ML19209C119: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Tl C. . . -s TOLEDO Septembet 20, 1979 EDISDN Docket No. 50-346 License No. NPF-3 Serial No. 1-92 Mr. A. B. Davis, Chief Fuel Facilities and Safety Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
{{#Wiki_filter:...-
Tl C s
TOLEDO Septembet 20, 1979 EDISDN Docket No. 50-346 License No. NPF-3 Serial No. 1-92 Mr. A. B. Davis, Chief Fuel Facilities and Safety Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137


==Dear Mr. Davis:==
==Dear Mr. Davis:==
Line 22: Line 24:
Toledo Edison acknowledges receipt of your September 5, 1979 letter and report enclosure 79-16, referencing an apparent item of noncompliance to Davis-Besse Nuclear Power Station Unit No.1 commitment to the NRC listed as an " Infraction" under the heading of " Notice of Violation".
Toledo Edison acknowledges receipt of your September 5, 1979 letter and report enclosure 79-16, referencing an apparent item of noncompliance to Davis-Besse Nuclear Power Station Unit No.1 commitment to the NRC listed as an " Infraction" under the heading of " Notice of Violation".
Following a thorough examination of this item, Toledo Edison herein offers information regarding the item of noncompliance.
Following a thorough examination of this item, Toledo Edison herein offers information regarding the item of noncompliance.
Infraction: Technical Specification 6.8.2 requires that procedures, includ-ing the applicable procedures recommended in Appendix "A" of Regulatory Guide'l.33, be reviewed by the SRB and approved by the Station Superintendent prior to implementation. Appendix"A" of Regulatory Gr ide 1.33 lists the solid radwaste system as an activity which should be covered by written procedures.
Infraction: Technical Specification 6.8.2 requires that procedures, includ-ing the applicable procedures recommended in Appendix "A" of Regulatory Guide'l.33, be reviewed by the SRB and approved by the Station Superintendent prior to implementation. Appendix "A" of Regulatory Gr ide 1.33 lists the solid radwaste system as an activity which should be covered by written procedures.
Contrary to the above, the procedures for operation of a port-able radwaste solidification system, in use on numerous occasions during 1978 and 1979 to date, had not been reviewed by the SRB and approved by the Stat *;n Superintendent.
Contrary to the above, the procedures for operation of a port-able radwaste solidification system, in use on numerous occasions during 1978 and 1979 to date, had not been reviewed by the SRB and approved by the Stat *;n Superintendent.
Response: 1.Regulatory Guide 1.33, Appendix A, Section 7.b(1) specif-ically lists " spent resins and filter sludge" on " solid waste system".
Response:       1. Regulatory Guide 1.33, Appendix A, Section 7.b(1) specif-ically lists " spent resins and filter sludge" on " solid waste system". The type of material solidified was evaporator bottoms and the procedure was not reviewed by the SRB. On August 7, 1979, the SRB changed the classification of Procedure SP 1104.28 (Solid Radwaste Disposal) so that it will be reviewed by the SRB.
The type of material solidified was evaporator bottoms and the procedure was not reviewed by the SRB. On August 7, 1979, the SRB changed the classification of Procedure SP 1104.28 (Solid Radwaste Disposal) so that it will be reviewed by the SRB.
: 2. On September 4, 1979, a major modification to SP 1104.28 was prepared which included the vendor's procedure for solidification received by the Station on August 29, 1979.
2.On September 4, 1979, a major modification to SP 1104.28 was prepared which included the vendor's procedure for solidification received by the Station on August 29, 1979.
-                          The revised procedure was submitted to the SRB for review.
The revised procedure was submitted to the SRB for review.
1129 021 THE TOLEDO EDISON COMPANY     EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 SEP 26 IS79 M   g-)
-1129 021 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 SEP 26 IS79 M-)g
 
....Mr. A. B. Davis, Chief Docket No. 50-346
.
, Serial No. 1-92 September 20, 1979 Page 2 3.The revised procedure is expected to bt; reviewed by the SRB and approved by the Station Superintendent by September 28, 1979.Yours very truly, f/h : - -Richard P. Crouse Vice-President, Energy Supply TDM/DWB/ daw
                                      .
-(flL-1129 022}}
.
          .
Mr. A. B. Davis, Chief Docket No. 50-346                                           ,
Serial No. 1-92 September 20, 1979 Page 2
: 3. The revised procedure is expected to bt; reviewed by the SRB and approved by the Station Superintendent by September 28, 1979.
Yours very truly, f/h : - -
Richard P. Crouse Vice-President, Energy Supply TDM/DWB/ daw
  -
(
f l
L-1129 022}}

Revision as of 13:37, 19 October 2019

Responds to NRC 790905 Ltr Re Violation Noted in IE Insp Rept 50-346/79-16.Corrective Actions:Major Mod to Solid Radwaste Disposal Was Prepared & Submitted for Review
ML19209C119
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/20/1979
From: Crouse R
TOLEDO EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-92, NUDOCS 7910110728
Download: ML19209C119 (2)


Text

...-

Tl C s

TOLEDO Septembet 20, 1979 EDISDN Docket No. 50-346 License No. NPF-3 Serial No. 1-92 Mr. A. B. Davis, Chief Fuel Facilities and Safety Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Davis:

Toledo Edison acknowledges receipt of your September 5, 1979 letter and report enclosure 79-16, referencing an apparent item of noncompliance to Davis-Besse Nuclear Power Station Unit No.1 commitment to the NRC listed as an " Infraction" under the heading of " Notice of Violation".

Following a thorough examination of this item, Toledo Edison herein offers information regarding the item of noncompliance.

Infraction: Technical Specification 6.8.2 requires that procedures, includ-ing the applicable procedures recommended in Appendix "A" of Regulatory Guide'l.33, be reviewed by the SRB and approved by the Station Superintendent prior to implementation. Appendix "A" of Regulatory Gr ide 1.33 lists the solid radwaste system as an activity which should be covered by written procedures.

Contrary to the above, the procedures for operation of a port-able radwaste solidification system, in use on numerous occasions during 1978 and 1979 to date, had not been reviewed by the SRB and approved by the Stat *;n Superintendent.

Response: 1. Regulatory Guide 1.33, Appendix A, Section 7.b(1) specif-ically lists " spent resins and filter sludge" on " solid waste system". The type of material solidified was evaporator bottoms and the procedure was not reviewed by the SRB. On August 7, 1979, the SRB changed the classification of Procedure SP 1104.28 (Solid Radwaste Disposal) so that it will be reviewed by the SRB.

2. On September 4, 1979, a major modification to SP 1104.28 was prepared which included the vendor's procedure for solidification received by the Station on August 29, 1979.

- The revised procedure was submitted to the SRB for review.

1129 021 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 SEP 26 IS79 M g-)

.

.

.

.

Mr. A. B. Davis, Chief Docket No. 50-346 ,

Serial No. 1-92 September 20, 1979 Page 2

3. The revised procedure is expected to bt; reviewed by the SRB and approved by the Station Superintendent by September 28, 1979.

Yours very truly, f/h : - -

Richard P. Crouse Vice-President, Energy Supply TDM/DWB/ daw

-

(

f l

L-1129 022