Informs of Granting Licensee Request for Withholding 871207 submittal,WCAP-10856,from Public Disclosure Per 10CFR2.790. If Basis for Withholding Info from Public Disclosure Changes NRC Should Be So Notified
ML20151M092
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/29/1988
From: Hopkins J
Office of Nuclear Reactor Regulation
To: Wiesemann R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
CAW-87-124, NUDOCS 8808040301
Download: ML20151M092 (3)


Text

u y

[cuo g g

UNITED STATES NUCLE AR REGULATORY COMMISSION 5 ;j WASHINGTON, D. C. 20555 July 29, 1988

%....+

Docket No. 50-424 Mr. Robert A. Wiesemann, Manager Regulatory and Legislative Affairs Westinghouse Electric Corporation Box 355 Pittsburgh, Pennsylvania 15230-0355

Dear Mr. Wiesemann:

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAW-87-124)

By letter dated December 7, 1987, Georgia Power Company submitted WCAP-10856, Revision 0,"Westinghouse NSSS Mechanical Equipment for the Georgia Power Company Plant Vogtle Unit 1," and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. Their submittal included your December 3, 1987, letter and affidavit.

You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1. The information sought to be withheld is owned and has been held in confidence by Westinghouse.
2. The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public.
3. The information was transmitted to the Comission in confidence.

l 4. The information is not available in public sources.

5. Public disclosure of this information would cause substantial harm to the competitive position of Westinghouse.

l l We have reviewed your application and the material in accordance with the I requirements of 10 CFR 2.790 and, on the basis of your statements, have l

determined that the submitted information sought to be withheld contains l trade secrets or propriety commercial information.

Therefore, the version of the submitted information marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Witholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

~

8808040301 800729 a/

, PDR ADOCK 05000424 U(

P PNU 0

r s

. 9 Mr. Wiesemann If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely,

/s/

Jon B. Hopkins, Project Manager Project Directorate II-3 Division of Reactor Projects -I/II cc: See next page DISTRIBUTION DechetIDle NRC PDR Local PDR PDII-3 Reading S. Varga 14-E-4 G. Lainas 14-H-3 D. Matthews 14-H-25 H. Rood 14-H-25 J. Hopkins 14-H-25 E. Jordan MNBB-3302 B. Grimes 9-A-2

-ACRS-(10) ll-1015-V0GTLE PLANT FILE

{, jkubLc.h PDII-3 OG PDI.-3 o/

JHopkins:sw ESh maker Ditatthews 7 //f'/88 /q/g/88 1 88 7/ cy8a t

l 1

4 Mr. W. G. Hairston, III Georgia Power Company Vogtle Electric Generating Plant CC*

Hr. L. T. Gucwa Resident Inspector Manager of Safety and Licensing Nuclear Regulatory Commission Georgia Power Company P.O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302

. Deppish Kirkland, III, Counsel Mr. Ruble A. Thomas Office of the Consumers' Utility Executive Consultant Council Southern Company Services, Inc. Suite 225 P.O. Box 2625 32 Peachtree Street, N.E.

Birmingham, Alabama 35202 Atlanta, Georgia 30302 Mr. Paul D. Rice James E. Joiner Vice President & Project Director Troutman, Sanders, Lockerman, Georgia Power Company & Ashmore Post Office Box 282 1400 Candler Building Waynesboro, Georgia 30830 127 Peachtree Street, N.E.

Atlanta, Georgia 30303 Mr. J. A. Bailey Project Licensing Manager Danny Feig

. Southern Company Services, Inc. 1130 Alta Avenue P.O. Box 2625 Atlanta, Georgia 30307 Birmingham, Alabama 35202 Carol Stangler Ernest L. Blake, Jr. Gecrgians Against Nuclear Energy Bruce W. Churchill, Esq. 425 Euclid Terrace Shaw, Pittman, Potts and Trowbridge Atlanta, Georgia 30307 2300 N Street, N. W.

Washington, D. C. 20037 Mr. R. P. Mcdonald Executive Vice President -

Mr. G. Bockhold, Jr. Nuclear Operations General Manager Nuclear Operations Georgia Power Company Georgia Power Company P.O. Box 4545 P.O. Box 1600 Atlanta, Georgia 30302

Waynesboro, Georgia 30830 l

Regional Administrato*, Region II Mr. W. G. Hairston, III l

U.S. Nuclear Regulatory Comission Senior Vice President -

i 101 Harietta Street, N.W., Suite 2900 Nuclear Operations Atlanta, Georgia 30323 Georgia Power Company l

P. 0. Box 4545 Atlanta, Georgia 30302 l