Security Baseline Inspection Report 05000282/2021402 and 05000306/2021402
ML21208A039
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/28/2021
From: Steven Orth
Plant Support Branch II
To: Domingos C
Northern States Power Company, Minnesota
References
IR 2021402
Download: ML21208A039 (7)


Text

July 28, 2021

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - SECURITY BASELINE INSPECTION REPORT 05000282/2021402 AND 05000306/2021402

Dear Mr. Domingos:

On July 15, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Orth, Steven on 07/28/21 Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000282 and 05000306 License Numbers: DPR-42 and DPR-60 Report Numbers: 05000282/2021402 and 05000306/2021402 Enterprise Identifier: I-2021-402-0057 Licensee: Northern States Power Company, Minnesota Facility: Prairie Island Nuclear Generating Plant Location: Welch, MN Inspection Dates: May 13, 2021 to July 15, 2021 Inspectors: J. Kutlesa, Physical Security Inspector P. Negrete, Security Specialist Approved By: Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework.

In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements Tier II: 02.06 (b, c); 02.08 (a, b, d, e, f, g)

Tier III: 02.09

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1) Tier I: All Requirements Tier II: 02.05; 02.06 (a - e, g - n); 02.07 Tier III: 02.09; 02.10; 02.11
(2) Observed annual Force-on-Force conducted on June 28, 2021 and July 02, 2021.

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following procedure elements:

Security Training (1 Partial)

(1) (Partial)

Tier I: 02.04 Tier II: N/A Tier III: N/A

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Partial)

(1) (Partial)

The inspectors evaluated aspects of the licensees protective strategy change documented under Security Plan Revision 12 to 13 through the observation of security training activities and limited scope/annual drills and exercises to ensure that these changes did not decrease the safeguards effectiveness of the plan.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) Unit 1 (02/2020 through 04/2021)

Unit 2 (02/2020 through 04/2021)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 15, 2021, the inspectors presented the security baseline inspection results to Christopher P. Domingos and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.02 Corrective Action 501000052516 NRC Observation 2021 Access Control 05/25/2021

Documents 501000052526 NRC Observation 2021 Access Control 05/25/2021

Resulting from 501000052552 NRC Observation 2021 Access Control 05/25/2021

Inspection

Miscellaneous PINGP Security Plan, Training and Qualification Plan, 13

Safeguards Contingency Plan

A-SEC-FLT-2020- 2020 Nuclear Oversight Audit of Fleet Security and Cyber 07/31/2020

Security

Procedures FP-S-FSIP-06 Searches 18-A

FP-S-FSIP-13 Information Control Program 15

QF 1763 (FP-S- Security Post Instruction 5

FSIP-02)

QF 1775 (FP-S- Definitions 17

FSIP-02)

Work Orders 700088568 Replace Door 39 Maglok 04/05/2021

71130.05 Calculations CAL 95127-C-001 Burns McDonnell Site Barrier Blast Analysis 1

CAL 95127-C-001 Blast Analysis 1A

Miscellaneous PINGP Security Timelines: Timeline Assessment & Basis 06/22/2020

2018, 2019 & 2020 Annual FoF Drill Binders N/A

MOU Between PINGP and Red Wing, MN Police Department 08/14/2020

Procedures CD 11.6 Safety/Security Interface 6

FP-S-FSIP-01 Security Compensatory Measures 17

FP-S-FSIP-08 Contingency Plan Implementing Procedures 16-A

FP-S-FSIP-08 Contingency Plan Implementing Procedures 16

71130.07 Procedures FL-BSE-025-005 Tactical Qualification Course of Fire 0

71130.09 Engineering 601000002958 Protective Netting 715' Drop Area 04/15/2021

Changes

Miscellaneous N/A Proficiency Training Schedule Undated

71151 Miscellaneous N/A Performance Indicator Data 02/2020

through

04/2021

5