ML19340E252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:_          _          ._
{{#Wiki_filter:_          _          ._
__
m
m
          >
                   .t*
                   .t*
                     ., \
                     ., \
Line 29: Line 27:
: c.        a    .;
: c.        a    .;
                   'A                                                        C          Totroo s                                                              o EDISON
                   'A                                                        C          Totroo s                                                              o EDISON
                   -i January 2,p1981                                                          L81-005 FILE: RR 2 (NP-33-80-115)
                   -i January 2,p1981                                                          L81-005 FILE: RR 2 (NP-33-80-115) j, '
                              ,
j, '
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137


Line 38: Line 34:
Reportabic Occurrence 80-090 Davis-Besse Nuclear Power Station Unit 1 Date of Occurrence: December 5, 1980 Enclosed are three copies of Licensee Event Report 80-090 with a supplemental infor-mation sheet which is being submitted in accordance with Technical Specification 6.9 to provide 30 day written notification of the subject occurrence.
Reportabic Occurrence 80-090 Davis-Besse Nuclear Power Station Unit 1 Date of Occurrence: December 5, 1980 Enclosed are three copies of Licensee Event Report 80-090 with a supplemental infor-mation sheet which is being submitted in accordance with Technical Specification 6.9 to provide 30 day written notification of the subject occurrence.
Yours truly, Tm D M Terry D. Murray                                                          -
Yours truly, Tm D M Terry D. Murray                                                          -
Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Enclosure cc:    Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Enc 1:      30 copica Mr. Norman llaller, Director Office of Management Program Analysis
Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Enclosure cc:    Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Enc 1:      30 copica Mr. Norman llaller, Director Office of Management Program Analysis Enc 1: 3 copics N
                                                            '
Enc 1: 3 copics N
Mr. Luis Reyes NRC Resident Inspector f
Mr. Luis Reyes NRC Resident Inspector f
                                                            ,
Enc 1: 1 copy                                  .
Enc 1: 1 copy                                  .
                                                            .
9 l
9 l
3 4
3 4
EDISON PLAZA
EDISON PLAZA
* 300 MADISON AVENUE    TOLEDO. OHIO 43652 THE TOLEDO EDISON COMP /NY 8101060
* 300 MADISON AVENUE    TOLEDO. OHIO 43652 THE TOLEDO EDISON COMP /NY 8101060 3
* 3 I
I 749        -
<
749        -
a}}
a}}

Latest revision as of 10:19, 31 January 2020

Forwards LER 80-090/03L-0
ML19340E252
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/02/1981
From: Jenny Murray, Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19340E253 List:
References
L81-005, L81-5, TAC-43253, NUDOCS 8101060749
Download: ML19340E252 (1)


Text

_ _ ._

m

.t*

., \

c

. w.

'-l -

$y

c. a .;

'A C Totroo s o EDISON

-i January 2,p1981 L81-005 FILE: RR 2 (NP-33-80-115) j, '

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reportabic Occurrence 80-090 Davis-Besse Nuclear Power Station Unit 1 Date of Occurrence: December 5, 1980 Enclosed are three copies of Licensee Event Report 80-090 with a supplemental infor-mation sheet which is being submitted in accordance with Technical Specification 6.9 to provide 30 day written notification of the subject occurrence.

Yours truly, Tm D M Terry D. Murray -

Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Enclosure cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Enc 1: 30 copica Mr. Norman llaller, Director Office of Management Program Analysis Enc 1: 3 copics N

Mr. Luis Reyes NRC Resident Inspector f

Enc 1: 1 copy .

9 l

3 4

EDISON PLAZA

  • 300 MADISON AVENUE TOLEDO. OHIO 43652 THE TOLEDO EDISON COMP /NY 8101060 3

I 749 -

a