rch 2, 2007

SUBJECT:

ANNUAL ASSESSMENT LETTER - PRAIRIE ISLAND NUCLEAR GENERATING STATION, UNITS 1 AND 2 (05000282/2007001; 05000306/2007001)

Dear Mr. Palmisano:

On February 14, 2007, the NRC staff completed its performance review of Prairie Island Nuclear Generating Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated as "Exempt from Public Disclosure in Accordance with 10 CFR 2.390" and marked as "Official Use Only - Security-Related Information" will include the physical protection review and resultant inspection plan.

Overall, Prairie Island Nuclear Generating Plant Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs are indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.

Additionally, on September 28, 2006, the staff issued a Severity Level III Notice of Violation (NOV) in accordance with the NRCs Enforcement Policy. The NOV was for the licensees failure to provide complete and accurate information regarding the proper crediting of reactivity manipulations for two applicants seeking a license and simulator testing requirements. We will review the stations corrective actions for this NOV during the week of October 15, 2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2008. Significant inspections planned for this year include an Independent Spent Fuel Storage Installation Inspection in June 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Enclosure: Prairie Island Nuclear Generating Plant Inspection/Activity Plan DISTRIBUTION: