IR 05000282/2022501
| ML22230D073 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 08/22/2022 |
| From: | Patricia Pelke NRC/RGN-III/DRS/OLB |
| To: | Domingos C Northern States Power Co |
| References | |
| IR 2022501 | |
| Download: ML22230D073 (8) | |
Text
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000282/2022501 AND 05000306/2022501
Dear Mr. Domingos:
On August 4, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000282 and 05000306
License Numbers:
Report Numbers:
05000282/2022501 and 05000306/2022501
Enterprise Identifier:
I-2022-501-0009
Licensee:
Northern States Power Company, Minnesota
Facility:
Prairie Island Nuclear Generating Plant
Location:
Welch, MN
Inspection Dates:
August 01, 2022 to August 04, 2022
Inspectors:
E. Fernandez, Reactor Inspector
G. Hansen, Senior Emergency Preparedness Inspector
R. Ng, Project Engineer
P. Zurawski, Senior Resident Inspector
Approved By:
Patricia J. Pelke, Chief
Operations Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process.
The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise on August 2, 2022.
The exercise scenario simulated an event at the Prairie Island Nuclear Generating Plant that initiated with the declaration and notification of an Alert in response to AC power to both Safeguards Buses 15 and 16 being reduced to a single power source for 15 minutes or longer. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of a Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation - Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for the biennial emergency plan exercise on June 29,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12)===
- (1) July 1, 2021 through April 30, 2022 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) July 1, 2021 through April 30, 2022 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) July 1, 2021 through April 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On August 4, 2022, the inspectors presented the emergency preparedness biennial exercise inspection results to Christopher Domingos and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
QIM
501000064087
EP Drill - Missing Info in PINGP 911
06/01/2022
QIM
501000064089
EP Drill - Emergency Action Level Poster
06/21/2022
QIM
501000064104
EP Drill - Emergency Team Status Board
06/21/2022
QIM
501000064121
EP Drill - TSC Coordinator Location
06/21/2022
QIM
501000064131
EP Drill - EOF Telephone Headset Mic
06/24/2022
QIM
501000064133
EP Drill-Consequences of Invite Only
06/21/2022
QIM
501000064139
EP Drill
06/22/2022
Corrective Action
Documents
QIM
501000064145
ERO Drill - Initial Control Room Classification
06/24/2022
Miscellaneous
22 Prairie Island Evaluated Exercise Performance
Summary - PowerPoint Presentation
08/04/2022
Prairie Island Nuclear Generating Plant Emergency Plan
1ECA-0.0
Loss of All Safeguards AC Power
1FR-P.1
Response to Imminent Pressurized Thermal Shock Condition
F3-10
Personnel Accountability
F3-13
Offsite Dose Calculation
F3-14.1
Onsite Radiological Monitoring
F3-17
Core Damage Assessment
F3-2
Classification of Emergencies
F3-2.1
Emergency Action Level Technical Bases
F3-4
Responsibilities During an Alert, Site Area Emergency, or
General Emergency
F3-5
Emergency Notifications
F3-6
Activation and Operation of Technical Support Center
Procedures
F3-7
Activation and Operation of Operational Support Center
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
F3-8
Recommendations for Offsite Protective Actions
F3-9
Emergency Evacuation
F8-3
Activation and Operation of the EOF
PINGP 1576
Emergency Action Level Matrix
Miscellaneous
Prairie Island Nuclear Generating Plant (PINGP) Emergency
Plan 2022 Exercise Scenario
06/02/2022
NRC Performance Indicator Data, Emergency Preparedness
- Alert and Notification System Reliability
07/01/2021 -
03/31/2022
NRC Performance Indicator Data, Emergency Preparedness
- Drill/Exercise Performance
07/01/2021 -
03/31/2022
71151
Miscellaneous
NRC Performance Indicator Data, Emergency Preparedness
- ERO Drill Participation
07/01/2021 -
03/31/2022