ML17285B232: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000397/1989006]]


=Text=
=Text=
{{#Wiki_filter:.ACCELERATOR)
{{#Wiki_filter:.ACCELERATOR)
DISHUBUTION
DISHUBUTION DEMONST$&TION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)ESSION NBR:9005020002 DOC.DATE: 90/04/25 NOTARIZED:
DEMONST$&TION SYSTEM REGULATORY
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION BOUCHEY,G.D.
INFORMATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)
DISTRXBUTION
 
SYSTEM (RXDS)ESSION NBR:9005020002
==SUBJECT:==
DOC.DATE: 90/04/25 NOTARIZED:
Provides addi response to violations noted in Insp Repts 50-397/89-06
NO FACIL:50-397
WPPSS Nuclear Project, Unit 2, Washington
Public Powe AUTH.NAME AUTHOR AFFILIATION
BOUCHEY,G.D.
Washington
Public Power Supply System RECIP.NAME
RECIPIENT AFFILIATXON
Document Control Branch (Document Control Desk)SUBJECT: Provides addi response to violations
noted in Insp Repts 50-397/89-06
&50-397/89-17.
&50-397/89-17.
DISTRIBUTION
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: DOCKET 05000397 RECIPXENT ID CODE/NAME PD5 PD INTERNAL ACRS AEOD/DEXIB DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9 D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RES/DSR/HFB/HFS RNAL: LPDR NSIC COPIES LTTR ENCL 2 1 1 1 1 1 1 1.1 1 1 RECIPIENT XD CODE/NAME SAMWORTH,R AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/ILRB12 OE D~RE G FI!TW'RC PDR COPIES LTTR ENCL NOIR TO ALL"RIDS" RECIPIEKIS:
CODE: IE01D COPIES RECEIVED:LTR
P~HELP US TO REDUCE WASIZl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISHUBUTION TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 April 25, 1990 G02-90-080 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.Gentlemen:
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
 
of Violation Response NOTES: DOCKET 05000397 RECIPXENT ID CODE/NAME PD5 PD INTERNAL ACRS AEOD/DEXIB
==Subject:==
DEDRO NRR/DLPQ/LPEB10
 
NRR/DREP/PEPB9
==Reference:==
D NRR/DST/DIR
 
8E2 NUDOCS-ABSTRACT
1)2)NUCLEAR PLANT NO.2, LICENSE NO.NPF-21 NRC INSPECTION REPORTS 89-06 AND 89-17 ADDITIONAL RESPONSE TO NOTICES OF VIOLATION Letter, G02-89-202, GD Bouchey (SS)to NRC nNRC Inspection Reports 89-06 and 89-13", dated October 31, 1989'Letter, G02-89-147, GD Bouchey (SS)to NRC"NRC Inspec'tion Report 89-17", dated August 29, 1989 The purpose of this letter is to provide revised scheduled completion dates for commitments made in response to Notices of Violation (NOVs)89-06 and 89-17.The reason for the revised schedule is that completing the commitments has taken longer than was originally anticipated.
OGC/HDS2 RES/DSR/HFB/HFS
In Reference 1), the Supply System provided a revised schedule for the complete review of work practices, including any necessary changes required.In the letter it was stated that formal changes to the process would be accomplished by February 1, 1990.Although the changes to Plant Procedure (PPM)1.3.7,"Maintenance Work Request", have been made, this procedure will not be implemented until after the upcoming maintenance and refueling outage, which is currently scheduled from April 20, 1990 to June 3, 1990.Accordingly, it is now anticipated that the procedure will be implemented by August 1, 1990.'s'005020002 5'00425 F DR AOOCK 0bt.t00397 Poi-}}
RNAL: LPDR NSIC COPIES LTTR ENCL 2 1 1 1 1 1 1 1.1 1 1 RECIPIENT XD CODE/NAME SAMWORTH,R
AEOD AEOD/TPAD NRR SHANKMAN,S
NRR/DOEA DIR 11 NRR/DRIS/DIR
NRR/PMAS/ILRB12
OE D~RE G FI!TW'RC PDR COPIES LTTR ENCL NOIR TO ALL"RIDS" RECIPIEKIS:
P~HELP US TO REDUCE WASIZl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISHUBUTION
TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL  
WASHINGTON
PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington
Way~Richland, Washington
99352 April 25, 1990 G02-90-080
Docket No.50-397 U.S.Nuclear Regulatory
Commission
Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.Gentlemen:
Subject: Reference:
1)2)NUCLEAR PLANT NO.2, LICENSE NO.NPF-21 NRC INSPECTION
REPORTS 89-06 AND 89-17 ADDITIONAL
RESPONSE TO NOTICES OF VIOLATION Letter, G02-89-202, GD Bouchey (SS)to NRC nNRC Inspection
Reports 89-06 and 89-13", dated October 31, 1989'Letter, G02-89-147, GD Bouchey (SS)to NRC"NRC Inspec'tion
Report 89-17", dated August 29, 1989 The purpose of this letter is to provide revised scheduled completion
dates for commitments
made in response to Notices of Violation (NOVs)89-06 and 89-17.The reason for the revised schedule is that completing
the commitments
has taken longer than was originally
anticipated.
In Reference 1), the Supply System provided a revised schedule for the complete review of work practices, including any necessary changes required.In the letter it was stated that formal changes to the process would be accomplished
by February 1, 1990.Although the changes to Plant Procedure (PPM)1.3.7,"Maintenance
Work Request", have been made, this procedure will not be implemented
until after the upcoming maintenance
and refueling outage, which is currently scheduled from April 20, 1990 to June 3, 1990.Accordingly, it is now anticipated
that the procedure will be implemented
by August 1, 1990.'s'005020002
5'00425 F DR AOOCK 0bt.t00397
Poi-
}}

Revision as of 13:11, 17 August 2019

Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17
ML17285B232
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/25/1990
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-080, GO2-90-80, NUDOCS 9005020002
Download: ML17285B232 (3)


Text

.ACCELERATOR)

DISHUBUTION DEMONST$&TION SYSTEM REGULATORY INFORMATION DISTRXBUTION SYSTEM (RXDS)ESSION NBR:9005020002 DOC.DATE: 90/04/25 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION BOUCHEY,G.D.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON Document Control Branch (Document Control Desk)

SUBJECT:

Provides addi response to violations noted in Insp Repts 50-397/89-06

&50-397/89-17.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: DOCKET 05000397 RECIPXENT ID CODE/NAME PD5 PD INTERNAL ACRS AEOD/DEXIB DEDRO NRR/DLPQ/LPEB10 NRR/DREP/PEPB9 D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RES/DSR/HFB/HFS RNAL: LPDR NSIC COPIES LTTR ENCL 2 1 1 1 1 1 1 1.1 1 1 RECIPIENT XD CODE/NAME SAMWORTH,R AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/ILRB12 OE D~RE G FI!TW'RC PDR COPIES LTTR ENCL NOIR TO ALL"RIDS" RECIPIEKIS:

P~HELP US TO REDUCE WASIZl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISHUBUTION TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 April 25, 1990 G02-90-080 Docket No.50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.Gentlemen:

Subject:

Reference:

1)2)NUCLEAR PLANT NO.2, LICENSE NO.NPF-21 NRC INSPECTION REPORTS 89-06 AND 89-17 ADDITIONAL RESPONSE TO NOTICES OF VIOLATION Letter, G02-89-202, GD Bouchey (SS)to NRC nNRC Inspection Reports 89-06 and 89-13", dated October 31, 1989'Letter, G02-89-147, GD Bouchey (SS)to NRC"NRC Inspec'tion Report 89-17", dated August 29, 1989 The purpose of this letter is to provide revised scheduled completion dates for commitments made in response to Notices of Violation (NOVs)89-06 and 89-17.The reason for the revised schedule is that completing the commitments has taken longer than was originally anticipated.

In Reference 1), the Supply System provided a revised schedule for the complete review of work practices, including any necessary changes required.In the letter it was stated that formal changes to the process would be accomplished by February 1, 1990.Although the changes to Plant Procedure (PPM)1.3.7,"Maintenance Work Request", have been made, this procedure will not be implemented until after the upcoming maintenance and refueling outage, which is currently scheduled from April 20, 1990 to June 3, 1990.Accordingly, it is now anticipated that the procedure will be implemented by August 1, 1990.'s'005020002 5'00425 F DR AOOCK 0bt.t00397 Poi-