Integrated Inspection Report 05000282/2023001 and 05000306/2023001
ML23130A172
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/10/2023
From: Hironori Peterson
NRC/RGN-III/DORS/RPB3
To: Domingos C
Northern States Power Company, Minnesota
References
IR 2023001
Download: ML23130A172 (1)


Text

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION REPORT 05000282/2023001 AND 05000306/2023001

Dear Christopher P. Domingos:

On March 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant. On April 17, 2023, the NRC inspectors discussed the results of this inspection with Timothy Borgen, Plant Manager, and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Hironori Peterson, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000282 and 05000306

License Numbers:

DPR-42 and DPR-60

Report Numbers:

05000282/2023001 and 05000306/2023001

Enterprise Identifier:

I-2023-001-0065

Licensee:

Northern States Power Company

Facility:

Prairie Island Nuclear Generating Plant

Location:

Welch, MN

Inspection Dates:

January 01, 2023 to March 31, 2023

Inspectors:

A. Dahbur, Senior Reactor Inspector

K. Pusateri, Resident Inspector

D. Tesar, Senior Resident Inspector

Approved By:

Hironori Peterson, Chief

Reactor Projects Branch 3

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Both Unit 1 and Unit 2 began the inspection period at rated thermal power and remained at or near rated thermal power for the remainder of the inspection period with the exception of brief power reductions to perform surveillance testing or flexible power operations.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (2 Samples)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather - winter storm warning, impending heavy, wet snow walkdown of risk significant equipment on January 3, 2023.
(2) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather sub-zero weather (-17°F) on January 31, 2023.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)121 motor-driven cooling water pump (MDCLP) alignment during 22 diesel-driven cooling water pump (DDCLP) work window on January 23, 2023 (2)22 DDCLP fuel oil system on January 12, 2023 (3)12 DDCLP fuel oil system on January 12, 2023

(4) D6 emergency diesel generator (EDG) walkdown with D5 EDG out of service (OOS)for maintenance on February 7, 2023

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 480V system on March 21, 2023.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Area (FA) 31A, train hot shutdown panel and auxiliary feed pump room on January 5, 2023
(2) FA 32B, train hot shutdown panel and auxiliary feed pump room on January 11, 2023
(3) FA 41B, screenhouse ground floor, elevation 670' on January 20, 2023
(4) FA 41A, screenhouse cooling water pump room, elevation 695' on February 16, 2023
(5) FA 26 D2, diesel room, elevation 695' on March 6, 2023
(6) FA 25 D1, diesel room, elevation 695' on March 7, 2023

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the: Unit 1 and Unit 2 auxiliary feed pump rooms on March 14, 2023.

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) TP 1789B, "AFW [auxiliary feedwater] Pump Room Cooler Flushing, Flow Balancing, DP Monitoring, & Air Side Inspection, Train B"

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during control room observation for flexible power operations on February 7, 2023.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator requalification simulator session as-found evaluation on January 30, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (3 Samples 1 Partial)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Work Order (WO) 700106556, "Bus 27 Work Window," on January 11, 2023 (2)fire door maintenance and WO 0010354, "Install Second Fusible Link Door #62," on January 13, 2023 (3)

(Partial)

Evaluation of bus 15 high resistance readings on March 1, 2023

(4) CV-31652, "11 Cooling Water Strainer Backwash Valve Timing Not Meeting Acceptance Criteria," on March 9, 2023

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Risk evaluation during 22 DDCLP work, w/ 122 fuel oil storage tank OOS on January 23, 2023
(2) Elevated airborne tritium levels inside Unit 2 containment on February 2, 2023
(3) Risk during D5 EDG preventative maintenance window on February 7, 2023 (4)21 cooling water strainer maintenance procedure GMP ADAM-001 on January 18, 2023
(5) Risk during 22 turbine-driven auxiliary feedwater (TDAFW) pump lube oil cooling water valve maintenance on March 3, 2023
(6) Unplanned entry into 72-hr LCO for failure of SY-37417/SY-37418 to close on March 2, 2023
(7) Unplanned inoperability of 121 control room chiller on March 12, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (10 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)122 spent fuel pool OOS (2)22 DDCLP level switch 16687 (3)21 motor-driven auxiliary feedwater (MDAFW) pump lube oil leak (4)21 safety injection pump inboard seal leak active (corrective action program (CAP) 501000070785)

(5)122 control room chiller purge run time >10 minutes (CAP 501000070774)

(6) CV-31419 22 TDAFW pump recirc lube oil cooling control valve
(7) CV-31630 indicating light failure during SP 2130A
(8) Prompt and past operability determinations for Unit 1 sump B (9)121 control room chiller purge inoperability (CAP 501000071311)
(10) Cooling water header/D2 operability with failure of SV-37465 on March 2, 2023

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) RS-19-1, Furmanite repair and restoration non-conforming condition
(2) FP-5-1, temporary change in support of maintenance > 90 days

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1) Post-Maintenance Testing for D5 EDG following maintenance window on February 10, 2023
(2) WO 700107540, "PMT for 12 Safety Injection Offline Motor Test"
(3) WO 700093987, "PMT for Cooling Tower 12 Transformer"

Surveillance Testing (IP Section 03.01) (8 Samples)

(1) WO 700106980, "SP 2101 - 21 MD AFWP QUARTERLY FLOW TEST"
(2) WO 700106518, "SP 2295 - D5 Diesel Generator 6 Month Fast Start Test"
(3) SP 1106B, "Comprehensive Test," on February 2, 2023
(4) PMT for 22 DDCLP on January 27, 2023
(5) PM 3122-10, "Cardox Preventive Maintenance," on February 28, 2023
(6) WO 700111800, "PMT for 21 RHR Pump Offline Motor Test MSIP 3033"
(7) SP 2307, "D6 EDG 6 Month Fast Start," on February 27, 2023
(8) SP 1342, "Neutron Flux Monitor Alignment at Reactor Power," on March 7, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) SP 1151A, "Train A Cooling Water System Quarterly Test" (WO 700109442)

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) TP 1479, "Portable 12KW Diesel Generator Quarterly Functional Test," on February 6, 2023

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) EP drill evaluation (w/DEP) on January 24,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) Unit 1 (January 1, 2022, through December 31, 2022)
(2) Unit 2 (January 1, 2022, through December 31, 2022)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (2 Samples)

(1) Unit 1 (January 1, 2022, through December 31, 2022)
(2) Unit 2 (January 1, 2022, through December 31, 2022)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)

(1) Unit 1 (January 1, 2022, through December 31, 2022)
(2) Unit 2 (January 1, 2022, through December 31, 2022)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

(1) CARDOX follow-up (CAPS 501000059308, 501000060623, 501000064175) on January 10, 2023 (2)22 DDCLP follow-up on January 30,

INSPECTION RESULTS

Observation: Annual Follow-Up of CAP 501000061742, 22 DDCL Pump 71152A The inspectors reviewed the actions taken for corrective action program (CAP) 501000061742 and 501000065653 associated with the 22 diesel-driven cooling water pump (DDCLP) and the related Green non-cited violation (NCV). CAP 501000061742 was written documenting the original issue, and CAP 501000065653 was written as a follow-up to ensure actions taken were sufficient to address all aspects of the NCV.

Licensee procedure FP-R-LIC-06 Section 5.16.2 specifies that:

"The RCL [Regulatory Compliance Lead] should review the inspection report to confirm that each violation, finding, unresolved item, insight and observation has been entered into the corrective action system in accordance with FP-PA-ARP-01.

1. The RCL SHALL initiate a new CAP for new issues, observations, and insights not

previously identified.

2. GENERATE a CAP to capture inspection report review.

a. The CAP should highlight any notable differences in characterization from issue descriptions that were initiated during the inspection, including observations.

b. The CAP should be cross referenced to the related CAPs that are tracking the resolution of the finding, violation, observation, etc.

c. The CAP should recommend that the RAM is the owner and that the issue owner for each finding/violation perform an evaluation of the information presented in the inspection report against existing requests to identify differences in characterization/description that would require changes to the completed causal evaluation, extent of condition, extent of cause, etc.; or additional corrective action.

d. The issue owner SHALL generate a new CAP for differences that require changes or additional corrective action."

Per step c above, the objective of the review is to to identify differences in characterization/description that would require changes to the completed causal evaluation, extent of condition, extent of cause, etc.; or additional corrective action. However, the review performed and documented in CAP 501000065653 appears to focus on the licensee's viewpoint that the violation they received was an error on the part of the NRC. The licensee credited actions taken months after the issue of concern was identified as justification of why a violation had not been warranted. Inspectors could find no evaluation of the actions taken compared to the violation received to ensure all aspects of the violation were addressed.

Thus, it appears the intent of the procedure was not met. However, the corrective actions taken were sufficient.

Although this comparison could not be located, inspectors reviewed the actions taken associated with CAP 501000061742, as well as additional actions taken which were not documented in the CAP and did not identify any additional actions needed. Following discussion with licensee management, the licensee concurred with the inspectors' assessment and initiated CAP 501000070556 Lessons Learned on Recent NRC Violations, to look at the recent NRC violations pertaining to the 22 DDCLP and the CO2 system for any lessons learned. The inspectors did not identify any more than minor findings or violations during this review.

Observation: Annual Follow-Up of CAP 501000064651, CARDOX System 71152A The inspectors performed a 71152A Problem Identification and Resolution follow-up sample on corrective action programs (CAPs) 501000064651 and 501000068866. The original issue (CAP 501000064651) was associated with NRC questions on the licensees CARDOX (CO2 flooding) system. Based upon the responses to the questions, the NRC determined that the licensee had failed to maintain compliance with their licensing basis, for both their original and then their National Fire Protection Association (NFPA) 805 licensing basis requirements.

The licensee is required to comply with NFPA 12 (1972 Edition) for their CARDOX system. In their docketed license application (and subsequent license amendment request [LAR]) the licensee identified that their compliance with NFPA 12 was based upon the system being able to establish a 50 percent CO2 concentration, and to maintain that concentration for 15 minutes, with the ability to extend that time to 30 minutes with a second shot of CO2 from the system (double shot capacity). The NRC approved those requests based upon the information provided. Thus, the 50 percent for 15 minutes with a double shot capacity became part of the licensee's licensing basis. The licensee determined that they could maintain the 50 percent concentration for 11 minutes, at high differential pressures as documented in CAP 501000064651. The NRC issued the licensee a Green NCV for their failure to maintain compliance with their licensing basis.

CAP 501000068866 was written following issuance of the NRC report documenting the NCV. Licensee procedure FP-R-LIC-06 Section 5.16.2 specifies in part that:

The CAP should recommend that the RAM is the owner and that the issue owner for each finding/violation perform an evaluation of the information presented in the inspection report against existing requests to identify differences in characterization/description that would require changes to the completed causal evaluation, extent of condition, extent of cause, etc.; or additional corrective action.

The intent of CAP 501000068866 was to perform an evaluation of the report and NCV to ensure actions were in place to correct all aspects of the violation received. However, the response documented in CAP 501000068866 was that the licensee disagreed with the NRCs interpretation of their licensing basis. The licensee indicated that NFPA 12 does not specify a required hold time; therefore, they were in compliance with NFPA 12. The NRC acknowledges that a specific hold time is not established in NFPA 12, however there are specific criteria that the licensee is required to be able to meet. NFPA 12 specifies that, 2232. For deep seated fires, the required extinguishing concentration must be maintained for a sufficient period of time to allow the smoldering to be extinguished and the material to cool to a point at which reignition will not occur when the inert atmosphere is dissipated.

Although the licensee indicated that they comply with NFPA 12 (1972), they do not provide any technical justification for how they meet the above criteria. The NRC determined that the licensees compliance is based upon their docketed license application (and subsequent LAR) commitment and the safety evaluation report documenting NRC approval.

Because the licensee believed they were in compliance with their licensing basis, actions taken to resolve the issue were based upon this belief. The licensee made changes to several of their fire protection documents which they screened as being minor changes to remove references to outdated information.

The inspectors determined the licensees actions to remove requirements from licensee procedures and their fire protection program documentation were not consistent with the requirements for implementing a change to their licensing basis documents. Although the licensee is authorized to make changes to their fire protection licensing basis without prior NRC approval, this may be considered to be more than a minor change, and the appropriate process should be followed. The inspectors determined that based upon the actions taken, the licensee could potentially consider additional reevaluation.

Following discussion with licensee management, the licensee concurred with the inspectors' assessment and initiated CAP 501000070556 Lessons Learned on Recent NRC Violations, to look at the recent NRC violations pertaining to the 22 DDCLP and the CO2 System for any lessons learned.

The inspectors determined that the initial actions taken for CAP 501000068866 did not appear to meet the intent of the CAP or the procedural requirements of FP-R-LIC-06, but since the CAP was still open there would have been additional opportunities for the licensee to identify and correct the condition without NRC intervention. Based upon discussions with the licensee and initiation of CAPs 501000070556 and 501000070955, the inspectors determined that the licensee had entered the condition into their CAP to drive towards resolution. The inspectors did not identify any more than minor findings or violations during this review.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 17, 2023, the inspectors presented the integrated inspection results to Timothy Borgen, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

TP 1637

Winter Plant Operation

71111.01

Work Orders

WO 700101875

TP 1637 Annual Winter Plant Operation

10/09/2022

71111.04

Procedures

C1.1.20.6-1

Unit 1 480V System Switches and Indication Checklist

71111.05

Miscellaneous

NFPA NO. 80-

1968

Standard for Fire Doors and Windows

07/12/1068

Procedures

TP 1789B

AFW Pump Room Cooler Flushing, Flow Balancing, DP

Monitoring, & Air Side Inspection, Train B

71111.07A

Work Orders

WO 700106862

TP 1789B - AFWP Room Cooler Flushing

01/18/2023

501000066741

Minor Aging Issues with ISFSI Casks

09/27/2022

501000066794

NOS: Annual Submittal Letter Not in DRMS

09/28/2022

501000068192

SP Not Performed On 11 Aux Bldg Exh Fan

11/04/2022

501000068212

SP Not Performed On 22 Aux Bldg MUAH

11/05/2022

501000069619

FP-5-1 Needs T-MOD Tag

01/03/2023

501000069767

16027 OOT During ICPM 1-416

01/10/2023

501000069779

16026 OOT During ICPM 1-416

01/10/2023

Corrective Action

Documents

501000070539

Pitting on Coolant Piping

2/08/2023

608000000970

Bus 15 Contact Resistance Evaluation

2/24/2023

Engineering

Evaluations

608000000970

Bus 15 Contact Resistance Evaluation

2/24/2023

ANSI/NETA MTS-

2019

Standard for Maintenance Testing Specifications for

Electrical Power Equipment and Systems

2019

EPRI 2018

Technical Report

Reliability and Maintenance of Bolted Busbar Connections

May 2018

EPRI 2019

Technical Report

Nuclear Maintenance Applications Center: Bolted Joint

Fundamentals, Revision 1

November

2019

EPRI Report

Electrical Connector Application Guidelines, Final Report

December

2002

EPRI Technical

Report,

Deliverable

Number:

3002011484

Reliability and Maintenance of Bolted Busbar Connections

May 2018

71111.12

Miscellaneous

MS 3.2.1.9-1D

Recommended Maintenance & Surveillance 5HK, 7.5HK &

2/23/1993

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

HK Switchgear Equipment

QF0739, Request

Number 240,

Revision 1

EPRI TR 104213, Section 7 - Temperature Limitations

Associated with Torque Tables

11/16/2022

QF0739, Request

Number 240,

Revision 2

EPRI TR 104213, Section 7 - Temperature Limitations

Associated with Torque Tables

11/16/2022

QF0739, Request

Number 242,

Revision 1

Engineering Evaluation 608000000896 Says Current Heat

Load is Acceptable, However Maintenance is Performed

Every 4 Years

11/16/2022

QF0739, Request

Number 242,

Revision 2

Engineering Evaluation 608000000896 Says Current Heat

Load is Acceptable, However Maintenance is Performed

Every 4 Years

11/16/2022

QF0739; Request

Number: 242,

Revision 2

The Engineering Evaluation 608000000896 Says the

Current Heat Load Is Acceptable, However the Maintenance

Is Performed Every 4 Years.

11/16/2022

Technical Report

Xcel Prairie Island Switchgear Bolted Bus Bar Connection

2/22/2023

Procedures

H65.2.12

Electrical Cables & Connections not Subject to 10 CFR 50.49 Environmental Qualification Requirements Aging

Management Program

WO 700014416

4kV SFGDS Bus Thermography 3rd Qtr

09/22/2020

WO 700015575

4kV SFGDS Bus Thermography (3rd Qtr)

09/22/2020

Work Orders

WO 700032763

4kV SFGDS Bus Thermography 3Q

2/13/2019

501000070669

Standards Not Utilized/Adhered To

2/13/2023

501000070772

Unit 1 Containment Pressure Rising

2/19/2023

501000070774

2 Cont Room Chiller Purge Run Time >10

2/17/2023

71111.13

Corrective Action

Documents

501000070785

SI Pump Inboard Seal Leak Active

2/19/2023

Calculations

Calculation No.:

2005-11126

Containment Sump Debris Size Distribution and Filter

Efficiency

501000066521

Temp Drop on Cylinder Exhaust Temp 7

09/19/2022

501000070651

Document Bus 15 Lessons Learned

2/12/2023

501000070659

44500-0203 Not Lit During SP 2130A

2/13/2023

501000070820

U2 PORV Limiting Stroke Time Calculation

2/20/2023

71111.15

Corrective Action

Documents

501000071174

CV-31652 11 CLG WTR STRNR BCKWSH Timing

03/08/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EC 12083

GSI-191 Analysis to Support Final GL 2004-02 Supplemental

Response

03/04/2008

Engineering

Changes

EC 12083

GSI-191: Refined Analysis of SI Pump and RHR Pump Seals

05/14/2008

2005-11126

Containment Sump Debris Size Distribution and Filter

Efficiency

608000000970

Bus 15 Contact Resistance Evaluation

2/24/2023

608000000970

Bus 15 Contact Resistance Evaluation

2/24/2023

ENG-ME-334

Sect XI Design Basis Valve Limiting Stroke Times

Engineering

Evaluations

ENG-ME-654

Evaluation of Downstream Effects-Emergency Core Cooling

Systems (ECCS)

ANSI/NETA MTS-

2019

Standard for Maintenance Testing Specifications for

Electrical Power Equipment and Systems

2019

ANSI/NETA MTS-

2019

Standard for Maintenance Testing Specifications for

Electrical Power Equipment and Systems

2019

CV-31652

Prairie Island Inservice Testing Valve Data Sheets - Unit 1;

Strainer Backwash

Document 2005-

01780

GSI-191 Downstream Effects - Flow Clearances

EPRI 2018

Technical Report

Reliability and Maintenance of Bolted Busbar Connections

May 2018

EPRI 2019

Technical Report

Nuclear Maintenance Applications Center: Bolted Joint

Fundamentals, Revision 1

November

2019

EPRI Report

Electrical Connector Application Guidelines, Final Report

December

2002

IEC 62271-1

International Electrotechnical Commission - High-Voltage

Switchgear and Control Gear

Informational

Report

Bus Bar Bolted Connections Reliability and Testing

21

MS 3.2.1.9-1D

Recommended Maintenance & Surveillance 5HK, 7.5HK &

15HK Switchgear Equipment

2/23/1993

QF0739, Request

Number 240

EPRI TR 104213, Section 7 - Temperature Limitations

Associated with Torque Tables

11/16/2022

Miscellaneous

QF0739, Request

Number 240,

EPRI TR 104213, Section 7 - Temperature Limitations

Associated with Torque Tables

11/16/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Revision 2

QF0739, Request

Number 242

Engineering Evaluation 608000000896 Says Current Heat

Load Is Acceptable, However Maintenance Is Performed

Every 4 Years

11/16/2022

QF0739, Request

Number 242,

Revision 2

Engineering Evaluation 608000000896 Says Current Heat

Load Is Acceptable, However Maintenance Is Performed

Every 4 Years

11/16/2022

QF0739, Request

Number 299,

CAP

501000071181

If the Drill Bit Evaluated in QIM 501000070903 Were to

Bypass the Strainer, Could the Length of the Bit Cause an

Internal Blockage Concern Which Has Not Yet Been

Previously Evaluated?

03/02/2023

Technical Report

IEEE Standard for Metal-Clad Switchgear

2015

Technical Report

Xcel Prairie Island Switchgear Bolted Bus Bar Connection

2/22/2023

FP-OP-OL-01

Operability

FP-WM-SP-01

Fleet Surveillance Test Program

H10.1

ASME Inservice Testing Program

SP 1151A

Train A Cooling Water System Quarterly Test

Procedures

SP 2130A

Train A Containment Vacuum Breakers Quarterly Tests

WO 700015575

4kV SFGDS Bus Thermography (3rd Qtr)

09/22/2020

WO 700032763

3kV SFGDS Bus Thermography 3Q

2/13/2019

Work Orders

WO 700032769

4kV SFGDS Bus Thermography 3Q

04/10/2019

71111.18

Miscellaneous

QF0739, Request

Number 288

Based on the as Left Condition From WO 9904812, Repair

Leak on RS-19-1, Was the Valve Returned to the Original As

Designed Configuration?

01/06/2023

Miscellaneous

QF0739, Request

Number 293

Outdated Calibration Stickers on Power Cables for 121, 122,

23, and 124 Portable 12kW Diesel Generator

2/10/2023

2M-CL-3002-2-22

Isolation and Restoration of 22 Diesel Cooling Water Pump

2M-CL-3002-2-22

Isolation and Restoration of 22 Diesel Cooling Water Pump

ICPM 2-500D

D5 Speed Sensor and Magnetic Pickup Signal Selector

(MPU) Calibration Check (D5 Outage)

MSIP 3033

Off-Line Motor Testing Using the PDMA Motor Tester

PM 3122-3

Shield Bldg, Category 1 Vent Zone, Fire and Security Door

Inspection

71111.24

Procedures

SP 1106B

Diesel Cooling Water Pump Monthly Test

106

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SP 2130A

Train A Containment Vacuum Breakers Quarterly Tests

SP 2295

D5 Diesel Generator 6 Month Fast Start Test

SP 2295

D5 Diesel Generator 6 Month Fast Start Test

SP 2307

D6 Diesel Generator 6 Month Fast Start Test

TP 1725

Containment & Aux Building Chiller Inspection

WO 700026911

PMT/RTS IR-E1/SAP-B/D5

08/25/2022

WO 700026911

PMT/RTS IR-E1/SAP-B/D5

08/25/2022

WO 700053796

PM 3002-10-22-22 DDCLP MAJOR MAINT

10/23/2019

WO 700053796

PM 3002-10-22 22 DDCLP Major Maint

10/23/2019

WO 700071230

Burnish D5 Relays

03/10/2023

WO 700090408

PMT/RTS IT/FDTL/D5 RELAY

07/16/2021

WO 700093987

CT12 XFMR Replacement

03/20/2023

WO 700093987

CT12 SFMR Replacement

03/20/2023

WO 700099073

PMT/RTS Replacement Relays

01/27/2023

WO 700099938

D5 ENG 1 Fuel Oil Feed Press Low Alarm

2/10/2023

WO 700103537

Cal D5 Mag Pick Up MPU and Speed Sensor

2/10/2023

WO 700105991

CNMT/AUX BLDG CHLR INSP

2/15/2023

WO 700106518

SP 2295 D5 DG Fast Start Test

01/01/2023

WO 700107261

Shield Bldg Cat 1 Vent Zone & Fire

01/28/2023

WO 700108623

SP2130A TRN A CTMT Vacuum BKR QTR

03/02/2023

WO 700108739

SP 1106B 22 DIESEL CL PMP MNTHLY

03/08/2023

WO 700108878

SP 2295 D5 DG Fast Start Test

03/13/2023

WO 700109442

SP 1151 A TRN A CL QTR TEST

03/23/2023

WO 700109707

SP 2307 D6 DG Fast Start Test

03/31/2023

Work Orders

WO 700111800

Offline Test - MTR 25-7(21 RHR PMP)

05/16/2023

501000066542

CO2 Licensing Basis

09/18/2022

Corrective Action

Documents

501000070556

Lessons Learned on Recent NRC Violations

2/08/2023

Engineering

Changes

ECR

60100004055

CO2 System Update to Calculation Criteria and 2nd Shot

Requirement

71152A

Miscellaneous

FPEE-11-038

Code Compliance Review; NFPA 12, Standard on Carbon

Dioxide Extinguishing Systems, 1972; Relay and Computer

Room, Fire Area 18

2