IR 05000282/2023010

From kanterella
Jump to navigation Jump to search
NRC Inspection Report 05000282/2023010 and 05000306/2023010
ML23229A178
Person / Time
Site: Prairie Island  
Issue date: 08/17/2023
From: Jamie Benjamin
NRC/RGN-III/DORS/EB1
To: Conboy T
Northern States Power Company, Minnesota
References
IR 2023010
Download: ML23229A178 (1)


Text

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - NRC INSPECTION REPORT 05000282/2023010 AND 05000306/2023010

Dear Thomas Conboy:

On August 3, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Prairie Island Nuclear Generating Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Prairie Island Nuclear Generating Plant.

August 17, 2023 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jamie C. Benjamin, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000282 and 05000306

License Numbers:

DPR-42 and DPR-60

Report Numbers:

05000282/2023010 and 05000306/2023010

Enterprise Identifier:

I-2023-010-0044

Licensee:

Northern States Power Company

Facility:

Prairie Island Nuclear Generating Plant

Location:

Welch, MN

Inspection Dates:

June 12, 2023 to June 30, 2023

Inspectors:

M. Domke, Reactor Inspector

K. Fay, Reactor Inspector

Approved By:

Jamie C. Benjamin, Chief

Engineering Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Retain Commercial Grade Survey and Source Surveillance Records Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000282,05000306/2023010-01 Open/Closed

[H.7] -

Documentation 71111.21N.03 The inspectors identified a Green finding and associated Non-Cited Violation (NCV) of 10 CFR50 Appendix B, Criterion XVII when the licensee failed to retain commercial grade survey and source surveillance records for the life of the basic component.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication (Section 03.01)

The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:

(1) MID 224000-2, Valve, Plug 3/8 in., 3000 PSI, Compression, 316SS
(2) MID 6555103-2, Pin, Cotter, 1/8 in., 1.5 in. Stainless Steel, Release Spindle Nut
(3) MID KMT116-2, Compound, Sealing, Adhesive, 10.1 oz., Tube/Caulker
(4) MID KOL11G-2, Lubricant Oil, 55 gal. drum
(5) MID KNP2FF-2, Connector, Terminal, 20 to 14 AWG to 12 AWG
(6) MID 160-1115-2, Nut, Manway Primary and Secondary
(7) MID 6588539-2, Coolant, Antifreeze, Ethylene Glycol, Liquid concentrate
(8) MID KES117-2, Splice, Conductor, 20 to 14AWG, 20 to 12 AWG
(9) MID 6620354-2, Hose, Flexible Braided, 1/4 in., 316 Stainless Steel
(10) MID 6621168-2, Valve, Ball, 1/4 in., 2200 PSIG, Stainless Steel
(11) MID KSL12T-2, Tee, Tube, 3/8 in., Compression, 2600 lb., Brass

INSPECTION RESULTS

Failure to Retain Commercial Grade Survey and Source Surveillance Records Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000282,05000306/2023010-01 Open/Closed

[H.7] -

Documentation 71111.21N.03 The inspectors identified a Green finding and associated Non-Cited Violation (NCV) of 10 CFR50 Appendix B, Criterion XVII when the licensee failed to retain commercial grade survey and source surveillance records for the life of the basic component.

Description:

On June 12, 2023, inspectors verifying critical characteristics for commercial grade surveys requested documentation describing conditional approvals to determine what conditions were associated with commercial grade surveys for selected component samples. Commercial grade surveys are activities conducted by the purchaser or its agent to verify that a supplier of commercial grade items controls, through quality activities, the critical characteristics of specifically designated commercial grade items, as a method to accept those items for safety-related use. On June 14, 2023, the licensee informed inspectors that conditional approvals associated with commercial grade surveys greater than 3 years were unavailable due to document retention policies at the facility. Inspectors later learned the same document retention requirements of 3 years were applied to commercial grade surveys, e.g., dedication method 2. Components installed in the plant over 3 years ago did not have documentation supporting their safety-related pedigree. In addition to conditional approvals for surveys and the commercial grade surveys themselves, source surveillance reports developed from implementing commercial grade dedication method 3 were not retained beyond 3 years.

According to the Updated Final Safety Analyses Report at Prairie Island, nuclear plant operational and support activities are conducted under the Northern States Power Minnesota (NSPM) Quality Assurance Topical Report (QATR), designated NSPM-1. NSPM-1 is the top-level policy document that establishes the manner in which quality is to be achieved and presents NSPM's overall philosophy regarding achievement and assurance of quality.

NSPM-1 responds to and intends to satisfy the requirements of Appendix B of 10 CFR Part 50.

Record retention times are provided in NSPM-1 by cited regulatory guide RG1.28 revision 3, 1985, Quality Assurance Program Requirements, but instead of using ASME NQA-1 1983a as described by RG 1.28 revision 3, NSPM uses NQA-1 1994. NQA-1 1994 Basic Requirement 7, Control of Purchased Items and Services, requires procurement of items and services to be controlled to assure conformance with specified requirements.

NQA-1 Supplement 7S-1, Supplementary Requirements for Control of Purchased Items and Services, provides amplified requirements for control of purchased items and services.

Section 5.2 under Supplement 7S-1,requires activities performed to verify conformance to procurement documents to be recorded. Source surveillances and inspections, audits, receiving inspections, non-conformances, dispositions, waivers, and corrective actions shall be documented according to Section 5.2. The record life is further prescribed in NQA-1 1994 Supplement 17S-1, Supplementary Requirements for Quality Assurance Records, Section 2.7.1, lifetime records. Lifetime records are those that meet one or more of the following criteria:

(a) those which would be of significant value in demonstrating capability for safe operation;
(b) those which would be of significant value in maintaining, reworking, repairing, replacing, or modifying an item;
(c) those which would be of significant value in determining the cause of an accident or malfunction of an item;
(d) those which provide required baseline data for in-service inspections. Lifetime records are required to be maintained by or for the plant owner for the life of the particular item while it is installed in the plant or stored for future use.

On June 27, 2023, the licensee initiated quality issue no. 501000074880 to assure procurement documents are appropriately retained and to align documentation and retention of source surveillance records between procedures for receipt of quality items, FP-SC-RSI-02 and for dedication of commercial grade items, FP-SC-PE-01.

On June 28, 2023 the licensee initiated quality issue no. 501000074923 to acknowledge objective evidence for the fulfillment of critical characteristics could not be provided for components installed in safety-related applications for components commercially-dedicated by method 2 and installed greater than 3 years.

Corrective Actions: QIM 501000074943, 6/28/2023, CGD Objective Evidence QIM 501000074880, 6/27/2023, FP-SC-PE-01 and FP-SC-RSI-02 Alignment

Performance Assessment:

Performance Deficiency: The licensee failed to maintain quality assurance records for purchased equipment that conformed to the procurement documents in accordance with 10 CFR 50, Appendix B, Criterion XVII, Quality Assurance Records. Specifically, equipment qualification documentation provided by commercial grade surveys were not maintained as required by NQA-1-1994 as lifetime records and instead destroyed after 3 years.

Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Inspection manual chapter (IMC) 0612 Appendix E provides examples of minor issues, and this finding most closely relates to example 1.a. when the licensee failed to document and evaluate test results in accordance with regulatory requirements. The example for more-than-minor describes the performance deficiency affected the mitigating systems cornerstone attributes of equipment performance and procedure quality and adversely impacted the cornerstone objective. The example shows when a significant number of records associated with equipment are missing that reasonable assurance for operability is called into question. Inspectors discussed with licensee staff their operability process and associated equipment reviews and evaluations regarding this performance deficiency and understand the licensee position that presumption of operability as updated by NEI 18-03 was not lost and requirements for entering the operability determination process did not appear to be satisfied.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The finding was routed through the process described in IMC 0609 Appendix A, Exhibit 2, Part A, Mitigating SSCs and PRA Functionality. All six questions were answered "no," therefore, the finding screens to green.

Cross-Cutting Aspect: H.7 - Documentation: The organization creates and maintains complete, accurate and up-to-date documentation. Record retention for commercial grade surveys and surveillances showing critical characteristics had been satisfied for the life of the basic components were not created upon receipt inspection due to lack of procedure guidance to retain those documents.

Enforcement:

Violation: 10 CFR 50 Appendix B, Criterion XVII requires, in part, sufficient records to furnish evidence of activities affecting quality. Records shall include closely-related data such as qualifications of equipment. Records are required to be identifiable and retrievable. Contrary to the above, the licensee failed to retain commercial grade surveys and source surveillances for life of commercially-dedicated basic components.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 30, 2023, the inspectors presented the Exit Meeting inspection results to Thomas Conboy and other members of the licensee staff.

On August 3, 2023, the inspectors presented the Re-exit meeting inspection results to Tim Johnson and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

501000069858

23 CGD FSA: CGD Industry Experience

01/12/2023

501000069864

23 CGD FSA: CGD Form Enhancements

01/12/2023

605000001590

OSD&D

07/18/2020

Corrective Action

Documents

605000001591

OSD&D

07/18/2020

501000071553

Flexitallic Gasket Found Defective

03/23/2023

501000074142

Incorrect Legacy Material ID

05/31/2023

501000074153

Legacy PO Not Located

06/02/2023

501000074163

MID Shelf Life Requirement Incorrect

06/02/2023

501000074510

Mislabeled Drawer in Warehouse

06/14/2023

501000074520

CAP 501000047963 Actions Not Timely

06/15/2023

501000074537

Missing Oct Warehouse Temp Readings

06/16/2023

501000074563

No Records for Warehouse Monthly PM

06/16/2023

501000074564

CGD-2006-013-03 Material Acceptance Criteria

06/16/2023

501000074718

Incomplete Information Provided to NRC

06/22/2023

501000074771

Legacy POs Lack Required Language

06/23/2023

501000074880

FP-SC-PE-01 and FP-SC-RSI-02 Alignment

06/27/2023

501000074923

CGD Objective Evidence

06/28/2023

Corrective Action

Documents

Resulting from

Inspection

501000074937

NRC CGD Inspection Debrief Observations

06/29/2023

Engineering

Changes

00SG02

Steam Generator Replacement Project

04/12/2004

2015-011

D5 and D6 Fleet Charge Antifreeze and Coolant, CID's

6588539 and 6596703

CGD-2006-001

Cotter Pin

CGD-2006-0013

Burndy Uninsulated Copper Compression Connectors

(Supersedes PINGP CGE-Pl-0009)

CGD-2006-0013

Burndy Uninsulated Copper Compression Connectors

(Supersedes PINGP CGE-Pl-0009)

CGD-2008-006

Swagelok Flexible Hoses

CGD-2009-005

Silicone RTV 108 (108C) -Supersedes CGE-PI-0003

CGD-2009-007

Industrial and Engine Oils (Supersedes CGE-PI-0027)

71111.21N.03

Engineering

Evaluations

CGD-2013-011

Swagelok Valves (Supersedes CGE-PI-0113)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CGD-2013-013

Swagelok Fittings -Brass and Carbon Steel (Supersedes

CGE-PI-0112 for Brass)

CGICF01

EPRI CGI Joint Utility Task Group Commercial Grade

Item Evaluation for Compression Fittings

00020809

Purchase Order for Cotter Pin

00029778

Purchase Order for Splice

4000002332

Purchase Order Lubricant: INDL Oil, 55 GAL DRM

4000006830

Purchase Order for Coolant, Antifreeze

4000007219

Purchase order for Flexible Hose

4000008310

Purchase Order for Ball Valve

4000012335

Purchase Order Plug Valve

4000012734

Purchase Order for Adapter: Tube, Brass

4000016022

Purchase Order for Compound, Sealing Silicone Rubber

Adhesive

4000021138

Purchase Order for Terminal Connector

NP-5652

Guideline for the Utilization of Commercial Grade Items in

Nuclear Safety-Related Applications (NCIG-07)

NQA-1 1994

Quality Assurance Requirements for Nuclear Facility

Applications

07/29/1994

NSPM-1

Quality Assurance Topical Report

Miscellaneous

PS 3549 SQ

Purchase Order Unit 1 Replacement Steam Generator

03/02/2004

FP-NO-SAS-01

Supplier Qualification and Maintenance of the Qualified

Suppliers List

FP-NO-SAS-03

Performance of Commercial Grade Surveys

FP-NO-SAS-06

Source Surveillance

FP-OP-OL-01

Operability

FP-SC-PE-01

Dedication of Commercial Grade Items and Services

FP-SC-RSI-01

Receiving

FP-SC-RSI-02

Quality Receipt

Procedures

FP-SC-RSI-03

Overage, Shortage, Damaged and Discrepant (OSD&D)

Report

16