Certifies That Training Programs for Initial Licensing & Requalification Training of Operators & Senior Operators at Plant Accredited by Inpo,Per Generic Ltr 87-07
ML17328A695
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/30/1990
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1127, GL-87-07, GL-87-7, NUDOCS 9005100189
Download: ML17328A695 (5)


Text

ACCELERATED UTION DEMON TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9005100189 DOC.DATE: 90/04/30 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana' 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana 6 05000316 AUTH. NAME AUTHOR AFFILIATION ALEXICH,M.P. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E. Document Control Branch (Document Control Desk)

SUBJECT:

Certifies that operator training programs accredited by INPO,per GL 87-97.

DISTRIBUTION CODE: M003D TITLE: Operator Regualification COPIES RECEIVED:LTR Program 2 ENCL 0 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA PD3-1 PD GIITTER,J.

INTERNAL: AEOD/DOA AEOD/DSP/TPAB

/~PQ/ FB11 NRR/DLPQ/LOLB10 REG FILE 01 RGN3 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASIEl CONTACT THE.DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DIFERIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL

I ~ ~

~ ~

Indiana Michigan Power Company

~

P.O. Box 16631 d Coiumbus, OH 43216 AEP:NRC:1127 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 CERTIFICATION OF OPERATOR TRAINING PROGRAMS U ~ S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Attn: T. ED Murley April 30, 1990

Dear Dr. Murley:

On March 29, 1987, the NRC issued Generic Letter 87-07, "Information Transmittal of Final Rulemaking for Revisions to Operator Licensing - 10 CFR 55 and Conforming Amendments." This letter stated that licensees may substitute an accredited training program for initial and requalification training programs previously approved by the NRC by certifying that the substitute training program is both accredited and based upon a systems approach to training. The Cook Nuclear Plant recently completed the final element of selection and analysis of licensed operator tasks for requalification training, using a systematic approach.

In accordance with the requirement of Generic Letter 87-07, certification is hereby made that training programs for both initial licensing and requalification training of operators and senior operators at Cook Nuclear Plant Units 1 and 2 are (1) accredited by the Institute of Nuclear Power Operations (INPO),

and (2) based on a systems approach to training, as defined in 10 CFR Section 55.4 and by applicable INPO guidelines. The date of original accreditation of the operator training programs is October 15, 1986.

We understand that this certification permits us to utilize the options detailed in 10 CFR Sections 55.31 (a) and 55.59 (c).

This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

--- 900%100185 900430 PDR ADOCK 05000315 pP)

V PDC

Dr. T. E. Murley AEP:NRC:1127 Sincerely, M. P. Alex ch Vice President MPA/eh cc: D. H. Villiams, Jr.

A. A. Blind - Bridgman R. C. Callen G ~ Charnoff NFEM Section Chief A. B. Davis - Region III NRC Resident Inspector - Bridgman