SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION REPORT 05000282/2021002 AND 05000306/2021002

Dear Mr. Domingos:

On June 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Hironori Peterson Branch 3 Division of Reactor Projects Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000282 and 05000306

License Numbers:

DPR-42 and DPR-60

Report Numbers:

05000282/2021002 and 05000306/2021002

Enterprise Identifier:

I-2021-002-0100

Licensee:

Northern States Power

Facility:

Prairie Island Nuclear Generating Plant

Location:

Welch, Minnesota

Inspection Dates:

April 01, 2021 to June 30, 2021

Inspectors:

S. Bell, Health Physicist

M. Garza, Emergency Preparedness Inspector

I. Hafeez, Reactor Inspector

K. Pusateri, Resident Inspector

J. Robbins, Operations Engineer

D. Tesar, Senior Resident Inspector

C. Zoia, Senior Operations Engineer

Approved By:

Hironori Peterson, Chief

Branch 3

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Units 1 and 2 operated at or near full power for the entirety of the inspection period, with the exception of brief power reductions to perform surveillance testing or flexible power operations.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) SP 1039 The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of high winds/tornadoes for the following systems:

Tornado Missile Walkdown on 05/12/2021

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather with extreme heat forecast, with chillers out of service on 06/03/2021.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) D5/D6 Station Blackout Diesel (SBO) Generator Walkdown on 04/26/2021
(2) D1/D2 Emergency Diesel Generator Walkdown on 04/22/2021
(3) CST to Auxiliary Feed Water Walkdowns on 05/12/2021 (4)11/22 Auxiliary Feed Water Walkdown during 12 AFW work window on 05/25/2021

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zone 75 Fire Areas 41 and 41A on 04/13/2021
(2) Fire Zone 74 Fire Area 41B on 04/13/2021
(3) Fire Zone 11 Fire Area 20 and 81 Bus 15 and 16 Switchgear Rooms on 04/20/2021
(4) Fire Zone 12 Fire Area 18 Relay and Cable Spreading Room on 04/20/2021
(5) Fire Zone 2 Fire Area 31 Auxiliary Feed Water Pump Room B Train on 05/20/2021

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Turbine Building flood area Auxiliary Feed Water Pump Room on 05/20/2021

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on June 14, 2021. All results were acceptable.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on May 10, 2021.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

No findings or violations were identified

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during FLEX power ops on 06/21/2021
(2) The inspectors observed and evaluated Control Room during 21 residual heat removal run on 05/13/2021

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated simulator scenario during pilot week on 06/14/2021

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) D6 Emergency Diesel Generator - With MSPI (QIM 501000049987) on 04/20/2021 (2)22CC Heat exchanger temperature control valve failed to control temperature (QIM 39650) on 04/23/2021

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)122 instrument air compressor unavailability on 04/13/2021

(2) T-3 certification meeting and operations focus item review on 04/15/2021 (3)122 diesel driven fire pump failure to start using 'B' battery bank (AR 501000050937 and 501000051005) on 05/03/2021 (4)22 charging pump failed post-maintenance testing risk assessment on 05/19/2021
(5) Part 21 for safety related motor control center buckets (AR 501000051541) on 05/05/2021
(6) Risk walkdown of ZX and CL systems during orange grid on 06/10/2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) D6 diesel failure to reach rated speed/voltage (AR 501000049987) on 04/15/2021
(2) Trend in 1N42 upper excore Quadrant Power Tilt Ratio (QPTR) (AR 501000049687)on 04/26/2021 (3)122 battery room refrigeration cooling unit (AR 501000052128) on 05/18/2021 (4)11/21 containment/auxiliary building chiller failures on 05/19/2021 (5)121 Fuel Oil Storage Tank (FOST) diesel transfer pump failed to start on 06/08/2021
(6) Residual heat removal sump pump operability (Part 21 issue) on 06/09/2021

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(2 Partials)

The inspectors evaluated the following temporary or permanent modifications:

(1)

(Partial)

Fuel oil supply line for 23 D5 fuel oil storage tank (EC 601000001947) on 05/17/2021 (2)

(Partial)2 - 500 Ton chiller Temporary Modification on 06/22/2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) D5 emergency diesel generator motor damper MD-32422 (WO 700088385) on 04/08/2021
(2) SV-39403/39409 post-maintenance testing on 04/22/2021 (3)11 CL strainer post-maintenance testing (WO 700075963) on 04/29/2021
(4) CV-31999 limit switch replacement (WO 700047608) on 06/02/2021
(5) Troubleshoot and repair 22 change pump on 06/03/2021
(6) SP 1101 12 Motor Driven Auxiliary Feedwater Pump quarterly flow test on 06/03/2021

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) SP 1093 D1 Diesel Generator Slow Start on 04/05/2021 (2)11 Residual Heat Removal Testing TS 3.5.2.A on 05/06/2021
(3) SP 1307 D2 Diesel Generator 6-month Fast Start on 04/27/2021 (4)11 SI Testing TS 3T.5.2.A on 05/06/2021 (5)21 CC Comprehensive Test on 05/10/2021

Inservice Testing (IP Section 03.01) (2 Samples)

(1) SP 1102 11 Turbine Driven Auxiliary Feedwater Pump Quarterly Surveillance on 04/15/2021
(2) SP 1130A Containment Vacuum Breaker Test 3.6.8.A on 05/05/2021

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the following maintenance and testing of the alert and notification system:

2019 Annual ANS Review Report

2020 Annual ANS Review Report

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (2 Samples)

The inspectors evaluated:

(1) Emergency Preparedness Drill / Training Evolution on 06/08/2021
(2) Emergency Preparedness Exercise on 06/15/2021

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Calibration and Testing Program (IP Section 03.02) (10 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) Mirion Fastscan Whole Body Counter
(2) JL Shepherd Model 89 Instrument Calibrator
(3) Unit 1 Containment High Range Radiation Monitor
(4) Gamma Spectroscopy System

-Unit 11; 3L Solid Geometry

-Unit 12; 60 ml Liquid Geometry

-Unit 13; 3L Gas Marinelli Geometry

(5) Eberline Small Article Monitor (SAM); Model 11; SN 309741
(6) Eberline Portal Monitor; Model PM7; SN 479831
(7) Rados Personnel Contamination Monitor; Model Two Step; SN 479902
(8) Johnson; Model 200W Survey Meter; SN 293099
(9) Eberline AMS-4; SN 476326
(10) Eberline ASP-1; SN 3958 Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1)1R-19; Unit 1 Steam Generator Blowdown Monitor (2)1R-37; Unit 1 Auxiliary Building Vent Gas Monitor

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Sampling and Analysis (IP Section 03.02) (3 Samples)

The inspectors evaluated the sampling and analysis of the following release pathways:

(1) Waste Gas Decay Tank System
(2) Liquid Waste System
(3) Continuous Gaseous Effluent Release Systems

Dose Calculations (IP Section 03.03) (2 Samples)

The inspectors evaluated the following dose calculations:

(1) Gaseous effluent dose calculations for first quarter 2021.
(2) Liquid effluent dose calculations for first quarter

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===

(1) Unit 1 October 1, 2020, through March 31, 2021
(2) Unit 2 October 1, 2020, through March 31, 2021

BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)

(1) Unit 1 RCS Leakage January 1, 2021, through June 30, 2021
(2) Unit 2 RCS Leakage January 1, 2021, through June 30, 2021

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) July 01, 2020, through March 31, 2021 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
(1) July 01, 2020, through March 31, 2021

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) Unit 2 Emergency Diesel Generator Issues Cognitive Trend Analysis on 06/21/2021

71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Follow-Up (IP Section 03.01)

(1) D6 diesel failure to reach speed and voltage on 06/03/2021

INSPECTION RESULTS

Observation: Semi Annual Review of D5/D6 Emergency Diesel Generators 71152 Resident Inspectors reviewed Corrective Action products associated with the D5 and D6 Emergency Diesel Generators which were generated from June 2020 thru June 2021 as well as Open/Active CAP's. There were several equipment deficiencies documented in the Corrective Action Program, but no common theme or trend was identified. The inspectors did not identify any violations or findings during the review.

Observation: D6 Diesel Failure to Reach Rated Speed and Voltage 71153 Inspectors conducted a follow up of the failure of the D6 diesel to reach rated speed and voltage. Inspectors reviewed circuit design against applicable design requirements. The inspectors identified potential improvement opportunities associated with start circuit design, however, no design deficiencies were identified. The licensee has initiated Corrective Actions to develop a procedure providing recovery instructions should the same or similar failure recur, and to investigate implementing enhancements to the fast start circuitry. The inspectors did not identify any findings or violations associated with the review.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 23, 2021, the inspectors presented the emergency preparedness program inspection exit meeting inspection results to Mr. C. Domingos, Site Vice President, and other members of the licensee staff.

On May 19, 2021, the inspectors presented the radiation protection baseline inspection results to Mr. H. Hanson, Plant Manager, and other members of the licensee staff.

On May 28, 2021, the inspectors presented the Prairie Island 2021 biennial operator requalification program inspection results to Mr. H. Hanson, Plant Manager, and other members of the licensee staff.

On June 15, 2021, the inspectors presented the Prairie Island 2021 biennial operator requalification program inspection results (71111.11A) to Mr. C. Boegeman, Training Manager, and other members of the licensee staff.

On June 30, 2021, the inspectors presented the integrated inspection results for (71124.08) to Mr. C. Domingos, Site Vice President, and other members of the licensee staff.

On July 28, 2021, the inspectors presented the integrated inspection report results to Mr. C. Domingos, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

F5 Appendix A

Fire Zone 12 Fire Area 18 Relay and Cable Spreading Room

F5 Appendix A

Fire Detection Zone 74 Fire Area 41B

F5 Appendix A

Fire Zone 75 Fire Area 41 and 41A

71111.05

Procedures

Fire Zone 11 Fire

Area 20 and 81

BUS 15 and 16 Switchgear Rooms

7000079895

SP 2089A-2A RHR Pump and Suction Valve From RWST

05/13/2021

71111.11A

Work Orders

700079895

SP 2089A RHR Pump and Suction Valve Quarterly Test

05/13/2021

QF 1073-02

Crew Simulator Examination Summary for Crew 4

QF 1073-03

Individual Operator Simulator Examination Summary for

each Crew 4 RO and SRO

QF 1073-04

STA/SE Simulator Examination Summary for Crew 4

QF-1081-02, Rev.

(FP-T-SAT-81)

Simulator Testing Review Form - Transient Tests (Cycle 31)

05/18/2021

SIMULATOR

EXERCISE

GUIDE (SEG) PI-

LOR-NRC-2001S

20 LOR NRC SIMULATOR EVALUATION #1

SIMULATOR

EXERCISE

GUIDE (SEG) PI-

LOR-NRC-2002S

20 LOR NRC SIMULATOR EVALUATION #2

SIMULATOR

EXERCISE

GUIDE (SEG) PI-

LOR-NRC-2003S

20 LOR NRC SIMULATOR EVALUATION #3

Various

Operating Exam Data for JPMs and Scenarios from 2019

and 2020

Various

List of Current Open Simulator Deviations

Various

Scenarios and JPMs for the 2021 Requalification Exam

Cycle

71111.11B

Miscellaneous

WEEK 2 CREW 2

21 LOR NRC

Written Exam Questions with Correct Answers Indicated

and Plausibility Statements for the Distractors

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Biennial Written

Exam Key

FP-T-SAT-71

NRC Exam Security Requirements

FP-T-SAT-73

Licensed Operator Requalification Program Examinations

FP-T-SAT-80

Simulator Configuration Management

Procedures

FP-T-SAT-81

Simulator Testing and Documentation

Self-Assessments 60700000630

21 Pre-IP 71111.11B Self-Assessment

04/08/2021

71111.13

Procedures

T-3 Certification Package

04/15/2021

501000048107

DDCLP Auto Start

Corrective Action

Documents

501000049987

D6 Didn't Come up to Full Speed

03/30/2021

Drawings

NE 116757

D6 Emergency Generator Start Sequences

NE 116575

D6 Emergency Generator Radiator Fans

NE-11675

D6 Emergency Generator Speed Governor

WM-0156

Completed WO Task Report-PMRQ 18703-06 - B26/LD SEQ

CAB - REPLACE 27N & RXMH2 RELAYS

06/14/2017

Miscellaneous

XCE-07478

Failure Analysis of a Relay

04/29/2021

71111.15

Procedures

2C20.7

D5/D6 Diesel Generators Operating Procedure

ENG-ME-066

D5/D6 Fuel Oil Storage Requirements

Calculations

PI-D5T-1

Analysis of Record and Engineering Calculations

11/02/1992

71111.18

Calibration

Records

ENG-ME-066

D5/D6 Fuel Oil Storage Requirements

Corrective Action

Documents

501000052715

MV-32247, '22 AFW TO 22 SG MV'

06/02/2021

Prairie Island Updated Safety Analysis Report-Plant Standby

Diesel Generator System

Regulatory Guide 1.9

Regulatory Guide-Selection, Design, Qualification, and

Testing of Emergency Diesel Generator Units Used as Class

1E Onsite Electric Power Systems at Nuclear Power Plants

Regulatory Guide 1.9

Regulatory Guide-Selection, Design, Qualification, and

Testing of Emergency Diesel Generator Units Used as Class

1E Onsite Electric Power Systems at Nuclear Power Plants

71111.19

Procedures

Updated Safety

Analysis Report

Plant Standby Diesel Generator Systems - USAR Section 8

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

700085414

CL Strainer Motor PA

01/29/2021

700029674

SV 37409

10/20/2020

700029688

SV-37403 Replacement

03/16/2021

700047608

Replace Open/Close Limit Switch

06/30/2021

700075963

GMP ADAM-001 11 CLG Water Strainer Inspection

04/05/2021

700079904

SP 2102 22 Turbine B-Driven Auxiliary Feed Water Pump

Quarterly Test

05/20/2021

700079904

SP 2102 22 TB-Driven Auxiliary Feedwater Pump Quarterly

Test

04/16/2021

700080588

SP 1101 12 MD Auxiliary Feedwater Pump Quarterly Flow

and Valve Test

05/27/2021

700085414

CL Strainer Motor Pa (AR 50100048109)

01/29/2021

700085414

CL Strainer Motor PA

01/29/2021

Work Orders

700090868

Troubleshoot and Repair 22 CHG PMP

05/19/2021

700070318

Offline Test - MTR 15-4 (11 RHR PUMP)

05/09/2021

700075027

SP 21SSA CC System/Check Valve UT Test Train A

2/03/2021

700077690

Turbine Driven Auxiliary Feedwater Quarterly Test

04/15/2021

71111.22

Work Orders

700081175

SP 1093 D1 DG Slow Start

04/07/2021

501000025406

Dakota County

04/11/2019

501000027074

Pierce County Siren P-41

05/08/2019

501000034587

Red Wing Siren R-01 Out of Service

11/11/2019

501000035108

Siren Testing Conducted 1 Day Early

11/26/2019

501000036047

EP Potential Siren Failure P-36

2/26/2019

501000048334

SP 1397 Weekly Siren Test

2/03/2021

501000048756

SP 1397 Weekly Siren Test

2/17/2021

Corrective Action

Documents

501000049220

SP 1397 Weekly Siren Test

03/03/2021

Fire Plans

SP 1397

EPlan Fixed Siren Test

2/10/2021

PI-2019-677

CFR 50.54(q) Review Form

06/04/2019

SP 1397

EPlan Fixed Siren Test

01/14/2020

SP 1397

EPlan Fixed Siren Test

10/21/2020

SP 1397

EPlan Fixed Siren Test

11/13/2019

SP 1397

EPlan Fixed Siren Test

07/03/2019

71114.02

Miscellaneous

SP 1397

EPlan Fixed Siren Test

03/03/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

501000048033

NOS: Response to Drill Untimely

01/22/2021

Corrective Action

Documents

501000048120

Everbridge Auto ERO Testing

01/26/2021

71114.03

Miscellaneous

Semi-annual Emergency Organization Augmentation

Response Drills

January

2019 -

December

20

501000028353

TSC Room Temperature Indication Failed

06/09/2019

501000029764

Upper TSC HVAC Not Maintaining Temperature

07/18/2019

501000030186

TSC Upper Level HVAC Ckt 1 Compressor

07/13/2019

501000031446

TSC Room Temperature High

09/04/2019

501000035000

NOS: EP Interface Agency Support

11/27/2019

501000038185

Classification Data for RMs

2/28/2020

501000041154

Emergency Shift Communicator Staffing

05/30/2020

501000041596

LOR DEP Notification Time Exceeded Goal

06/17/2020

501000041597

ORO Email Rejecting EP's 577 Form

06/17/2020

501000041747

AutoDial to TI Casino Not Working

06/22/2020

501000047833

Regulatory Review Wasn't Assigned to EP

01/15/2021

501000047877

NOS: SRD Not Functioning in EP Facility

01/19/2021

Corrective Action

Documents

501000047991

NOS: EPIP Change Review

01/21/2021

21 Nuclear Oversight Audit of Fleet Emergency

Preparedness

01/29/2021

2019 Nuclear Oversight Audit of Prairie Island Emergency

Preparedness

2/18/2019

71114.05

Miscellaneous

Nuclear Oversight EP Annual Evaluation

2/05/2019

Mirion Fastscan Whole Body Counter

08/12/2020

JL Shepherd Model 89 Instrumentation Calibrator

2/02/2020

Gamma Spectroscopy System; Unit 11: 3L Solid Geometry

09/15/2020

Gamma Spectroscopy System; Unit 12; 60 ML Liquid

Geometry

04/24/2018

Gamma Spectroscopy System; Unit 13; 3L Gas Marinelli

Geometry

04/12/2018

293099

Johnson Model 293099 Survey Meter

2/08/2021

71124.05

Calibration

Records

309741

Small Article Monitor; Model 11

05/01/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

3958

Eberline ASP-1 Survey Instrument

09/02/2020

476326

Eberline AMS-4 Air Monitor

08/27/2020

479831

Portal Monitor; Model PM-7

06/21/2020

479902

Rados Personnel Contamination Monitor Model Two Step

2/07/2020

700050776

SP 1027.2A NMC Train A Calibration

08/07/2019

700050777

SP 1927,4 High Range RMS

07/17/2019

501000022044

SSA 71124.08 Degraded Cabling

01/16/2019

501000026362

Instrument Failed Calibration As Found

04/26/2019

501000026757

Rad Monitor Performance - Adverse Trend

05/03/2019

501000026773

JL Shepherd Calibrator Budgeting

05/03/2019

501000029479

Missing Gasket at 2RE-22 Flow Totalizer

07/12/2019

501000040983

Incorrect RP Instrument Calibration

05/26/2020

Corrective Action

Documents

501000040984

Incorrect RP Instrument Acceptance Range

05/26/2020

Miscellaneous

Radiochemistry Analytical Crosscheck Data

2019-2020

2019 Land Use Census at Prairie Island

09/13/2019

20 Land Use Census at Prairie Island

09/28/2020

2019 Annual Radioactive Effluent Report and Offsite Dose

Calculation Manual

05/15/2020

20 Annual Radioactive Effluent Report and Offsite Dose

Calculation Manual

05/14/2021

Miscellaneous

February 2021 Chemistry Monthly Release Report

03/17/2021

CY-ENVR-401

Liquid Waste Tank Release Report

CY-ENVR-511

Airborne Continuous Release Report

CY-ENVR-512

Gas Decay Tank Release Instruction

71124.06

Procedures

H4

Offsite Dose Calculation Manual

Corrective Action

Documents

501000051547

U1 Containment LHRA Lockbox Failure

05/05/2021

Radiological Effluent Summary Dose Data from

July 01, 2020 through March 31, 2021.

Various

Electronic Dosimetry Alarm Logs - October 1, 2020 through

March 31, 2021

Various

71151

Miscellaneous

Unit 1 and Unit 2 Radiochemistry Dose Equivalent Analysis

Data from October 1, 2020 through March 31, 2021.

Various

17