ML19320A986: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:~                              --
{{#Wiki_filter:~                              --
                          ,
5      *
5      *
: y.  --
: y.  --
              .  ,
1                              punne service company e ceItende 16805 ROAD 19%
1                              punne service company e ceItende 16805 ROAD 19%
                              -
PLATTEVILLE, COLOR ADO 80651
PLATTEVILLE, COLOR ADO 80651
,                                                        June 19, 1980 Fort St. Vrain Unit No. 1 P-80165 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive
,                                                        June 19, 1980 Fort St. Vrain Unit No. 1 P-80165 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive
Line 36: Line 33:
Enclosed please find a copy of Reportable Occurrence Report No. 50-267/
Enclosed please find a copy of Reportable Occurrence Report No. 50-267/
80-26, Preliminary, submitted per the requirements of Technical Specifi-cation' AC 7.5.2(b)1 and AC 7.5.2(b)2.
80-26, Preliminary, submitted per the requirements of Technical Specifi-cation' AC 7.5.2(b)1 and AC 7.5.2(b)2.
Also, please find enclosed one copy of the Licensee Event Report for
Also, please find enclosed one copy of the Licensee Event Report for Reportable Occurrence Report No. 502267/80-26.
                                                  -
Reportable Occurrence Report No. 502267/80-26.
Very truly yours,
Very truly yours,
                                                                 +    W Don Warembourg            /                                                  I Manager, Nuclear Production DW/cls Enclosure                                                                                                            ,
                                                                 +    W Don Warembourg            /                                                  I Manager, Nuclear Production DW/cls Enclosure                                                                                                            ,
l cc: Director, MIPC                                                                                                  1
l cc: Director, MIPC                                                                                                  1 80070809                                    y or    -                                  -
<-
                                                                                                                                        ,
80070809                                    y or    -                                  -
y  w  --yyp  >r  -- w-- a-r v  -9y w e- y-p- =%g y 9 - ,- ,- t w9- ew--r+*4-e--
y  w  --yyp  >r  -- w-- a-r v  -9y w e- y-p- =%g y 9 - ,- ,- t w9- ew--r+*4-e--


   . w_
   . w_
.
           =
           =
* e         *
e
      .
* OCCURRENCE REPORT DISTRIBUTION Number of Copies De pa r t men t o f E ne r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -      1  (P Letter)
.
OCCURRENCE REPORT DISTRIBUTION Number of Copies De pa r t men t o f E ne r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -      1  (P Letter)
San Francisco Operations Office Attn: California Patent Group 1333 Broadway Oakland, California 94612 De pa r t me n t o f E ne r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    1  (P Letter)
San Francisco Operations Office Attn: California Patent Group 1333 Broadway Oakland, California 94612 De pa r t me n t o f E ne r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    1  (P Letter)
Office of Nuclear Engineering Programs Washington, D.C. 20545 De p a r t men t o f Ene r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -      1  (P Letter)
Office of Nuclear Engineering Programs Washington, D.C. 20545 De p a r t men t o f Ene r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -      1  (P Letter)
Line 65: Line 54:
NRC Resident Site inspector      --------------------------                                    1  (P Letter, LER)
NRC Resident Site inspector      --------------------------                                    1  (P Letter, LER)


                                                                                  ,
.    .
j  ".  ,
j  ".  ,
REPORT DATE:              June 19,1980              REPORTABLE OCCURRENCE 80-26 ISSUE O OCCURRENCE DATE:          May 24, 1980              Page 1 of 4 FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 191/2 PLATTEVILLE, COLORADO 80651 REPORT No. 50-267/80-26/03-L-0 Preliminary i
REPORT DATE:              June 19,1980              REPORTABLE OCCURRENCE 80-26 ISSUE O OCCURRENCE DATE:          May 24, 1980              Page 1 of 4 FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 191/2 PLATTEVILLE, COLORADO 80651 REPORT No. 50-267/80-26/03-L-0 Preliminary i
IDENTIFICATION OF                                                                ;
IDENTIFICATION OF                                                                ;
OCCURRENCE:
OCCURRENCE:
l
l During performance of the monthly check of the helium circulator seal mal-function pressure differential switches. it was discovered that eight of twelve switch units tripped outside the limits specified in LCO 4.4.1, Table 4.4-3.
                                                                                          '
During performance of the monthly check of the helium circulator seal mal-function pressure differential switches. it was discovered that eight of twelve switch units tripped outside the limits specified in LCO 4.4.1, Table 4.4-3.
This is reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)1 and AC 7.5.2(b)2.
This is reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)1 and AC 7.5.2(b)2.
EVENT DESCRIPTION:
EVENT DESCRIPTION:
Line 85: Line 70:
m                    ,
m                    ,


                                                                                      ,
    .    .
        *
    .
          *
      .
  ..        .
REPORTABLE OCCURRENCE 80-26
REPORTABLE OCCURRENCE 80-26
               .                                                ISSUE O Page 2 of 4 CAUSE DESCRIPTION:-
               .                                                ISSUE O Page 2 of 4 CAUSE DESCRIPTION:-
Line 100: Line 78:
The investigation of the problem associated with the helium circulator seal malfuction trip switches has been completed, and Public Service Company Nuclear Project Department is proceeding on a path to replace the existing eq uipment.
The investigation of the problem associated with the helium circulator seal malfuction trip switches has been completed, and Public Service Company Nuclear Project Department is proceeding on a path to replace the existing eq uipment.
I l
I l
!
!
                                                                                        .


                                                             ~
                                                             ~
                                                                                      ,
      .  .
             ~
             ~
      ,
         'd REPORTABLE OCCURRENCE 80-26 ISSUE O Page 4 of 4-Prepared By:        22J.
         'd
    .        .
REPORTABLE OCCURRENCE 80-26 ISSUE O Page 4 of 4-
                                                                                .
Prepared By:        22J.
Asa B. Reed Technical Services Technician Reviewed By:    /    f
Asa B. Reed Technical Services Technician Reviewed By:    /    f
                           /e.T chnical W. 'Gahm Services  Supervisor Reviewed By:
                           /e.T chnical W. 'Gahm Services  Supervisor Reviewed By:
Frank M. Mathie Operations Manager Approved By:      4      Wm M Don Warembourg            f7 Manager, Nuclear Production i
Frank M. Mathie Operations Manager Approved By:      4      Wm M Don Warembourg            f7 Manager, Nuclear Production i
,
  .
l-
l-
_,  .,.          -        --


                                                                                      ,
  .    <
y *e
y *e
;c        .
;c        .
                                        -
REPORTABLE OCCURRE!!CE 80-26 ISSUE O Page 3 of 4 TABLE 1 As Found Inches H2O      As Lef t Inches 1120 Increasing  Decreasing  Increasing    Decreasing Trip Point  Trip Point  Trip Point    Trip Point 1A Circulator  PDIS-21149  +77          -9          +77            -9 PDIS-21151  +75          -15 @        +75            -6 PDIS-21153  +74          -19 @        +74            -5 1B Circulator . PDIS-21155  +88 h        -20 h        +77            -6 PDIS-21157  +74                      +74
REPORTABLE OCCURRE!!CE 80-26 ISSUE O Page 3 of 4 TABLE 1 As Found Inches H2O      As Lef t Inches 1120 Increasing  Decreasing  Increasing    Decreasing Trip Point  Trip Point  Trip Point    Trip Point 1A Circulator  PDIS-21149  +77          -9          +77            -9 PDIS-21151  +75          -15 @        +75            -6 PDIS-21153  +74          -19 @        +74            -5 1B Circulator . PDIS-21155  +88 h        -20 h        +77            -6 PDIS-21157  +74                      +74
                                                       -23 @                      -6 PDIS-21159  +92 h        -8          +74            -8 1C Circulator  PDIS-21150  +76          -13h        +76            -6 PDIS-21152  +74          -12 @        +74            -6 PDIS-21154  +75          -5          +75            -5 1D Circulator  PDIS-21156  +74                      +74
                                                       -23 @                      -6 PDIS-21159  +92 h        -8          +74            -8 1C Circulator  PDIS-21150  +76          -13h        +76            -6 PDIS-21152  +74          -12 @        +74            -6 PDIS-21154  +75          -5          +75            -5 1D Circulator  PDIS-21156  +74                      +74
                                                       -28 @                      -3 PDIS-21158    +74          -7          +74            -7 P DIS-21160  +75          -8          +75            -8
                                                       -28 @                      -3 PDIS-21158    +74          -7          +74            -7 P DIS-21160  +75          -8          +75            -8
             @ Denotes switches which were cut of tolerance.}}
             @ Denotes switches which were cut of tolerance.}}

Latest revision as of 05:04, 1 February 2020

Forwards LER 80-026/03L-0
ML19320A986
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/19/1980
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Seyfritt K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19320A987 List:
References
NUDOCS 8007080422
Download: ML19320A986 (6)


Text

~ --

5 *

y. --

1 punne service company e ceItende 16805 ROAD 19%

PLATTEVILLE, COLOR ADO 80651

, June 19, 1980 Fort St. Vrain Unit No. 1 P-80165 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive

=

Suite 1000 Arlington, Texas- 76012

Reference:

Facility Operating License No. DPR-34 Docket No. 50-267 i

Dear Mr. Seyfrit:

Enclosed please find a copy of Reportable Occurrence Report No. 50-267/

80-26, Preliminary, submitted per the requirements of Technical Specifi-cation' AC 7.5.2(b)1 and AC 7.5.2(b)2.

Also, please find enclosed one copy of the Licensee Event Report for Reportable Occurrence Report No. 502267/80-26.

Very truly yours,

+ W Don Warembourg / I Manager, Nuclear Production DW/cls Enclosure ,

l cc: Director, MIPC 1 80070809 y or - -

y w --yyp >r -- w-- a-r v -9y w e- y-p- =%g y 9 - ,- ,- t w9- ew--r+*4-e--

. w_

=

e

  • OCCURRENCE REPORT DISTRIBUTION Number of Copies De pa r t men t o f E ne r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

San Francisco Operations Office Attn: California Patent Group 1333 Broadway Oakland, California 94612 De pa r t me n t o f E ne r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Office of Nuclear Engineering Programs Washington, D.C. 20545 De p a r t men t o f Ene r gy - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Mr. Glen A. Newby, Chief HTR Branch ,

Division of Nuclear Power Development Mail Station B-107 Washington, D.C. 20545 De p a r t me n t o ' Ene r gy - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Attn: Senior Program Coordinator P. O. Box 81325 San Diego, California 92138 Mr. Karl V. Seyf rit. Director ------------------------- l

( 1 (Original of P Letter Region IV .

and Copy of LER)

Of fice of Inspection and Enforcement Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Di r e c to r - - - - - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - 1 (P Letter, LER)

Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 W. Bushnell, Site Manager - -------------------------- 10 (Original of FPLC Letter General Atomic Company plus Two Copics, One P. O. Box 426 Copy of P Lettr . , One Platteville, Colorado 80651 Copy of LER)

NRC Resident Site inspector -------------------------- 1 (P Letter, LER)

j ". ,

REPORT DATE: June 19,1980 REPORTABLE OCCURRENCE 80-26 ISSUE O OCCURRENCE DATE: May 24, 1980 Page 1 of 4 FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 191/2 PLATTEVILLE, COLORADO 80651 REPORT No. 50-267/80-26/03-L-0 Preliminary i

IDENTIFICATION OF  ;

OCCURRENCE:

l During performance of the monthly check of the helium circulator seal mal-function pressure differential switches. it was discovered that eight of twelve switch units tripped outside the limits specified in LCO 4.4.1, Table 4.4-3.

This is reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)1 and AC 7.5.2(b)2.

EVENT DESCRIPTION:

During normal plant operation, instrument personnel performed the circulator i seal malfunction (buffer-mid-buffer) switch operability check. The switches are normally calibrated on an annual basis; however, due to the problems cited in the previous reports as listed on the LER, a check of buffer-mid-buffer trip settings on a monthly basis has been undertaken as an interim measure to test operability.

There are twelve buffer-mid-buffer switch units, three per circulator. Each switch unit contains two electrical switches. The range of the sensing ele-ment is from (-) 100 inches of water to zero to (+) 100 inches of water.

One of the electrical switches in each unit must operate at greater than or equal to (-) 10 inches water (negative buffer-mid-buffer), and the other electrical switch must operate at less than or equal to (+) 80 inches water (positive buffer-mid-buffer) per Table 4.4-3.

The trip settings for the twelve switches - are listed in Table 1.

The. switch settings, which were found to be less conservative than those established by the Technical Specification did not prevent the fulfillment i of the functional requirements of the system. '

l l

l 1

m ,

REPORTABLE OCCURRENCE 80-26

. ISSUE O Page 2 of 4 CAUSE DESCRIPTION:-

Dirt buildup and accumulation in the electrical switches prevented them from making proper contact.

CORRECTIVE ACTION:

The trip settings of the electrical switches were re-adjusted to the proper trip points.

Due to the continuing problems being experienced with the electrical switches, the interim check of the trip settings is being conducted on a monthly basis.

The investigation of the problem associated with the helium circulator seal malfuction trip switches has been completed, and Public Service Company Nuclear Project Department is proceeding on a path to replace the existing eq uipment.

I l

~

~

'd REPORTABLE OCCURRENCE 80-26 ISSUE O Page 4 of 4-Prepared By: 22J.

Asa B. Reed Technical Services Technician Reviewed By: / f

/e.T chnical W. 'Gahm Services Supervisor Reviewed By:

Frank M. Mathie Operations Manager Approved By: 4 Wm M Don Warembourg f7 Manager, Nuclear Production i

l-

y *e

c .

REPORTABLE OCCURRE!!CE 80-26 ISSUE O Page 3 of 4 TABLE 1 As Found Inches H2O As Lef t Inches 1120 Increasing Decreasing Increasing Decreasing Trip Point Trip Point Trip Point Trip Point 1A Circulator PDIS-21149 +77 -9 +77 -9 PDIS-21151 +75 -15 @ +75 -6 PDIS-21153 +74 -19 @ +74 -5 1B Circulator . PDIS-21155 +88 h -20 h +77 -6 PDIS-21157 +74 +74

-23 @ -6 PDIS-21159 +92 h -8 +74 -8 1C Circulator PDIS-21150 +76 -13h +76 -6 PDIS-21152 +74 -12 @ +74 -6 PDIS-21154 +75 -5 +75 -5 1D Circulator PDIS-21156 +74 +74

-28 @ -3 PDIS-21158 +74 -7 +74 -7 P DIS-21160 +75 -8 +75 -8

@ Denotes switches which were cut of tolerance.