{{#Wiki_filter:REGULATORY
{{#Wiki_filter:REGULATORY INFORNATION DISTRIBUTION SYSTEN (RIDS)ACCESSION NBR: 8712300003 DOC.DATE: 87/12/17 NOTARIZED:
INFORNATION
NO FACIL: 50-397 WPPSS Nuclear Pro Ject>Unit 2>Washington Public Powe AUTH.NANE, AUTHOR AFFILIATION SORENSEN>G.C.Washington Public Power Supply System RECIP.MANE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000397  
DISTRIBUTION
 
SYSTEN (RIDS)ACCESSION NBR: 8712300003
==SUBJECT:==
DOC.DATE: 87/12/17 NOTARIZED:
Requests extension to required response time to 880205 foT responding to violations noted in Insp rept 50-397/87-19>
NO FACIL: 50-397 WPPSS Nuclear Pro Ject>Unit 2>Washington
per 871216 telcon.DISTRIBUTION CODE: IEOID COPIES RECEIVED: LTR j ENCL J SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: REC IP IENT ID CODE/NANE PDS PD COP IES LTTR.ENCL 1 1 RECIPIENT ID CODE/NANE SANWORTH>R COPIES LTTR ENCL 2 2 INTERNAL: ACRS DEDRO NRR/DLPG/PEB NRR/DREP/EPB NRR/DRIS DIR RNAN>J RGN5 FILE 01 TERNAL: LPDR NSIC 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'1 AEOD NRR NORISSEAU>
Public Powe AUTH.NANE, AUTHOR AFFILIATION
D NRR/DOEA DIR NRR/DREP/RPB NRR/PNAS/ILRB OGC/HDS2 RES DEPY GI NRC PDR 1 1 1 1 1 2 2 1-1 1 1 1 1 go.gg fog TOTAL NUNBER OF COPIES REGUlRED: LTTR 23 ENCL 23  
SORENSEN>G.C.Washington
 
Public Power Supply System RECIP.MANE RECIPIENT AFFILIATION
Washington Public Power Supply System 3000 George Washington Way.P.O.Box 968 Richland, Washington 99352-0968 (509)372-5000 December 17, 1987 G02-87-288
Document Control Branch (Document Control Desk)DOCKET 05000397 SUBJECT: Requests extension to required response time to 880205 foT responding
to violations
noted in Insp rept 50-397/87-19>
per 871216 telcon.DISTRIBUTION
CODE: IEOID COPIES RECEIVED: LTR j ENCL J SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Violation Response NOTES: REC IP IENT ID CODE/NANE PDS PD COP IES LTTR.ENCL 1 1 RECIPIENT ID CODE/NANE SANWORTH>R COPIES LTTR ENCL 2 2 INTERNAL: ACRS DEDRO NRR/DLPG/PEB
NRR/DREP/EPB
NRR/DRIS DIR RNAN>J RGN5 FILE 01 TERNAL: LPDR NSIC 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'1 AEOD NRR NORISSEAU>
D NRR/DOEA DIR NRR/DREP/RPB
NRR/PNAS/ILRB
OGC/HDS2 RES DEPY GI NRC PDR 1 1 1 1 1 2 2 1-1 1 1 1 1 go.gg fog TOTAL NUNBER OF COPIES REGUlRED: LTTR 23 ENCL 23  
Washington
Public Power Supply System 3000 George Washington
Way.P.O.Box 968 Richland, Washington
99352-0968
(509)372-5000
December 17, 1987 G02-87-288
'ocket'No.
'ocket'No.
50-397 U.S.Nuclear Regulatory
50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Commission
 
Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
==Subject:==
Subject: Reference:
 
NUCLEAR PLANT NO.2, LICENSE NPF-21 NRC INSPECTION
==Reference:==
REPORT 87-19, REQUEST FOR EXTENSION OF RESPONSE TIME Letter, JB Martin (NRC RV)to GC Sorensen (SS)"NRC Inspection
 
at WNP-2", dated 12/8/87 The reference forwarded the results of the NRC special team Safety System Functional
NUCLEAR PLANT NO.2, LICENSE NPF-21 NRC INSPECTION REPORT 87-19, REQUEST FOR EXTENSION OF RESPONSE TIME Letter, JB Martin (NRC RV)to GC Sorensen (SS)"NRC Inspection at WNP-2", dated 12/8/87 The reference forwarded the results of the NRC special team Safety System Functional Inspection (SSFI)conducted August 3-28, 1987 at WNP-2 and included a request that the Supply System provide a response to the enclosed violation within 30 days (January 7, 1988).It should be noted that the Supply System has continued to work to resolve those issues identified in the SSFI exit interview.
Inspection (SSFI)conducted August 3-28, 1987 at WNP-2 and included a request that the Supply System provide a response to the enclosed violation within 30 days (January 7, 1988).It should be noted that the Supply System has continued to work to resolve those issues identified
in the SSFI exit interview.
However the Supply System has reviewed the Notice of Violation and considers that in order to provide a quality response an extension to the 30 days is needed;This request for extension is based on the following considerations:
However the Supply System has reviewed the Notice of Violation and considers that in order to provide a quality response an extension to the 30 days is needed;This request for extension is based on the following considerations:
The number of violations, although level 4 and 5, will require a much larger effort to assemble, review, and approve than any Notice of Violation previously
The number of violations, although level 4 and 5, will require a much larger effort to assemble, review, and approve than any Notice of Violation previously responded to.Key personnel necessary to ensure an accurate, quality response will be on Holiday throughout the next few weeks, and the plant has just completed a short but intense outage.This combined with the Holiday Season, results in requested and granted vacation time for personnel to both recover from the outage and enjoy the season.87gpf 7 8 R P,gOCH PDR~Zgpppp3 5ppp397 can.rid<I Wo.g pep ICE'/<3~pl I Page Two NRC INSPECTION REPORT 87-19, RE(}VEST FOR EXTENSION OF RESPONSE TIME Accordingly, the Supply System hereby requests an extension to the required response time to February 5, 1988.This request was informally discussed in a telephone conversation, December 16,'987, between Messrs R.-'J.Pate of your staff and P.L.Powell-of the.Supply System.Should you have further questions, please contact Mr.P.L.Powell, Manager, WNP-2 Licensing.
responded to.Key personnel necessary to ensure an accurate, quality response will be on Holiday throughout
Very truly yours, G.C.Sorensen,,Manager Regulatory Programs PLP/bk cc: JB Martin-NRC RV RB Samworth-NRC NS Reynolds-BCPER DL Williams-BPA-399 NRC Site Inspector-901A  
the next few weeks, and the plant has just completed a short but intense outage.This combined with the Holiday Season, results in requested and granted vacation time for personnel to both recover from the outage and enjoy the season.87gpf 7 8 R P,gOCH PDR~Zgpppp3 5ppp397 can.rid<I Wo.g pep ICE'/<3~pl I  
'0}}
Page Two NRC INSPECTION
REPORT 87-19, RE(}VEST FOR EXTENSION OF RESPONSE TIME Accordingly, the Supply System hereby requests an extension to the required response time to February 5, 1988.This request was informally
discussed in a telephone conversation, December 16,'987, between Messrs R.-'J.Pate of your staff and P.L.Powell-of the.Supply System.Should you have further questions, please contact Mr.P.L.Powell, Manager, WNP-2 Licensing.
Very truly yours, G.C.Sorensen,,Manager
Regulatory
Programs PLP/bk cc: JB Martin-NRC RV RB Samworth-NRC NS Reynolds-BCPER DL Williams-BPA-399 NRC Site Inspector-901A  
'0
}}

Revision as of 13:25, 17 August 2019

Requests Extension to Required Response Time to 880205 for Responding to Violations Noted in Insp Rept 50-397/87-19,per 871216 Telcon
ML17279A744
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/17/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-87-288, NUDOCS 8712300003
Download: ML17279A744 (5)


Text

REGULATORY INFORNATION DISTRIBUTION SYSTEN (RIDS)ACCESSION NBR: 8712300003 DOC.DATE: 87/12/17 NOTARIZED:

NO FACIL: 50-397 WPPSS Nuclear Pro Ject>Unit 2>Washington Public Powe AUTH.NANE, AUTHOR AFFILIATION SORENSEN>G.C.Washington Public Power Supply System RECIP.MANE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000397

SUBJECT:

Requests extension to required response time to 880205 foT responding to violations noted in Insp rept 50-397/87-19>

per 871216 telcon.DISTRIBUTION CODE: IEOID COPIES RECEIVED: LTR j ENCL J SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: REC IP IENT ID CODE/NANE PDS PD COP IES LTTR.ENCL 1 1 RECIPIENT ID CODE/NANE SANWORTH>R COPIES LTTR ENCL 2 2 INTERNAL: ACRS DEDRO NRR/DLPG/PEB NRR/DREP/EPB NRR/DRIS DIR RNAN>J RGN5 FILE 01 TERNAL: LPDR NSIC 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'1 AEOD NRR NORISSEAU>

D NRR/DOEA DIR NRR/DREP/RPB NRR/PNAS/ILRB OGC/HDS2 RES DEPY GI NRC PDR 1 1 1 1 1 2 2 1-1 1 1 1 1 go.gg fog TOTAL NUNBER OF COPIES REGUlRED: LTTR 23 ENCL 23

Washington Public Power Supply System 3000 George Washington Way.P.O.Box 968 Richland, Washington 99352-0968 (509)372-5000 December 17, 1987 G02-87-288

'ocket'No.

50-397 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

Reference:

NUCLEAR PLANT NO.2, LICENSE NPF-21 NRC INSPECTION REPORT 87-19, REQUEST FOR EXTENSION OF RESPONSE TIME Letter, JB Martin (NRC RV)to GC Sorensen (SS)"NRC Inspection at WNP-2", dated 12/8/87 The reference forwarded the results of the NRC special team Safety System Functional Inspection (SSFI)conducted August 3-28, 1987 at WNP-2 and included a request that the Supply System provide a response to the enclosed violation within 30 days (January 7, 1988).It should be noted that the Supply System has continued to work to resolve those issues identified in the SSFI exit interview.

However the Supply System has reviewed the Notice of Violation and considers that in order to provide a quality response an extension to the 30 days is needed;This request for extension is based on the following considerations:

The number of violations, although level 4 and 5, will require a much larger effort to assemble, review, and approve than any Notice of Violation previously responded to.Key personnel necessary to ensure an accurate, quality response will be on Holiday throughout the next few weeks, and the plant has just completed a short but intense outage.This combined with the Holiday Season, results in requested and granted vacation time for personnel to both recover from the outage and enjoy the season.87gpf 7 8 R P,gOCH PDR~Zgpppp3 5ppp397 can.rid<I Wo.g pep ICE'/<3~pl I Page Two NRC INSPECTION REPORT 87-19, RE(}VEST FOR EXTENSION OF RESPONSE TIME Accordingly, the Supply System hereby requests an extension to the required response time to February 5, 1988.This request was informally discussed in a telephone conversation, December 16,'987, between Messrs R.-'J.Pate of your staff and P.L.Powell-of the.Supply System.Should you have further questions, please contact Mr.P.L.Powell, Manager, WNP-2 Licensing.

Very truly yours, G.C.Sorensen,,Manager Regulatory Programs PLP/bk cc: JB Martin-NRC RV RB Samworth-NRC NS Reynolds-BCPER DL Williams-BPA-399 NRC Site Inspector-901A