{{#Wiki_filter:August 1 6, 2019 Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642 SUBJECT: ERRATA-PRAIRIE ISLAND NUCLEAR GENERATING PLANT-INTEGRATED INSPECTION REPORT 05000282/2019002; 05000306/2019002; AND 07200010/2019001
{{#Wiki_filter:ust 16, 2019
 
==SUBJECT:==
ERRATAPRAIRIE ISLAND NUCLEAR GENERATING PLANTINTEGRATED INSPECTION REPORT 05000282/2019002; 05000306/2019002; AND 07200010/2019001


==Dear Mr. Sharp:==
==Dear Mr. Sharp:==
The NRC identified that the inspection report sent to you dated August 2, 2019 (ML19214A181) inadvertently omitted three inspection observations from the report and failed to reference the Independent Spent Fuel Storage Installation Inspection Report number 07200010/2019001. As a result, the NRC has reissued the report in its entirety with the updated subject. None of these changes affected the technical content of the report.
The NRC identified that the inspection report sent to you dated August 2, 2019 (ML19214A181)
inadvertently omitted three inspection observations from the report and failed to reference the Independent Spent Fuel Storage Installation Inspection Report number 07200010/2019001. As a result, the NRC has reissued the report in its entirety with the updated subject. None of these changes affected the technical content of the report.


On June 30, 2019
On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant. On July 2, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant. On July 2, 2019
, the NRC inspectors discussed the results of this inspection with you and other members of your staff.


The results of this inspection are documented in the enclosed report. The NRC inspectors did not identify any finding or violation of more than minor significance
The NRC inspectors did not identify any finding or violation of more than minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding
."


Sincerely,
Sincerely,
/RA/ Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket No s. 05000282; 05000306; and 07200010/2019001 License No s. DPR-42 and DPR-60  
/RA/
Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket Nos. 05000282; 05000306; and 07200010/2019001 License Nos. DPR-42 and DPR-60


===Enclosure:===
===Enclosure:===
As stated  
As stated


==Inspection Report==
==Inspection Report==
Docket Number s: 05000282; 05000306; and 07200010/2019001 License Numbers:
Docket Numbers: 05000282; 05000306; and 07200010/2019001 License Numbers: DPR-42 and DPR-60 Report Numbers: 05000282/2019002; 05000306/2019002 and 0720010/2019001 Enterprise Identifier: I-2019-002-0057 and I-2019-001-0141 Licensee: Northern States Power Company, Minnesota Facility: Prairie Island Nuclear Generating Plant Location: Welch, Minnesota Inspection Dates: April 01, 2019 to June 30, 2019 Inspectors: S. Bell, Health Physicist M. Garza, Emergency Preparedness Inspector L. Haeg, Senior Resident Inspector M. Learn, Reactor Engineer V. Myers, Senior Health Physicist K. Pusateri, Resident Inspector Approved By: Hironori Peterson, Chief Branch 3 Division of Reactor Projects Enclosure
DPR-42 and DPR-60 Report Numbers:
05000282/2019002
; 05000306/2019002 and 0720010/2019001 Enterprise Identifier:
I-2019-002-0057 and I-2019-001-0141 Licensee: Northern States Power Company, Minnesota Facility: Prairie Island Nuclear Generating Plant Location: Welch, Minnesota Inspection Dates:
April 01, 2019 to June 30, 2019 Inspectors:
S. Bell, Health Physicist M. Garza, Emergency Preparedness Inspector L. Haeg, Senior Resident Inspector M. Learn, Reactor Engineer V. Myers, Senior Health Physicist K. Pusateri, Resident Inspector Approved By:
Hironori Peterson, Chief Branch 3 Division of Reactor Projec ts 2


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a n integrated inspection at Prairie Island Nuclear Generating Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Prairie Island Nuclear Generating Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
. List of Findings and Violations No findings or violations of more than minor significance were identified.


Additional Tracking Items Type Issue Number Title Report Section Status URI 05000282,05000306/2 018002-01 Results of ISFSI Cask Array Dose Calculation Not Incorporated into FSAR 60855.1 Closed 3
List of Findings and Violations No findings or violations of more than minor significance were identified.
 
Additional Tracking Items Type       Issue Number             Title                             Report Section Status URI       05000282,05000306/2     Results of ISFSI Cask Array       60855.1        Closed 018002-01                Dose Calculation Not Incorporated into FSAR


=PLANT STATUS=
=PLANT STATUS=


Prairie Island Unit 1 operated at full power for the entirety of the inspection period, with the exception of 1) a power reduction to 40 percent power on April 27, 2019, to address elevated bearing vibrations on the #11 feedwater pump.
===Prairie Island Unit 1 operated at full power for the entirety of the inspection period, with the exception of 1) a power reduction to 40 percent power on April 27, 2019, to address elevated bearing vibrations on the #11 feedwater pump. Unit 1 was returned to 100 percent power on May 1, 2019; and 2) a power reduction to 75 percent power on June 4, 2019 for a flexible power operation demonstration.
 
Unit 1 was returned to 100 percent power on May 1, 2019; and 2) a power reduction to 75 percent power on June 4, 2019 for a flexible power operation demonstration.


Prairie Island Unit 2 operated at full power for the entirety of the inspection period, with the exception of a brief down power on May 28, 2019, to support main generator capability testing.
Prairie Island Unit 2 operated at full power for the entirety of the inspection period, with the exception of a brief down power on May 28, 2019, to support main generator capability testing.


==INSPECTION SCOPES==
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
-rm/doc-collections/insp
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
-Water Reactor Inspection Program - Operations Phase.The inspectors performed plant status activities described in IMC 2515 Appendix D, "Plant Status" and conducted routine reviews using IP 71152, "Problem Identification and Resolution.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==
Line 78: Line 67:
==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==


===Partial Walkdown Sample (IP Section 03.01)
===Partial Walkdown Sample (IP Section 03.01)===
(2 Sample s)  The inspectors evaluated system configurations during partial walkdowns of the following systems/train s: (1) #12 residual heat removal subsystem on May 10, 2019 (2) #11 and #12 auxiliary feed water pumps on April 25, 2019 71111.04S  
{{IP sample|IP=IP 71111.04|count=2}}
- Equipment Alignment Complete Walkdown Sample (IP Section 03.02)===
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
    (1)     #12 residual heat removal subsystem on May 10, 2019 (2)     #11 and #12 auxiliary feed water pumps on April 25, 2019
 
===71111.04S - Equipment Alignment Complete Walkdown Sample (IP Section 03.02) ===
{{IP sample|IP=IP 71111.04|count=1}}
{{IP sample|IP=IP 71111.04|count=1}}
: (1) The inspectors evaluated system configurations during a complete walkdown of fire protection systems in the plant screenhouse on June 19, 2019
: (1) The inspectors evaluated system configurations during a complete walkdown of fire protection systems in the plant screenhouse on June 19, 2019
Line 88: Line 81:
===Annual Inspection (IP Section 03.02)===
===Annual Inspection (IP Section 03.02)===
{{IP sample|IP=IP 71111.05A|count=1}}
{{IP sample|IP=IP 71111.05A|count=1}}
: (1) The inspectors evaluated fire brigade performance in response to smoke detected in the 121 motor
: (1) The inspectors evaluated fire brigade performance in response to smoke detected in the 121 motor-driven fire pump room on May 28, 2019
-driven fire pump room on May 28, 2019


==71111.05Q - Fire Protection==
==71111.05Q - Fire Protection==


===Quarterly Inspection (IP Section 03.01)
===Quarterly Inspection (IP Section 03.01)===
(4 Sample s)  The inspectors evaluated fire protection program implementation in the following selected areas:
{{IP sample|IP=IP 71111.05Q|count=4}}
 
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Fire zones 3, 11 and 12; feedwater pump area on May 8, 2019
: (1) Fire zones 3, 11 and 12; feedwater pump area on May 8, 2019
: (2) Fire zone 75; screenhouse 695' elevation on May 24, 2019
: (2) Fire zone 75; screenhouse 695' elevation on May 24, 2019
Line 102: Line 96:
==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures==


Inspection Activities  
===Inspection Activities - Internal Flooding (IP Section 02.02a.)===
- Internal Flooding (IP Section 02.02a.)===
{{IP sample|IP=IP 71111.06|count=1}}
{{IP sample|IP=IP 71111.05Q|count=1}}
 
The inspectors evaluated internal flooding mitigation protections in the:
The inspectors evaluated internal flooding mitigation protections in the:
: (1) D1 and D2 emergency diesel generator rooms on May 28, 2019 Inspection Activities  
: (1) D1 and D2 emergency diesel generator rooms on May 28, 2019 Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)===
- Underground Cables (IP Section 02.02c.)
The inspectors evaluated cable submergence protection in:


(1 Sample)  The inspectors evaluated cable submergence protection in:
===(1)   121 motor-driven fire pump room on May 29, 2019
: (1) 121 motor-driven fire pump room on May 29, 2019


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
Line 116: Line 109:
===Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)===
===Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)===
{{IP sample|IP=IP 71111.11Q|count=1}}
{{IP sample|IP=IP 71111.11Q|count=1}}
: (1) The inspectors observed and evaluated licensed operator performance in the main control room during Unit 1 power capability testing on April 3, 2019 Licensed Operator Requalification Training/Examinations (IP Section 03.02)
: (1) The inspectors observed and evaluated licensed operator performance in the main control room during Unit 1 power capability testing on April 3, 2019 Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
(1 Sample)
: (1) The inspectors observed and evaluated an operator requalification session in the
: (1) The inspectors observed and evaluated an operator requalification session in the simulator on May 10, 2019
 
===simulator on May 10, 2019


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==


===Routine Maintenance Effectiveness Inspection (IP Section 02.01)
===Routine Maintenance Effectiveness Inspection (IP Section 02.01)===
(3 Sample s)  The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
{{IP sample|IP=IP 71111.12|count=3}}
 
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Unit 2 safety injection system on April 4, 2019
: (1) Unit 2 safety injection system on April 4, 2019
: (2) 121 motor-driven cooling water pump April 2, 2019
: (2) 121 motor-driven cooling water pump April 2, 2019
Line 130: Line 126:
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==


Risk Assessment and Management Sample (IP Section 03.01) (5 Sample s)  The inspectors evaluated the risk assessments for the following planned and emergent work activities:
===Risk Assessment and Management Sample (IP Section 03.01)===
{{IP sample|IP=IP 71111.13|count=5}}
 
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) AR 501000026841; Unit 1 Feedwater System Trouble Alarm on May 4, 2019
: (1) AR 501000026841; Unit 1 Feedwater System Trouble Alarm on May 4, 2019
: (2) AR 501000024929; Breaker 1H3 Tripped Open Due to Ground Fault on April 3, 2019
: (2) AR 501000024929; Breaker 1H3 Tripped Open Due to Ground Fault on April 3, 2019
Line 139: Line 138:
==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==


Operability Determination or Functionality Assessment (IP Section 02.02)
===Operability Determination or Functionality Assessment (IP Section 02.02)===
(4 Sample s)  The inspectors evaluated the following operability determinations and functionality assessments:
{{IP sample|IP=IP 71111.15|count=4}}
: (1) AR 501000026842; 4
 
-CL-90 Cooling Water Pipe Leak on May 8, 2019
The inspectors evaluated the following operability determinations and functionality assessments:
: (1) AR 501000026842; 4-CL-90 Cooling Water Pipe Leak on May 8, 2019
: (2) AR 501000027295; 125 VDC Battery Float Alarms on May 13, 2019
: (2) AR 501000027295; 125 VDC Battery Float Alarms on May 13, 2019
: (3) AR 501000027333; TD 33 Steam Leak on May 17, 2019
: (3) AR 501000027333; TD-6-33 Steam Leak on May 17, 2019
: (4) AR 501000027988; 22 Containment Spray Pump Seal Leakage on May 31, 2019
: (4) AR 501000027988; 22 Containment Spray Pump Seal Leakage on May 31, 2019


==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications==


Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)===
===Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)===
{{IP sample|IP=IP 71111.12|count=1}}
{{IP sample|IP=IP 71111.18|count=1}}
 
The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
: (1) Temporary modification to address through wall leak on 4
: (1) Temporary modification to address through wall leak on 4-CL-90 (cooling water supply piping to 12 auxiliary feedwater pump) on May 4, 2019
-CL-90 (cooling water supply piping to 12 auxiliary feedwater pump) on May 4, 2019


==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==


===Post Maintenance Test Sample (IP Section 03.01)
===Post Maintenance Test Sample (IP Section 03.01)===
(3 Sample s)  The inspectors evaluated the following post maintenance tests:
{{IP sample|IP=IP 71111.19|count=3}}
 
The inspectors evaluated the following post maintenance tests:
: (1) 121 motor-driven cooling water pump following pump replacement on May 30, 2019
: (1) 121 motor-driven cooling water pump following pump replacement on May 30, 2019
: (2) 22 containment spray pump pressure test on May 31, 2019
: (2) 22 containment spray pump pressure test on May 31, 2019
Line 165: Line 167:
==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==


The inspectors evaluated the following surveillance tests:
===The inspectors evaluated the following surveillance tests:
Inservice Testing (IP Section 03.01)===
Inservice Testing (IP Section 03.01)===
{{IP sample|IP=IP 71111.19|count=1}}
{{IP sample|IP=IP 71111.22|count=1}}
: (1) SP 1106C; 121 Cooling Water Pump Quarterly Test on April 5, 2019 RCS Leakage Detection Testing (IP Section 03.01)
: (1) SP 1106C; 121 Cooling Water Pump Quarterly Test on April 5, 2019 RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)===
(1 Sample)
: (1) SP 2001AA; Reactor Coolant System Leakage Test on May 3, 2019
: (1) SP 2001AA; Reactor Coolant System Leakage Test on May 3, 2019 Surveillance Tests (other) (IP Section 03.01)
 
(2 Sample s)
===Surveillance Tests (other) (IP Section 03.01) (2 Samples)===
: (1) SP 2307; D6 Diesel Generator 6
: (1) SP 2307; D6 Diesel Generator 6-month Fast Start Test on April 22, 2019
-month Fast Start Test on April 22, 2019
 
: (2) SP 1106B; 22 Diesel Driven Cooling Water Pump Monthly Test on April 5, 2019
===(2)   SP 1106B; 22 Diesel Driven Cooling Water Pump Monthly Test on April 5, 2019


==71114.02 - Alert and Notification System Testing==
==71114.02 - Alert and Notification System Testing==


===Inspection Review (IP Section 02.01
===Inspection Review (IP Section 02.01-02.04)===
-02.04)===
{{IP sample|IP=IP 71114.02|count=1}}
{{IP sample|IP=IP 71114.02|count=1}}
: (1) The inspectors evaluated the following maintenance and testing of the alert and notification system:
: (1) The inspectors evaluated the following maintenance and testing of the alert and notification system:
Prairie Island Annual Siren Maintenance 2017 Prairie Island Annual Siren Maintenance 2018
* Prairie Island Annual Siren Maintenance 2017
* Prairie Island Annual Siren Maintenance 2018


==71114.03 - Emergency Response Organization Staffing and Augmentation System==
==71114.03 - Emergency Response Organization Staffing and Augmentation System==


===Inspection Review (IP Section 02.01
===Inspection Review (IP Section 02.01-02.02)===
-02.02)===
{{IP sample|IP=IP 71114.03|count=1}}
{{IP sample|IP=IP 71114.03|count=1}}
: (1) The inspectors evaluated the readiness of the Emergency Response Organization
: (1) The inspectors evaluated the readiness of the Emergency Response Organization
Line 193: Line 194:
==71114.05 - Maintenance of Emergency Preparedness==
==71114.05 - Maintenance of Emergency Preparedness==


===Inspection Review (IP Section 02.01  
===Inspection Review (IP Section 02.01 - 02.11)===
- 02.11)===
{{IP sample|IP=IP 71114.05|count=1}}
{{IP sample|IP=IP 71114.05|count=1}}
: (1) The inspectors evaluated the maintenance of the emergency preparedness program
: (1) The inspectors evaluated the maintenance of the emergency preparedness program
Line 202: Line 202:
===Drill/Training Evolution Observation (IP Section 03.02)===
===Drill/Training Evolution Observation (IP Section 03.02)===
{{IP sample|IP=IP 71114.06|count=1}}
{{IP sample|IP=IP 71114.06|count=1}}
The inspectors evaluated:
The inspectors evaluated:
: (1) a licensed operator simulator scenario involving Drill and Exercise Performance Indicator opportunities on May 29, 2019 Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
: (1) a licensed operator simulator scenario involving Drill and Exercise Performance Indicator opportunities on May 29, 2019 Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
  (1 Sample) The inspectors evaluated:
(1 Sample)===
: (1) an emergency preparedness drill on April 10, 2019
The inspectors evaluated:
 
===(1)   an emergency preparedness drill on April 10, 2019


==RADIATION SAFETY==
==RADIATION SAFETY==
Line 213: Line 216:
===Calibration and Testing Program (IP Section 02.02)===
===Calibration and Testing Program (IP Section 02.02)===
{{IP sample|IP=IP 71124.05|count=1}}
{{IP sample|IP=IP 71124.05|count=1}}
The inspectors evaluated the calibration and testing program implementation.
The inspectors evaluated the calibration and testing program implementation.
: (1) Alarm Setpoint and Calibration Method Check of Personnel Contamination Monitors, Portal Monitors and Small Article Monitors Rados Two Step Personnel Contamination Monitor Serial Number 479903 Eberline PM
: (1) Alarm Setpoint and Calibration Method Check of Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
-7 Portal Monitor Serial Number PM594 Failure to Meet Calibration or Source Check Acceptance Criteria Microrem survey instrument Serial Number 566362 Air sampler mass flow meter Serial Number 476405 Telepole survey instrument Serial Number 580336 Walk Downs and Observations (IP Section 02.01)
* Rados Two Step Personnel Contamination Monitor Serial Number 479903
(1 Sample) The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.
* Eberline PM-7 Portal Monitor Serial Number PM594 Failure to Meet Calibration or Source Check Acceptance Criteria
: (1) Portable Survey Instruments Ludlum Model 177 Serial Number 478529 Ludlum Model 177 Serial Number 478524 MG Telepole Serial Number 6612
* Microrem survey instrument Serial Number 566362
-134  Eberline Model AMS4 Serial Number 1726 Ludlum Model 9
* Air sampler mass flow meter Serial Number 476405
-3 Serial Number 298975 Source Check Demonstration Minirad Model 3500 Ludlum Model 9
* Telepole survey instrument Serial Number 580336 Walk Downs and Observations (IP Section 02.01) (1 Sample)===
-3  Ludlum Model 177 Area Radiation Monitors and Continuous Air Monitors Eberline AMS4 Continuous Air Monitor Serial Number 1726 Eberline AMS4 Continuous Air Monitor Serial Number 537454 R29 Area Radiation Monitor
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.


{{a|1R57}}
===(1)    Portable Survey Instruments
==1R57 Area Radiation Monitor==
* Ludlum Model 177 Serial Number 478529
 
* Ludlum Model 177 Serial Number 478524
R4 Area Radiation Monitor Personnel Contamination Monitors, Portal Monitors and Small Article Monitors Rados Model Two Step Serial Number 479903 Eberline SAM
* MG Telepole Serial Number 6612-134
-11 Small Article Monitor Serial Number 309741 Eberline PM
* Eberline Model AMS4 Serial Number 1726
-7 Portal Monitor Serial Number 479831
* Ludlum Model 9-3 Serial Number 298975 Source Check Demonstration
* Minirad Model 3500
* Ludlum Model 9-3
* Ludlum Model 177 Area Radiation Monitors and Continuous Air Monitors
* Eberline AMS4 Continuous Air Monitor Serial Number 1726
* Eberline AMS4 Continuous Air Monitor Serial Number 537454
* R29 Area Radiation Monitor
* 1R57 Area Radiation Monitor
* R4 Area Radiation Monitor Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
* Rados Model Two Step Serial Number 479903
* Eberline SAM-11 Small Article Monitor Serial Number 309741
* Eberline PM-7 Portal Monitor Serial Number 479831


==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment==
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment==
Line 233: Line 248:
===Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02)===
===Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02)===
{{IP sample|IP=IP 71124.06|count=1}}
{{IP sample|IP=IP 71124.06|count=1}}
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
: (1) RE-18, Liquid Effluent Radiation Monitor 2R-37, Unit 2 Auxiliary Building Vent Gas Monitor Dose Calculations (IP Section 02.05)
    (1)
(1 Sample) The inspectors reviewed the following to asses public dose:
* RE-18, Liquid Effluent Radiation Monitor
: (1) Liquid and gaseous discharge permits to evaluate public dose calculations:
* 2R-37, Unit 2 Auxiliary Building Vent Gas Monitor Dose Calculations (IP Section 02.05) (1 Sample)===
PIGB2018-209, Steam Release PILB2019-016, Liquid Batch Tanks PIGC2018-215; Unit 1 Shield Building Vent Annual radiological effluent release reports:
The inspectors reviewed the following to asses public dose:
2017 Annual Effluent Release Report 2018 Annual Effluent Release Report Abnormal gaseous or liquid tank discharges:
122 Waste Gas Compressor Moisture Separator Weld Leak, 2017  Instrumentation and Equipment (IP Section 02.04)
(1 Sample)  The inspectors reviewed the following radioactive effluent discharge system surveillance test results:
: (1) Unit 1 Auxiliary Building Special Ventilation System Sampling and Analysis (IP Section 02.03)
(1 Sample)  The inspectors reviewed the following:
: (1) Radioactive effluent sampling and analysis activities:
Aerated Drains Treatment Tank Liquid Discharges Auxiliary Building Gaseous Discharges Shield Building Gaseous Discharges Effluent discharges made with inoperable effluent monitors:
None Available Walk Downs and Observations (IP Section 02.01
) (1 Sample)  The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:
: (1) 2R-22, Unit 2 Shield Building Vent Gas Monitor 2R-37, Unit 2 Auxillary Building Vent Gas Monitor A 1R-19, Unit 1 Steam Generator Blowdown Monitor R-18, Waste Disposal System Liquid Effluent Monitor Auxiliary Building Special Ventilation System


==OTHER ACTIVITIES
===(1)   Liquid and gaseous discharge permits to evaluate public dose calculations:
- BASELINE==
* PIGB2018-209, Steam Release
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
* PILB2019-016, Liquid Batch Tanks
EP01: Drill/Exercise Performance (IP Section 02.12)
* PIGC2018-215; Unit 1 Shield Building Vent Annual radiological effluent release reports:
(1 Sample)
* 2017 Annual Effluent Release Report
: (1) April 1, 2018 through March 31, 2019 EP02: ERO Drill Participation (IP Section 02.13)
* 2018 Annual Effluent Release Report Abnormal gaseous or liquid tank discharges:
(1 Sample)
* 122 Waste Gas Compressor Moisture Separator Weld Leak, 2017 Instrumentation and Equipment (IP Section 02.04) (1 Sample)===
: (1) April 1, 2018 through March 31, 2019 EP03: Alert & Notification System Reliability (IP Section 02.14)
The inspectors reviewed the following radioactive effluent discharge system surveillance test
(1 Sample)
: (1) April 1, 2018 through March 31, 2019 MS07: High Pressure Injection Systems (IP Section 02.06)
(2 Sample s)
: (1) Unit 1 (April 1, 2018 through March 31, 2019)
: (2) Unit 2 (April 1, 2018 through March 31, 2019)
MS08: Heat Removal Systems (IP Section 02.07)
(2 Sample s)
: (1) Unit 1 (April 1, 2018 through March 31, 2019)
: (2) Unit 2 (April 1, 2018 through March 31, 2019)


==71152 - Problem Identification and Resolution==
===results:
: (1) Unit 1 Auxiliary Building Special Ventilation System Sampling and Analysis (IP Section 02.03) (1 Sample)===
The inspectors reviewed the following:


===Annual Followup of Selected Issues (IP Section 02.03)===
===(1)   Radioactive effluent sampling and analysis activities:
{{IP sample|IP=IP 71152|count=1}}
* Aerated Drains Treatment Tank Liquid Discharges
The inspectors reviewed the licensee's implementation of its corrective action program related to the following issue:
* Auxiliary Building Gaseous Discharges
: (1) Implementation of adverse condition monitoring program Semiannual Trend Review (IP Section 02.02)
* Shield Building Gaseous Discharges Effluent discharges made with inoperable effluent monitors:
(1 Sample)
* None Available Walk Downs and Observations (IP Section 02.01) (1 Sample)===
: (1) The inspectors reviewed the corrective action program for potential adverse trends in licensee's 10 CFR 50.65(a)(4) (online risk management) program on April 29, 2019 71153 - Followup of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03)
The inspectors walked down the following gaseous and liquid radioactive effluent monitoring
(1 Sample)
: (1) The inspectors evaluated control room personnel performance following a 121 motor-driven fire pump electrical fault on May 28, 2019 Reporting (IP Section 03.05)
(1 Sample)
: (1) Prairie Island Event Notification 53853 and subsequent retraction on May 15, 2019


==OTHER ACTIVITIES==
===and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants (1 Partial)  (1) (Partial)  The inspectors closed Unresolved Item 05000282/2018002
  (1)
-01; 05000306/2018002
* 2R-22, Unit 2 Shield Building Vent Gas Monitor
-01, "Results of ISFSI Cask Array Dose Calculation Not Incorporated into FSAR."
* 2R-37, Unit 2 Auxillary Building Vent Gas Monitor A
* 1R-19, Unit 1 Steam Generator Blowdown Monitor
* R-18, Waste Disposal System Liquid Effluent Monitor
* Auxiliary Building Special Ventilation System


The details of this review are documented in the inspection results below.
==OTHER ACTIVITIES - BASELINE==


No findings or violations were identified.
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12) ===
{{IP sample|IP=IP 71151|count=1}}
: (1) April 1, 2018 through March 31, 2019 EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
: (1) April 1, 2018 through March 31, 2019


==INSPECTION RESULTS==
===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)===
Observation
: (1) April 1, 2018 through March 31, 2019
: Aggregate review of Adverse Condition Monitoring Program 71152 The inspectors reviewed, in aggregate, plant issues being monitored as part of the licensee's adverse condition monitoring program.


This included a review of programmatic requirements and processes, as well as discussions with engineering and operations personnel to determine whether active adverse conditions, in aggregate, were manageable.
===MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)===
: (1) Unit 1 (April 1, 2018 through March 31, 2019)


The inspectors also reviewed whether the licensee was appropriately monitoring adverse conditions by establishing criteria or set points for which further evaluation or action was designated.
===(2)    Unit 2 (April 1, 2018 through March 31, 2019)
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)===
: (1) Unit 1 (April 1, 2018 through March 31, 2019)


The inspectors determined, overall, that the licensee was effectively managing adverse conditions and no concerns were identified as part of this review.
===(2)    Unit 2 (April 1, 2018 through March 31, 2019)


Observatio n:  Review of 10 CFR 50.65 (a)(4) online risk management program 71152 The inspectors reviewed licensee procedures and processes, and interviewed knowledgeable licensee personnel regarding the station's implementation of their online risk management program. In particular, the inspectors questioned the licensee's bases for determining whether equipment remained available or unavailable with respect to online risk and work management following certain emergent issues during the inspection period.
==71152 - Problem Identification and Resolution==


For a fe w instances where the licensee determined equipment to be available due to the ability to "start", the inspectors questioned whether consideration was given as to the ability for the equipment to continue to perform its function for any particular amount of time. In some instances, based on discussions with the inspectors, the licensee revisited their availability bases and modified the online risk model to reflect unavailability and/or implemented measures to minimize any impact to overall online risk.
===Annual Followup of Selected Issues (IP Section 02.03)===
{{IP sample|IP=IP 71152|count=1}}


Based on these revisions, the licensee initiated changes to how availability bases decisions were documented in operator logs, and also improved interactions with licensee risk analysts when complicated availability questions arose going forward.
The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:
: (1) Implementation of adverse condition monitoring program Semiannual Trend Review (IP Section 02.02) (1 Sample)===
: (1) The inspectors reviewed the corrective action program for potential adverse trends in


Observation
===licensee's 10 CFR 50.65(a)(4) (online risk management) program on April 29, 2019
:  Prairie Island Event Notification 53853 and retraction 71153 The inspectors reviewed Prairie Island Event Notification 53853 submitted on January 1, 2019, as well as the retraction of this EN made on March 22, 2019.


The EN was submitted due to both Unit 2 emergency diesel generators being briefly declared inoperable during extreme cold temperatures on January 31, 2019.
===71153 - Followup of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03) ===
{{IP sample|IP=IP 71153|count=1}}
: (1) The inspectors evaluated control room personnel performance following a 121 motor-driven fire pump electrical fault on May 28, 2019 Reporting (IP Section 03.05) (1 Sample)===
: (1) Prairie Island Event Notification 53853 and subsequent retraction on May 15, 2019


Following the period of inoperability for D5 & D6, the licensee performed calculations to show that based on the short duration of the low temperatures, the actual lowest temperature that the equipment would have been exposed would not have been lower than the operability limit.
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants (1 Partial)
    (1)    (Partial)
The inspectors closed Unresolved Item 05000282/2018002-01; 05000306/2018002-01, Results of ISFSI Cask Array Dose Calculation Not Incorporated into FSAR. The details of this review are documented in the inspection results below. No findings or violations were identified.


Therefore, the EDGs remained operable for this issue and a retraction to the Event Notification was made. The inspectors reviewed the calculations, held discussions with engineering personnel, and determined that the basis for the retraction was reasonable.
==INSPECTION RESULTS==
Observation: Aggregate review of Adverse Condition Monitoring Program                    71152 The inspectors reviewed, in aggregate, plant issues being monitored as part of the licensee's adverse condition monitoring program. This included a review of programmatic requirements and processes, as well as discussions with engineering and operations personnel to determine whether active adverse conditions, in aggregate, were manageable. The inspectors also reviewed whether the licensee was appropriately monitoring adverse conditions by establishing criteria or set points for which further evaluation or action was designated. The inspectors determined, overall, that the licensee was effectively managing adverse conditions and no concerns were identified as part of this review.


Unresolved Item (Closed) Results of ISFSI Cask Array Dose Calculation Not Incorporated into F SAR 05000282,05000306/2018002
Observation: Review of 10 CFR 50.65 (a)(4) online risk management program              71152 The inspectors reviewed licensee procedures and processes, and interviewed knowledgeable licensee personnel regarding the station's implementation of their online risk management program. In particular, the inspectors questioned the licensee's bases for determining whether equipment remained available or unavailable with respect to online risk and work management following certain emergent issues during the inspection period. For a few instances where the licensee determined equipment to be available due to the ability to start, the inspectors questioned whether consideration was given as to the ability for the equipment to continue to perform its function for any particular amount of time. In some instances, based on discussions with the inspectors, the licensee revisited their availability bases and modified the online risk model to reflect unavailability and/or implemented measures to minimize any impact to overall online risk. Based on these revisions, the licensee initiated changes to how availability bases decisions were documented in operator logs, and also improved interactions with licensee risk analysts when complicated availability questions arose going forward.
-01 60855.1


=====Description:=====
Observation: Prairie Island Event Notification 53853 and retraction                    71153 The inspectors reviewed Prairie Island Event Notification 53853 submitted on January 1, 2019, as well as the retraction of this EN made on March 22, 2019. The EN was submitted due to both Unit 2 emergency diesel generators being briefly declared inoperable during extreme cold temperatures on January 31, 2019. Following the period of inoperability for D5
In Unresolved Item 05000282/2018002
& D6, the licensee performed calculations to show that based on the short duration of the low temperatures, the actual lowest temperature that the equipment would have been exposed would not have been lower than the operability limit. Therefore, the EDGs remained operable for this issue and a retraction to the Event Notification was made. The inspectors reviewed the calculations, held discussions with engineering personnel, and determined that the basis for the retraction was reasonable.
-01; 05000306/2018002
-01, the inspectors documented an item of concern associated with the licensee's updating of their independent spent fuel storage installation (ISFSI) Final Safety Analysis Report (FSAR).


Specifically, the inspectors questioned whether or not the licensee is required to update the ISFSI FSAR with the offsite dose results of calculation TN40HT
Unresolved Item      Results of ISFSI Cask Array Dose Calculation Not                60855.1 (Closed)              Incorporated into FSAR 05000282,05000306/2018002-01
-0502 for an array of casks in accordance with 10 CFR 72.70. To address this unresolved item, the inspectors reviewed correspondence between the licensee and the NRC and interviewed a member of the licensee's staff.


The inspectors reviewed whether calculation TN40HT
=====Description:=====
-0502 was submitted to the NRC by the licensee since the submission of the original FSAR.
In Unresolved Item 05000282/2018002-01; 05000306/2018002-01, the inspectors documented an item of concern associated with the licensees updating of their independent spent fuel storage installation (ISFSI) Final Safety Analysis Report (FSAR).


The inspectors determined that the licensee never submitted calculation TN40HT
Specifically, the inspectors questioned whether or not the licensee is required to update the ISFSI FSAR with the offsite dose results of calculation TN40HT-0502 for an array of casks in accordance with 10 CFR 72.70.
-0502 to the NRC.


Further, the inspectors confirmed that the ISFSI FSAR contained the results of a separate offsite dose analysis that was representative of the conditions at the Prairie Island ISFSI.
To address this unresolved item, the inspectors reviewed correspondence between the licensee and the NRC and interviewed a member of the licensees staff. The inspectors reviewed whether calculation TN40HT-0502 was submitted to the NRC by the licensee since the submission of the original FSAR. The inspectors determined that the licensee never submitted calculation TN40HT-0502 to the NRC. Further, the inspectors confirmed that the ISFSI FSAR contained the results of a separate offsite dose analysis that was representative of the conditions at the Prairie Island ISFSI.


Since calculation TN40HT
Since calculation TN40HT-0502 was never submitted to the NRC, and the FSAR already contains results of offsite dose analysis that is representative of the conditions at the Prairie Island ISFSI, the inspectors determined that the licensee was not required to update the ISFSI FSAR with the results of calculation TN40HT-0502 in accordance with 10 CFR 72.70.
-0502 was never submitted to the NRC, and the FSAR already contains results of offsite dose analysis that is representative of the conditions at the Prairie Island ISFSI, the inspectors determined that the licensee was not required to update the ISFSI FSAR with the results of calculation TN40HT
-0502 in accordance with 10 CFR 72.70.


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
 
* On July 2, 2019, the inspectors presented the integrated inspection results to Mr. S. Sharp and other members of the licensee staff.
On July 2, 2019, the inspector s presented the integrated inspection results to Mr. S. Sharp and other members of the licensee staff.
* On May 2, 2019, the inspectors presented the Emergency Preparedness Baseline Inspection/Performance Indicator Verification exit meeting to Ms. D. Wilson, Director of Site Performance and other members of the licensee staff.
 
* On June 20, 2019, the inspectors presented the radiation protection baseline inspection results to Ms. D. Wilson, Director Site Performance and Operations Support, and other members of the licensee staff.
On May 2, 2019
, the inspector s presented the Emergency Preparedness Baseline Inspection/Performance Indicator Verification exit meeting to Ms. D. Wilson, Director of Site Performance and other members of the licensee staff.
 
On June 20, 2019
, the inspector s presented the radiation protection baseline inspection results to Ms. D. Wilson, Director Site Performance and Operations Support, and other members of the licensee staff.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Procedure Type Designation
Inspection Type             Designation           Description or Title                               Revision or
Description or Title
Procedure                                                                                              Date
Revision or Date 71111.04 Drawings NF-39222 Flow Diagram Feedwater and Auxiliary Feedwater Unit 1 05/04/2007
71111.04   Drawings         NF-39222               Flow Diagram Feedwater and Auxiliary Feedwater     05/04/2007
71111.04S Drawings NF-39228-1 Fire Protection & Screen Wash System
Unit 1
71111.05A Corrective Action Documents  AR 501000027914
71111.04S Drawings         NF-39228-1             Fire Protection & Screen Wash System               95
Received Multiple Unexpected Alarms
71111.05A Corrective Action AR 501000027914       Received Multiple Unexpected Alarms                 05/29/2019
05/29/2019
Documents
71111.05Q Procedures
71111.05Q Procedures         F5 Appendix F         Fire Area 32; Fire Hazard Analysis                 36
F5 Appendix F
Fire Detection Zone 2 Auxiliary Feedwater Pump Rooms, Elevation 695'     48
Fire Area 32; Fire Hazard Analysis
Fire Detection Zone 74 Screenhouse Ground Floor, Elevation 670'           34
Fire Detection Zone 2
Fire Detection Zone 75 Screenhouse Operating Floor Elevation 695'         44
Auxiliary Feedwater Pump Rooms, Elevation 695'
71111.06   Calculations     PI-S-027               Internal Flooding Evaluation of D5/D6 Area         05/21/1999
Fire Detection Zone 74
Corrective Action AR 501000027900       Water Intrusion and Short Damage                   05/28/2019
Screenhouse Ground Floor, Elevation 670'
Documents
Fire Detection Zone 75
Procedures       H65.2.21               Inaccessible Medium and Low Voltage Cables Not     2
Screenhouse Operating Floor Elevation 695'
Subject to 10 CFR 50.49 Environmental Qualification
71111.06 Calculations
Requirements Aging Management Program
PI-S-027 Internal Flooding Evaluation of D5/D6 Area
PINGP 1732             Cable Condition Monitoring Cable Inspection         1
05/21/1999
71111.11Q Miscellaneous     None                   Prairie Island Nuclear Generating Plant Emergency   04/10/2019
Corrective Action Documents  AR 501000027900
Plan Drill
Water Intrusion and Short Damage
SEG# P9118ST-0903     Cycle 181 SIM Session #3                           0
05/28/2019
Procedures       SP 1282               U1 MOD-025 Verification and Data Reporting of       0
Procedures
Generator Real and Reactive Power Capabilities
H65.2.21 Inaccessible Medium and Low Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Aging Management Program
                                                    (NERC)
PINGP 1732
71111.12   Corrective Action AR 501000023356       121 Fltr Water Strainer Packing Leak               02/20/2019
Cable Condition Monitoring Cable Inspection
Documents        AR 501000024769       121 MDCLP: Broken Bearing Water Line               03/28/2019
71111.11Q Miscellaneous
AR 501000024793       121 MDCLP Driver Stand Baseplate UT Data           03/28/2019
None Prairie Island Nuclear Generating Plant Emergency Plan Drill
AR 501000024856       121 CLP Motor Uncoupled Run Vibrations             03/31/2019
04/10/2019
AR 501000024877       121 MDCLP Shaft Seal High Temp and Low Flow         03/29/2019
SEG# P9118ST
AR 501000024886       121 MDCLP Issues During Pump Test                   03/29/2019
-0903 Cycle 181 SIM Session #3
AR 501000024890       121 MDCLP Motor Lwr Bearing .008 Axial             03/30/2019
Procedures
AR 501000024992       Roll UP Cap for 121 MDCLP                           04/02/2019
SP 1282 U1 MOD-025 Verification and Data Reporting of Generator Real and Reactive Power Capabilities (NERC) 0 71111.12 Corrective Action Documents  AR 501000023356
Work Orders       WO# 700047563         121 Cooling Water Pump Baseline Test               0
21 Fltr Water Strainer Packing Leak
Inspection Type             Designation           Description or Title                           Revision or
2/20/2019
Procedure                                                                                          Date
AR 501000024769
71111.13   Corrective Action AR 501000026173       11 Feed Water Pump Inboard Brg Vibes Rising     04/23/2019
21 MDCLP: Broken Bearing Water Line
Documents        AR 501000026594       Thermal Fatigue Failure Risk CV-31040           04/30/2019
03/28/2019
AR 501000026841       U1 Feedwater System Trouble Alarm ROC           05/04/2019
AR 501000024793
AR 501000028641       Received OPdT Rod Stop/RB Channel Alert         06/19/2019
21 MDCLP Driver Stand Baseplate UT Data
AR 501000028971       Potential U1 RCS Flow Anomaly                   06/25/2019
03/28/2019
AR 501000029445       Decision Making for UT Inspection               07/11/2019
AR 501000024856
AR 501000029454       Need for Improved Risk Recognition             07/11/2019
21 CLP Motor Uncoupled Run Vibrations
Miscellaneous     PI_PROD2_5.3_20190225 Current Risk Summary Report as of 03/31/2019   03/31/2019
03/31/2019
21:40
AR 501000024877
Procedures       1C1.4 AOP1           Rapid Power Reduction Unit 1                   15
21 MDCLP Shaft Seal High Temp and Low Flow
C18.1                 Engineered Safeguards Equipment Support Systems 53
03/29/2019
IC28.2               Unit 1 Feedwater System                         46
AR 501000024886
71111.15   Corrective Action AR 501000026842       4 CL-90 Pipe Line Cooling Water Drip           05/04/2019
21 MDCLP Issues During Pump Test
Documents        AR 501000027295       125 VDC 12 Battery Float ERCS Alarms           05/12/2019
03/29/2019
AR 501000027333       TD-6-33 Steam Leak                             05/13/2019
AR 501000024890
AR 501000027988       22 CS Pump Mechanical Seal Leakage             05/31/2019
21 MDCLP Motor Lwr Bearing .008
AR 501000028736       Re-Evaluate Clamp on 4-CL-90                   06/19/2019
" Axial 03/30/2019
Corrective Action AR 501000028092       Dry Yellow Material on 22 CS Pump Cooler       06/03/2019
AR 501000024992
Documents
Roll UP Cap for 121 MDCLP
Resulting from
04/02/2019
Inspection
Work Orders
Drawings         NF-39237             Flow Diagra Containment Internal Spray System   07/11/2007
WO# 700047563
Units 1 and 2
21 Cooling Water Pump Baseline Test
PT 62160817           Seal Piping                                     0
Inspection Procedure Type Designation
Miscellaneous     FP-OP-ACM-01         22 CS Pump Mechanical Seal Leak Rate - Unit 2   05/31/2019
Description or Title
FP-PA-HU-05           Type 1 Operational Decision Making Evaluation   05/31/2019
Revision or Date 71111.13 Corrective Action Documents  AR 501000026173
Checklist 22 Containment Spray Pump Mechanical
Feed Water Pump Inboard Brg Vibes Rising
Seal
04/23/2019
71111.22   Corrective Action AR 501000026726       U2 RCS Leakrate Exceeds H60 Action Level 2     05/03/2019
AR 501000026594
Documents
Thermal Fatigue Failure Risk CV
Procedures       SP 1106C             121 Cooling Water Pump Quarterly Test           50
-31040 04/30/2019
SP 2307               D6 Diesel Generator 6-Month Fast Start Test     43
AR 501000026841
Work Orders       WO 700046796         SP 2307 D6 6-Month Fast Start Test             04/16/2019
U1 Feedwater System Trouble Alarm ROC
Inspection Type             Designation     Description or Title                             Revision or
05/04/2019
Procedure                                                                                      Date
AR 501000028641
71114.02   Corrective Action QIM501000013992 SP1397 Weekly Siren Testing
Received OPdT Rod Stop/RB Channel Alert
Documents        QIM501000014787 SP1397 Weekly Siren Testing
06/19/2019
Miscellaneous                     Alert and Notification System Design Report       4
AR 501000028971
PINGP Annual Alert and Notification Review Report 01/09/2019
Potential U1 RCS Flow Anomaly
2018
06/25/2019
AR 501000029445
Decision Making for UT Inspection
07/11/2019
AR 501000029454
Need for Improved Risk Recognition
07/11/2019
Miscellaneous
PI_PROD2_5.3_20190225
Current Risk Summary Report as of 03/31/2019 21:40 03/31/2019
Procedures
1C1.4 AOP1
Rapid Power Reduction Unit 1
C18.1 Engineered Safeguards Equipment Support Systems
IC28.2 Unit 1 Feedwater System
71111.15 Corrective Action Documents  AR 501000026842
CL-90 Pipe Line Cooling Water Drip
05/04/2019
AR 501000027295
25 VDC 12 Battery Float ERCS Alarms
05/12/2019
AR 501000027333
TD-6-33 Steam Leak
05/13/2019
AR 501000027988
CS Pump Mechanical Seal Leakage
05/31/2019
AR 501000028736
Re-Evaluate Clamp on 4
-CL-90 06/19/2019
Corrective Action Documents Resulting from Inspection
AR 501000028092
Dry Yellow Material on 22 CS Pump Cooler
06/03/2019
Drawings NF-39237 Flow Diagra Containment Internal Spray
System Units 1 and 2
07/11/2007
PT 62160817
Seal Piping
Miscellaneous
FP-OP-ACM-01 22 CS Pump Mechanical Seal Leak Rate  
- Unit 2 05/31/2019
FP-PA-HU-05 Type 1 Operational Decision Making Evaluation Checklist 22 Containment Spray Pump Mechanical Seal 05/31/2019
71111.22 Corrective Action Documents  AR 501000026726
U2 RCS Leakrate Exceeds H60 Action Level 2
05/03/2019
Procedures
SP 1106C 121 Cooling Water Pump Quarterly Test
SP 2307 D6 Diesel Generator 6
-Month Fast Start Test
Work Orders
WO 700046796
SP 2307 D6 6
-Month Fast Start Test
04/16/2019
 
Inspection Procedure Type Designation
Description or Title
Revision or Date 71114.02 Corrective Action Documents  QIM501000013992
SP1397 Weekly Siren Testing
QIM501000014787
SP1397 Weekly Siren Testing
Miscellaneous
Alert and Notification System Design Report
PINGP Annual Alert and Notification Review Report
2018 01/09/2019
Prairie Island Siren Maintenance Checklists from
Prairie Island Siren Maintenance Checklists from
2017 and 2018
2017 and 2018
71114.03 Corrective Action Documents  QIM501000005853
71114.03   Corrective Action QIM501000005853 Issue And Failure to Respond to Aug Test
Issue And Failure to Respond to Aug Test
Documents        QIM501000014183 SEC Issues During Simulator Session
QIM501000014183
Procedures       F3-1.1         On-shift Staffing Analysis Report                 3A
SEC Issues During Simulator Session
SP 1744         Semi-Annual Emergency Organization Augmentation   44
Procedures
Response Drill
F3-1.1 On-shift Staffing Analysis Report
Work Orders       WO700026217     SP 1744 Emergency Organization Augmentation
3A SP 1744 Semi-Annual Emergency Organization Augmentation Response Drill
Response Test
Work Orders
WO700044381     SP 1744 Emergency Organization Augmentation
WO700026217
Response Test
SP 1744 Emergency Organization Augmentation Response Test
71114.05   Corrective Action AR603000001473 EP Critique Report
WO700044381
Documents        AR603000001686 EP Critique Report
SP 1744 Emergency Organization Augmentation Response Test
AR603000001793 EP Critique Report
71114.05 Corrective Action Documents AR603000001473
AR603000001794 EP Critique Report
EP Critique Report
AR603000002777 EP Critique Report
AR603000001686
AR603000003000 EP Critique Report
EP Critique Report
AR606000000729 Emergency Plan NRC Baseline Inspection
AR603000001793
Readiness
EP Critique Report
AR606000000861 EP Critique Report
AR603000001794
QIM501000004321 SPC-EP-114 EOP Setpoint Changes
EP Critique Report
QIM501000008126 NOS: Fleet EP Surveillence Management
AR603000002777
QIM501000008132 NOS: Inconsistent PASS Drill Frequency
EP Critique Report
QIM501000008135 NOS: EP Consult Omission on EC
AR603000003000
QIM501000008182 NOS: May 2017 Drill Report Lacks 9.09 Obj
EP Critique Report
QIM501000008275 NOS IRMA: EP Objective Administration and
AR606000000729
Tracking
Emergency Plan NRC Baseline Inspection Readiness  AR606000000861
QIM501000008277 NOS Semiannual HP Drills
EP Critique Report
Inspection Type             Designation       Description or Title                               Revision or
QIM501000004321
Procedure                                                                                        Date
SPC-EP-114 EOP Setpoint Changes
Miscellaneous                       Prairie Island Nuclear Generating Plant Emergency 56
QIM501000008126
Plan
NOS: Fleet EP Surveillence Management
Self-                               Focused Self-Assessment Plan and Report EP
QIM501000008132
Assessments                        Program Assessment 12/10/2018 - 01/19/2019
NOS: Inconsistent PASS Drill Frequency
A-EP-PINGP-2018-1 2018 Nuclear Oversight PINGP Emergency             03/09/2018
QIM501000008135
Preparedness Audit
NOS: EP Consult Omission on EC
A-EP-PINGP-2019-1 2019 Nuclear Oversight Audit of Prairie Island     03/07/2019
QIM501000008182
Emergency Preparedness
NOS: May 2017 Drill Report Lacks 9.09 Obj
71124.05   Calculations                       2018 Prairie Island Radiological Isotopic Mixture 08/01/2018
QIM501000008275
Evaluation
NOS IRMA: EP Objective Administration and Tracking QIM501000008277
Calibration                         Canberra Fastscan Whole Body Counter (WBC)         08/16/2018
NOS Semiannual HP Drills
Records                            JL Shepherd Irradiator Calibration                 12/4/2018
 
AMS-4 Calibration Data Sheet for SN 0351           03/28/2019
Inspection Procedure Type Designation
Eberline PCM-1B Calibration Data Sheet For         08/07/2018
Description or Title
SN 293283
Revision or Date Miscellaneous
Portal Monitor Calibration Data Sheet For         01/16/2019
Prairie Island Nuclear Generating Plant Emergency Plan 56 Self-Assessments
SN 514991
Focused Self
SAM-11 Calibration Data Sheet For SN 538530       08/07/2018
-Assessment Plan and Report EP Program Assessment 12/10/2018  
AMP-100 Calibration Data Sheet For SN 5013-044     03/04/2019
- 01/19/2019
4084.01           Certificate Of Calibration For ASP-1 SN 1565       05/08/2019
A-EP-PINGP-2018-1 2018 Nuclear Oversight PINGP Emergency Preparedness Audit
Miscellaneous                       Radiochemistry Interlaboratory Comparison Program 05/06/2019
03/09/2018
Data
A-EP-PINGP-2019-1 2019 Nuclear Oversight Audit of Prairie Island Emergency Preparedness
Radiochemistry Interlaboratory Comparison Program 12/12/2018
03/07/2019
Data
71124.05 Calculations
SSA 606000000562 2018 Prairie Island Isotopic Mix Evaluation       0
2018 Prairie Island Radiological Isotopic Mixture Evaluation
Procedures       RPIP 1531         JL Shepherd Source Calibrator Operation           11
08/01/2018
71124.06   Corrective Action 01555235         Incorrect Volume On Gas Marineli                   04/10/2017
Calibration Records  Canberra Fastscan Whole Body Counter (WBC)
Documents        501000026917     Radiation Monitoring System Deep Dive Inspection   05/06/2019
08/16/2018
Miscellaneous     1526914          Off-Site Dose Calculation Manual Change Evaluation 10/11/2016
JL Shepherd Irradiator Calibration
PIGB2018-209     11 Steam Release Effluent Report                   09/23/2018
2/4/2018 AMS-4 Calibration Data Sheet for SN 0351
PIGC2018-215     Unit 1 Shield Building Vent Continuous Gaseous     12/05/2018
03/28/2019
Release Report
Eberline PCM
PILB2019-106     121 ADT Monitor Tank Liquid Batch Release Report   06/18/2019
-1B Calibration Data Sheet For
Inspection Type             Designation     Description or Title                               Revision or
SN 293283 08/07/2018
Procedure                                                                                        Date
Portal Monitor Calibration Data Sheet For
Procedures       SP 1125         Gas Decay Tank Monthly Activity Analysis           39
SN 514991 01/16/2019
SP 1783.1B     Westinghouse Radiation Monitor Electronic           01/10/2018
SAM-11 Calibration Data Sheet For SN 538530
Calibration Train B
08/07/2018
SWI STE-10     Evaluation of Out of Tolerance Calibration Data in  6
AMP-100 Calibration Data Sheet For SN 5013
Instrumentation and Control Procedures
-044 03/04/2019
Work Orders       700006828       18 Month 121 Auxiliary Building Special Ventilation 12/11/2017
4084.01 Certificate Of Calibration For ASP
Filter Testing
-1 SN 1565 05/08/2019
700010175       West Radiation Monitor Train B Calibration         02/17/2018
Miscellaneous
700010177       Victoreen Radiation Monitor Calibration             2/16/2018
Radiochemistry Interlaboratory Comparison Program Data 05/06/2019
700012241       NMC Radiation Monitor Train A Calibration           2/17/2018
Radiochemistry Interlaboratory Comparison Program Data 12/12/2018
71151     Corrective Action AR501000009426 DEP Failure for Incorrect PAR
SSA 606000000562
Documents        QIM501000021789 Simulator DEP Failure
2018 Prairie Island Isotopic Mix Evaluation
QIM501000022808 Simulator DEP Failure
Procedures
Miscellaneous                     NRC Performance Indicator Data; Emergency
RPIP 1531 JL Shepherd Source Calibrator Operation
Preparedness - Drill/Exercise Performance; 2nd
71124.06 Corrective Action Documents  01555235 Incorrect Volume On Gas Marineli
Quarter 2018 - 1st Quarter 2019
04/10/2017
NRC Performance Indicator Data; Emergency
501000026917
Preparedness - ERO Readiness; 2nd Quarter 2018
Radiation Monitoring System Deep Dive Inspection
                                            - 1st Quarter 2019
05/06/2019
NRC Performance Indicator Data; Emergency
Miscellaneous
Preparedness - Alert and Notification System
26914 Off-Site Dose Calculation Manual Change Evaluation
Reliability; 2nd Quarter 2018 - 1st Quarter 2019
10/11/2016
71152     Corrective Action AR 501000025067 13 Charging Pump Speed Controller Flashing         04/04/2019
PIGB2018-209 11 Steam Release Effluent Report
Documents
09/23/2018
Procedures       FG-OP-RSK-01   Configuration Risk Monitor User Guide               2
PIGC2018-215 Unit 1 Shield Building Vent Continuous Gaseous Release Report
FP-OP-RSK-01   Risk Monitoring and Risk Management                 9
2/05/2018
71153     Corrective Action AR 501000022572 Unplanned LCO Entry Into T.S. 3.8.1 B & E           01/31/2019
PILB2019-106 121 ADT Monitor Tank Liquid Batch Release Report
Documents
06/18/2 019
Procedures       F5 Appendix K   Fire Protection Systems Functional Requirements     28
Inspection Procedure Type Designation
17
Description or Title
Revision or Date Procedures
SP 1125 Gas Decay Tank Monthly Activity Analysis
SP 1783.1B
Westinghouse Radiation Monitor Electronic Calibration Train B
01/10/2018
SWI STE-10 Evaluation
of Out of Tolerance Calibration Data
i n Instrumentation and Control Procedures
Work Orders
700006828 18 Month 121 Auxiliary Building Special Ventilation Filter Testing
2/11/2017
700010175 West Radiation Monitor Train B Calibration
2/17/2018
700010177 Victoreen Radiation Monitor Calibration
2/16/2018 700012241 NMC Radiation Monitor Train A Calibration
2/17/2018 71151 Corrective Action Documents AR501000009426
DEP Failure for Incorrect PAR
QIM501000021789
Simulator DEP Failure
QIM501000022808
Simulator DEP Failure
Miscellaneous
NRC Performance Indicator Data; Emergency Preparedness  
- Drill/Exercise Performance; 2nd
Quarter 2018  
- 1st Quarter 2019
NRC Performance Indicator Data; Emergency Preparedness  
- ERO Readiness; 2nd
Quarter 2018  
- 1st Quarter 2019   NRC Performance Indicator Data; Emergency Preparedness  
- Alert and Notification System Reliability; 2nd
Quarter 2018  
- 1st Quarter 2019
71152 Corrective Action Documents  AR 501000025067
Charging Pump Speed Controller Flashing
04/04/2019
Procedures
FG-OP-RSK-01 Configuration Risk Monitor User Guide
FP-OP-RSK-01 Risk Monitoring and Risk Management
71153 Corrective Action Documents  AR 501000022572
Unplanned LCO Entry Into T.S. 3.8.1 B & E
01/31/2019
Procedures
F5 Appendix K
Fire Protection Systems Functional Requirements
28
}}
}}

Revision as of 23:12, 7 October 2019

Errata - Prairie Island Nuclear Generating Plant - Integrated Inspection Report 05000282/2019002; 05000306/2019002; and 07200010/2019001 (DRP-H.Peterson)
ML19231A273
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/16/2019
From: Hironori Peterson
Region 3 Branch 3
To: Sharp S
Northern States Power Company, Minnesota
References
IR 2019001
Download: ML19231A273 (20)


Text

ust 16, 2019

SUBJECT:

ERRATAPRAIRIE ISLAND NUCLEAR GENERATING PLANTINTEGRATED INSPECTION REPORT 05000282/2019002; 05000306/2019002; AND 07200010/2019001

Dear Mr. Sharp:

The NRC identified that the inspection report sent to you dated August 2, 2019 (ML19214A181)

inadvertently omitted three inspection observations from the report and failed to reference the Independent Spent Fuel Storage Installation Inspection Report number 07200010/2019001. As a result, the NRC has reissued the report in its entirety with the updated subject. None of these changes affected the technical content of the report.

On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant. On July 2, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket Nos. 05000282; 05000306; and 07200010/2019001 License Nos. DPR-42 and DPR-60

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000282; 05000306; and 07200010/2019001 License Numbers: DPR-42 and DPR-60 Report Numbers: 05000282/2019002; 05000306/2019002 and 0720010/2019001 Enterprise Identifier: I-2019-002-0057 and I-2019-001-0141 Licensee: Northern States Power Company, Minnesota Facility: Prairie Island Nuclear Generating Plant Location: Welch, Minnesota Inspection Dates: April 01, 2019 to June 30, 2019 Inspectors: S. Bell, Health Physicist M. Garza, Emergency Preparedness Inspector L. Haeg, Senior Resident Inspector M. Learn, Reactor Engineer V. Myers, Senior Health Physicist K. Pusateri, Resident Inspector Approved By: Hironori Peterson, Chief Branch 3 Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Prairie Island Nuclear Generating Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items Type Issue Number Title Report Section Status URI 05000282,05000306/2 Results of ISFSI Cask Array 60855.1 Closed 018002-01 Dose Calculation Not Incorporated into FSAR

PLANT STATUS

===Prairie Island Unit 1 operated at full power for the entirety of the inspection period, with the exception of 1) a power reduction to 40 percent power on April 27, 2019, to address elevated bearing vibrations on the #11 feedwater pump. Unit 1 was returned to 100 percent power on May 1, 2019; and 2) a power reduction to 75 percent power on June 4, 2019 for a flexible power operation demonstration.

Prairie Island Unit 2 operated at full power for the entirety of the inspection period, with the exception of a brief down power on May 28, 2019, to support main generator capability testing.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.03)

(1) The inspectors evaluated readiness for impending adverse weather conditions for heavy snowfall on April 10, 2019

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) #12 residual heat removal subsystem on May 10, 2019 (2) #11 and #12 auxiliary feed water pumps on April 25, 2019

71111.04S - Equipment Alignment Complete Walkdown Sample (IP Section 03.02)

(1) The inspectors evaluated system configurations during a complete walkdown of fire protection systems in the plant screenhouse on June 19, 2019

71111.05A - Fire Protection (Annual)

Annual Inspection (IP Section 03.02)

(1) The inspectors evaluated fire brigade performance in response to smoke detected in the 121 motor-driven fire pump room on May 28, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Fire zones 3, 11 and 12; feedwater pump area on May 8, 2019
(2) Fire zone 75; screenhouse 695' elevation on May 24, 2019
(3) Fire zone 2; auxiliary feedwater pump room on May 23, 2019
(4) Fire zone 74; screenhouse 670' elevation on June 18, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.)

The inspectors evaluated internal flooding mitigation protections in the:

(1) D1 and D2 emergency diesel generator rooms on May 28, 2019 Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)===

The inspectors evaluated cable submergence protection in:

===(1) 121 motor-driven fire pump room on May 29, 2019

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1) The inspectors observed and evaluated licensed operator performance in the main control room during Unit 1 power capability testing on April 3, 2019 Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
(1) The inspectors observed and evaluated an operator requalification session in the

===simulator on May 10, 2019

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Unit 2 safety injection system on April 4, 2019
(2) 121 motor-driven cooling water pump April 2, 2019
(3) 11 feed water pump on May 1, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) AR 501000026841; Unit 1 Feedwater System Trouble Alarm on May 4, 2019
(2) AR 501000024929; Breaker 1H3 Tripped Open Due to Ground Fault on April 3, 2019
(3) AR 501000026173; 11 Feedwater Elevated Vibrations on April 29, 2019
(4) AR 501000025118; 13 Charging Pump Out of Service on April 6, 2019
(5) AR 501000028641; Received OPdT Rod Stop/Runback Channel Alert on June 19, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) AR 501000026842; 4-CL-90 Cooling Water Pipe Leak on May 8, 2019
(2) AR 501000027295; 125 VDC Battery Float Alarms on May 13, 2019
(3) AR 501000027333; TD-6-33 Steam Leak on May 17, 2019
(4) AR 501000027988; 22 Containment Spray Pump Seal Leakage on May 31, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

The inspectors evaluated the following temporary or permanent modifications:

(1) Temporary modification to address through wall leak on 4-CL-90 (cooling water supply piping to 12 auxiliary feedwater pump) on May 4, 2019

71111.19 - Post-Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01)

The inspectors evaluated the following post maintenance tests:

(1) 121 motor-driven cooling water pump following pump replacement on May 30, 2019
(2) 22 containment spray pump pressure test on May 31, 2019
(3) 12 residual heat removal system on June 20, 2019

71111.22 - Surveillance Testing

===The inspectors evaluated the following surveillance tests:

Inservice Testing (IP Section 03.01)===

(1) SP 1106C; 121 Cooling Water Pump Quarterly Test on April 5, 2019 RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)===
(1) SP 2001AA; Reactor Coolant System Leakage Test on May 3, 2019

Surveillance Tests (other) (IP Section 03.01) (2 Samples)

(1) SP 2307; D6 Diesel Generator 6-month Fast Start Test on April 22, 2019

===(2) SP 1106B; 22 Diesel Driven Cooling Water Pump Monthly Test on April 5, 2019

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04)

(1) The inspectors evaluated the following maintenance and testing of the alert and notification system:
  • Prairie Island Annual Siren Maintenance 2017
  • Prairie Island Annual Siren Maintenance 2018

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02)

(1) The inspectors evaluated the readiness of the Emergency Response Organization

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11)

(1) The inspectors evaluated the maintenance of the emergency preparedness program

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02)

The inspectors evaluated:

(1) a licensed operator simulator scenario involving Drill and Exercise Performance Indicator opportunities on May 29, 2019 Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)

(1 Sample)===

The inspectors evaluated:

===(1) an emergency preparedness drill on April 10, 2019

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Calibration and Testing Program (IP Section 02.02)

The inspectors evaluated the calibration and testing program implementation.

(1) Alarm Setpoint and Calibration Method Check of Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
  • Rados Two Step Personnel Contamination Monitor Serial Number 479903
  • Eberline PM-7 Portal Monitor Serial Number PM594 Failure to Meet Calibration or Source Check Acceptance Criteria
  • Microrem survey instrument Serial Number 566362
  • Air sampler mass flow meter Serial Number 476405
  • Telepole survey instrument Serial Number 580336 Walk Downs and Observations (IP Section 02.01) (1 Sample)===

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.

===(1) Portable Survey Instruments

  • Ludlum Model 177 Serial Number 478529
  • Ludlum Model 177 Serial Number 478524
  • MG Telepole Serial Number 6612-134
  • Eberline Model AMS4 Serial Number 1726
  • Ludlum Model 9-3 Serial Number 298975 Source Check Demonstration
  • Minirad Model 3500
  • Ludlum Model 9-3
  • Ludlum Model 177 Area Radiation Monitors and Continuous Air Monitors
  • Eberline AMS4 Continuous Air Monitor Serial Number 1726
  • Eberline AMS4 Continuous Air Monitor Serial Number 537454
  • R29 Area Radiation Monitor
  • 1R57 Area Radiation Monitor
  • R4 Area Radiation Monitor Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
  • Rados Model Two Step Serial Number 479903
  • Eberline SAM-11 Small Article Monitor Serial Number 309741

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02)

The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:

(1)

  • RE-18, Liquid Effluent Radiation Monitor
  • 2R-37, Unit 2 Auxiliary Building Vent Gas Monitor Dose Calculations (IP Section 02.05) (1 Sample)===

The inspectors reviewed the following to asses public dose:

===(1) Liquid and gaseous discharge permits to evaluate public dose calculations:

  • PIGB2018-209, Steam Release
  • PILB2019-016, Liquid Batch Tanks
  • 2017 Annual Effluent Release Report
  • 2018 Annual Effluent Release Report Abnormal gaseous or liquid tank discharges:
  • 122 Waste Gas Compressor Moisture Separator Weld Leak, 2017 Instrumentation and Equipment (IP Section 02.04) (1 Sample)===

The inspectors reviewed the following radioactive effluent discharge system surveillance test

===results:

(1) Unit 1 Auxiliary Building Special Ventilation System Sampling and Analysis (IP Section 02.03) (1 Sample)===

The inspectors reviewed the following:

===(1) Radioactive effluent sampling and analysis activities:

  • Aerated Drains Treatment Tank Liquid Discharges
  • Auxiliary Building Gaseous Discharges
  • None Available Walk Downs and Observations (IP Section 02.01) (1 Sample)===

The inspectors walked down the following gaseous and liquid radioactive effluent monitoring

===and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:

(1)

  • 2R-37, Unit 2 Auxillary Building Vent Gas Monitor A
  • R-18, Waste Disposal System Liquid Effluent Monitor
  • Auxiliary Building Special Ventilation System

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12) ===

(1) April 1, 2018 through March 31, 2019 EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
(1) April 1, 2018 through March 31, 2019

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) April 1, 2018 through March 31, 2019

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (April 1, 2018 through March 31, 2019)

===(2) Unit 2 (April 1, 2018 through March 31, 2019)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)===

(1) Unit 1 (April 1, 2018 through March 31, 2019)

===(2) Unit 2 (April 1, 2018 through March 31, 2019)

71152 - Problem Identification and Resolution

Annual Followup of Selected Issues (IP Section 02.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:

(1) Implementation of adverse condition monitoring program Semiannual Trend Review (IP Section 02.02) (1 Sample)===
(1) The inspectors reviewed the corrective action program for potential adverse trends in

===licensee's 10 CFR 50.65(a)(4) (online risk management) program on April 29, 2019

71153 - Followup of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03)

(1) The inspectors evaluated control room personnel performance following a 121 motor-driven fire pump electrical fault on May 28, 2019 Reporting (IP Section 03.05) (1 Sample)===
(1) Prairie Island Event Notification 53853 and subsequent retraction on May 15, 2019

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants (1 Partial)

(1) (Partial)

The inspectors closed Unresolved Item 05000282/2018002-01; 05000306/2018002-01, Results of ISFSI Cask Array Dose Calculation Not Incorporated into FSAR. The details of this review are documented in the inspection results below. No findings or violations were identified.

INSPECTION RESULTS

Observation: Aggregate review of Adverse Condition Monitoring Program 71152 The inspectors reviewed, in aggregate, plant issues being monitored as part of the licensee's adverse condition monitoring program. This included a review of programmatic requirements and processes, as well as discussions with engineering and operations personnel to determine whether active adverse conditions, in aggregate, were manageable. The inspectors also reviewed whether the licensee was appropriately monitoring adverse conditions by establishing criteria or set points for which further evaluation or action was designated. The inspectors determined, overall, that the licensee was effectively managing adverse conditions and no concerns were identified as part of this review.

Observation: Review of 10 CFR 50.65 (a)(4) online risk management program 71152 The inspectors reviewed licensee procedures and processes, and interviewed knowledgeable licensee personnel regarding the station's implementation of their online risk management program. In particular, the inspectors questioned the licensee's bases for determining whether equipment remained available or unavailable with respect to online risk and work management following certain emergent issues during the inspection period. For a few instances where the licensee determined equipment to be available due to the ability to start, the inspectors questioned whether consideration was given as to the ability for the equipment to continue to perform its function for any particular amount of time. In some instances, based on discussions with the inspectors, the licensee revisited their availability bases and modified the online risk model to reflect unavailability and/or implemented measures to minimize any impact to overall online risk. Based on these revisions, the licensee initiated changes to how availability bases decisions were documented in operator logs, and also improved interactions with licensee risk analysts when complicated availability questions arose going forward.

Observation: Prairie Island Event Notification 53853 and retraction 71153 The inspectors reviewed Prairie Island Event Notification 53853 submitted on January 1, 2019, as well as the retraction of this EN made on March 22, 2019. The EN was submitted due to both Unit 2 emergency diesel generators being briefly declared inoperable during extreme cold temperatures on January 31, 2019. Following the period of inoperability for D5

& D6, the licensee performed calculations to show that based on the short duration of the low temperatures, the actual lowest temperature that the equipment would have been exposed would not have been lower than the operability limit. Therefore, the EDGs remained operable for this issue and a retraction to the Event Notification was made. The inspectors reviewed the calculations, held discussions with engineering personnel, and determined that the basis for the retraction was reasonable.

Unresolved Item Results of ISFSI Cask Array Dose Calculation Not 60855.1 (Closed) Incorporated into FSAR 05000282,05000306/2018002-01

Description:

In Unresolved Item 05000282/2018002-01; 05000306/2018002-01, the inspectors documented an item of concern associated with the licensees updating of their independent spent fuel storage installation (ISFSI) Final Safety Analysis Report (FSAR).

Specifically, the inspectors questioned whether or not the licensee is required to update the ISFSI FSAR with the offsite dose results of calculation TN40HT-0502 for an array of casks in accordance with 10 CFR 72.70.

To address this unresolved item, the inspectors reviewed correspondence between the licensee and the NRC and interviewed a member of the licensees staff. The inspectors reviewed whether calculation TN40HT-0502 was submitted to the NRC by the licensee since the submission of the original FSAR. The inspectors determined that the licensee never submitted calculation TN40HT-0502 to the NRC. Further, the inspectors confirmed that the ISFSI FSAR contained the results of a separate offsite dose analysis that was representative of the conditions at the Prairie Island ISFSI.

Since calculation TN40HT-0502 was never submitted to the NRC, and the FSAR already contains results of offsite dose analysis that is representative of the conditions at the Prairie Island ISFSI, the inspectors determined that the licensee was not required to update the ISFSI FSAR with the results of calculation TN40HT-0502 in accordance with 10 CFR 72.70.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 2, 2019, the inspectors presented the integrated inspection results to Mr. S. Sharp and other members of the licensee staff.
  • On May 2, 2019, the inspectors presented the Emergency Preparedness Baseline Inspection/Performance Indicator Verification exit meeting to Ms. D. Wilson, Director of Site Performance and other members of the licensee staff.
  • On June 20, 2019, the inspectors presented the radiation protection baseline inspection results to Ms. D. Wilson, Director Site Performance and Operations Support, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.04 Drawings NF-39222 Flow Diagram Feedwater and Auxiliary Feedwater 05/04/2007

Unit 1

71111.04S Drawings NF-39228-1 Fire Protection & Screen Wash System 95

71111.05A Corrective Action AR 501000027914 Received Multiple Unexpected Alarms 05/29/2019

Documents

71111.05Q Procedures F5 Appendix F Fire Area 32; Fire Hazard Analysis 36

Fire Detection Zone 2 Auxiliary Feedwater Pump Rooms, Elevation 695' 48

Fire Detection Zone 74 Screenhouse Ground Floor, Elevation 670' 34

Fire Detection Zone 75 Screenhouse Operating Floor Elevation 695' 44

71111.06 Calculations PI-S-027 Internal Flooding Evaluation of D5/D6 Area 05/21/1999

Corrective Action AR 501000027900 Water Intrusion and Short Damage 05/28/2019

Documents

Procedures H65.2.21 Inaccessible Medium and Low Voltage Cables Not 2

Subject to 10 CFR 50.49 Environmental Qualification

Requirements Aging Management Program

PINGP 1732 Cable Condition Monitoring Cable Inspection 1

71111.11Q Miscellaneous None Prairie Island Nuclear Generating Plant Emergency 04/10/2019

Plan Drill

SEG# P9118ST-0903 Cycle 181 SIM Session #3 0

Procedures SP 1282 U1 MOD-025 Verification and Data Reporting of 0

Generator Real and Reactive Power Capabilities

(NERC)

71111.12 Corrective Action AR 501000023356 121 Fltr Water Strainer Packing Leak 02/20/2019

Documents AR 501000024769 121 MDCLP: Broken Bearing Water Line 03/28/2019

AR 501000024793 121 MDCLP Driver Stand Baseplate UT Data 03/28/2019

AR 501000024856 121 CLP Motor Uncoupled Run Vibrations 03/31/2019

AR 501000024877 121 MDCLP Shaft Seal High Temp and Low Flow 03/29/2019

AR 501000024886 121 MDCLP Issues During Pump Test 03/29/2019

AR 501000024890 121 MDCLP Motor Lwr Bearing .008 Axial 03/30/2019

AR 501000024992 Roll UP Cap for 121 MDCLP 04/02/2019

Work Orders WO# 700047563 121 Cooling Water Pump Baseline Test 0

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.13 Corrective Action AR 501000026173 11 Feed Water Pump Inboard Brg Vibes Rising 04/23/2019

Documents AR 501000026594 Thermal Fatigue Failure Risk CV-31040 04/30/2019

AR 501000026841 U1 Feedwater System Trouble Alarm ROC 05/04/2019

AR 501000028641 Received OPdT Rod Stop/RB Channel Alert 06/19/2019

AR 501000028971 Potential U1 RCS Flow Anomaly 06/25/2019

AR 501000029445 Decision Making for UT Inspection 07/11/2019

AR 501000029454 Need for Improved Risk Recognition 07/11/2019

Miscellaneous PI_PROD2_5.3_20190225 Current Risk Summary Report as of 03/31/2019 03/31/2019

21:40

Procedures 1C1.4 AOP1 Rapid Power Reduction Unit 1 15

C18.1 Engineered Safeguards Equipment Support Systems 53

IC28.2 Unit 1 Feedwater System 46

71111.15 Corrective Action AR 501000026842 4 CL-90 Pipe Line Cooling Water Drip 05/04/2019

Documents AR 501000027295 125 VDC 12 Battery Float ERCS Alarms 05/12/2019

AR 501000027333 TD-6-33 Steam Leak 05/13/2019

AR 501000027988 22 CS Pump Mechanical Seal Leakage 05/31/2019

AR 501000028736 Re-Evaluate Clamp on 4-CL-90 06/19/2019

Corrective Action AR 501000028092 Dry Yellow Material on 22 CS Pump Cooler 06/03/2019

Documents

Resulting from

Inspection

Drawings NF-39237 Flow Diagra Containment Internal Spray System 07/11/2007

Units 1 and 2

PT 62160817 Seal Piping 0

Miscellaneous FP-OP-ACM-01 22 CS Pump Mechanical Seal Leak Rate - Unit 2 05/31/2019

FP-PA-HU-05 Type 1 Operational Decision Making Evaluation 05/31/2019

Checklist 22 Containment Spray Pump Mechanical

Seal

71111.22 Corrective Action AR 501000026726 U2 RCS Leakrate Exceeds H60 Action Level 2 05/03/2019

Documents

Procedures SP 1106C 121 Cooling Water Pump Quarterly Test 50

SP 2307 D6 Diesel Generator 6-Month Fast Start Test 43

Work Orders WO 700046796 SP 2307 D6 6-Month Fast Start Test 04/16/2019

Inspection Type Designation Description or Title Revision or

Procedure Date

71114.02 Corrective Action QIM501000013992 SP1397 Weekly Siren Testing

Documents QIM501000014787 SP1397 Weekly Siren Testing

Miscellaneous Alert and Notification System Design Report 4

PINGP Annual Alert and Notification Review Report 01/09/2019

2018

Prairie Island Siren Maintenance Checklists from

2017 and 2018

71114.03 Corrective Action QIM501000005853 Issue And Failure to Respond to Aug Test

Documents QIM501000014183 SEC Issues During Simulator Session

Procedures F3-1.1 On-shift Staffing Analysis Report 3A

SP 1744 Semi-Annual Emergency Organization Augmentation 44

Response Drill

Work Orders WO700026217 SP 1744 Emergency Organization Augmentation

Response Test

WO700044381 SP 1744 Emergency Organization Augmentation

Response Test

71114.05 Corrective Action AR603000001473 EP Critique Report

Documents AR603000001686 EP Critique Report

AR603000001793 EP Critique Report

AR603000001794 EP Critique Report

AR603000002777 EP Critique Report

AR603000003000 EP Critique Report

AR606000000729 Emergency Plan NRC Baseline Inspection

Readiness

AR606000000861 EP Critique Report

QIM501000004321 SPC-EP-114 EOP Setpoint Changes

QIM501000008126 NOS: Fleet EP Surveillence Management

QIM501000008132 NOS: Inconsistent PASS Drill Frequency

QIM501000008135 NOS: EP Consult Omission on EC

QIM501000008182 NOS: May 2017 Drill Report Lacks 9.09 Obj

QIM501000008275 NOS IRMA: EP Objective Administration and

Tracking

QIM501000008277 NOS Semiannual HP Drills

Inspection Type Designation Description or Title Revision or

Procedure Date

Miscellaneous Prairie Island Nuclear Generating Plant Emergency 56

Plan

Self- Focused Self-Assessment Plan and Report EP

Assessments Program Assessment 12/10/2018 - 01/19/2019

A-EP-PINGP-2018-1 2018 Nuclear Oversight PINGP Emergency 03/09/2018

Preparedness Audit

A-EP-PINGP-2019-1 2019 Nuclear Oversight Audit of Prairie Island 03/07/2019

Emergency Preparedness

71124.05 Calculations 2018 Prairie Island Radiological Isotopic Mixture 08/01/2018

Evaluation

Calibration Canberra Fastscan Whole Body Counter (WBC) 08/16/2018

Records JL Shepherd Irradiator Calibration 12/4/2018

AMS-4 Calibration Data Sheet for SN 0351 03/28/2019

Eberline PCM-1B Calibration Data Sheet For 08/07/2018

SN 293283

Portal Monitor Calibration Data Sheet For 01/16/2019

SN 514991

SAM-11 Calibration Data Sheet For SN 538530 08/07/2018

AMP-100 Calibration Data Sheet For SN 5013-044 03/04/2019

4084.01 Certificate Of Calibration For ASP-1 SN 1565 05/08/2019

Miscellaneous Radiochemistry Interlaboratory Comparison Program 05/06/2019

Data

Radiochemistry Interlaboratory Comparison Program 12/12/2018

Data

SSA 606000000562 2018 Prairie Island Isotopic Mix Evaluation 0

Procedures RPIP 1531 JL Shepherd Source Calibrator Operation 11

71124.06 Corrective Action 01555235 Incorrect Volume On Gas Marineli 04/10/2017

Documents 501000026917 Radiation Monitoring System Deep Dive Inspection 05/06/2019

Miscellaneous 1526914 Off-Site Dose Calculation Manual Change Evaluation 10/11/2016

PIGB2018-209 11 Steam Release Effluent Report 09/23/2018

PIGC2018-215 Unit 1 Shield Building Vent Continuous Gaseous 12/05/2018

Release Report

PILB2019-106 121 ADT Monitor Tank Liquid Batch Release Report 06/18/2019

Inspection Type Designation Description or Title Revision or

Procedure Date

Procedures SP 1125 Gas Decay Tank Monthly Activity Analysis 39

SP 1783.1B Westinghouse Radiation Monitor Electronic 01/10/2018

Calibration Train B

SWI STE-10 Evaluation of Out of Tolerance Calibration Data in 6

Instrumentation and Control Procedures

Work Orders 700006828 18 Month 121 Auxiliary Building Special Ventilation 12/11/2017

Filter Testing

700010175 West Radiation Monitor Train B Calibration 02/17/2018

700010177 Victoreen Radiation Monitor Calibration 2/16/2018

700012241 NMC Radiation Monitor Train A Calibration 2/17/2018

71151 Corrective Action AR501000009426 DEP Failure for Incorrect PAR

Documents QIM501000021789 Simulator DEP Failure

QIM501000022808 Simulator DEP Failure

Miscellaneous NRC Performance Indicator Data; Emergency

Preparedness - Drill/Exercise Performance; 2nd

Quarter 2018 - 1st Quarter 2019

NRC Performance Indicator Data; Emergency

Preparedness - ERO Readiness; 2nd Quarter 2018

- 1st Quarter 2019

NRC Performance Indicator Data; Emergency

Preparedness - Alert and Notification System

Reliability; 2nd Quarter 2018 - 1st Quarter 2019

71152 Corrective Action AR 501000025067 13 Charging Pump Speed Controller Flashing 04/04/2019

Documents

Procedures FG-OP-RSK-01 Configuration Risk Monitor User Guide 2

FP-OP-RSK-01 Risk Monitoring and Risk Management 9

71153 Corrective Action AR 501000022572 Unplanned LCO Entry Into T.S. 3.8.1 B & E 01/31/2019

Documents

Procedures F5 Appendix K Fire Protection Systems Functional Requirements 28

17