ML20235S128
| ML20235S128 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/01/1987 |
| From: | Mark Miller Office of Nuclear Reactor Regulation |
| To: | Wiesemann R WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| References | |
| CAW-84-23, CAW-85-031, CAW-85-31, NUDOCS 8710080332 | |
| Download: ML20235S128 (3) | |
Text
_...
e V
f[
I%,
UNITED STATES g
NUCLEAR REGULATORY COMMISSION 7;
j WASHINGTON, D. C. 20555
\\...../
l 1 007 1987 l
Docket Nos.:
50-424 l
and 50-425 Mr. R. A. Wiesemann l
Manager, Regulatory and Legislative Affairs Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230
Dear Mr. Wiesemann:
Subject:
Request for Withholding Infonnation from Public Disclosure (CAW-84-23 and CAW-85-031)
By its applications dated April 27, 1984, and ipril 16, 1985, Georgia Power Company submitted responses to Question 491.2 and Draft Safety Evaluation Report Open Item 71 and requested that they be withheld from public dis-closure pursuant to 10 CFR 2.790. Also enclosed were affidavits from the Westinghouse Electric Corporation dated May 12, 1976 and November 28, 1979, respectively.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
1.
The document contains information which is customarily held in confidence by Westinghouse.
2.
The infonnation has been held in confidence by Westinghouse and is not available in public sources.
3.
The information is the result of analyses performed by expenditure of I
considerable time and effort to Westinghouse.
We have reviewed your applications and the material based on the requirements and criteria of 10 CFR 2.790 and on the basis of your statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.
Therefore, the above named information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of per-sons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area.
We will, of course, insure that the consultants have sicnec the appropriate agreements for handling proprietary information.
h00Q9$ h y
P 1
Mr. R. A. Wiesmemann If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You should also understand that the NRC may have cause to review this determination in the future, such as if the scope of a Freedom of Infonnation Act request includes your information.
In all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Melan e A. Miller, Project Manager Project Directorate 11-3 Division of Reactor Projects I/II see nen DISTRIBUTION:
Docket File NRC PDR Local PDR PRC System PDII-3 Reading MDuncan SVarga/Glainas JPartlow EJordan ACRS(10)
MMiller 1
i
-lIfphl/II PDil,-
/DRPI/II l
MDd6c'a]/DRPI/II t fitbr/mac
'~
n Acting PD 0 /,./87 09gj/87 09/,Y/87 f6/ / /87 k
_m-._.
f.
r b
.Mr. J. P. O'Reilly Georgia Power Company.
Vogtle Electric Generating.P1 ant l
cc:
Mr. L.- T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Commission Georgia Power Company P. O. Box 572 P.O.. Box 4545 Atlanta,. Georgia.
Waynesboro, Georgia 30830 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing' Office of the Consumers' Utility.
'Vogtle' Project Council Georgia Power Company /
Suite 225
" Southern Company. Services Inc.
'32 Peachtree Street, N.W.
P.O. Box 2625,
Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Paul D. Rice
-Troutman, Sanders, Lockerman, Vice President & Project General Manager
& Ashmore-Georgia. Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree. Street, N.E.
Waynesboro, Georgia. 30830 Atlanta, Georgia 30303 Danny Feig.
Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.
P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.
Atlanta, Georgia 30307 Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
. Washington, D.
C.-
20037 Mr. G. Bockhold, Jr.
Vogtle Plant Manager Georgia Power Company Route 2, Box' 299-A Waynesboro, Georgia 30830 i
Regional Administrator,. Region II
. U.S. Nuclear. Regulatory Commission
-101 Marietta Street, N.W., Suite 2900 Atlanta,-Georgia 30323 Mr. R. E. Conway j
Senior Vice President and Project Director I
Georgia Power Company Rt. 2, F. O. Box 299A I
Waynesboro, Georgia 30830 i
u