ML19339C858

From kanterella
Revision as of 10:58, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1981
ML19339C858
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/06/1981
From: Murray T
TOLEDO EDISON CO.
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19339C859 List:
References
L81-120, NUDOCS 8102120131
Download: ML19339C858 (1)


Text

-

< 9 ronco u EDISDN February 6, 1981 L81-120 FILE: RR 2 (P-6-81-01)

Docket No. 50-346 License No. NPF-3 Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Co= mission Washington, D. C. 20555

Dear Mr. Stello:

Monthly Operating Report, January, 1981 Davis-Besse Nuclear Power Station Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 for the month of January,1981.

Yodrs truly, G ;D.M? - p on Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/lj k Enclosure cc: Mr. James G. Keppler Regional Director, Region III Encl: 1 Mr. Norman Haller, Director Office of Management Program Analysis Enc 1: 2 Mr. Luis Reyes NRC Resident Inspector 1

c Encl:

r in g) ll u i __

r'

  • W*

I L L.

.ThE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAD! SON AVENUE TOLEDO. CH:0 43552 810 212 0 tM g_ -

_