ML19269C594: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:k
{{#Wiki_filter:k Public servlee company e onanmde P. O. Box 361, Pla tteville, Colorado 80651 January 26, 1979 Fo r t S t . Vrain Unit No. 1 P-79028 Mr. Themis P. Spels Advanced Reactors Branch Division of Project Management Nuclear Regulatory Commission Washington, D.C. 20555 Docket No. 50-267
        .
Public servlee company e onanmde P. O. Box 361, Pla tteville, Colorado 80651 January 26, 1979 Fo r t S t . Vrain Unit No. 1 P-79028 Mr. Themis P. Spels Advanced Reactors Branch Division of Project Management Nuclear Regulatory Commission Washington, D.C. 20555 Docket No. 50-267


==SUBJECT:==
==SUBJECT:==
Line 24: Line 22:


==Dear Mr. Speis:==
==Dear Mr. Speis:==
                                                              ,
Public Service Company of Colorado requests that the requirements for performance of Specification SR 5.2.13 - PCRV Concrete Helium Perreability Surveillance, and SR 5.2.14 - PCRV Liner Corrosion Sur-veillance, be waived during the first refueling at Fo r t S t . Vrain.
Public Service Company of Colorado requests that the requirements for performance of Specification SR 5.2.13 - PCRV Concrete Helium Perreability Surveillance, and SR 5.2.14 - PCRV Liner Corrosion Sur-veillance, be waived during the first refueling at Fo r t S t . Vrain.
Both of these tests are required to be performed at the end of the third year following initial power operation.
Both of these tests are required to be performed at the end of the third year following initial power operation.
Line 32: Line 29:
Your consideration of this request and your prompt reply will be appreciated.
Your consideration of this request and your prompt reply will be appreciated.
Very truly yours, M
Very truly yours, M
Don Warembourg                          O Manager, Nuclear Production DW/alk
Don Warembourg                          O Manager, Nuclear Production DW/alk 7902060IM}}
                                                                                #
7902060IM}}

Latest revision as of 19:09, 1 February 2020

Inservice Insp of Concrete Helium Permeability & Liner Corrosion Surveillance Will Be Delayed Until Second Refueling Outage
ML19269C594
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/26/1979
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Speis T
Office of Nuclear Reactor Regulation
References
P-79028, NUDOCS 7902060191
Download: ML19269C594 (1)


Text

k Public servlee company e onanmde P. O. Box 361, Pla tteville, Colorado 80651 January 26, 1979 Fo r t S t . Vrain Unit No. 1 P-79028 Mr. Themis P. Spels Advanced Reactors Branch Division of Project Management Nuclear Regulatory Commission Washington, D.C. 20555 Docket No. 50-267

SUBJECT:

In-Service Inspection of the Concrete Helium Permeability and Liner Corrosion Surveil-lances

Dear Mr. Speis:

Public Service Company of Colorado requests that the requirements for performance of Specification SR 5.2.13 - PCRV Concrete Helium Perreability Surveillance, and SR 5.2.14 - PCRV Liner Corrosion Sur-veillance, be waived during the first refueling at Fo r t S t . Vrain.

Both of these tests are required to be performed at the end of the third year following initial power operation.

In initially establishing the three year period following initial power operation, it was felt that the recctor would experience con-siderable operation at full power and that analysis af ter the three year pe-iod would be representative of a rather high neutron fluence.

Operation of the reactor since initial power operation in July,1976, has not exceeded 70% and the reactor has been shutdown for prolonged periods of time. Performance of these surveillance tests at this time will not provide representative base line data and certainly will not be representative of full power operation.

We are requesting, the re fo re , that performance of these tests be de-layed until the second refueling outage.

Your consideration of this request and your prompt reply will be appreciated.

Very truly yours, M

Don Warembourg O Manager, Nuclear Production DW/alk 7902060IM