IR 05000282/2023420

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000282/2023420 and 05000306/2023420
ML23151A209
Person / Time
Site: Prairie Island  
Issue date: 06/01/2023
From: Clark J
Security Performance Evaluation Branch
To: Domingos C
Northern States Power Company, Minnesota
References
IR 2023420
Download: ML23151A209 (6)


Text

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - SECURITY BASELINE INSPECTION REPORT 05000282/2023420 AND 05000306/2023420

Dear Christopher P. Domingos:

On May 4, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant and discussed the results of this inspection with Timothy Borgen, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60 Enclosure:

As stated June 1, 2023 Signed by Clark, Jefferson on 06/01/23

ML23151A209 x

SUNSI Review x

Non-Sensitive



Sensitive x

Publicly Available



Non-Publicly Available OFFICE NSIR/DSO/SPEB RIII NSIR/DSO/SPEB NSIR/DSO/SPEB NAME P. Coughlin N. Egan J. Berry J. Clark DATE 05/31/2023 05/31/2023 05/31/2023 06/01/2023

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000282 and 05000306

License Numbers:

DPR-42 and DPR-60

Report Numbers:

05000282/2023420 and 05000306/2023420

Enterprise Identifier:

I-2023-420-0016

Licensee:

Northern States Power Company - Minnesota

Facility:

Prairie Island Nuclear Generating Plant

Location:

Welch, Minnesota

Inspection Dates:

April 10, 2023 to May 04, 2023

Inspectors:

J. Berry, Team Leader, NSIR

P. Coughlin, Senior Physical Security Inspector, NSIR

N. Egan, Senior Physical Security Inspector, RIII

A. Woyansky, Physical Security Inspector, NSIR

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

Office of Nuclear Security and Incident Response

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS125961.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 4, 2023, the inspectors presented the security baseline inspection results to Timothy Borgen, Plant Manager and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

501000072455

Security Duck and Cover not Followed

501000072480

Drill Player Neutralized

501000073089

Broken PIDS wires

501000073108

FOF Program Update

501000073119

Evaluate Thermal Optics for FOF

501000073139

NRC Observations

501000073151

Evaluate Delay Barrier Enhancement

Corrective Action

Documents

Resulting from

Inspection

501000073162

Minor Violation Site Specific Analysis

Calc. 95127-C-

001

Blast Analysis of Defensive Fighting Positions and

Qualification of Natural Terrain as a Vehicle Barrier System

Rev 12

EC 21130

Underground Pathways Evaluation

11/17/2012

Engineering

Evaluations

TSA

Target Set Assessment

Rev 2

Prairie Island Nuclear Generating Plant Security Plan,

Training and Qualification Plan, Safeguards Contingency

Plan

Rev 13,

09/15/2020

Prairie Island Nuclear Generating Plant Independent Spent

Fuel Storage Installation Safeguards Contingency Plan

Rev 6,

08/05/2022

Prairie Island Nuclear Generating Plant Independent Spent

Fuel Storage Installation Security Plan

Rev 9,

08/05/2022

23 Prairie Island Nuclear Generating Plant Protective

Strategy Brief

Rev 0

FL-BSE-400-005L

MILES Operation

Rev 6

FL-BSE-600-001L

Contingency Response

Rev 7

FL-BSE-600-002F

Drill Controller

Rev 10

FP-S-FSIP-04

Equipment Inventory, Maintenance, Testing and Calibration

Rev 30

FP-S-FSIP-08

Contingency Plan Implementing Procedures

Rev 8

FP-S-FSIP-14

Security Drill and Exercise Program

Rev 14

SE-0021

Use of Force

Rev 12

SE-0025

Conduct of Security Operations

Rev 24

SF-1379

Perimeter Intrusion Detection System Performance Test

Rev 14

71130.03

Procedures

SP-1651

Weekly Perimeter Intrusion Detection System Operability

Test

Rev 49