| issue date = 04/25/1990
| issue date = 04/25/1990
| title = Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17
| title = Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17
| author name = BOUCHEY G D
| author name = Bouchey G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 00:18, 19 June 2019

Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17
ML17285B232
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/25/1990
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-90-080, GO2-90-80, NUDOCS 9005020002
Download: ML17285B232 (3)


See also: IR 05000397/1989006

Text

.ACCELERATOR)

DISHUBUTION

DEMONST$&TION SYSTEM REGULATORY

INFORMATION

DISTRXBUTION

SYSTEM (RXDS)ESSION NBR:9005020002

DOC.DATE: 90/04/25 NOTARIZED:

NO FACIL:50-397

WPPSS Nuclear Project, Unit 2, Washington

Public Powe AUTH.NAME AUTHOR AFFILIATION

BOUCHEY,G.D.

Washington

Public Power Supply System RECIP.NAME

RECIPIENT AFFILIATXON

Document Control Branch (Document Control Desk)SUBJECT: Provides addi response to violations

noted in Insp Repts 50-397/89-06

&50-397/89-17.

DISTRIBUTION

CODE: IE01D COPIES RECEIVED:LTR

ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation Response NOTES: DOCKET 05000397 RECIPXENT ID CODE/NAME PD5 PD INTERNAL ACRS AEOD/DEXIB

DEDRO NRR/DLPQ/LPEB10

NRR/DREP/PEPB9

D NRR/DST/DIR

8E2 NUDOCS-ABSTRACT

OGC/HDS2 RES/DSR/HFB/HFS

RNAL: LPDR NSIC COPIES LTTR ENCL 2 1 1 1 1 1 1 1.1 1 1 RECIPIENT XD CODE/NAME SAMWORTH,R

AEOD AEOD/TPAD NRR SHANKMAN,S

NRR/DOEA DIR 11 NRR/DRIS/DIR

NRR/PMAS/ILRB12

OE D~RE G FI!TW'RC PDR COPIES LTTR ENCL NOIR TO ALL"RIDS" RECIPIEKIS:

P~HELP US TO REDUCE WASIZl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISHUBUTION

TAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL

WASHINGTON

PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington

Way~Richland, Washington

99352 April 25, 1990 G02-90-080

Docket No.50-397 U.S.Nuclear Regulatory

Commission

Attn: Document Control Desk Mail Station Pl-137 Washington, D.C.Gentlemen:

Subject: Reference:

1)2)NUCLEAR PLANT NO.2, LICENSE NO.NPF-21 NRC INSPECTION

REPORTS 89-06 AND 89-17 ADDITIONAL

RESPONSE TO NOTICES OF VIOLATION Letter, G02-89-202, GD Bouchey (SS)to NRC nNRC Inspection

Reports 89-06 and 89-13", dated October 31, 1989'Letter, G02-89-147, GD Bouchey (SS)to NRC"NRC Inspec'tion

Report 89-17", dated August 29, 1989 The purpose of this letter is to provide revised scheduled completion

dates for commitments

made in response to Notices of Violation (NOVs)89-06 and 89-17.The reason for the revised schedule is that completing

the commitments

has taken longer than was originally

anticipated.

In Reference 1), the Supply System provided a revised schedule for the complete review of work practices, including any necessary changes required.In the letter it was stated that formal changes to the process would be accomplished

by February 1, 1990.Although the changes to Plant Procedure (PPM)1.3.7,"Maintenance

Work Request", have been made, this procedure will not be implemented

until after the upcoming maintenance

and refueling outage, which is currently scheduled from April 20, 1990 to June 3, 1990.Accordingly, it is now anticipated

that the procedure will be implemented

by August 1, 1990.'s'005020002

5'00425 F DR AOOCK 0bt.t00397

Poi-