- APPENDIX A 7pRMiwAt BCOC,W TZRwi NA WiCK Po)W NO. Nd.

Ta~ pe RARV

~v v,p~v AN TERYlNAL POI NT 7f RHiNAK, CA)s~

Po~~T'io No.

'SpLiCE t7yp>CN )

/0 8087PR;I WIRING TO BE CONNECTED VALVE IMO-128 Page 15 of 31 Rev. 0

    • 1 THP 6030 IMP-305 APPENDIX A CONTAINMENT VALVES REPAIR PROCEDURE WIRES TO BE DISCONNECTED t AT MCC 1-EZC-C I

I WIRE NO. TERMINAL CABLE NO. l(COLOR CODE) POINT ÃO. REMARKS WIRES 3, 4 ~ 7 AND 2(BL) 8 10 CONTAINED IN CABLE 3(RYL) 11 9190PG-1 NJST BE DIS-9190PQ-1 4(BK) 6 CONNECTED AND THEN 7(BKYL) 7 SPLICED TO A NEW WIRE 10(YL) 2 POR CONNECTION TO THE TEMPORARY CONTROL PANEL AT TERMINAL POINTS 5, 1, 7, AND 4 RESPECTIVELY.

2(BL) 3(RYI.)

4(BK) ll 8

6 5(GNBK) 5 6(GNYL) 10 9082G- 1 I 7(BKYL) 7 I 8(RBK) 3 I 9(RGN) 8A j 10(YL) 2 I 11(GN) 1 I

MIRING TABULATION FOR RHR INLET ISOLATION VALVE ICM-129 Page 16 of 31 Rev. 0

+*1 THP 6030 IMP 305

'APPENDIX A .

TKRWiuA SlRE Ho.

PO]+7 No. COc.dR RGM SL

'7 SKVL 8x

/0 .VL 9(fopt -I WIRING TO BE DISCONNECTED AT MCC 1-EZC-C VALVE ICM-129 Page 17 of 31 Rev. 0

    • 1 THP 6030 IP 305 APPENDIX A TfRpi Mh WE'RE

&pic QO. HO, IO Ta~~~~v .

3 V&fKW AN 7'ERR t NAL PO I N 7 7ERHiHAL, u))

Point No &la.

SPLtCE (TvPICIL)

RYl.

/0 WIRING To BE CONNECT )~/OPAL I VALVE ICN-129 Page 18 of 31 Rev. 0

~ ~

I

    • 1 THP 6030 IMP-305 APPENDIX A CONTAINM1 NT VALVES REPAIR PROCEDURE I

WIRES TO bE DISCONNECTED AT MCC 1-EZC-A I WIRE NO. TERMINAL CABLE NO. I(COLOR CODE) POINT NO.

I 2(BL) 8 WIRES 2, 3, 4, 7 AND 8750PR-1 I

I 3(RYL) 4(BK) ll6 10 CONTAINED IN CABLE 8750PR-1 MUST BE DIS-I 7(BKYL) 7 CONNECTED AND THEN I 10(YL) 2 SPLICED TO A NEW WIRE I POR CONNECTION TO THE I I TEMPORARY CONTROL I PANEL AT TERMINAL I

I POINTS AND 4 ll, 5, 1, 7 RESPECTIVELY.

I I

I 2(BL)

I I

I I

I I

3(RYL) 4(BK) ll 8

6 I I 5(GNBK) 5 I I I 6(GNYL) 10 I I 8676R-1 I 7 (BKYL) 7 I I I 8(RBK) 3 I I I 9(RGN) 8A I I I 10(YL) 2 I I I 12(GY) 12 I I 13(GN) 13 I I

WIRING TABULATION FOR PRESSURIZER PORV BLOCK VALVE NMO-151 Page 19 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A 7ERhf!Algal.

8L. CK TERH~uA WIRE hto.

Peiev'o. COLOR l3 I GQ I Z. I7 RYa b GNARL

'3 RGN SC 7

8KBK RBK so .V'L.

-OPR-I R-I WIRING TO BE DISCONNECTED AT MCC 1-EZC-A VALVE NMO-151 Page 20 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A y.pRMi rvha S~Ot K TfRgi NA WICK PoiM NO. HO, MP TKxPo RORY:

ra c ZMD, Qv mar.W Ahl 7'ERYI NAL, N7- 'O]

7ERW~XA< u)iaE PotuT'o Alp.

~PL'CE (~V PICf}L)

RVc.

8 7 7 Ky

/0 Va 8750 PR-)

WIRING TO BE CONNECTED VALVE NMO-151 Page 21 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A CONTAINMENT VALVES REPAIR PROCEDURE WIRES TO BE DISCONNECTED I AT MCC 1-EZC-B I I WIRE NO. TERMINAl CABLE NO. I(COLOR CODE) POINT NO.

2(BL) 3(RYL) I 8

11 WIRES 2, 3, i, 7 AND 10 CONTAINED IN CABLE I

I 8753PR-1 i(BX) I 6 8750PR-1 MUST BE DIS- I 7(BKYL) CONNECTED AND THEN 10(YL) 2 SPLICED TO h NEW WIRE I FOR CONNECTlQN TO THE I TEMPORARY CONTROL PANEL AT TERMINAL POINTS ll, 5, 1, AND 4 RESPECTIVElY.

7 I

2(BL)

I I

I I

I I

3(RYL) 4(BK) ll 8

6 I I '(GNBK) 5 I I 6(GNYL) 10 I 8677R-1 I 7(BKYL) 7 I I a(RBK) 3 I I 9(RGN) Bh I I 10(YL) 2 I I 12 (GY) 12 I I 13(GN) 13 I I WIRING TABULATION FOR PRESSURIZER PORV BLOCK VALVE NMO-152 Page 22 of 31 Rev. 0

    • 1 THP 6030 IMP-305 APPENDIX A TER'H]eAI 8~ CK TZPWiuA w'ARE Ho.

POtN7 No. g COLOR l3 I lQ iZ iP 3 RSC t'0 b <NIAL 9 RtN Gl.

'7 ALKYL Bv 5'BK 10 .YL 87BF a-9C77R-WIRING TO BE DISCONNECTED AT MCC 1-EZC-B VALVE NMO-152 Page 23 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A 7$ R< f NAt S~Ot'l4 rfRpiul wikK Po(W No. ND.

Tc~poMRV Tv~i E.A TERPfl NAL pOi+7-7ECHivAL, u)iaE Boiler ko No.

SPalcE (+YPICAL)

Bt.

/0 WIRING TO BE CONNECTED VALVE NMO-152 Page 24 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A CONTAIN%.'NT VALVES REPAIR PROCEDURE I

WIRES TO BE DISCONNECTED AT MCC 1-EZC-D I WIRE NO. TERMINAL CABLE NO. l(COLOR CODE) POINT NO.

WIRES 2, 3, 4, 7 AND 2(Bt.) 8 10 CONTAINED IN CABLE 3(RYL) 11 8764PG-1 MUST BE DIS-8764PG-1 4(BK) 6 CONNECTED AND THEN 7.(BKYI ) 7 SPLICED TO h NEW WIRE 10(YL) 2 FOR CONNECTION TO THE TEMPORARY CONTROl PANEL AT TERMINAL POINTS AND 4 ll, 5, 1, 7 RESPECTIVELY.

I I

I 2(BL)

I I

I I

I I

3(RYt 4(BK)

) ll 8

6 I I 5(GNBK) 5 I I 6(GNYL) 10 I 8931G-1 I 7(BKYL) 7 I I 8(RBK) 3 l I 9(RGN) 8A I I 10(YL) 2 I I 12(GY) 12 I I 13(GN) 13 I I WIRING TABULATION FOR PRESSURIZER PORV BLOCK VALVE NMO-153 gage 25 of 31 4ev. 0

  • a1 THP 6030 IMP 305 APPENDIX A TSRPf >eht 8~ CK TZRX>uA F'OINT IVO.

13 /

'7 8KYL NBK 87CHP'& I AT MCC 1-EZC-D WIRING TO BE DISCONNECTED VATVE NMO-153 Page 26 of 31 Rev. 0

    • 1 THP 6p3p Z~ 305 APPENDIX A

~R~i NJSL Boot.'K TfRHi MA wMK PowT NO. hid.

eP TKxPe RARY~

ra e END. Ze~e~a r4u TERHt NIL PO]NF TERmiNAL u)>

Pot~7 Mo No.

Ba Ayg

+f'L>CE (<yp>CW ).

7 7

/0 WIRING TO BE CONNECTED VALVE NMO-153 Page 27 of 31 Rev. 0

~ ~ 0

~ ~ ~ ~

~ ~

~ ~ ~ ~

$ ~

TE'RHlwA VIRK HO.

RliNr arp. CO~OR II GN Rsa b GMYL 8A 9 RGN 8L

'7 8KYL xo .VL.

9i81PG- I 9o83$ -I MIRING TO BE DISCONNECTED AT MCC 1-EZC-C VALVE ICM-ill Page 29 of 31 Rev. 0

i< I I-R **1 THP 6030 MP.305 APPENDIX A 7f R+fNAL4 BLOC 7fRg)hll PotM NO.

Pg~PO RARy .

e ZHD. QQ~ f~P~

Aht 7'ERR I NAL POINT 7EWWIHAL, t'ai Poi~T No bio.

'pl.iCE tTYPIChL)

R.yg 7 7

/0 q>81PG- J WIRING TO BE CONNECTED VALVE ICM-ill Page 30 of 31 Rev. 0

    • 1 THP 6030 IMP.305 APPENDIX A pcs, rz~nrwav roar N>. (~sr>chic) hali'ac pro. (re~~<)

IZ,

"- PI aw 34 I I

/ Z. 5 I I I

/0 I I I I 8A I

~ l~~ ~ ~~~~~~~~~~el Z Q~rgoL, Ski T~

r~<Pog,hay Chary 4~0 Tee]cgriiu Auc 0

Ops'- C orat-'~r S~/re&

PJi 7>! Pair!.8 r!fl) CO<~< >

~gtvcH POS<r~o< CozrhC.7 errKT hler. az6a Cc.aS F FuwCrioal "jjI')6H " Sl OC I I t-2. X gag C>RCulT 1%LogJ + 5 /OE 3 HI-+ X, () pp~g~

SiOC l-0 Cite.vf1'glypt" sH CiRCQt7 7~l8 5I elf i T

)C- DKNaTf5 "oeTAc,T cLosfD TEMPORARY CONTROL ARD INDICATION PANEL TYPICAL WIRING AND SWITCH DEVELOPMENT Page 31 of 31 Rev. 0

q ~

~ a i.,

e r

J I

I ff I'(

EPP Appendix B LIST OF EFFECTIVE PAGES Revision Number and Dat 1 of 6 Revision 4 - 12/15/ 2 2of6 Revision 4 - /15/82 1

3of6 Revision 4 - 12/15/82 4of6 Revisi 4 - 12/15/82 5of6 Re sion 4 - 12/15/82 6 of evision 4 - 12/15/82 Attachm 1, Page 1 of 1 Revision 4 - 12/15/82 Attachmeh2 2, Page 1 of2 Revision 4 - 12/15/82 Page 20f2 Revision 4 - 12/15/82 , Page 1 of2 Revision 4 - 12/15/82 Page 2 of 2 Revision 4 - 12/15/82 l

A hment 4, Page Page 1

Page 3 Page 4 ttachment 5, Page 1 of 2of4 of of of 4

4 4

Revision Revision Revision Revision 4

4 4

4

- 12/15/82 Revision 4 - 12/15/82

- 12/15/82

- 12/15/82

- 12/15/82 DEC 17 1982 Page 1 of 1 Memorial Hospital Agreement Revision 4

EPP Appendix B INDIANA AND MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT HOSPITAL ASSISTANCE PLAN GENERAL All Company safety policies and procedures applicable to conventional generating plant operations apply to the Donald C. Cook Nuclear Plant.

In addition, special rules and procedures govern work involving radio-active material. Although measures have been taken to control radio-active contamination, its presence will require the implementation of special procedures governing the treatment of a person injured in a contaminated area. First, the person must be decontaminated unless the nature and/or extent of the injury makes immediate removal from the area and treatment necessary or requires treatment in the area.

Second, if a wound is involved, it may become contaminated with radio-active material and complete decontamination may not be possible with-out aggravating the injury.

All D. C. Cook Plant Operating Department personnel, appropriate tech-nicians and the staff have a working knowledge of decontamination pro-cedures and all Shift Operating Engineers, Chemical and Radiation Pro-tection Supervisors and Chemical and Radiation Protection Technicians have completed courses of instruction in First Aid. Normally one or more of these employees will be available to administer fi rst aid while decontamination procedures are completed.

In the event the injury endagers life or limb, immediate medical treat-ment shall always precede decontamination procedures'onsequently, provisions have been made for contamination control at Memorial Hospial in St. Joseph and Mercy Hospital in Benton Harbor.

In cooperation with Indiana & Michigan Electric Company, the partici-pating hospitals will have a staff of physicians and hospital personnel trained to implement the proper methods of contamination control.

Indiana & Michigan Electric Company will ensure that training courses are conducted to provide hospital personnel with basic knowledge of radiation and contamination, as well as control methods. Annual con-ferences and refresher classes will be conducted. Also eriodic tests runs to ensure the o erabilit of the Hos ital Assistance P an w> 1 Indiana & Michigan Electric Company will ensure the following contami-nation control supplies will be furnished to the hospitals:

1. Disposable Gowns 24 pair
2. Surgical Gloves 24 pair
3. Surgeon Caps 12 Page 1 of 6 Memorial Hospital Agreement Revision 4'