Category:Letter
MONTHYEARIR 05000282/20240032024-11-13013 November 2024 Integrated Inspection Report 05000282/2024003, 05000306/2024003 & 07200010/2024001 ML24310A1682024-11-0505 November 2024 Core Operating Limits Report (COLR) for Cycle 34, Revision 0 ML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 2024-09-27
[Table view] Category:License-Operator
MONTHYEARML24262A2142024-09-18018 September 2024 Form 5.1-1 Post Examination Check Sheet (PI 2024) IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 ML24262A2132024-09-0606 September 2024 Form 2.1-1 Examination Preparation Checklist (PI 2024) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter ML24262A2122024-08-23023 August 2024 Form 1.3-1 Exam Security Agreement ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant ML24262A2012024-07-24024 July 2024 Form 2.3-4 Written Examination Quality Checklist ML24262A2002024-07-24024 July 2024 Form 2.3-2 Operating Test Quality Checklist ML24262A1522024-07-24024 July 2024 Form 2.3-1 Examination Outline Quality Checklist ML24262A1532024-07-24024 July 2024 Form 3.4-1 Scenario Events & Evolutions Checklist ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22243A2142022-08-26026 August 2022 Form 2.3-3 Operating Test Review Worksheet for Prairie Island 2022 Post OV Resubmittal Comments Final Copy ML22243A2192022-08-26026 August 2022 2.3-5 - Written Examination Review Worksheet 08122022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22243A2212022-08-26026 August 2022 NRC Comments and Resolution on PINGP Outline - Final ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22237A1582022-08-19019 August 2022 Ile Administered Written Exam RO and SRO Final ML22236A6622022-08-19019 August 2022 Ile Administered Walkthrough Portion JPMs RO and SRO ML22236A5132022-08-19019 August 2022 Ile 3.2-2 ML22236A5082022-08-19019 August 2022 Ile 3.2-1 ML22236A6662022-08-19019 August 2022 Ile Administered Dynamic Simulator Scenarios ML22236A5152022-08-19019 August 2022 Ile 3.3-1 ML22236A5162022-08-19019 August 2022 Ile 4.1 PWR and Common ML22237A2932022-08-0808 August 2022 Ile Proposed RO SRO Written Exam ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A2862022-08-0808 August 2022 Ile Proposed Operating Test - Dynamic Simulator Scenarios ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A2822022-08-0808 August 2022 Ile Proposed Operating Test - Walkthrough Portion JPMs RO and SRO ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1722020-09-21021 September 2020 ES-201-1 ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs 2024-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24262A2142024-09-18018 September 2024 Form 5.1-1 Post Examination Check Sheet (PI 2024) IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 ML24262A2132024-09-0606 September 2024 Form 2.1-1 Examination Preparation Checklist (PI 2024) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter ML24262A2122024-08-23023 August 2024 Form 1.3-1 Exam Security Agreement ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant ML24262A2012024-07-24024 July 2024 Form 2.3-4 Written Examination Quality Checklist ML24262A1522024-07-24024 July 2024 Form 2.3-1 Examination Outline Quality Checklist ML24262A1532024-07-24024 July 2024 Form 3.4-1 Scenario Events & Evolutions Checklist ML24262A2002024-07-24024 July 2024 Form 2.3-2 Operating Test Quality Checklist ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22243A2192022-08-26026 August 2022 2.3-5 - Written Examination Review Worksheet 08122022 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22243A2212022-08-26026 August 2022 NRC Comments and Resolution on PINGP Outline - Final ML22243A2142022-08-26026 August 2022 Form 2.3-3 Operating Test Review Worksheet for Prairie Island 2022 Post OV Resubmittal Comments Final Copy ML22236A5082022-08-19019 August 2022 Ile 3.2-1 ML22236A5152022-08-19019 August 2022 Ile 3.3-1 ML22236A5132022-08-19019 August 2022 Ile 3.2-2 ML22236A6662022-08-19019 August 2022 Ile Administered Dynamic Simulator Scenarios ML22236A5162022-08-19019 August 2022 Ile 4.1 PWR and Common ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22236A6622022-08-19019 August 2022 Ile Administered Walkthrough Portion JPMs RO and SRO ML22237A1582022-08-19019 August 2022 Ile Administered Written Exam RO and SRO Final ML22237A2862022-08-0808 August 2022 Ile Proposed Operating Test - Dynamic Simulator Scenarios ML22237A2822022-08-0808 August 2022 Ile Proposed Operating Test - Walkthrough Portion JPMs RO and SRO ML22237A2932022-08-0808 August 2022 Ile Proposed RO SRO Written Exam ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 L-PI-20-028, 75 Day Letter2020-08-27027 August 2020 75 Day Letter ML20245E5792020-08-27027 August 2020 ES-301-6 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5662020-08-27027 August 2020 ES-401-6 2024-09-06
[Table view] |
Text
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANTNRC INITIAL LICENSE EXAMINATION REPORT 05000282/2022301; 05000306/2022301
Dear Mr. Domingos:
On August 22, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Prairie Island Nuclear Generating Plant. The enclosed report documents the results of those examinations.
Preliminary observations noted during the examination process were discussed on August 15, 2022, with Mr. Tim Borgen and other members of your staff. An exit meeting was conducted by teleconference on August 26, 2022, between Mr. Harlan Hanson of your staff and Mr. Chuck Zoia, Chief Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicants. During the teleconference, the NRC resolutions of any post-examination comments submitted by the facility, initially received by the NRC on August 22, 2022, were discussed.
The NRC examiners administered an initial license examination operating test during the week of August 8, 2022. The written examination was administered by Prairie Island Nuclear Generating Plant training department personnel on August 12, 2022. Two Senior Reactor Operator and five Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on August 25, 2022. Seven applicants passed all sections of their respective examinations. Two were issued senior operator licenses and five were issued operator licenses.
The as-administered written examination and operating test, as well as documents related to the development and review (outlines, review comments and resolutions, etc.) of the examination will be withheld from public disclosure until August 22, 2024.
August 31, 2022 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Robert J. Orlikowski, Acting Branch Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosures:
1. Examination Report 05000282/2022301; 05000306/2022301 2. Simulator Fidelity Report
REGION III==
Docket Nos:
50-282; 50-306 License Nos:
DPR-42; DPR-60 Report Nos:
05000282/2022301; 05000306/2022301 Enterprise Identifier L-2022-OLL-0022 Licensee:
Northern States Power Company, Minnesota Facility:
Prairie Island Nuclear Generating Plant Location:
Welch, MN Dates:
August 9 - 22, 2022 Examiners:
C. Zoia, Chief Examiner, Senior Operations Engineer J. Nance, Operations Engineer L. Rodriguez, Senior Reactor Inspector Approved By:
R. Orlikowski, Acting Branch Chief Operations Branch Division of Reactor Safety
SUMMARY OF FINDINGS
ER 05000282/2022301; 05000306/2022301; 08/09/2022-08/22/2022; Prairie Island Nuclear
Generating Plant; Initial License Examination Report.
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, Revision 12.
Examination Summary:
Seven of seven applicants passed all sections of their respective examinations. Two applicants were issued senior operator licenses and five applicants were issued operator licenses.
(Section 4OA5.1)
REPORT DETAILS
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
The U.S. Nuclear Regulatory Commission (NRC) examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 12, to develop, validate, administer, and grade the written examination and operating test. The written examination outlines were prepared by the NRC staff and were transmitted to the facility licensees staff. Members of the facility licensees staff developed the operating test outlines and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of June 27, 2022, with the assistance of members of the facility licensees staff. During the on-site validation week, the examiners audited two license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of August 9, 2022, through August 11, 2022. The facility licensee administered the written examination on August 12, 2022.
b. Findings
- (1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement.
During validation of the written examination, several questions were modified or replaced. All changes made to the proposed written examination, were made in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and documented on Form 2.3-5, Written Examination Review Worksheet.
The Form 2.3-5, the written examination outlines, and both the proposed and final written examinations, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS) on August 22, 2024, (ADAMS Accession Numbers ML21188A222, ML21188A221, ML21188A220, and ML21188A223 respectively).
On August 22, 2022, the licensee submitted documentation noting that there were no post-examination comments for consideration by the NRC examiners when grading the written examination.
The NRC examiners graded the written examination on August 23, 2022, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
- (2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.
During the validation of the operating test, several Job Performance Measures (JPMs)required minor modifications, two required replacements, and some modifications were made to the dynamic simulator scenarios. All changes made to the operating test portion of the examination, were made in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and documented on Form 2.3-3, Operating Test Review Worksheet. The Form 2.3-3, the operating test outlines, and both the proposed and final as administered dynamic simulator scenarios and JPMs, will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS on August 22, 2024, (ADAMS Accession Numbers, ML21188A222, ML21188A221, ML21188A220, and ML21188A223 respectively).
The NRC examiners completed operating test grading on August 25, 2022.
- (3) Examination Results Two applicants at the Senior Reactor Operator (SRO) level and five applicants at the Reactor Operator (RO) level were administered written examinations and operating tests. Seven applicants passed all portions of their examinations and were issued their respective operating licenses on August 25, 2022.
.2 Examination Security
a. Scope
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiners used the guidelines provided in NUREG 1021, Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
b. Findings
There were no exam security issues identified during the exam process.
4OA6 Meetings
.1 Debrief
The chief examiner presented the examination teams preliminary observations and findings on August 15, 2022, to Mr. T. Borgen, General Manager Enterprise and Nuclear Training and other members of the Prairie Island Nuclear Generating Plant Operations and Training Department staff.
.2 Exit Meeting
The chief examiner conducted an exit meeting on August 26, 2022, with Mr. H. Hanson, Plant Manager, by teleconference. The NRCs final disposition of the stations grading of the written examination were disclosed and discussed during the teleconference. The chief examiner asked the licensee whether any of the retained submitted material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- C. Domingos, Site Vice President
- H. Hanson Jr., Plant Manager
- T. Borgen, General Manager Enterprise and Nuclear Training
- C. Boegeman, Director of Nuclear Training
- S. Skoyen, Director of Operations
- J. Bremer, Site Regulatory Affairs Manager
- G. Lange, Training Manager
- Z. Elbert, Training Supervisor Operations
- T. Gagliardo, Area Vice President Enterprise Learning and Technical Training
- J. Laughlin, Vice President Engineering and Technical Services
- E. Sonnenberg, Principle Operation Training
- F. Collins, NRC Exam Developer
- J. Hasner, Senior Operations Instructor
- J. Maunu, Principle Operations Training
- M. Petersen, Fleet Simulator General Supervisor
- P. Johnson, Regulatory Analyst
- C. Waits, Operations Site Representative
U.S. Nuclear Regulatory Commission
- P. Pelke, Operations Branch Chief
- D. Tesar, Senior Resident Inspector
- K. Pusateri, Resident Inspector
C.Zoia, Senior Operations Engineer, Chief Examiner
- J. Nance, Operations Engineer, Examiner
- L. Rodriguez, Senior Reactor Inspector, Examiner
- R. Baker, Senior Operations Engineer
- G. Roach, Senior Operations Engineer
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF ACRONYMS USED
ADAMS
Agencywide Document Access and Management System
JPMs
Job Performance Measures
NRC
U.S. Nuclear Regulatory Commission
RO
Reactor Operator
SRO
Senior Reactor Operator
SIMULATION FACILITY FIDELITY REPORT
Facility Licensee:
Northern States Power Company, Minnesota
Facility Docket Nos.:
50-282; 50-306
Operating Tests Administered:
August 9-11, 2022
The following documents observations made by the U.S. Nuclear Regulatory
Commission (NRC) examination team during the initial operator license examination.
These observations do not constitute audit or inspection findings and are not, without further
verification and review, indicative of non-compliance with Title 10 of the Code of Federal
Regulations, Section 55.45(b). These observations do not affect NRC certification or approval
of the simulation facility other than to provide information which may be used in future
evaluations. No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following item was
observed:
ITEM
DESCRIPTION
Sim WO - C2D-049
Control Switch CS-46930, D2 Start/Stop switch had intermittent issues