{{#Wiki_filter:February 21, 2008  
{{#Wiki_filter:February 21, 2008 LICENSEE:       Nuclear Management Company (NMC)
 
FACILITY:       Monticello Nuclear Generating Plant
LICENSEE: Nuclear Management Company (NMC)  
 
FACILITY: Monticello Nuclear Generating Plant  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE FEBRUARY 13, 2008, MEETING WITH THE LICENSEE TO DISCUSS PRE-APPLICATION ISSUES RELATED TO A FUTURE EXTENDED POWER UPRATE AMENDMENT APPLICATION (TAC NO. MD5531)  
OF THE FEBRUARY 13, 2008, MEETING WITH THE LICENSEE TO DISCUSS PRE-APPLICATION ISSUES RELATED TO A FUTURE EXTENDED POWER UPRATE AMENDMENT APPLICATION (TAC NO. MD5531)
 
On February 13, 2008, the Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Nuclear Management Company (NMC) at Westinghouse offices located at 12300 Twinbrook Parkway, Rockville, Maryland. This was the third of such meetings; the previous ones were held on June 5 and October 3, 2007 (see meeting summaries at Accession Nos. ML071710328 and ML072840499). The purpose of this meeting was to specifically discuss the licensee=s proposed approach to demonstrate steam dryer structural integrity at extended power uprate (EPU) conditions in preparation for a future amendment to approve EPU. A list of attendees is provided as Enclosure 1. The licensee=s handout material has been docketed and is publicly available at Accession No. ML080450480.
On February 13, 2008, the Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Nuclear Management Company (NMC) at Westinghouse offices located at 12300 Twinbrook Parkway, Rockville, Maryland. This was the third of such meetings; the previous ones were held on June 5 and October 3, 2007 (see meeting summaries at Accession Nos. ML071710328 and ML072840499). The purpose of this meeting was to specifically discuss the licensee
The licensees presentation, depicting its approach to demonstrate steam dryer structural integrity, was outlined by the handout material. The NRC staff discussed with the licensee various aspects of the approach but did not raise any significant technical concerns.
=s proposed approach to demonstrate steam dryer structural integrity at extended power uprate (EPU) conditions in preparation for a future amendment to approve EPU. A list of attendees is provided as Enclosure 1. The licensee
A portion of the meeting was closed to the public to discuss information proprietary to the licensee and its contractor Continuum Dynamics Incorporated (CDI). To assist in this discussion, NMC personnel provided a handout containing proprietary information. NMC personnel collected all copies at the end of this portion of the meeting; thus, the handout is not docketed as part of this meeting summary.
=s handout material has been docketed and is publicly available at Accession No. ML080450480.  
Before the meeting adjourned, members of the public were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.
 
The licensee's presentation, depicting its approach to demonstrate steam dryer structural integrity, was outlined by the handout material. The NRC staff discussed with the licensee various aspects of the approach but did not raise any significant technical concerns.  
 
A portion of the meeting was closed to the public to discuss information proprietary to the licensee and its contractor Continuum Dynamics Incorporated (CDI). To assist in this discussion, NMC personnel provided a handout containing proprietary information. NMC personnel collected all copies at the end of this portion of the meeting; thus, the handout is not docketed as part of this meeting summary.  
 
Before the meeting adjourned, members of the public were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.
 
Please direct any inquiries to Mr. Peter Tam, NRC Project Manager for Monticello, at 301-415-1451, or pst@nrc.gov


Sincerely,  
Please direct any inquiries to Mr. Peter Tam, NRC Project Manager for Monticello, at 301-415-1451, or pst@nrc.gov Sincerely,
      /RA/ Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
                                            /RA/
 
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263
Docket No. 50-263  


==Enclosure:==
==Enclosure:==


List of Attendees  
List of Attendees cc w/encl: See next page
 
cc w/encl: See next page  
 
Please direct any inquiries to Mr. Peter Tam, NRC Project Manager for Monticello, at 301-415-1451, or pst@nrc.gov


Sincerely,  
Please direct any inquiries to Mr. Peter Tam, NRC Project Manager for Monticello, at 301-415-1451, or pst@nrc.gov Sincerely,
      /RA/ Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
                                              /RA/
 
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263
Docket No. 50-263  


==Enclosure:==
==Enclosure:==


List of Attendees  
List of Attendees cc w/encl: See next page DISTRIBUTION:
PUBLIC                        LPL3-1 r/f                    RidsNrrDorlLpl3-1 RidsNrrPMPTam                  RidsNrrLATHarris              RidsOgcRp RidsAcrsAcnw&mMailCenter      TBloomer, EDO                RidsRgn3Mailcenter TAlexion, NRR                        JO=Driscoll, NRR              KManoly, NRR CBasavaraju, NRR              HCruz, NRR                    TLiu, NRR MChawla, NRR Package: ML080510058 Summary Accession No.: ML080450168 Meeting Notice Accession No.: ML080040201 Licensee=s Handout Accession No.: ML080450480 OFFICE        LPL3-1/PM  LPL3-1/LA      EMCB/BC        LPL3-1/BC(A)
NAME          PTam        THarris*        KManoly        PMilano DATE          2/19/08    2/21/08        2/19/08        2/21/08
*Concurred by e-mail OFFICIAL RECORD COPY


cc w/encl:  See next page
MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND NUCLEAR MANAGEMENT COMPANY (NMC)
 
DISTRIBUTION:
PUBLIC    LPL3-1 r/f  RidsNrrDorlLpl3-1 RidsNrrPMPTam  RidsNrrLATHarris  RidsOgcRp RidsAcrsAcnw&mMailCenter TBloomer, EDO  RidsRgn3Mailcenter TAlexion, NRR  JO
=Driscoll, NRR  KManoly, NRR  CBasavaraju, NRR  HCruz, NRR  TLiu, NRR    MChawla, NRR
 
Package:  ML080510058 Summary Accession No.:  ML080450168 Meeting Notice Accession No.:  ML080040201 Licensee=s Handout Accession No.:  ML080450480 OFFICE  LPL3-1/PM LPL3-1/LA EMCB/BC  LPL3-1/BC(A)
 
NAME  PTam  THarris*  KManoly  PMilano DATE  2/19/08  2/21/08  2/19/08  2/21/08 *Concurred by e-mail OFFICIAL RECORD COPY MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND NUCLEAR MANAGEMENT COMPANY (NMC)
LIST OF ATTENDEES MONTICELLO NUCLEAR GENERATING PLANT EXTENDED POWER UPRATE (EPU)
LIST OF ATTENDEES MONTICELLO NUCLEAR GENERATING PLANT EXTENDED POWER UPRATE (EPU)
FEBRUARY 13, 2008 Name     Organization Kenneth Albrecht   NMC Tom Alexion   NRC/NRR/Generic Communication & Power Uprate Branch (Lead Project Manager for EPU)
FEBRUARY 13, 2008 Name                             Organization Kenneth Albrecht                 NMC Tom Alexion                     NRC/NRR/Generic Communication & Power Uprate Branch (Lead Project Manager for EPU)
Alan Bilanin     CDI (Continuum Dynamics Incorporated)
Alan Bilanin                     CDI (Continuum Dynamics Incorporated)
Alexander Boschitsch   CDI Mahesh (Mac) Chawla NRC/NRR/
Alexander Boschitsch             CDI Mahesh (Mac) Chawla             NRC/NRR/Plant Licensing Branch III-1 Chakrapani (Pani) Basaravaju)   NRC/NRR/Mechanical & Civil Engineering Branch George Inch                     Constellation Joe Ferrante                     NMC Michael Jonzen                   AREVA Lynne Gunderson                 NMC Ed Hartwig                       TVA (Browns Ferry)
Plant Licensi ng Branc h III-1 Chakrapani (Pani) Basaravaju) NRC/NRR/Mechanical & Civil Engineering Branch George Inch   Constellation Joe Ferrante   NMC Michael Jonzen   AREVA Lynne Gunderson   NMC Ed Hartwig     TVA (Browns Ferry)
Kamal Manoly                     NRC/NRR/Mechanical and Civil Engineering Branch Gary Pavis                       Constellation David Potter                     NMC Peter Tam                       NRC/NRR/Plant Licensing Branch III-1 Edward Weinkam                   NMC Allen Williams                   NMC
Kamal Manoly   NRC/NRR/Mechanical and Civil Engineering Branch Gary Pavis     Constellation David Potter   NMC Peter Tam     NRC/NRR/Plant Licensing Branch III-1 Edward Weinkam   NMC Allen Williams   NMC Monticello Nuclear Generating Plant
 
cc:
 
Peter M. Glass Assistant General Counsel Xcel Energy Services, Inc.
414 Nicollet Mall Minneapolis, MN  55401
 
U.S. Nuclear Regulatory Commission Resident Inspector's Office 2807 W. County Road 75 Monticello, MN  55362
 
Manager, Nuclear Safety Assessment Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN  55362-9637
 
Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN  55155-4194
 
Commissioner Minnesota Department of Health 717 Delaware Street, S. E.
Minneapolis, MN  55440
 
Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN  55313 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN  55101-2198
 
Manager - Environmental Protection Division Minnesota Attorney General
=s Office 445 Minnesota S t., Suite 900 St. Paul, MN  55101-2127
 
Nuclear Asset Manager Xcel Energy, Inc.
414 Nicollet Mall, R.S. 8 Minneapolis, MN  55401


Dennis L. Koehl Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016}}
Monticello Nuclear Generating Plant cc:
Commissioner Peter M. Glass                      Minnesota Department of Commerce Assistant General Counsel            85 7th Place East, Suite 500 Xcel Energy Services, Inc.          St. Paul, MN 55101-2198 414 Nicollet Mall Minneapolis, MN 55401                Manager - Environmental Protection Division Minnesota Attorney General=s Office U.S. Nuclear Regulatory Commission  445 Minnesota St., Suite 900 Resident Inspector's Office          St. Paul, MN 55101-2127 2807 W. County Road 75 Monticello, MN 55362                Nuclear Asset Manager Xcel Energy, Inc.
Manager, Nuclear Safety Assessment  414 Nicollet Mall, R.S. 8 Monticello Nuclear Generating Plant  Minneapolis, MN 55401 Nuclear Management Company, LLC 2807 West County Road 75            Dennis L. Koehl Monticello, MN 55362-9637            Chief Nuclear Officer Nuclear Management Company, LLC Commissioner                        700 First Street Minnesota Pollution Control Agency  Hudson, WI 54016 520 Lafayette Road St. Paul, MN 55155-4194 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.
Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313}}

Revision as of 19:31, 14 November 2019

02/13/2008-Summary of Meeting with Nuclear Management Company to Discuss Pre-Application Issues Related to a Future Extended Power Uprate Amendment Application
ML080450168
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/21/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Shared Package
ML080510058 List:
References
TAC MD5531
Download: ML080450168 (5)


Text

February 21, 2008 LICENSEE: Nuclear Management Company (NMC)

FACILITY: Monticello Nuclear Generating Plant

SUBJECT:

SUMMARY

OF THE FEBRUARY 13, 2008, MEETING WITH THE LICENSEE TO DISCUSS PRE-APPLICATION ISSUES RELATED TO A FUTURE EXTENDED POWER UPRATE AMENDMENT APPLICATION (TAC NO. MD5531)

On February 13, 2008, the Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Nuclear Management Company (NMC) at Westinghouse offices located at 12300 Twinbrook Parkway, Rockville, Maryland. This was the third of such meetings; the previous ones were held on June 5 and October 3, 2007 (see meeting summaries at Accession Nos. ML071710328 and ML072840499). The purpose of this meeting was to specifically discuss the licensee=s proposed approach to demonstrate steam dryer structural integrity at extended power uprate (EPU) conditions in preparation for a future amendment to approve EPU. A list of attendees is provided as Enclosure 1. The licensee=s handout material has been docketed and is publicly available at Accession No. ML080450480.

The licensees presentation, depicting its approach to demonstrate steam dryer structural integrity, was outlined by the handout material. The NRC staff discussed with the licensee various aspects of the approach but did not raise any significant technical concerns.

A portion of the meeting was closed to the public to discuss information proprietary to the licensee and its contractor Continuum Dynamics Incorporated (CDI). To assist in this discussion, NMC personnel provided a handout containing proprietary information. NMC personnel collected all copies at the end of this portion of the meeting; thus, the handout is not docketed as part of this meeting summary.

Before the meeting adjourned, members of the public were given the opportunity to communicate with the NRC staff both verbally and through the use of public meeting feedback forms. No comment or feedback was received at this time.

Please direct any inquiries to Mr. Peter Tam, NRC Project Manager for Monticello, at 301-415-1451, or pst@nrc.gov Sincerely,

/RA/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

List of Attendees cc w/encl: See next page

Please direct any inquiries to Mr. Peter Tam, NRC Project Manager for Monticello, at 301-415-1451, or pst@nrc.gov Sincerely,

/RA/

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

List of Attendees cc w/encl: See next page DISTRIBUTION:

PUBLIC LPL3-1 r/f RidsNrrDorlLpl3-1 RidsNrrPMPTam RidsNrrLATHarris RidsOgcRp RidsAcrsAcnw&mMailCenter TBloomer, EDO RidsRgn3Mailcenter TAlexion, NRR JO=Driscoll, NRR KManoly, NRR CBasavaraju, NRR HCruz, NRR TLiu, NRR MChawla, NRR Package: ML080510058 Summary Accession No.: ML080450168 Meeting Notice Accession No.: ML080040201 Licensee=s Handout Accession No.: ML080450480 OFFICE LPL3-1/PM LPL3-1/LA EMCB/BC LPL3-1/BC(A)

NAME PTam THarris* KManoly PMilano DATE 2/19/08 2/21/08 2/19/08 2/21/08

  • Concurred by e-mail OFFICIAL RECORD COPY

MEETING BETWEEN NUCLEAR REGULATORY COMMISSION (NRC) AND NUCLEAR MANAGEMENT COMPANY (NMC)

LIST OF ATTENDEES MONTICELLO NUCLEAR GENERATING PLANT EXTENDED POWER UPRATE (EPU)

FEBRUARY 13, 2008 Name Organization Kenneth Albrecht NMC Tom Alexion NRC/NRR/Generic Communication & Power Uprate Branch (Lead Project Manager for EPU)

Alan Bilanin CDI (Continuum Dynamics Incorporated)

Alexander Boschitsch CDI Mahesh (Mac) Chawla NRC/NRR/Plant Licensing Branch III-1 Chakrapani (Pani) Basaravaju) NRC/NRR/Mechanical & Civil Engineering Branch George Inch Constellation Joe Ferrante NMC Michael Jonzen AREVA Lynne Gunderson NMC Ed Hartwig TVA (Browns Ferry)

Kamal Manoly NRC/NRR/Mechanical and Civil Engineering Branch Gary Pavis Constellation David Potter NMC Peter Tam NRC/NRR/Plant Licensing Branch III-1 Edward Weinkam NMC Allen Williams NMC

Monticello Nuclear Generating Plant cc:

Commissioner Peter M. Glass Minnesota Department of Commerce Assistant General Counsel 85 7th Place East, Suite 500 Xcel Energy Services, Inc. St. Paul, MN 55101-2198 414 Nicollet Mall Minneapolis, MN 55401 Manager - Environmental Protection Division Minnesota Attorney General=s Office U.S. Nuclear Regulatory Commission 445 Minnesota St., Suite 900 Resident Inspector's Office St. Paul, MN 55101-2127 2807 W. County Road 75 Monticello, MN 55362 Nuclear Asset Manager Xcel Energy, Inc.

Manager, Nuclear Safety Assessment 414 Nicollet Mall, R.S. 8 Monticello Nuclear Generating Plant Minneapolis, MN 55401 Nuclear Management Company, LLC 2807 West County Road 75 Dennis L. Koehl Monticello, MN 55362-9637 Chief Nuclear Officer Nuclear Management Company, LLC Commissioner 700 First Street Minnesota Pollution Control Agency Hudson, WI 54016 520 Lafayette Road St. Paul, MN 55155-4194 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.

Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313