Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17286A2801990-08-27027 August 1990 Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d) ML17286A2671990-08-23023 August 1990 Provides Info on Steps Taken to Minimize Potential Effects of NRC Maint Insp Interface Record, Form on Candor of Supply Sys Personnel When Talking W/Nrc Inspectors ML17286A2641990-08-20020 August 1990 Advises That Tech Spec Rev Re ATWS Recirculation Pump Trip Will Be Submitted by 900928,per Discussions W/ P Eng & H Lee ML17285B4341990-08-20020 August 1990 Withdraws 900302 Request for Amend to Tech Spec 3.8.1.1, AC Sources Reducing Excessive Testing of Diesel Generators. IR 05000397/19900141990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4171990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4041990-08-0202 August 1990 Submits Justification for Continued Operation W/Emergency Diesel Generator 2 Shorted Turns ML17285B3981990-07-30030 July 1990 Advises That Installation of Detector Check Valve in Fire Protection Underground Piping Sys Complete,Per 890911 Ltr. Sys Monitors for Underground Sys Leakage Over Entire Fire Protection Sys ML17285B3991990-07-27027 July 1990 Forwards Justification for Continued Operation Re Emergency Diesel Generator 2 Shorted Turns.Justification Concludes That Diesel Generator Capable of Supporting Present Operability Requirements of Tech Specs ML17285B3711990-07-12012 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Confirms That Items 1,2,3,4 & 5 of Requested Actions of Operating Reactors Completed ML17285B3761990-07-12012 July 1990 Discusses Potential for Surface Entry & Mining Near Plant Sites.Concludes That NRC Need Not Consider Issue as One Requiring Continued Monitoring ML17285B3781990-07-11011 July 1990 Requests Waiver of Compliance from Tech Spec 3.8.1.2 Re Ac Sources - Shutdown.Waiver Will Allow Performance of Rotor Pole Ac Voltage Drop Test to Provide Confirmation That for Extended Run Degradation Condition Will Not Occur ML17285B3841990-07-10010 July 1990 Forwards Util 1990 Emergency Exercise Scenario.W/O Encl ML17285B3661990-07-0505 July 1990 Advises of Listed Organizational & Personnel Changes, Effective 900707.J Burn Will Be New Director of Projects, C Powers Promoted to Director of Engineering & J Baker Promoted to Plant Manager ML17285B3641990-06-29029 June 1990 Advises That All Equipment Identified W/Atws Safety Function Acceptable from Environ Qualification Standpoint. ATWS Equipment Has Been Determined to Be Qualified to Normal Design Environ Conditions Followed by ATWS Accident Environ ML17285B3571990-06-28028 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. ML20055D2391990-06-28028 June 1990 Forwards Response to Re Violations Noted in Insp Rept 50-397/90-12.Response Withheld (Ref 10CFR73.21) ML17285B3501990-06-22022 June 1990 Advises That Mods to Recirculation Pump Trip Sys Implemented During 1990 Spring Refueling Outage.Remaining ATWS Items to Be Resolved as Listed ML17285B3511990-06-20020 June 1990 Forwards WPPSS-FTS-129, BWR Transient Analysis Model, for Review & Approval ML17285B3441990-06-20020 June 1990 Advises That Util Intends to Utilize R-value of 0.13% Delta K/K in Cycle 6 Implementing Procedures.Should R-value Change in Final Startup & Operations Rept,Changed Value Shall Be Used Instead ML17285B3451990-06-19019 June 1990 Forwards Rev 10 to EPIP 13.1.1, Classifying Emergency. Rev Includes New Format of Matrix Charts Intended to Improve Identification of Symptomatic & situation-based Emergency Conditions ML17285B3431990-06-18018 June 1990 Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601 ML17285B3461990-06-15015 June 1990 Responds to NRC Evaluation Findings of Licensed Operator Requalification Program.Quality of Written Exam & Job Performance Measure Question Bank Testing Matls Will Be Improved to Meet Std Prior to Next Program Evaluation Cycle ML17285B3301990-06-12012 June 1990 Forwards Warrant for $50,000 in Response to Order Imposing Civil Monetary Penalty Dtd 900521 ML17285B3251990-06-0707 June 1990 Advises That Calculated Max Control Room Temp Re Station Blackout Will Be Provided by 900701 ML17285B2931990-05-29029 May 1990 Responds to NRC 900426 Ltr Re Violations Noted in Insp Rept 50-397/90-09.Validity of Violation Challenged.Opposes Issuance of Severity Level IV Violation Based on Listed Reasons ML17285B2861990-05-22022 May 1990 Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991 ML17285B2881990-05-11011 May 1990 Forwards Engineering Std EES-4,Rev 0, Setpoint Methodology, as Committed in Util 900329 Ltr.W/O Encl ML17285B2471990-05-0101 May 1990 Advises That No Changes to Tech Specs Required as Stated in 891130 Ltr in Response to Generic Ltr 89-21 Requesting Plant Status on Implementation of USI Re ATWS ML17285B2741990-04-26026 April 1990 Advises That Util Has No Comments on Licensed Operator Annual Requalification Exam During Wks of 900226 & 0305.All Comments Resolved When Exams Administered ML17285B2321990-04-25025 April 1990 Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17 ML17285B2121990-04-19019 April 1990 Responds to Fire Protection Issues Identified in 900201 Notice of Violation.Corrective Actions:Major Hardware Changes Implemented & Independent Consultant Will Be Employed to Review Fire Protection Program ML17285B2221990-04-16016 April 1990 Forwards Status Rept for Commitments Made in 891130 Ltr Re commercial-grade Dedication Process.Resolution of 10 Samples Identified by NRC & 50 Samples Identified by Cynga Completed ML17285B1881990-04-11011 April 1990 Responds to NRC 900312 Ltr Re Violations Noted in Insp Rept 50-397/90-01.Corrective Actions:Complete Job & Task Analysis Completed for Health Physics Technician Training Program & New Program Will Include Training on Fundamentals ML17285B1821990-04-0505 April 1990 Requests Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii) & (IV) to Allow Delayed Submittal of NRC Form-474, Simulation Facility Certification & to Administer Simulation Test as Upgraded,Respectively ML17285B1741990-04-0505 April 1990 Advises That NRC Approved Use of Final Feedwater Temp Reduction in Amend 77 to License NPF-21 ML20012F6141990-04-0404 April 1990 Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML17285B2041990-03-29029 March 1990 Requests Review of Encl Topical Rept WPPSS-FTS-127,Rev 0, Qualification of Core Physics Methods for BWR Design & Analysis. Upon Rept Approval,Tech Spec Changes (Per Generic Ltr 88-16) Scheduled for Jan 1992 ML17285B1421990-03-29029 March 1990 Forwards Revised Schedule for Plant Equipment Setpoint Methodology Program Plan.Methodology Revised to Incorporate Latest ISA Std Draft.Setpoint Program Design Team for FY90 Onsite,Trained & Began Work on 900312 ML17285B1381990-03-29029 March 1990 Forwards Concluding Rept of Results Requested by Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment. Air Quality Testing Performed to Date Reveals Steadily Improving Results ML17285B1131990-03-28028 March 1990 Advises of Release of Subchannel Thermal Hydraulic Computer Code & Requests Review of VIPRE-01 Mod-02 & Issuance of SER for PWR & BWR Applications.Bwr Qualification Analyses Completed & Rept on BWR Applications Encl ML17285B1331990-03-23023 March 1990 Responds to NRC 900221 Ltr Re Violations Noted in Insp Rept 50-397/89-40.Corrective Actions:Plant Procedure 10.25.63, Emergency Lighting Insp in Process of Being Expanded to Provide Instructions & Check Sheets to Ensure Uniform Insps ML17285B1311990-03-21021 March 1990 Forwards Proposed Bases Change Re 891129 Request for Amend to Tech Spec Table 4.3.6.1, Srm/Irm Detector Not-Full-In Functional Test. Bases Change Describes Special Circumstances Re Test Exception ML17285B1291990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in LWRs & Generic Ltr 89-21 Re Status of Implementation of Usis.Tech Specs Adequate to Verify Operability of Overfill Protection Sys ML17285B1171990-03-19019 March 1990 Suppls 900102 Response Re Implementation of fitness-for-duty Program at Facility.All Items Identified as Incomplete as of 900103 Completed at End of Jan 1990 ML17285B1121990-03-15015 March 1990 Provides Level of Property & Liability Insurance Coverage for Facility,Per 10CFR50.54(w)(2) Annual Requirement ML17285B0931990-03-0202 March 1990 Forwards Supplementary Info Re 900214 Application for Amend to License NPF-21,revising Tech Spec 3.3.7.5 to Address Failed Safety/Relief Valve Position Indicators ML17285B0741990-03-0202 March 1990 Responds to NRC 900201 Ltr Re Violations Noted in Insp Rept 50-397/89-30.Corrective Action:Plant Personnel Currently in Process of Making Improvements to Plant Operations Procedure Writers Guide ML17285B0861990-03-0101 March 1990 Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01 ML17285B0581990-02-26026 February 1990 Forwards Washington Nuclear Plant-2 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989 & Amend 7 to Odcm. 1990-08-27
[Table view] |
Text
AC CRT RATED D3 BUTION DEMONS ON SYSTEM REGULAT ., INFORMPT1ON, DISTRIBUTIOh YSTEM (RIDS)
ACCESSION NBR:8808020174 DOC.DATE: 88/07/26 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Responds to NRC Bulletin 87-002,Suppls 1 6 2 re whether fasteners in stores at facilities met requirements.
DISTRIBUTION CODE: IE57D COPIES RECEIVED:LTR 1 ENCL I SIZE: I TITLE: 87-02 a 87-02 Supplement, Fastener Testing to Determine Confor ance w/
D NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME PD5 LA LTTR ENCL 1 0 ID CODE/NAME NRR ROSSPT LTTR ENCL 1 1 I
PD5 PD 1 1 SAMWORTH,R 1 1 h INTERNAL: AEOD/DOA 1 1 AEOD/DSP 1 '
1 AEOD/DSP/TPAB 1 1 NRR/DEST/ADE 8H 1 NRR/DEST/ADS 7E 1 1 NRR/DOEA/EAB 11 1' NRR/DOEA/GCB 11 1 1 NRR/DRIS/VIB 9D 2 2 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OI 1 1 ICKZXCI" 1 1 RES/DSIR/EIB 1 1 RGN5 FILE 01 1 1 EXTERNAL: EG&G BARNESPB 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 22
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 G02-88-162 July 26, 1988 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:
Subject:
NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF"21 RESPONSE TO NRC BULLETIN 87-02, SUPPLEMENTS 1 AND 2
Reference:
NRC Bulletin 87-02, "Fastener Testing to Determine Conformance with Applicable Material Specifications",
dated November 6, 1987
- 2) NRC Bulletin 87-02, Supplement 1, dated April 22, 1988
- 3) NRC Bulletin 87-02, Supplement 2, dated June 10, 1988
- 4) Letter, G02-88-007, GC Sor ensen to NRC, "WNP-2 Fastener Testing Program", dated January 11, 1988
- 5) Letter, G02-88-075, GC Sorensen to NRC, "WNP-2 Fastener Testing Program, Supplemental Repor t", dated March 31, 1988 The subject bulletin (Reference 1) required licensees to review their receipt inspection requirements and internal controls for fasteners and to independently determine, through testing, whether fasteners in stores at their facilities met required mechanical and chemical specification requirements. The Supply System did this, and provided the responses in References 4 and 5.
8808020174 880726 PDR ADOCK 05000397 6 PNU
Page Two RESPONSE TO NRC BULLETIN 87-02, SUPPLEMENTS 1 AND 2 Supplement 1 to the subject bulletin (Reference 2) required licensees to provide a list of the suppliers and manufacturers from whom safety related and non safety related fasteners have been purchased, including addresses, and the type of fasteners purchased. Supplement 2 to the subject bulletin (Reference 3) clari-fied the type of information being required (i.e., limited to ferrous fasteners 1/4 inch in diameter or greater), and further clarified a "best-effort" approach to non safety related fasteners'he purpose of this letter is to provide the information required by Supplements 1 and 2 to the subject bulletin.
The Supply System has completed review of its records. Attachment 1 provides the names and addresses of the suppliers and manufacturer s identified from the review from whom we may have obtained safety related fasteners. If both safety related and non safety related fasteners were obtained from the same supplier, they were included in Attachment 1. The time period for each particular manufacturer is as indicated in the attachments. Similar information for non safety related fasteners is provided in Attachment 2.
Attachment 3 contains the commonly used bolting material specifications utilized at WNP-2, and completes the Supply System's response to Supplements 1 and 2 to the subject bulletin.
Very truly yours, G. C. orensen, Ma ger Regulatory Programs HLA/bk cc: JB Martin - NRC RV NS Reynolds BCP8R RB Samworth NRC DL Williams BPA/399 NRC Site Inspector - 901A
STATE OF WASHINGTON)
Subject:
Bulletin 87-02
)
COUNTY OF BENTON )
I, J. W. Shannon, being duly sworn, subscribe to and say that I am the Deputy Managing Director for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in true.
it are DATE Z6 , 1988 J. . S annon De ty Managing Director On this day personally appeared before me J. W. Shannon to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this ~day of 1988.
otary u ic and forteSAE OF WASHINGTON Residing a '
ATTACHMENT 1 Page 1 of 5 ETT RELATED VENDDRS (FASTENEI July 1988 A8G Engineering Co. II B&G Manufacturing 4640 East LaPamle Ave. PO Box 260 Anaheim, CA 92806 3067 Unionville Pike September 1982 - May 1988 Hatfield, PA 19440 Mar ch 1980 Abbot Valve 8 Fitting Co 6090 Cochran Rd Bingham Wil1amette Solon, OH 44139 Swan Island June 1983 Portland, OR July 1974 Acme Industrial 4322 NW Yeon Ave BIF Industries Portland, OR 97210 West Warwick 8 November 1977 Providence, RI August 1977 Aerofast Industrial Products PO Box 15342 Borg Warner Nuclear Valve Div.
Salt Lake City, UT 84115 7500 Tyrone Ave.
June 1977 - March 1980 Van Nuys, CA 91409 November 1979 - August 1983 Amfac Electric Supply Co.
1925 West A Street Cardinal Industrial Products, Pasco, WA 99301 3873 W. Oquendo April 1976 November 1982 Las Vegas, NV 89118 December 1978 - May 1988 Anchor/Darling Valve Co PO Box 3428 Cisco (Coarse Industrial Supply) 701 1st Street 1262 Urban Avenue South Wi lliamsport, PA 17701 Seattle, WA 98168 December 1982 - January 1988 October 1979 - May 1986 Anchor Darling Valve Co Coast Industrial Supply Suite 320 15750 Salt Lake Ave One Delmont Avenue City of Industry, CA 91745 Bala Cynwyd, PA 19000 February 1976 - September 1978 May 1978 - January 1980 Crane - Deming Pump Co Anderson Greenwood Salem, Ohio PO Box 1097 November 1977 - February 1979 Bellaire, TX 77401 April 1979 - November 1983 Crosby Valve & Gage Co.
43 Kendrick St.
Automatic Products Wrentham, MA 02093 1019 Columbia Drive SE April 1986 Suite 6 Richland, Wa 99352 Divesco - NSSS Inc.
December 1979 5000 Hwy 80 East Jackson, MS 39208 February 1987
ATTACHMENT 1 Page 2 of 5 AFETV RELATED VENDORS (FASTENE~ July 1988 Dobbens Metal Products Globe Machinery January 1977 E 1st 8 Court Des Moines, Iowa Dragon Valve Octob'er 1978 13457 Excelsion Drive PO Box 489 Gould, Inc Norwalk, CA 90650 The Commons Bldg, Suite C155 September 1982 - November 1987 1200 112th NE Bellevue, WA 98004 Dresser Industries February 1979 PO Box 1487 Burlingame, CA 94010 Guyon Alloys August 1982 3400 Rogerdale Rd Houston, TX 72042 ERG Manufacturing August 1978 - May 1983 PO Box 260 3067 Unionvi lie Pike Hilti Fastening Co Hatville, PA 19440 14500 Doolittle Drive March 1980 San Leandre, CA -94557 August 1978 - April 1980 El ectr omoti ve Di v. GM Corp Division of General Motors Hilti Incorporated 181 Main Ave. 1811 S Palouse Street Sacramento, CA 95838 Kennewick, WA 99336 March 1982 - June 1986 February 1976 - October 1982 Fasteners, Inc H.K. Porter PO Box 804 Springdale, Ark 423 N. Oregon March 1976 - April 1981 Pasco, WA 99302 March 1975 - April 1988 Hubb Steel PO Box 125 General Electric Co. Tucker, GA 30084 Nuclear Energy Division Sept. 1982 March 1988 175 Curtner Ave San Jose, CA 95125 ITT Grinnell Cor p July 1974 May 1988 '240 Northwest 29th Ave Portland, OR 97210 General Electric Supply (GESCO) September 1978 - September 1982 1928 West A Street Pasco, WA 99301 ITT Grinnell February 1976 October 1985 Diaphram Valve Div Lancaster, PA General Electric Co. December 1982 2929 NW 29th Portland, OR 97207, ITT Grinnel December 1982 - April 1983 3101 Ellott Avenue Seattle, WA 98121 General Electric Co. June 1980 Wilmington, N.C.
July 1974 - September 1981
ATTACHMENT 1 Page 3 of 5 FETY RELATED VENDORS (FASTENEIO July 1988 James C. Hhi te Co. Limitorque Corp PO Box 5495 5114 ttoodall Road Station B PO Box 11318 Greenvi lie, South Carolina 29606 Lynchbur g, VA
-
24506 September 1977 August 1982 September 1987 Joy Manufacturing Co. McCulloch Industrial Inc 338 South Broadway 1800 Freeway Blvd PO Box 431C Minneapolis, MN 55440
New Philadelphia, OH 44663 June 1978 April 1980 November 1978 - February 1988 McJunkin Corp John Perine Co. Inc. PO Box 553 820 South Adams Charelston, Hest Virginia Seattle, t(A 98108 September 1978 January 1974 - May 1988 M8M Bolt Co.
Joseph Dyson 8 Sons Inc T209 East Ainsworth Dependable Div Pasco, MA 99301 PO Box 4378 June 1983 May 1988 Cl evel and, OH 44137 December 1975 Murdock, Inc Compton, CA Keystone Tubular Services July 1974 PO Box 1109 Auburn, WA 98002 North Coast Electric April 1978 - March 1979 171 South Jackson Seattle, MA 98108 Kaman Instrumentation Mar ch 1976 - October 1978 1500 Garden of Gods Road Colorado Springs, CO 80933 Northwest Bolt 8 Nut Co May 1982 - March 1983 4250 Eighth Avenue Northwest Seattle, MA 98107 Leckenby Structr ual Steel Corp April 1977 - September 1978 2745 11th S.ll.
Seattle, MA 98134 -Nova Machine Products Corp April 1977 18685 Sheldon Road Middleburg Heights, OH 44130 Liberty Equipment 8 Supply Co. October 1987 - May 1988 620 E. Bruneau Kennewick, MA 99336 NPS Industries October 1979 - February 1988 1 Harmon Plaza Secaucus, NJ 07094 Limitorque Corp August 1978 - July 1983 c/o Norman Rupp Co.
1710 SE Brooklyn NPS Industries Portland, OR 97202 2750 SW Moody August 1982 - June 1983 Portland, OR 97201 March 1980 - June 1984
ATTACHMENT 1 Page 4 of 5 AFETY RELATED VENDORS (FASTENEIW July 1988 Pacific Scientific Ryerson Steel 1346 S. State College Blvd. PO Box 3525 Anaheim, CA 92803 Seattle, WA 98124 April 1983 August 1978 Portland Bolt 8 Manufacturing Seattle Valve E Fitting 1210 NW Johnson 13417 NE 20th Street Portland, OR 97209 Bellevue, WA 98005 Mar ch 1976 - June 1983 March 1980 Power 8 Engineered Products Co Southern Bolt 8 Fastener Corp.
157 Helen Street PO Box 7196 South Plainfield, NJ 07080 Shreveport, LA 71107 March 1980 June 1987 August 1979 - July 1987 Power Piping Southwestern Research Institute 829 Beaver Avenue 6220 Culebra Road Pittsburg, PA 15233 San Antonio, TX 78284 December 1979 - May 1988 November 1978 Pybus Steel Special T-Metals Co. Inc Orondo Street 8 Columbia River PO Box 5922 PO Box 678 Lenexa, MS 66215 Wenatchee, WA 98801 June 1978 August 1978 - August 1983 Standard Fittings Co Ray Bristow Inc PO Box 1266 1640 NW 14th Ave Opelousa, LA 76570 Portland, OR 97209 April 1978 April 1976 - February 1983 Stoney Electric Co.
R.E.C. Corp 2780 South Raritan Street 2 Sheraton Plaza Englewood, CO 80110 New Rochelle, NY 10801 September 1978 - October 1979 November 1981 Stoneway Electric Co.
Reliance El ectri c 630 Railroad Street 24701 Euclid AVe. Richland, WA 99352 Cleveland, OH 44117 July 1978 - August 1982 June 1983 Tacoma Screw Products Rocky Mountain Nuclear Suite B 2001 Center Street June 1977 Tacoma. WA 98402 June 1975 - July 1987 Rosemount 12727 NE 20th St. Suite 20 Technical Controls Bellevue, WA 98005 12841 NE 14th Place January 1980 Bellevue, WA 93005 August 1978 - May 1982
ATTACHMENT 1 Page 5 of 5 AFETY RELATED VENDORS (FASTENE Teledyne Osco Votaw Precision Tool Co.
2966 E 55th Street Santa Fe Springs, CA Cleveland, OH 44127 July 1974 - October 1981 July 1973 - September 1973 Westinghouse Terry Steam Turbine Corp. PO Box 3938 PO Box 555 Seattle, WA 98124 Windsor, CT 06095 September 1977 - April 1982 July 1974 - February 1984 Westinghouse The Burhanan-Sharp Co June 1975 June 1981 PO Box 3906 (conducting own file search)
Seattle, WA 98124 April 1975 Westinghouse Electric Co.
PO Box 2040 Uni strut Tri Cities, WA 99302 353005 Michigan Ave West July 1978 Wayne, MI 48184 Apri 1 1982 Westron Inc 5101 N Interstate Ave Unistrut Nor thwest Service Center Portland, OR 97217 18401 Cascade Avenue South March 1980 Southcenter South Industrial Park Seattle, WA 98188 Worchester Gear March 1973 - June 1983 November 1976 Unit Process Company 420 6th Street South Kirkland, WA 98004 U.S. Gypsum Glove Metal products Division Rual Rt. 2 Pinckneyville,
-
Ill 62274 October 1977 May 1978 Valley Nut & Bolt 10111 Tilley Road SW Olympia, WA 98502 January 1981 - February 1985 Velan Engineering Ltd 2125 Ward Avenue St. Laurent EC H4M IT6 quebec, Canada January 1983 - August 1985 Velan Valve Velan Engineering St. Laurent, Montreal Canada March 1978 October 1982
ATTACHMENT 2 Page 1 of 5 SAFETY RELATED VENDORS (FASTE S) July 1988 A8T Supply Consolidated Electr ical Distr. Inc.
PO Box 63 515 W Entict Midvale, YT 84047 PO Box 6105 February 1977 - March 1977 Kennewick, WA 99336 Apr il 1977 Allied Bolt PO Box 80004 Consolidate Supply Seattle, WA 98108 900 E Chemical Drive December 1974 - March 1984 Kennewick, WA 99336 April 1982 Allied Bolt 103 E Kennewick Ave Construction Tool Service In.
Kennewick, WA 99336 3616 Liberty Avenue September 1982 - March 1985 Pittsburgh, PA 15201 October 1975 - March 1982 Allied Bolt 611 West Ainsworth Crane Co Pasco, WA 9301 Demming Pump Div February 1987 - May 1987 1453 Allen Road Salem, OH 44460 Asea Inc December 1975 - June 1986 Sweden April 1975 - July 1981 Crane Co Chemical Pump Div Bailey Meter Co Harrington Industry ial park 29801 Euclid Ave War rington, PA 18976 Wickliffe, OH 44092 November 1981 June 1979 Dis-Tran Products Inc.
B IF PO Box 7237 West Warwick Alexandria, LA 71301 Providence, RI July 1977 May 1975 - May 1978 Supplier - Limitorque Corp DeLaval Inc.
5114 Woodall Rd 853 Nottingham Way Lynchburg, VA PO Box 8788 Trenton, NJ 08650 Branch Instrument Co. March 1988 5500 4th Ave. S Seattle, WA 98108 DeLaval Turbine, Inc February 1980 Condenser 5 Filter Div.
Front Street Bronom Inst. Florence, NJ 08518 5500 4th Avenue 50 April 1977 - February 1981 Seattle, WA 98108 August 1978 DeLaval Tur bine Inc One Penn Plaza, 250 W 34th St Compressor Engineering Corp New York, NY 10001 5440 Alder September 1974 June 1975 Houston, TX 77081 March 1987
ATTACHMENT 2 Page 2 of 5 SAFETY RELATEO VENOORS (FASTEIQS) July 1988 Ecodyne/Graver Water Div GE Supply Co.
350 Sherman Ave 1928 West A Street Newark, NJ 07042 Pasco, Wa 99302 May 1978 June '1975 February 1978 Electro-Motive Div. General Electric General Motors Corp Industrial Sales Division Parts Sales Dept 112 Andover Park East La Grange, IL 60525 Seattle, WA 98188 January 1988 - June 1988 November 1975 Esco Corp General Electric PO Box 2583 Mobile Communications Div Spokane, WA 99220 Service Parts August 1981 PO Box 4164 Lynchburg, YA 24502 Fairbanks Morse Pump Div March 1978 - December 1986 3601 Fairbanks Ave Kansas City, KS 66110 Graybar Electric Co. Inc.
July 1981 - August 1985 West 1033 Gar dner Avenue Spokane, WA 99201 Familian Northwest July 1975 September 1975 223 N Benton Kennewick, WA Hayward Tyler Pump Co July 1978 November 1982 1170 Burnett Ave, Suite K Concord, CA 94520 Fasteners Inc June 1980 N 720 Fancher Road PO Box 3004 H.K. Porter Inc.
Spokane, WA 99220 2437 W. Fulton St.
December 1975 - September 1980 Chicago, ILL 60612 May 1976 Fasteners Inc.
400 W Moore H.K. Porter Co.
Walla Walla, WA 8315 SW Barbur Blvd August 1975 - January 1976 Portland, OR 97219 June 1978 - December 1978 Globe Metal Products Division U.S. Gypsum Co. Hilti Fastenings Systems Inc.
Rural Route 2 632 Cedar Pinckneyville, Ill 62274 Richland, WA 99352
- November 1975 June 1977 September 1975 Goulds Pumps Inc Inland Tool & Supply 240 Fall St 223 Rd 24 PO Box 330 Pasco, WA 99301 Seneca Falls, NY 13148 June 1977 March 1979 - June 1986
ATTACHMENT 2 Page 3 of 5 SAFETY RELATED VENDORS (FASTE S) July 1988 Ingrsoll Rand Co Limitorque Corp 10400 NW 13th Ave 2600 East Mira PO Box 1868 Lorna Way Vancouver, WA 98686 Anaheim, CA 92806 December 1985 June 1982 Ingersoll Rand Co MCC Powers, Inc.
227 Park Ave name changed to New York, NY 10017 Landis & Gyr Powers, Inc August 1976 1720 124th Ave NE Bellevue, HA 98005 Ingesoll Rand Co October 1985 - October 1987 Painted Post, NY
June 1978 July 1982 McMaster Carr Supply Co 9630 Norwalk Blvd Ingersoll Rand Co PO Box 54960 Phi lipsburg, NJ Santa Fe Springs, CA 90670 July 1975 - April 1981 October 1976 - April 1988 Inland Tool Monarch Machine 223 S 24th 410 South Oregon Pasco, WA 99301 Pasco, HA 99301 November 1978 September 1975 ITT Grinnell Midwest Bolt 8 Supply PO Box 4189 1685 NE 53rd Spokane, WA 99202 Des Moines, Iowa August 1982 July 1978 ITT Grinnel1 Milliore Corp E 909 Sprague 80 Ashby Rd Spokane, WA 99202 Bedford, MA 01780 October 1981 February 1982 April 1984 Kaman Sciences Corp Nash Engineering Co 1500 Garden of the Gods Rd PO Box 2466 PO Box 7463 Redmond, HA 98052 Colorado Springs, CO 80933 December 1986 - April 1987 May 1986 Nevada Nut 8 Bolt Inc Kansas City Bolt, Nut 8 Screw Co. 3650 West Russell Road 1324 Hest 12th Street Las Vegas, NV 89102 Kansas City, Md 64101 January 1981 - October 1982 November 1978 Northwest Controls Kennewi ck Industrial S. 26 Napa Str eet 113 E Columbia Drive Spokane, WA 99202 Kennewick, HA 99336 August 1980 August 1978 - January 1979
i ATTACHMENT 2 SAFETY RELATED VENDORS (FAST~S)
Page 4 of July 1988 5
Norton Corrosion Limited Ines The Marley Co 22327 89th Ave. PO Box 2912 Woodinvi lie, WA 98072 Mission, KS 66201 September 1972 April 1981 Pacific Valve The Marley Co 3201 Walnut Avenue c/o Olympia Engineered Sales Longbeach, Ca 90807 PO Box 549 November 1977 - July 1982 Bellevue, WA 98109 February 1978 March 1986 Platt Electric Supply Inc.
8300 Gage Blvd. Thompson Lighting Kennewick, WA 99336 901 Sibley Hwy April 1977 - June 1977 . St. Paul, MN 55118 October 1979 Portland Electric & Plumbing 114 S. Auburn Union Pump Co Kennewick, WA 99336 87 Capital Ave September 1981 Battle Creek, MI 49016 November 1984 - January 1985 Ray Bristow Co.
1819 SW Court Ave. Uni strut Pendelton, OR 97801
- April 14800 S. Marquar dt Avenue November 1976 1982 Santa Fe Springs, Ca 90670 August 1977 Safeway Supply Inc.
PO Box 3437 Uni strut East 1507 Sprague Avenue 733 South Fidalgo Spokane, WA 99220 Seattle, WA 98108 January 1979 - February 1979 May 1975 - August 1981 Sime Construction Co. Unistrut Northwest Service Center Box 6184 18401 Cascade South Kennewick, WA 99336 Southcenter Industrial Park October 1975 Seattle, WA 98188 February 1978 - October 1983 Southwestern Engineers Subsidiary of Tyler Corp Wallace & Tiernan Div PO Box 54940 300 120th NE Bldg 1, Suite 209 6111 E Bondini Blvd Bellevue, Wa 98005 Las Angeles, CA 90054 October 1979 February 1985 May 1986 Wallace & Treman Div St. Regi s Supply Pennwalt Corp Minneapolic & St. Paul Ave. 25 Main Street Tacoma, WA 98401 Bel 1 evil le, NJ 07129 February 1979 May 1975 - February 1985 Storey Electric Co. Wal worth Company 2780 S. Raritan Street PO Box 1009 Englewood, CO 80110 Paramount, Ca 90723 Januar y 1980 December 1981 March 1983
ATTACHMENT 2 Page 5 of 5 SAFETY RELATED VENDORS (FASTEIO51 July 1988 Wal worth Company 10190 Harwin Drive PO Box 297243 Houston, Tx 77036 Nay 1987 Walworth Greensburg, PA December 1979 - August 1982 Westinghouse 5901 SW Nacadah Ave Portland, OR 97210 June 1980 - December 1987 Westinghouse Electric 1019 Columbia Dr. SE Richland, WA 99352 Nay 1982 Worthington Pump Division c/o Mitchell Lewis 8 Staver 801 SE Alder Por tland, OR 97214 February 1988 Yakima Hardware Co. Inc.
226 S First Street Yakima, WA 98901 October 1977 Zurn Industrial Inc.
Cooling Tower Division Lincoln Center 5401 W Kennedy Blvd Tampa, FL 33609 August 1980
ATTACHMENT 3 COMMONLY USED BOLTING MATERIALS AT WNP-2 SA/A-193 GR 87 GR 88 SA/A-194 GR. 2H GR 4 GR 7 GR 8 SA/A-307 GR A GR 8 SA/A-320 GR L7 SA/A-325 (All types)
SA/A-354 GR BC SA/A-449 SA/A-490 SA/A-540 (All grades and classes)
SA/A-563 (All grades except "0")