August 2, 2019

Mr. Scott Sharp

Site Vice President

Prairie Island Nuclear Generating Plant

Northern States Power Company, Minnesota

1717 Wakonade Drive East

Welch, MN 55089-9642

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

INTEGRATED INSPECTION REPORT 05000282/2019002 AND

05000306/2019002

Dear Mr. Sharp:

On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at

Prairie Island Nuclear Generating Plant, Units 1 and 2. On July 2, 2019, the NRC inspectors

discussed the results of this inspection with you and other members of your staff. The results of

this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief

Branch 3

Division of Reactor Projects

Docket Nos. 05000282 and 05000306

License Nos. DPR-42 and DPR-60

Enclosure:

As stated

cc: Distribution via LISTSERV

ML19214A181

x

SUNSI Review

x

Non-Sensitive

Sensitive

x

Publicly Available

Non-Publicly Available

OFFICE RIII

NAME

HPeterson:nk

DATE

8/2/2019

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000282 and 05000306

License Numbers:

DPR-42 and DPR-60

Report Numbers:

05000282/2019002 and 05000306/2019002

Enterprise Identifier: I-2019-002-0057

Licensee:

Xcel Energy

Facility:

Prairie Island Nuclear Generating Plant

Location:

Welch, Minnesota

Inspection Dates:

April 01, 2019 to June 30, 2019

Inspectors:

S. Bell, Health Physicist

M. Garza, Emergency Preparedness Inspector

L. Haeg, Senior Resident Inspector

V. Myers, Senior Health Physicist

K. Pusateri, Resident Inspector

Approved By:

Hironori Peterson, Chief

Branch 3

Division of Reactor Projects

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Prairie Island Nuclear Generating Plant

in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the

NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer

to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type

Issue Number

Title

Report Section

Status

URI

05000282,05000306/2

018002-01

Results of ISFSI Cask Array

Dose Calculation Not

Incorporated into FSAR

60855.1

Closed

3

PLANT STATUS

Prairie Island Unit 1 operated at full power for the entirety of the inspection period, with the

exception of 1) a power reduction to 40 percent power on April 27, 2019, to address elevated

bearing vibrations on the #11 feedwater pump. Unit 1 was returned to 100 percent power on

May 1, 2019; and 2) a power reduction to 75 percent power on June 4, 2019, for a flexible

power operation demonstration.

Prairie Island Unit 2 operated at full power for the entirety of the inspection period, with the

exception of a brief down power on May 28, 2019, to support main generator capability testing.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem

Identification and Resolution. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.03) (1 Sample)

(1)

The inspectors evaluated readiness for impending adverse weather conditions for

heavy snowfall on April 10, 2019

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1)

Number 12 residual heat removal subsystem on May 10, 2019

(2)

Number(s) 11 and 12 auxiliary feed water pumps on April 25, 2019

71111.04S - Equipment Alignment

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated system configurations during a complete walkdown of fire

protection systems in the plant screenhouse on June 19, 2019

4

71111.05A - Fire Protection (Annual)

Annual Inspection (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated fire brigade performance in response to smoke detected in

the 121 motor-driven fire pump room on May 28, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (4 Samples)

The inspectors evaluated fire protection program implementation in the following selected

areas:

(1)

Fire zones 3, 11 and 12; feedwater pump area on May 8, 2019

(2)

Fire zone 75; screenhouse 695 elevation on May 24, 2019

(3)

Fire zone 2; auxiliary feedwater pump room on May 23, 2019

(4)

Fire zone 74; screenhouse 670 elevation on June 18, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in:

(1)

D1 and D2 emergency diesel generator rooms on May 28, 2019

Inspection Activities - Underground Cables (IP Section 02.02c.) (1 Sample)

The inspectors evaluated cable submergence protection in:

(1)

121 motor-driven fire pump room on May 29, 2019

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1)

The inspectors observed and evaluated licensed operator performance in the main

control room during Unit 1 power capability testing on April 3, 2019

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1)

The inspectors observed and evaluated an operator requalification session in the

simulator on May 10, 2019

5

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (3 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with

the following equipment and/or safety significant functions:

(1)

Unit 2 safety injection system on April 4, 2019

(2)

121 motor-driven cooling water pump April 2, 2019

(3)

11 feed water pump on May 1, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work

activities:

(1)

AR 501000026841; Unit 1 Feedwater System Trouble Alarm on May 4, 2019

(2)

AR 501000024929; Breaker 1H3 Tripped Open Due to Ground Fault on April 3, 2019

(3)

AR 501000026173; 11 Feedwater Elevated Vibrations on April 29, 2019

(4)

AR 501000025118; 13 Charging Pump Out of Service on April 6, 2019

(5)

AR 501000028641; Received OPdT Rod Stop/Runback Channel Alert on

June 19, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (4 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1)

AR 501000026842; 4-CL-90 Cooling Water Pipe Leak on May 8, 2019

(2)

AR 501000027295; 125 VDC Battery Float Alarms on May 13, 2019

(3)

AR 501000027333; TD-6-33 Steam Leak on May 17, 2019

(4)

AR 501000027988; 22 Containment Spray Pump Seal Leakage on May 31, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1)

Temporary modification to address through-wall leak on 4-CL-90 (cooling water

supply piping to 12 auxiliary feedwater pump) on May 4, 2019

6

71111.19 - Post-Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post maintenance tests:

(1)

121 motor-driven cooling water pump following pump replacement on May 30, 2019

(2)

22 containment spray pump pressure test on May 31, 2019

(3)

12 residual heat removal system on June 20, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Inservice Testing (IP Section 03.01) (1 Sample)

(1)

SP 1106C; 121 Cooling Water Pump Quarterly Test on April 5, 2019

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1)

SP 2001AA; Reactor Coolant System Leakage Test on May 3, 2019

Surveillance Tests (other) (IP Section 03.01) (2 Samples)

(1)

SP 2307; D6 Diesel Generator 6-month Fast Start Test on April 22, 2019

(2)

SP 1106B; 22 Diesel Driven Cooling Water Pump Monthly Test on April 5, 2019

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1)

The inspectors evaluated the following maintenance and testing of the alert and

notification system:

Prairie Island Annual Siren Maintenance 2017

Prairie Island Annual Siren Maintenance 2018

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1)

The inspectors evaluated the readiness of the Emergency Response Organization

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1)

The inspectors evaluated the maintenance of the emergency preparedness program

7

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1)

a licensed operator simulator scenario involving Drill and Exercise Performance

Indicator opportunities on May 29, 2019

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)

(1 Sample)

The inspectors evaluated:

(1)

an emergency preparedness drill on April 10, 2019

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Calibration and Testing Program (IP Section 02.02) (1 Sample)

The inspectors evaluated the calibration and testing program implementation.

(1)

Alarm Setpoint and Calibration Method Check of Personnel Contamination Monitors,

Portal Monitors and Small Article Monitors

Rados Two Step Personnel Contamination Monitor Serial Number 479903

Eberline PM-7 Portal Monitor Serial Number PM594

Failure to Meet Calibration or Source Check Acceptance Criteria

Microrem survey instrument Serial Number 566362

Air sampler mass flow meter Serial Number 476405

Telepole survey instrument Serial Number 580336

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walk downs.

(1)

Portable Survey Instruments

Ludlum Model 177 Serial Number 478529

Ludlum Model 177 Serial Number 478524

MG Telepole Serial Number 6612-134

Eberline Model AMS4 Serial Number 1726

Ludlum Model 9-3 Serial Number 298975

Source Check Demonstration

Minirad Model 3500

Ludlum Model 9-3

Ludlum Model 177

8

Area Radiation Monitors and Continuous Air Monitors

Eberline AMS4 Continuous Air Monitor Serial Number 1726

Eberline AMS4 Continuous Air Monitor Serial Number 537454

R29 Area Radiation Monitor

1R57 Area Radiation Monitor

R4 Area Radiation Monitor

Personnel Contamination Monitors, Portal Monitors and Small Article Monitors

Rados Model Two Step Serial Number 479903

Eberline SAM-11 Small Article Monitor Serial Number 309741

Eberline PM-7 Portal Monitor Serial Number 479831

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)

The inspectors reviewed the following gaseous and liquid effluent monitor instrument

calibrations and tests:

(1)

RE-18, Liquid Effluent Radiation Monitor

2R-37, Unit 2 Auxiliary Building Vent Gas Monitor

Dose Calculations (IP Section 02.05) (1 Sample)

The inspectors reviewed the following to asses public dose:

(1)

Liquid and gaseous discharge permits to evaluate public dose calculations:

PIGB2018-209, Steam Release

PILB2019-016, Liquid Batch Tanks

PIGC2018-215; Unit 1 Shield Building Vent

Annual radiological effluent release reports:

2017 Annual Effluent Release Report

2018 Annual Effluent Release Report

Abnormal gaseous or liquid tank discharges:

122 Waste Gas Compressor Moisture Separator Weld Leak, 2017

Instrumentation and Equipment (IP Section 02.04) (1 Sample)

The inspectors reviewed the following radioactive effluent discharge system surveillance test

results:

(1)

Unit 1 Auxiliary Building Special Ventilation System

9

Sampling and Analysis (IP Section 02.03) (1 Sample)

The inspectors reviewed the following:

(1)

Radioactive effluent sampling and analysis activities:

Aerated Drains Treatment Tank Liquid Discharges

Auxiliary Building Gaseous Discharges

Shield Building Gaseous Discharges

Effluent discharges made with inoperable effluent monitors:

None Available

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors walked down the following gaseous and liquid radioactive effluent monitoring

and filtered ventilation systems to assess the material condition and verify proper alignment

according to plant design:

(1)

2R-22, Unit 2 Shield Building Vent Gas Monitor

2R-37, Unit 2 Auxillary Building Vent Gas Monitor A

1R-19, Unit 1 Steam Generator Blowdown Monitor

R-18, Waste Disposal System Liquid Effluent Monitor

Auxiliary Building Special Ventilation System

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12) (1 Sample)

(1)

April 1, 2018 through March 31, 2019

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1)

April 1, 2018 through March 31, 2019

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1)

April 1, 2018 through March 31, 2019

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1)

Unit 1 (April 1, 2018 through March 31, 2019)

(2)

Unit 2 (April 1, 2018 through March 31, 2019)

10

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1)

Unit 1 (April 1, 2018 through March 31, 2019)

(2)

Unit 2 (April 1, 2018 through March 31, 2019)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issue:

(1)

Implementation of adverse condition monitoring program

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1)

The inspectors reviewed the corrective action program for potential adverse trends in

licensee's 10 CFR 50.65(a)(4) (online risk management) program on April 29, 2019

71153 - Follow-Up of Events and Notices of Enforcement Discretion

Personnel Performance (IP Section 03.03) (1 Sample)

(1)

The inspectors evaluated control room personnel performance following a 121 motor-

driven fire pump electrical fault on May 28, 2019

Reporting (IP Section 03.05) (1 Sample)

(1)

Prairie Island Event Notification 53853 and subsequent retraction on May 15, 2019

INSPECTION RESULTS

Unresolved Item

(Closed)

Results of ISFSI Cask Array Dose Calculation Not

Incorporated into FSAR

05000282,05000306/2018002-01

60855.1

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On May 2, 2019, the inspectors presented the Emergency Preparedness Baseline

Inspection/Performance Indicator Verification exit meeting to Ms. D. Wilson, Director of

Site Performance and other members of the licensee staff.

On June 20, 2019, the inspectors presented the Radiation Protection Baseline

Inspection results to Ms. D. Wilson, Director Site Performance and Operations Support,

and other members of the licensee staff.

On July 2, 2019, the inspectors presented the integrated inspection results to

Mr. S. Sharp and other members of the licensee staff.

11

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Drawings

NF-39222

Flow Diagram Feedwater and Auxiliary Feedwater

Unit 1

05/04/2007

71111.04S

NF-39228-1

Fire Protection & Screen Wash System

95

71111.05A

Corrective Action

Documents

AR 501000027914

Received Multiple Unexpected Alarms

05/29/2019

71111.05Q Procedures

F5 Appendix F

Fire Area 32; Fire Hazard Analysis

36

Fire Detection Zone 2

Auxiliary Feedwater Pump Rooms, Elevation 695

48

Fire Detection Zone 74

Screenhouse Ground Floor, Elevation 670

34

Fire Detection Zone 75

Screenhouse Operating Floor Elevation 695

44

71111.06

Calculations

PI-S-027

Internal Flooding Evaluation of D5/D6 Area

05/21/1999

Corrective Action

Documents

AR 501000027900

Water Intrusion and Short Damage

05/28/2019

Procedures

H65.2.21

Inaccessible Medium and Low Voltage Cables Not

Subject to 10 CFR 50.49 Environmental Qualification

Requirements Aging Management Program

2

PINGP 1732

Cable Condition Monitoring Cable Inspection

1

71111.11Q Miscellaneous

None

Prairie Island Nuclear Generating Plant Emergency

Plan Drill

04/10/2019

SEG# P9118ST-0903

Cycle 181 SIM Session #3

0

Procedures

SP 1282

U1 MOD-025 Verification and Data Reporting of

Generator Real and Reactive Power Capabilities

(NERC)

0

71111.12

Corrective Action

Documents

AR 501000023356

121 Fltr Water Strainer Packing Leak

02/20/2019

AR 501000024769

121 MDCLP: Broken Bearing Water Line

03/28/2019

AR 501000024793

121 MDCLP: Driver Stand Baseplate UT Data

03/28/2019

AR 501000024856

121 CLP Motor Uncoupled Run Vibrations

03/31/2019

AR 501000024877

121 MDCLP Shaft Seal High Temp and Low Flow

03/29/2019

AR 501000024886

121 MDCLP Issues During Pump Test

03/29/2019

AR 501000024890

121 MDCLP Motor Lwr Bearing .008 Axial

03/30/2019

AR 501000024992

Roll UP Cap for 121 MDCLP

04/02/2019

Work Orders

WO 700047563

121 Cooling Water Pump Baseline Test

0

12

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.13

Corrective Action

Documents

AR 501000026173

11 Feed Water Pump Inboard Brg Vibes Rising

04/23/2019

AR 501000026594

Thermal Fatigue Failure Risk CV-31040

04/30/2019

AR 501000026841

U1 Feedwater System Trouble Alarm ROC

05/04/2019

AR 501000028641

Received OPdT Rod Stop/RB Channel Alert

06/19/2019

AR 501000028971

Potential U1 RCS Flow Anomaly

06/25/2019

AR 501000029445

Decision Making for UT Inspection

07/11/2019

AR 501000029454

Need for Improved Risk Recognition

07/11/2019

Miscellaneous

PI_PROD2_5.3_20190225 Current Risk Summary Report as of 03/31/2019

21:40

03/31/2019

Procedures

1C1.4 AOP1

Rapid Power Reduction Unit 1

15

C18.1

Engineered Safeguards Equipment Support Systems

53

IC28.2

Unit 1 Feedwater System

46

71111.15

Corrective Action

Documents

AR 501000026842

4 CL-90 Pipe Line Cooling Water Drip

05/04/2019

AR 501000027295

125 VDC 12 Battery Float ERCS Alarms

05/12/2019

AR 501000027333

TD-6-33 Steam Leak

05/13/2019

AR 501000027988

22 CS Pump Mechanical Seal Leakage

05/31/2019

AR 501000028736

Re-Evaluate Clamp on 4-CL-90

06/19/2019

Corrective Action

Documents

Resulting from

Inspection

AR 501000028092

Dry Yellow Material on 22 CS Pump Cooler

06/03/2019

Drawings

NF-39237

Flow Diagra Containment Internal Spray System

Units 1 and 2

07/11/2007

PT 62160817

Seal Piping

00

Miscellaneous

FP-OP-ACM-01

22 CS Pump Mechanical Seal Leak Rate - Unit 2

05/31/2019

FP-PA-HU-05

Type 1 Operational Decision Making Evaluation

Checklist

22 Containment Spray Pump Mechanical Seal

05/31/2019

71111.22

Corrective Action

Documents

AR 501000026726

U2 RCS Leakrate Exceeds H60 Action Level 2

05/03/2019

Procedures

SP 1106C

121 Cooling Water Pump Quarterly Test

50

SP 2307

D6 Diesel Generator 6-Month Fast Start Test

43

Work Orders

WO 700046796

SP 2307 D6 6-Month Fast Start Test

04/16/2019

13

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.02

Corrective Action

Documents

QIM501000013992

SP1397 Weekly Siren Testing

QIM501000014787

SP1397 Weekly Siren Testing

Miscellaneous

Alert and Notification System Design Report

4

PINGP Annual Alert and Notification Review Report

2018

01/09/2019

Prairie Island Siren Maintenance Checklists from

2017 and 2018

71114.03

Corrective Action

Documents

QIM501000005853

Issue And Failure to Respond to Aug Test

QIM501000014183

SEC Issues During Simulator Session

Procedures

F3-1.1

On-shift Staffing Analysis Report

3A

SP 1744

Semi-Annual Emergency Organization Augmentation

Response Drill

44

Work Orders

WO700026217

SP 1744 Emergency Organization Augmentation

Response Test

WO700044381

SP 1744 Emergency Organization Augmentation

Response Test

71114.05

Corrective Action

Documents

AR603000001473

EP Critique Report

AR603000001686

EP Critique Report

AR603000001793

EP Critique Report

AR603000001794

EP Critique Report

AR603000002777

EP Critique Report

AR603000003000

EP Critique Report

AR606000000729

Emergency Plan NRC Baseline Inspection

Readiness

AR606000000861

EP Critique Report

QIM501000004321

SPC-EP-114 EOP Setpoint Changes

QIM501000008126

NOS: Fleet EP Surveillance Management

QIM501000008132

NOS: Inconsistent PASS Drill Frequency

QIM501000008135

NOS: EP Consult Omission on EC

QIM501000008182

NOS: May 2017 Drill Report Lacks 9.09 Obj

QIM501000008275

NOS: IRMA: EP Objective Administration and

Tracking

QIM501000008277

NOS Semiannual HP Drills

14

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Miscellaneous

Prairie Island Nuclear Generating Plant Emergency

Plan

56

Self-

Assessments

Focused Self-Assessment Plan and Report EP

Program Assessment 12/10/2018 - 01/19/2019

A-EP-PINGP-2018-1

2018 Nuclear Oversight PINGP Emergency

Preparedness Audit

03/09/2018

A-EP-PINGP-2019-1

2019 Nuclear Oversight Audit of Prairie Island

Emergency Preparedness

03/07/2019

71124.05

Calculations

2018 Prairie Island Radiological Isotopic Mixture

Evaluation

08/01/2018

Calibration

Records

Canberra Fastscan Whole Body Counter (WBC)

08/16/2018

JL Shepherd Irradiator Calibration

12/4/2018

AMS-4 Calibration Data Sheet for SN 0351

03/28/2019

Eberline PCM-1B Calibration Data Sheet For

SN 293283

08/07/2018

Portal Monitor Calibration Data Sheet For

SN 514991

01/16/2019

SAM-11 Calibration Data Sheet For SN 538530

08/07/2018

AMP-100 Calibration Data Sheet For SN 5013-044

03/04/2019

4084.01

Certificate Of Calibration For ASP-1 SN 1565

05/08/2019

Miscellaneous

Radiochemistry Interlaboratory Comparison Program

Data

05/06/2019

Radiochemistry Interlaboratory Comparison Program

Data

12/12/2018

SSA 606000000562

2018 Prairie Island Isotopic Mix Evaluation

0

Procedures

RPIP 1531

JL Shepherd Source Calibrator Operation

11

71124.06

Corrective Action

Documents

01555235

Incorrect Volume On Gas Marineli

04/10/2017

501000026917

Radiation Monitoring System Deep Dive Inspection

05/06/2019

Miscellaneous

1526914

Off-Site Dose Calculation Manual Change Evaluation 10/11/2016

PIGB2018-209

11 Steam Release Effluent Report

09/23/2018

PIGC2018-215

Unit 1 Shield Building Vent Continuous Gaseous

Release Report

12/05/2018

PILB2019-106

121 ADT Monitor Tank Liquid Batch Release Report

06/18/2019

15

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

SP 1125

Gas Decay Tank Monthly Activity Analysis

39

SP 1783.1B

Westinghouse Radiation Monitor Electronic

Calibration Train B

01/10/2018

SWI STE-10

Evaluation of Out-Of-Tolerance Calibration Data In

Instrumentation and Control Procedures

6

Work Orders

700006828

18-Month 121 Auxiliary Building Special Ventilation

Filter Testing

12/11/2017

700010175

West Radiation Monitor Train B Calibration

02/17/2018

700010177

Victoreen Radiation Monitor Calibration

2/16/2018

700012241

NMC Radiation Monitor Train A Calibration

2/17/2018

71151

Corrective Action

Documents

AR501000009426

DEP Failure for Incorrect PAR

QIM501000021789

Simulator DEP Failure

QIM501000022808

Simulator DEP Failure

Miscellaneous

NRC Performance Indicator Data; Emergency

Preparedness - Drill/Exercise Performance; 2nd

Quarter 2018 - 1st Quarter 2019

NRC Performance Indicator Data; Emergency

Preparedness - ERO Readiness; 2nd Quarter 2018

- 1st Quarter 2019

NRC Performance Indicator Data; Emergency

Preparedness - Alert and Notification System

Reliability; 2nd quarter 2018 - 1st quarter 2019

71152

Corrective Action

Documents

AR 501000025067

13 Charging Pump Speed Controller Flashing

04/04/2019

Procedures

FG-OP-RSK-01

Configuration Risk Monitor User Guide

2

FP-OP-RSK-01

Risk Monitoring and Risk Management

9

71153

Corrective Action

Documents

AR 501000022572

Unplanned LCO Entry Into T.S. 3.8.1 B & E

01/31/2019

Procedures

F5 Appendix K

Fire Protection Systems Functional Requirements

28