ML17354A576: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17354A576
| number = ML17354A576
| issue date = 07/10/1997
| issue date = 07/10/1997
| title = Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept.
| title = Refueling Outage ISI Rept.
| author name =  
| author name =  
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 06:13, 2 April 2019

Refueling Outage ISI Rept.
ML17354A576
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/10/1997
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17354A575 List:
References
NUDOCS 9707160096
Download: ML17354A576 (352)


Text

{{#Wiki_filter:0 TURKEY POINT PLANT UNIT 3 1997 REFUELING OUTAGE INSERVICE INSPECTION REPORT The required examinations scheduled during the Turkey Point Unit 3 refueling outage were completed. This completes the ISI requirements for the first refueling outage of the second period.of the third inspection interval.100%of the A, B, and C steam generator tubes were eddy current tested.14 tubes were plugged during this outage.The.NIS-2 forms discuss the repairs and replacements which took place since the previous Unit 3 submittal and during the 1997 refueling/ maintenance outage.Visual examination and functional testing of snubbers was completed in accordance with ASIDE Section XI and Technical Specifications. Visual examinations did not reveal any failures.There were no snubber failures in the, safety related functional test sample.The inservice inspection summary tables detail the examinations ~~~~~~~~~performed during the first outage of the second period of the third ten-year interval.Selected Class 1 and 2 piping and supports were examined with surface, volumetric, and visual examination techniques in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and the Turkey Point Units 3 and 4 ISI Program.0 9707fh0096 9707i0 PDR ADQCK 05000250 8 PDR 0 TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-1 Owners'ata Report-for Inservice Inspections 0 FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS Page 1 of 6 1.Owner: 2.Plant: Florida Power and Light Company, 700 Universe Blvd.juno Beach, Florida 33408 Florida Power&Light Company, Turkey Point Nuclear Power Plant, 9760 S.W.344th Street, Florida City, Florida 33035 3~Plant Unit:~Owner Certificate of Authorization (if recpxired) Commercial Service Date 6 National Board Number for Unit: 7~Components Inspected: Component or Appurtenance Manufacturer or Installer Manufacturer State o Nat'l or Installer Province Board Serial No.No.No.Reactor Pressure Vessel Reactor Coolant Pump B Regenerative Heat Exchanger RHR Heat Exchan er A Safety In'ection System Residual Heat Removal Main Feedwater System Main Steam System Babcock and Wilcox Westinghouse Westinghouse Atlas Bechtel-Bechtel Bechtel Bechtel 3PSRV1 3P200B 3E200 3E206A N/A N/A N/A N/A N/A N-160 N/A N/A N/A N/A N/A N/A N/A N A N/A N A N/A N/A N/A N/A.8~Examination Dates: From to 9~Inspection Period Identification

Second Period-10'nspection Interval Identification:

Third Interval, from 11.Applicable Edition of Section XI~39 Addenda~ug 12.Date/Revision of Inspection Plan:

NIS-1 Report (continued) Page 2 of 6 1.2e 3~4.5.6.Owner: Florida Po~er 8 Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.W.344th Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required)ComInercial Service Date: National Board Number for Unit: 13.Abstract of examinations and test.Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.An Inservice Examination of selected Class 1 and 2 components and piping systems of Florida Power and Light's Turkey Point Unit 3 was performed during the 1997 Refueling Outage.This.outage began on March 3, 1997 and ended on April 16, 1997.This was the first outage of the second period of the third ten year interval.The components and piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the ASME Section XI, 1989 Edition.Manual ultrasonic, visual, magnetic particle, and liquid penetrant non-destructive techniques were used to examine components, piping, and their supports.The examinations were performed'y FPL personnel, supported by examiners supplied by Raytheon Engineers&Constructors. Eddy Current testing was conducted on the three Steam Generators. A total of 9574 tubes were examined.Fourteen tubes required plugging.See the NIS-BB for details of the examinations. Several Class 1, 2, 3, MC, and CC areas were repl'aced or repaired since the last Summary Report was submitted. See the attached NIS-2 reports for a summary.The Steam Generator Feedwater Nozzle piping augmented examinations were conducted during this outage on all three loops.The entire area from the nozzle ramp to a point one pipe diameter out on the far side of the elbow was examined with ultrasonics. No reportable indications were noted.Snubber functional testing and visual examinations were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications as allowed under Relief Request number 4.Examinations were performed by Raytheon, Inc.and testing services were supplied by Basic-PSA, Inc.System-Pressure testing was conducted by the plant to ASME Section XI and applicable Plant Procedures.. One thimble tube was found to have a through wall leak.It was replaced and retested.Several mechanical connections were found to have leaks.These were all corrected. Leakage was detected at 2 RHR valve bonnets. 0 0 0 NIS-l Report.(continued) Page 3 of 6 e,,'4~5.6.Owner: Florida Power S Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Po~er Plant, 9760.S.M.344th, Street, Florida City, Florida 33035 Plant Unit:~O~ner Certificate of Authorization (if required)Comnercial'Service Date.: National Board Number for Unit: The bolt nearest the source of leakage was VT-l examined'nd found to be acceptable. During, the outage, the bolting on-the two valves;was removed,and examined.No other.leakage was reported.All Quality Group A, B, and C pressure tests required for the.first period of the third inservice inspection interval were completed. A listing of examinations performed is attached to this summary.The examinations performed during the outage meet the requirements of the Inspection Plan.14.Abstract of Results of Examinations and Tests.The seal surface on the Reactor Pressure Vessel head was examined using remote Visual techniques. No reportable indications were noted.Eddy Current testing was conducted on all three Steam Generators. See the'NIS-BB for details.A'VT-3 examination was, performed near the beginning of the outage to look for accumulated, boron crystals and evidence of leakage.A VT-2 examination was,performed during the system pressure test at plant startup.These.examinations were performed to meet the approved alternative requirements in Relief Request No.3.No reportable indications were detected.t The"B" R'eactor Coolant Pump Flywheel was examined in accordance with Technical Specifications.,No reportable indications were. 'f NIS-1 Report (continued) Page 4 of 64~5.6.Owner: Florida Power&Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.W;344th Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required)Comnercial Service Date: National Board.Number for Unit: noted.Residual Heat Exchanger A was examined using surface and volumetric techniques. A round indication was found on the end of one of the integral attachments with Liquid Penetrant. An engineering evaluation determined the indication to be a manufacturing process deficiency. The attachment has a partial penetration weld on the front side, and a cover weld on the back side.The indication was a result of the two welds not being joined at the end of the attachment, and was an acceptable condition. It was not a material or welding flaw, and is outside the scope of Section XI.No other indications were noted.The support on RHR Pump 3P210A was examined.with visual techniques. A bent bolt was found and accepted as-is by engineering evaluation. An engineering evaluation determined the support was outside the scope of Section XI.It is part of the building structure, with the pump body allowed to slide on top of an embedded plate.Both RHR pump supports have been removed from the ISI Program.Residual Heat Removal piping welds and supports were examined using visual, surface and volumetric techniques. Acceptable round and geometric indications were noted.No reportable indications were.noted.Safety Injection piping and.supports were examined using visual, surface and volumetric techniques. No reportable indications were noted.During the outage, the Boron Injection Tank was bypassed and~~~~~~~abandoned in place.The piping welds to the tank were removed il ik NIS-1 Report (continued) Page-5 of 64~5.6.Owner: Florida.Power S Light ComPany, 700'Universe Blvd.Juno Beach, Florida 33408 Plant:.Turkey Point Nuclear Power Plant, 9760 S.M.344th Street, Florida City, Florida 33035 Plant Unit:~O~ner Certificate of Authorization (if required)Conmercial Service Date: National Board Number for Unit: from service and several new welds were added to bypass the tank.See the examination tables for information on which-welds-and components were affected.Main Steam piping, was examined using surface and volumetric techniques. Acceptable geometric indications were noted.No reportable indications were noted.Augmented volumetric examinations were performed on the feedwater piping out from the Steam Generator nozzle.Acceptable geometric and slag indications were found.No reportable indications were noted.15.Abstract of Corrective Measures There were no corrective actions required as.a result of ISI examinations. Several acceptable rounded indications were removed for maintenance reasons as part of additional, surface preparation. 0 il ib NIS-1 Report (continued) 'Page 6 of 6: 4~5~6.Owner: Florida Power 8 Light Company, 700 Universe Blvd.'uno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.M.344th Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required>Comnercial Service Date: National Board Number for Unit: We certify that a)the statements made in this report are correct, b)the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c)corrective measures taken conform to the rules of the ASME Code, Section XI.Certificate of Authorization No.Expiration Date Date: Signed: By: CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 3/3/97 to 4/16/97, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data.Report in accordance with'he Inspection Plan and as required by the ASME Code, Section XI.By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. spect's S'ature National Board, State, Province, and.Endorsements Date: 8 r~ 0 Eg lt~ii, 4 TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-2 Owners'ata Report of Repairs and Replacements 0 FORH NIS 2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power&Li ht Date 12 06 95 700 Universe Blvd.Juno Beach Fl'.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Uni t 3 PWO¹:4229/63 WO¹: 95032858 9700 S'W 344 Street Florida Cit Fl.33034 Address Repair Organization P.O.'No.,Job No.,etc 3.Work Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp N A Authorization Ho.N A Expiration Date N A 4.Identification of System: 5.(a)Applicable Construction Code 831.1'955 Edition, NA Addenda,~N A Code Case INTAKE COOLING MATER System¹: 19 Qual I ty Group: C (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Cocponent Name of Hanufacturer (Manufacturer) National f Serial Ho.J Board I I I I Other Identification [Year J.Repaired J ASHE t[Built(Replaced or)Code J f Reptacement JSterp (I I/~Yes llo[INTAKE COOLING IMATER PUHP.IJONHSTOH PUHP[N/A)H/A iHOOEL 33 CHC I ST-5/UNK~(Replaced iNo 3P9A J INTAKE COOLING CWATER PUHP IBOLTS (40)/1-1 4"-7-UN-2A IJOHNSTOH PUHP iH/A IH/A fH/A[MODEL 33 CHC IST-2 JUNK.]Replacement ]Ho 3P9A IN/A]H/A (R90-0831 ASHE SA-307 GR 8 fUNK./Replacement)Ho 3P9A 7.'Description of Mork: 3A INTAKE COOLING WATER PUHP IST-5 REPLACED WITH SPARE IST-2.Pneunatict Hominal Operating Pressure X Pressure 15 psig Test Temperature 76;F 95-064-3 Sheet 2 of 2 FORM NIS-2 (Back)4l 9.Remarks: HEcMAMIcAL coNNEGTIoM No'WELDING REoUIRED.CERTIFI~CATE OF COMPLIANCE Me certify that the.statements made in the report are correct and this replacenmnt confonas to the r'ules of the ASHE Code, Section XI.Type Code Symbol Stamp Certificate Signed/thori tion NoM~A.'+M~jPcl~~N~ix.'QP-'wner'or OwnerOesignee, Title~Expiration Date Oate~/I~~NA 19'0 CERTIFICATE OF INSLRVICE I',NSPECTIOM I, the undersigned, holding a valid caanission issued by'hLI Na'tional Boar'd of Boiler and Pressure Vessel inspectors and the state or Province of, Onde County and.employed by Arkwright.Hutual Insurance Company of Norwood, Ha.have inspected the components described'n this owners Report during the period 11/21/95'o 12/06/95 arid state that to the best of my knowledge and balief, t'e Owner has performed examihations'nd taken corrective measures described in this Owners Report i'n adcordande with the requirements of the ASHE'ode, Section Xt.By signing this certi'ficate neither the Inspector nor his enpioyer makes any warranty, expressed or implied, concerning the examinations and corrective measurea doser'ibed in'hi's.Owner's Repo'rt.'Fur'thekmore, neither the Inspector nor his eeployen shall be liable in ariy amnnier for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Inspector SignQa,ure Comnissions 'MB'23~0II~I~ ~Nationhi Board, State, Providence, and Endorsements 'I9 95-064-3 FORM HIS~2 OWNERS REPORT FOR REPAIRS OR REPLACEHEN'IS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power 8 Li ht Date 12 05 95 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit 3 PWO¹:63/4109 WO¹:.95032545 9700 SW 344 Street'Florida Cit.Fl.33034 Address Repair Organization P.O.No.,Job Mo.,etc 3.Work Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032'Iype Code Symbol Stamp Authorization Ho.Expiration Date N A M A Address 4.Identification of System: 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~M A Code Case COMPONENT COOLING WATER System¹: 30 Quality Group: C (b)Applicable Edition of Section XI'Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component)BOLTS (4)Name of Manufacturer. IH/A/Manufacturer/ National)J Serial'No. 'Board Other.Identification IH/A iH/A)UTC349851 R94-4185 3E207C HX SA 193 GR 87]Year[Repaired]ASME f'JBui It]Replaced or J Code/f Replacement)Stamp f I I./Y~es No CHUNK.[Replacement)No 7.Description of Work: FOUR 4 HX'ANWAY BOLTS REPLACED ON UMIT-3'COMPONENT 'COOLING WATER HX 3C 3E207C.t 8.Tests Conducted: Hydrostatic: Other Pneuaatic: Pressure Nominal Operating Pressure psig Test Temperature 'F 95'63.3 'Sheet 2 of 2 FORH NIS-2', (Back)Ik 9.Remarks: MECHANICAL CONNECTION ~NO uELDING REQUIRED.. CERTIFICATE OF COHPLIANCE lie certify that the stater<ents made iin the report are correct and thiis replacement conforms to the r&ies of the ASHE Code, Section XI.Type Code Symbol Stamp N A Certific e f Autho ation No N~A Expiration Date N A Signed 42 7z('0 i~sR'A~4<.g. O~ner or Owner+Designee, Titl'.e 0 CERTIFICATE'OF INSERVICE INSPECTION I, the undersigned, holding a valid cor<mission issued by the National Board of Boiler and pressure vessel'nspectors and the state or Province of Dade.County. and employed by Arkwriight.Hutual Insurance Company of'orwood, Ha.have inspected the co<nponents descriibed in this Owners Report during the period 12/05/95~to~12/05/95 and state that to the best of my knowledge and belle<I, the O~ner has perfdrmed examinati'ons'and taken corrective measures described in this Owners Report in accordance wiith the requirements of the ASHE Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or'mplied, concerning, the examinations and correctiive measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be i,iable in any mann<'.r for any peraonal injury or'raper'ty 'amage or a loss of any kind arising from or connected with this inspection. 7 Inspect s Si ature C<x<missions NB 823~ON~I~I~Nat<ionsi 8'oard, state, providence, and Endorsements Date 19 4l 95.063.3 FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power 8 LI ht Name Date 03 04 96 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit 3 PMO¹:2579/63 MO¹: 95024075 9700 SM 344 Street Florida Cit Fl.33034 Address Repair Organization P.O.No.,Job Ho.,etc 3.Mork Performed by Florida Po~er 8, Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Date N A N A 4.Identification of System: SPENT FUEL COOLING System¹: 33 Quality Group: C 5.(a)Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~H A Addenda,~N A Code Case 6.Identification t Hame of Component (HINGE PIH PLUGS (2)Name of Hanufacturer [Hanufacturer(National], Serial No.Board Other Identification H/A iH/A IH/A IR91-5196 of Components Repaired or Replaced and-Replacement Components ]Year J Repaired ,]ASHE ([Built)Replaced or)Code J (Replacement)Stamp f I I/~res ue IUHK I Replacement I Ho 7.Description of Mork: CHECK VALVE HINGE PIN PLUGS REPLACED.t 8.Tests Conducted: Hydrostatic: Other VT-1 Pneunatic: Hominal Operating Pressure Pressure~sig Test iempereture 'F 96.001-3 Sheet 2 of 2', FORH NIS-2 (Back)9.'.Remarks: THls Is A MEcHANIcAL coHHEcTIDN No.uELDING'REO IR D.CERTIFICATE OF COHPI.IANCE Me certify that the statements made in,.the.report are correct and this replacement conforms to the rules~of the.ASHE Code, Section XI.Type Code Symbol Stamp'Certificate of Authorization No.~H'A Expiration Date N A O~ner or-Owner's Designee, Title CERT II'ICATE OF INSERVICI'. INSPECTION I, the undersigne'd, holding a, valid comaission issued by"the Hatiional Board.of'Boiler and Prdssule'less'.L ,inspectors and the state or Province of Dade'County ahd&rplbyed.by'Arkwrilbht.HutiiaL Insurance Coapany,'of Norwood, Ha.:have inspected the caqmnents described in this Owners Report during.the period 09/l)5/95 to'3/04/96 and.state that to the Imst of my knowledge and beliefthe (hner has performed examinations and taken corrective measures described in this Owners Report in'accordance with, the requirements of.the ASHE Code, Section XI.By signing this ceirtificate neither'the Inspector nor~hisI~Loylr stakes any warranty,'xpressed or impLied, concerning the examinations and corrective measures described in this Owner.'s Report.Furtheraere n'either the.Inspector nor his erployer shaLL be Liable in any manner for any personal injury, or',property damage or a loss of any k,ind arising from, or connected with this inspection. Inspectors S nature Ccmmissi&s ,NB 8230~N'~I National BoardState, Providence, alnd PndcIrsMnth Da 96-001-3 FORM HIS-2 OVNERS REPORT FOR'REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1.Ouner Fior ida Po22er&Li ht Name Date 03 25 96 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit lo¹: 95031214 PCH¹: 95.103 9700 SV 3CC Street Florida Cit Fl.3303C Address Repair Organization P.O.Ho.,Job No.,etc 3.Vork Performed by Florida Power&Li ht Hame P.O.Box 4332 Princeton Fl.33032 Type Code Symbol Staap Authorization Ho.Expiration Date M A Address 4.Identification. of'System: 5.(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case COMPONENT COOLING VATER System¹: 30 Quality Group: C (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Coaponent Hame of Hanufacturer)Hanufacturer) National))Serial Ho.Board Other Identification)year)Repaired)ASHE))Built)Replaced or)Code)')Replacement)Staap)I I I~PPP pp)1" BLIHD FLANGE)6 I IDEAL)N/A)H/A)UTC 390755, 3E207A,B,C)UHK.)Replacement ,)Mo HX'S)3" BLIND FLAMGE)6)BOLTS (24)&r)HUTS)HUTS (46)I)IDEAL H/A)H/A)N/A IH/A)H/A)UTC 390756, 3E207A,B,C)UNK.)Replacenent)Ho HX'S)H/A)R94-2667 BOLTS, R93-2122)UMK.)Replacement)Mo NUTS 3E207A B C HX'S)H/A')UTC351943 (15)UTC391981)UHK.)Replacement)Ho 31 3E207A B C)STUDS (24)I)M/A)H/A)U93.2949, 3E207A,B,C)UHK.)Replacement)Ho HX'S 7.Description of Vork: REHOVED PIPING AHERTAP PIPING FROH'UNIT 3 CCV HX'S.AND INSTALL BLIND FLANGES P 8.Tests Conducted: Hydrostatic: Pneunat i c: Nominal Operating Pressure X Pressure~2 ig Test Temperature 72~F'I 96-002-3 Sheet 2 of 2 FORK NIS-2 (Back)9.Remarks: MECHANICAL CONNECTION HO WELDIHB REQUIRED.CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to'the rules of the ASKE Code, Section XI.Type Code Syahoi Stamp~HA Certttioate Aothoritattoo No.~N A Expiration Date M'IAA Signed rtha.Jgl'9.Q/CERTIFICATE OF IHSERVI'CE INSPECTION I, the undersigned, holding a valid comnission issued by the Hational Board of Boileii and Pressure, Vessel, inspectors and the state or Province of Oade County and employ<by Arkwright Kutual Insurance Compan)I of Norwood, Ka.have inspected the components described in'his OImerp Rapport during the, period 11/09/96 to 03/24/96 and state that to the best of my knowledge and Qiief, the O~ner has performed examinations, and taken corrective measures described in this Owners Report in accordance with the requirements of tl)e ASKE Cod'e, Section XI.By signing this certificate neither the Inspector nor his eapioyer makes any warranty, express'r icy\led, concerning. the examinations and rorrective measures described in this Owner's Report.Furl'her~re, neither the Inspector nor hiis employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or conrected with this inspection. Inspect rs S ature Commissions 'HB 8235~M~I National Board, Statet Providence, and Endorsements 9z 96.002-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS 'As Required by the-Provisions of the ASME Code Section XI 1.Owner Florida Power&Li ht Name Date 05 23 96 700,Universe Blvd.Juno,Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PWO¹:6177/63 WO¹: 96008678 CR¹: 96-696 9700 SW 344 Street Florida Cit.Fl.33034 Address Repair Organization P.O.No.,Job No.,etc 3~Work Performed by Florida Power S, Li ht Name P.O.Box 4332 Princeton'Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date N A N A N A 4.Identification of System: CHEMICAL 8 VOLUME CONTROL System¹: 47 Quality"Group: B'.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable. Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired, or Replaced and Replacement Components Name of Component Name of Hanufacturer 'iHanufactureri National i ,i Serial No.Board Other Identification iYear J Repaired f ASHE (igui Iti Replaced or]Code (i Replacement igtamp J iCharging-Pump "8" iUnion I N52216 I N/A J3P2108 I I JUnk iReplacement Yes No No 7.Description of Work: REPLACED FLUID CYLINDER ASSEHBLY.8.Tests Conducted: Hydrostatic: Other VT-2 Pnewetic: Nominal Operating Pressure X Pressure~gggg stg test temperature 114~F 96.003.3 Sheet 2 of 2 FORH NIS-2 (Back)9.Remarks: No weldin r uired.CERTIFICATE OF COHPLIANCE Me certify that the statements made in t'e report aire correct and this replacement conforms to the rules of the ASHE Code, Section XI.Type Code Symbol Stamp N A Certificate Authorization No.N~A z.x..: j O~ner or Owner's Designee, Title'Expiration Date, N Date'.19 43>gd'ERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdi,'ng,a valid cccmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or province of Dade county and empl'oyed by Arkwright'Hutual'Insurance Company'of 'orwood, Ha.have inspected the components described in thiS Owners'eport during the period 04/11/96'o'5/20/96 and state that to the best of my knowlwige and beli6f, the Owner has performed examinlatilns and'(taken corrective measures described in this Owners Report in accord'ance with the requirenents of the ASHE'Code, Section XI.By signing this certificate neither the Inspector nor his ef3pioyer makes any warranty, expressed or is@lied, concerning the examinations and corrective measures descri'bed'in this owner's Report.Furthermore, neither the Inspector nor his erpioyer shall be liable in any manner, for'ny personal injury or property damage or a loss of any Ikind arising from or connected with'thiS inspertioh. I s~N tanoiasiorls NB s23h~s~t Inspecto s Sig~n are Nattonslt Board, State, Providence, and Bndtrsetnnts Date~19~+4.C 96.003e3 FORM NIS 2 OWNERS REPORT FOR REPAIRS OR'REPLACEMEHTS As Required by the Provisions of the ASME Code SectIon XI 1.Owner Florida Power B Li ht Name Date 07 01 96 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant'Turke Point Plant Unit PWO¹!5113/63 WO¹: 96002325 9700 SW 344 Street Florida Cit Fl.33034 Address Repair Organization P.O.Ho.,Job No.,etc 3.Work Performed by Florida Power B Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol'tsap Authorization Ho.Expiration Date N A N A N A 4.Identification of System: Intake Coolin Water S stem System¹: 19 Duality Group: C 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)'pplicable Edition of'ection XI Utilized for Repairs or Replacements '1989 Edition,~HA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Cocponents Name of Component Name'f Manufacturer IManufacturerI'ational I I Serial No.Board Other Identification IYear I Repaired I ASHE I IBuiltI Replaced or I Code I I Replacement ISterp I it~et se IICW CHECK VALVE IICW CHECK VALVE IUNK IUHK I41195 IH/A I3-50-331 IH/A IReplaced IHo I85223'IH/A I3-50-331 IH/A'IRepiacement ISTUDS(20)' 1/8" IHUTS 40 IUNK IH/A IN/A IUTC 383150 IN/A IReplacement IHo 7.Description of Work: REPLACED ICW CHECK VALVE 3-50-331.REPLACED 20 STUDS AHD 40 NUTS.8.Tests Conducted: Hydrostatic: Pnasast ic: Noainal Operating Pressure X Sressure~tg ig Test teegereture 91~F 96-004-3 Sheet 2 of 2 FORM NIS-2 (Back)Il 9.Remarks: MECHANICAL CONNECTION~NO llELDING REQUIRED, CERTIFICATE OF COMPLIANCE Ne certify that the statee!ents made in the ireport lire correct'nd th'is replacement conforms to the rules of the ASME Code, Section XI.Type Code Symbol StaaT!N A Certificate of A thorizaticp No., N~A Signed/gA n/,.-'~(~~g~, wner o Owner'.s Des ignee, Title Date i~lr Expiration Date N CERTIFICATE OF INSERVI CE'INSPIECT ION I, the undersigned, holding a valid caanission issued by'he National Board of Boiler'nd Pressure'Vesael'nspectors and the state or Province of Dade County and.employed by Arkwright.Mutual..insurance.Ceqjany of'orwood, Ma.have inspected the co!Txwents described in thi's Owners Report during the period 01/29/96 to 06/27/96 and state that to the best of my knowledge and belief, the o~ner has performed examinati'ons'and taken corrective measures described in this 0 rners Report iih accordance with the requirements of the ASME'ode, Section XI~By signing this certiificate'neither the Inspector nor hi's eepioyer'makes any isarrant5i, expressed or implied, concerning 'the examinations and corrective measurea descr'ibed in'hi's Owner's Report.Further'more,.'either the Inspector nor his employer shall be Liable in any a'mnner for any peraonal injury or'roperty damage or a loss of any kind arising from or connected with'his inspection. r o'--C(aaisslans ~HB 82 0 II~I!Inspec r4 S nature National Board, State, Providence, and Endorse!!ents Dat)y.7-4 96-004-3 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASNE Code Section XI Florida Power&Li ht Date 07 01 96 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1.of 2 2.Plant Turke Point Plant Unit 3 PQO¹:63/3C05 IO¹: 95028392 9700 SM 34C Street Florida Cit Fl.33034 Address Repair Organization P.O.Mo.,Job No.,etc 3.Ilork Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Type Code Symbol Stamp.Authorization No.Expiration Date N A M A Address 4.Identification of System: Intake Coolin lister S stem System¹: '19 Duality Group: C 5~(a)Applicable Construction Code 831.1 1955 Edition, NA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Nsnufacturer iNanufactureri National)]Serial Ho.Board, Other Identification iYear i Repaired[ASNE i/Builti Replaced or i Code/'i Replacement (Stamp/I I J~res ue iNODEL 33 CNC IST-1 3P9C"iUNK.iRepiacement iHo IH/A IIHTAKE COOLING MATER"PUNP IJOHHSTOH PUMP IH/A iIHTAKE COOLIHG MATER PUMP i JOHNSTON PUMP (H/A)MODEL 33 CNC IST-7 3P9C (UNK.iRepiaced iHo I 7.DescriPtion of Horkt INTAKE COOLING IIATER PUMP 3C'IST-7 REPLACED IIITH REBUILT SPARE IST-1.8.Tests Conducted: Hydrostatic: Pneusst i c: Nominal Operating Pressure X rressure~tr sig test teegersture 86~F 96-005-3 Sheet 2 of 2 FORH HIS-2.(Back)I 9.Remarks: HECHAHICAL CONNElCTICIN NO MELOIING REOUIRED.CERl'IFICAYE OIF CCHPLIAHCE Me certify that the statenents made in the report are correc't aFrd this'replacement conforms to the rules oF the ASHE Code, Section XI~Type Code Symbol Stanp Certificate of uthorization No.~NA gaiorat Toogate~ga/t-X4,.g~/tamer or ter'a TIeaigoee, Title 19 CERTIFICATE OF IHSIERVICE INSPECT IOH I, the undersigned, hollding a valid conrnission issued by the Nhtidnal'Boa'rd 6f Boiler snd preshure'essel' (inspectors and the state or Province of Oade County and entPLoged,bya A'rkuright.HutuaL, Insurance Co(rpany of Norrrood, Ha.have inspected the conpcnents described in this OMners Report during the period'FI/10'/95'l 07/01/96 and state that to thte best of my knowledge and belief, the Ogner has performed examinat'Ion~ snd taken corrective measures Tdescrib<in this thnM'.rs Report in accordance'with the requirements of the'ASHE Code, Section XI.I By signing this cert',ificate neither the Inspector nor, his employer makes any lrsrranty, expressed or, I implied, concerning the examinations snd corrective measurleS described in this Cnrnergs Report.FuI'thermor e, neither the Inspector rror his enployer shall be Liable'in Sny manner for'any'er'sorel 1'njury or property damage or a Loss of any kind arising from or connected Mith this inspection. Inspect s Si ature Natiorurl Board, State, Providence, and Endorsements Oats 19+&~96.005-3 FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACENENTS As Required by the Provisions of the ASNE Code Section XI Florida PoMer&.Li ht Date 08 27 96 700 Universe Blvd.Jwm Beach Fl-.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PlJO¹:7951/63 MO¹: 96018245 9700 SM 344 Street Flor ida Cit Fl.33034 Address Repair Organization P.O.Ho.,Job Ho.,etc 3.Hork Performed by Florida PoMer&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Staap-Authorization No.Expiration Date N A N A N A 4.Identification of System: 'CCM System¹: 30 Quality Group: C 5~(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b)Applicable Edition of Section XI Utilized.for Repairs or Replacements 1989'Edition,~NA Addenda,~NA Code Case 6.Identification of Conponents Repaired or Replaced and Replacement Components Hane of Conponent Nane of Hanufacturer 13E207C HUTS, HEAVY HEX (8 IH/A I (3E207C BOLTS (85)(Year (~Repaired (ASNE ((Built(Replaced or (Code ((Replacement (Stanp (I I/~Yes Mo (Hanufacturer(National (Serial Ho.~Board Other Ident If ication IN/A (H/A (UTC 398167 (N/A'Replacement (Ho.H 81990 (H/A (N/A (UTC.393249 R 35113048 (UHK (Replacement (Ho ASTN A-194 GR7 7.Description. of Mork: CLEAN DIRTY CONPONENT COOLING HEAT EXCHANGER TUBES REPLACED OUTLET DOOR iSTUDS AND BOLTIHG 8.Testa.ConductedI.Hydrostatict Pneunat ic: Hominal Operating Pressure Other Pressure~ig Test Telpereture ~F 96-006-3 Sheet 2 of 2 I;"ORK HIS-2 (Back)0 9.Remarks: THIS IS A KECHANICAL CONNECTION HO 4'ELDING REOLIIRE6. CERTIFICATE, OF C(NPLIAHCE Me certify that the statements made in the report are co'rredt ahd t'hisepair conforms to the'ru!Ls df the ASKE Code, Section XI.Type Code Symbol Stanp Certificate of Authori atj<o.~HA Signed Q 1 Owner or Owner's De knee,, Title Expiration Date H~A l~oate S/19~p CERTIF!CATIE OF IHSERVICE INSPECTION I, the undersigned, holding a val!d cocmission issued by the Haticnal-Board of Boiler and Preshurd Veksel'nspectors and the state or Province of Dade Catty and employed by hrkwright Kutual Insurance Cchpady of, Norwood, Ka.have inspected the caqxxients c!escribed in this-Owners Report during the period O'/19/96o !08/07/96 and state that to the best of my knowledge and belief,'the'Owner has performed examinations and taken corrective measures described in this Owxtrs Report'in accordance with the requirements of the'ASKL.Co'de,'ection XI.By signing this certificate neither the Insixmtor nor his~lawyer'akes 'any warranty, expressed or Implied, concerning the exam!nations and corrective measures described in this (!wner's Report.FuJ.thermo)a, neither the Inspector nor his esployer shall be liable in any'manner'for any persona'l Injury or property damage-or a loss of any kind arising from or corrected with this iinspectfon. Cannissions LL 8250 H i Inspec rs Si~ure Hatiorml Board, State, Prov!derma, and Endorsemeats Date 19 Q>0 96.006.3 FORH HIS-2 ONMERS REPORT FOR REPAIRS OR REPLACEHEHTS 'As Required by the Provisions of the ASNE Code Section XI 1.OMner Florida Poser 8 Li ht Date 08 07 96 700 Universe Blvd.Jum Beach Fl.33COS Address Sheet 1 of 2 2.Plant Turks Point Plant Unit PNO¹:5127/63 MO¹: 96002326 9700 SM 34C Street Florida Cit Fl.33034 Address Repair Organization P.O.Ko.,Job Ko.,etc 3.'llork,Performed by Florida Pc~sr 8 Li ht Kame P.O.Box 4332 Princeton Fl.33032 Address Type Code Syshol Steep Authorization Mo.Expiration Date N A N A N A 4.Identification of System: Intake-Coolin Mater S tern System,¹: 19 Quality Group: C 5.(a)Applicable Ccestruction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Coeponents>>Repaired or Replaced snd Replacement Coeponents Kame of Coaponent Kame of Manufacturer IHsnufacturerI Mational I ,I Serial No.Board Other Identification I"ear I Repaired I ASKE I IBuiltI Replaced or I Code I Replacement I St8flp I I[~res se IBOLTS (20)I IHUTS (20)IK/A IN/A IK/A IN/A IR 87-5164,'1-1/C"x5" IUKK IReplacement IMo UTC 351875 XJ-3-1COS IH/A IH/A IR 87-5164s 1 1/4" IUHK I Replacement I Ho UTC 351885 393251 7.Description of Nark: EXPANSION JOINT XJ-3-1408 REPLACED AT'3C ICM-PUMP DISCHARGE. Pneusst 1 c: ,Nominal Operating Pressure X Pressure~tr te test Teeeeersture 91~F 96.007-3 Sheet 2 of 2 FORH HIS1-2 (Back)9.Remarka: THIS IS A HECHANICAIL CONNECTION HO NELDING REOUIREIDa CERTIIF ICATE OF COHPLIANCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.Type Code Symbol StanTD N A Certificate of Authoris i io jN'A 9 7 Owner or OImer's Designees, Title Expiration Date 9'7 H A CERI'IF I CATE CIF INSERVICE INSPECTION I, the undersigned, holding a, valiid cNImission-issued by the National Board of Boiler and pressui e Vessel inspectors and the state or province of Dade County and employed by Arkwright IKutual Insurance Company iof Horwood, Ha.have inspected the caqDonents descrit>>d in thisi OwnersiReport during the period 01/30/96 to 08/07/96 and state that to the IDest of my knowledge and beliefthe 099ner has performed examinations and taken corrective measures described in this Owners Report inI accordance with the requirements of the AsHE code, Section XI.By signing this certificate neither the Inspector'nor'his'mployer makes any warranty, expressed or implied, concerning the examinations and corrective measuresi described. in<<his Ownercs Report.Furthersiores neither the Inspector nor his eeiployer shalll be liiable in any manner for any personal, injury or'roperty damage or a loss of any kind arising from oreconnected wi'th this inspection. Il ZA aHi cetasissieas ss 8999 II Inspecto s Si ndture National Beard, Stateprovidence, Snd Enddrsements Date 8'DZ 7 19?C 96-007e3 FORK NIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI Florida Pogger&Li ht Date 08 22 96 700 Universe Slvd.Juno Seach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PMO¹:63/8384 lO¹: 96020299.9700 SK 344 Street Florida Cit Fl.33034 Address Repair Organization P.O.No.,Job'Mo.,etc 3.'Mark Performed. by Florida Power&Li ht Name P.O.Sox 4332 Princeton Fl.33032 Address Type Code Syahol'tan@ Authorization Mo.Expiration Date N A H A 4.Identification of System: COMPONENT COOLIMG MATER System¹: 30 Guality Group: C 5.(a)Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 19S9 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or.Replaced and Replacement Components Kame of Component Name of Kanufacturer (Kanufacturer[ National)(Serial No.'Board Other.Identification lYear)Repaired I ASKE I (Guilt(Replaced or J Code J)Replacement (St~(I I i Teereue (NUTS (2)HX OUTLET DOOR iH/A'I'STUDS (2)NX OUTLET DOOR IH/A IH/A (H/A)H/A (3E207C UTC 393249'STK A-194 GR 7)H/A (3E207C UTC 398167 JUNK (Replacement [Ho (UHK)Replacement [Mo 7.Description of'Mork: 2 STUDS AND NUTS REPLACED OH 3C CCll HEAT EXCHANGER ACCESS DOOR.8.Tests Conducted: Hydrostatic: Pneumat i c: Hominal Operating Pressure 0 Other Pressure~tg test turgereture '.F 96.008-3 Sheet 2 of 2 FORM NIS.2 (IIack)9.Remarks: THIS IS A MECNNICAL CONN'ECTION. NO NELOING REOUIRED'ERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct an'd this replacement conforms to the kuieh of the ASME Code, Section XI.Type Code Symbol Ste~~HA Certificate of Authorlzeltie Ho.Signed Owner or Owner.>>Oessgnee, Title'I ecol tetlee oete~o'e I tete~2~19 j CERTIFICATE OF INSERVICE IHSF'ECTIOH I, the undersign9<, holding a valid ccemission issued by the National Board of Boiler and Pressurel'Vessell inspectors and'the eetate or Province of Oade County and employ'ed by Airkwright'Mutual Insur~nce Coo@any,of Norwood, Ma.have inspected the conponents described in this Owners Report during the period 08/07/96 to 08/22/96 and state that to the best of my knowledg'e ahd b'eliaf, the Owner has performed examinations and taken corrective measures ciescritxxl in this Owners Report in accordance with the rmiuirements bf the ASME Code, Section XI.I By signing this certificate.neiither the Inspectoi ndr hiis elnpiayer'makes any warranty, expriessad ol.iayli'ed, concerning the examinaticxm and corrective mea'suras d'escribed in this owneros,Report.'urthermore, neither the Inspector nor his employer shall be liable'in any inner for'any personal injury o'r pr'operty'amage or a loss of any kind arisiing from or connected with th'is.Inspactfon. Inspe ors~SI nature Comniissions NB 823~0~HI~Naltiodal Boar'd, State, Providence, anci Endorsements 19~~+0 96;008-3 FORM HIS-2 OVHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power 8 Li ht Date 09 26 96 700 Universe Blvd.J~o Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PlO'¹:63/7082 lO¹: 96014602 9700 SM 344 Street Florida Cit Fl.33034 Address'Repair Organization P.O'Ho.,dob Ho.,etc 3.Ilork Performed by Florida Power 8 Li ht.Kame P.O.Box 4332 Princeton Fl.33032 Address Type Code Synodal Sterp Authorization No.Expiration Date N A N A N A 4.Identification of System:.'CHEMICAL 8 VOLUME CONTROL System¹: 47 Quality Group: B 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b)Applicable Edition of Section XI Utilized.for Repairs or Replacements '1989 Edition,~HA Addenda,~NA Code Case 6..Identification of Ccgponents Repaired or Replaced*and Replacement Cooponents kame of Manufacturer iHanufactureri National'J'Serial Ko.Board Other Identification /Year (Repaired i ASHE ()guilt/Replaced or (Code i i Replacement JStsnp (I I i~res s iRELIF VALVE l2ttX 3 iRELIEF VALVE 12tt X 3 ,(STUDS (8)I (HUTS (16)ICROSBY VALVE T I51300'AGE IH/A IRV-3-203 (UHK.(Replaced iKo ICROSBY VALVE 8 IN82705 IH/A GAGE 0003 (UTC 371565, RV-3-203'/UNK.(Replacement iKo UP.O¹C95677-90722 C 0 IH/A iM/A N/A (UTC 391981, ASTM A-194 iUNK.iReplacement iHo GR 2H iH/A JUTC 378831, 5/8" X 11 UHC iUNX.(Replacement iMo 7.Description of Uork: RELIEF VALVE RV-3-203 REPLACED UITH TESTEO SPARE.EIGHT 8 STUDS AHD sIXTEEN 16 HUTS REPLACED.Pneumat ic: Hominal Operating Pressure X Pressure~270 tp Test Temperature 137 F 96-009-3 Sheet'2 of 2 FORH NIS-2 (Back)9.Remarks: HECHAMICAL CONHECTION. MO llELDIMG REOliJIRED. CERT IF I CA1'E OF COINPLIANCE Me certify that the statements made in the report are correct and this replacement confome to the rules,,of the ASHE Code, Section XI.Type Code Symbol Stamp~NA Certificate of Authorizat on Ho.~NA Signed I 3'>yre~ss gee'-wM-Ouner or-Owmr's Designee,, Title Etpitettetl tete~ee tete 19 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a'valid cannission issued by, the Khtiohal'Board of Boiler and Pressure Vessel.inspectors and the state or Province of Dadh Cunty and~loyjed by Arkuright Hutual Insurance Caiman'y of'oruood, Ha.have instated the compaeents d'escribed in this OMners R'epor t daring the period'6/05'/96o 09/26/96 and state that to the best of my knouledge and belief, the Ower has performed examiinat'ionf, and taken corrective measures describ<in this OMners Report in a'ccordan'ce with'he requirements of the,hSHE Code, Section XI.By signing this-certificate neither the Inspector nor h'is eaployer makes any werranty, expressed o'IsT!I(ed, concerning the examinations and corrective measures described in this 0 eer's Reix!rt.Furthermore; neither the Inspector nor his employer shall be liable in any manr!er for any personal injury or pkope'rty'amage or a loss of any kind arising from or coraected Mith this inspection. Inspect rs Si M,'orAniss fons ,,NB 823~0~HI~'ure 'a'tfohal Board, State, Provider!ce, and Endorsemeits Date 9'6-009-3 FORM HIS-2 (NHERS REPORT-FOR REPAIRS OR REPLACEHEHTS As Required'by the Provisions of the ASNE Code Section XI 1.Owner Florida Po~er S Li ht Date 10 28 96 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet of 2 2.Plant Turke Point Plant Unit ,PMO¹:63/0522 MO¹: 96027062 9700 SN 344 Street Florida Cit Fl.33034 Address Repair Organization P.O.Mo.,Job.No.,etc 3.Nark Performed by Florida Power B Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Syshol Stamp Authorization Ho.Expiration Date N A iH A N A 4.Identification of System: COHPONENT COOLING llATER System¹: 30 Quality Group: C 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case 6.Identification of Components Repaired or Replaced and Replacement Coaponents 0 Mane of Coaponent Meme of Manufacturer '[Manufacturer[ Mational (Serial Ho.Board Other Identification [Year[Repaired[ASNE[/Built/Replaced or/Code//Replacement (Stanp (I I/~tes ue IHUTS (30)CCM HX (OUTLET DOOR (BOLTS (30)'CM HX lOUTLET DOOR JN/A IN/A iH/A ,i3E2078 UTC 393249 ASTH A-194 GR 7 (N/A[3E2078 UTC 398167 (UMK)Replacement (Mo JUNK[Replacement ]Ho 7.Description of Mork: CCM HX 3B ACCESS'DOOR'TUDS AMD HUTS REPLACED.8.Tests Conducted: Hydrostatic: Pneunatfc: Hominal Operating Pressure Other Pressure~sig test tesgersture oF 96.010.3 Sheet 2 of 2 PORN, HIS-2 (Back)0 9.Remarks: THIS IS A NECNAHICAL CONNECTIOH. NO MELOIHG REOUIRED.CERTIFICATE OF CONPLIAhlCE Me certffy that the statements made fn the repor't are correct and,this replacement conforer to the rules of the ASHE Code, Section XI.Type Code Syrrhol Steep le A N~A Certificate of Authorization,No. Sfgned owner or owr3IrF's Designee, Tftle Expiration gate/Date pl/4 N A CERTIFICATE OF IHSERVICE I,NSPECTIOH I, the unders3gned, holding s valid conraissfon issuer(by, the Haf:fonaL Board of'oiler and Pressure VesseL inspectors and.the state or Province of Oade County and ettThloyed by Arkwright Nutual, Insurance CtxtTpanyi of Norwood, Na.have inspected the cortTxhnents de'scribed fri this Owners Report during che period 10/11/96 to 10/28/96 and state that to the best of my krewlcdgp and belief, the Owner has performed examinations and taken corrective measures described fn thiis Owners Report fn accordance wiith the requfreox.nts of the ASNE,Code, Section XI~By sfgn3ng this certificate neither the Inspector norI hiP eriployer Pmkgs any warranty, expressed or, I implied, concerning the examinations end corrective measures describedl in this Owner's Report.Furthermore, , (neither the Inspector nor his eoployer shall be LiabLe in sny manner for any per..onal injury or prpperIty, damage or a Loss of,any kind arising from or connected fifth, th(s ipspectfpn., Inspectors'fgrwhr.ure Cotrmfssions,, HB, 823~0M~I , Hatfonpl EIoard, State, P'rovidence, and Endorsements 19 96-010-3 FORM NIS-2 OWNERS REPORT'FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1~Owner Florida Power&Li ht Name Date 01 02 97 700:Universe Blvd.Juno Beach Fl.33408 Address Sheet.1 of 2 2.Plant Turke Point Plant Unit ,PHO¹:1204/63 lJO¹: 96031833 9700 SM 344 street Florida Cit Fl.33034 Address Repair Organization P.O.No.,Job Ho.,etc 3.Hork"Per formed by Florida Power&'Li ht.Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Date N A N A N A 4.Identification of System: COMPONENT COOLING HATER System¹: 30 Quality Group: C 5.(a)Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA'ode Case 6.fdentification of CoJJJponents Repaired or Replaced-and Replacement Components Name of Component Name of Manufacturer (Manufacturers. National (i Serial No.Board Other Identification iYear f Repaired[ASME i (Builti Replaced or/Code (.(Replacement .]Stamp i I I J~Y*s u IHUT (1)'i H/A iN/A iH/A)HEAVY HEX ASTM A-194 (UNK (Replacement (Ho UTC 393249 H CV333 7.,Description of Ilork: REPLACED ONE HUT ON COMPONENT COOLING HEAT EXCNANGER 8.Tests Conducted: Hydrostatic: Other Pnewetic: Hominal Operating Pressure Pressure~rg Test Teegersture 4F 97-001-3 Sheet 2 of'FORH HIS 2 (Back)0 9.Remarks: THIS HAS A HECHNICAL CONHECTIOH. HO WELDIHG REOUIRED'. CERTIFICATE OF COHPLIANCE Me certify that the statnnents made in the report are correct and this repl,aceaent conforms<<o the rule's of the ASME Code, Section XI.Type Code Symbol Stamp~NA Certificate of Authorizat3on Ho.~NA Exp3ration Date r 7/~,/ig 0 Q&gyr~"6"C.t4A..o.~./6 Owner or Owner~s Designee, Tif le , 19', CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding,a valid cixrmission issued by the National Board of Boiler and Pressur'e Vessel inspectors and the state or Province of Dade County"and employed by"Arkwrigh>> Hutual Insuran/e Con@any of Norwood, Ha.have inspected the components described in this Owners Report during the period 12/11/96 to 01/02/97 and state tha't to the best of my knowledge and belief,'the Owner has performed examinations and taken corrective measures descrlh<in this Owners Report in accordance with the reciuirements of the ASHE Code, Section XI.By signing this, cert.ificate neither the inspector nor his employer makes any warranty, express&1 o3 implied, concerning the examinations and corrective measures describe3 in this Owner's,Report. Furthermore, ne3ther the Inspector nor his employer shall be liable in any manner for any personal i,njury or pdopel ty'amage or a loss of any kind arising from or connected with this inspection. +~r/~~)Comnissions HB 8230 N I Inspector Si ture'atiodal Board,.State, Prov3dence, and Endorsements I I'I Date 19 P~'7-001-3 FDRH Nis-2 ouNERs REpoRT F0R REpAIRs 0R REpLAcEHENTs As Required by the Provisions of the ASHE Code Section XIFlorida Power S Li ht Date 02 03 97 700 Universe Blvd.Jwa Beach Fl.33408'ddress Sheet 1 of 2'2.Plant Turke Point Plant Unit PQO¹:63/1638 MO¹: 97001635 CR¹: 96-0070'9700 SM 344 Street Florida Cit Fl.33034 Address Repair Organization P.O.No.,Job No.,etc'.Mork Performed by Florida Power S Li ht ,Kame P.O.Box 4332 Princeton Fl.33032 Address Type Code Syshol Stamp Authorization No.Expiration Date N A N A M A 4.Identification of System: COHPOMENT COOLING MATER System¹: 30 Quality Group: C 5.(a)Applicable Construction Code B31.1 1955 Edition, NA AddendaP~M A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,NC16-1Code Case 6.Identification of'omponents Repaired or Replaced and Replacement Coaponents Kame of Component Name of Manufacturer)Manufacturer Kational i i Serial No.Board Other Ident if ication ,iYear.,l Repaired'ASHE I iguiltl Replaced or I Code'I ,i Replacement. JStasp Yes No 3E2078 Mestinghouse JN/A 047 iComponent Cooling Mater i1968 iRepaired Neat Excha er>>B>>Yes 7.Description of Mork: CUT 6>>X 8>>'ACCESS MOLE FOR FORIEGM HATERIAL RETRACTION. CCOE CASE M-416-1 NAS BEEN ENVIED FOR THIS REPAIR ACTIVITY.8.Tests Conducted: Hydrostatic: Pneunat i c.Nominal Operating Pressure X Other HT ROOT pressure~use is Test Tespereture MOH'F 97.002-3 Sheet',2 oi 2 FORM NIS-2 (Back)Ik B.Rnnerks: cede case gala-1 vas en oknl for this~ra ifr a~etlvit A.ll veld~i~as rforaecf in accordance with the FPL Weld Control Manual.CERTIFICATE OF COHPLI ANCE We certify that the statements made in the report are correct and this l repair'onforms to the rules of the ASHE Code, Section Xl~I I Type Code Symbol,Stamp N A Certificate of Authorization No.'NA S 1 gned r or Ownerks Oekignee, Titi&Expiration Bate~B'A I Oat.~4:>~~Y)CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holtiing a valid cccmlssicn I sued by tha National.Board of Boiler and pressure'es'sel 'nspectors and the state or province iof Blade county and,~>loyed by Arkwright Mutual, Insurance'ompany of'orwood, Ha.hive inspected the ccImpoients described. in this bkers Repoit during the period 01~/22/97~tfkd 02/03/97 and state that to the best of my knowledge aQ bI.Iiif, khe Owner has performed exami'nations'nd taken corrective measures ciescribcxi in thiis Owners Report in aecordanee with the requirements of the ASHE Code,'Section XI.I By signing this certificate neither the Inspector nor his enployer, makes any warranty, expressed or implied, concerning the exeainat3cfns and corrective measures descr'ibed in'his OWnerks Report.'urthermore, neither the'Inspector nor his employer shall be liable in any sender for any personal Injury or property damage or a loss of any kird arising-froaf or connected with th/s ins~tion.' Inspector S I g re Rational Board, Stateproviden, ce, and Enllorstnedts Oat 19 9'7 I 97-002-3 FORM HIS-2 OMNERS REPORT FOR'REPAIRS OR REPL'ACEMEH'IS As Required by the Provisions of the ASHE Code Section XI O 1.Owner Florida Po~er 8 Li ht Name Date 02 11 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Uni t 3 puo¹:63/8809 uo.¹: 96020605 9700 Su 344 Street Florida Cit Fl.33034~.Address Repair Organization P.O.Ho.,Job Ho.,etc 3~Ilork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032'ddress Type Code Symbol Stamp Authorization No.Expiration Date H A M A N A 4.Identification of System: COMPONENT COOLING HATER System¹: 30 Quality Group: C 5.(a)Applicable Construction Code 831.1 1955 Edition, NA Addenda,~M A'Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case 6.Identification of'Components Repaired or Replaced and Replacement Components Name of Coaponent Name of Manufacturer rIHanufacturerI National I Serial Ho.Board Other Identification IYear;I Repaired I ASME.I.'IBuiltI Replaced or I Code I'I Replacement IStamp I I I[~<<s ue I STUDS (160)I3 4" X 8 1 2" IHUTS (320)l3 4<<g I H/A'H/A IH/A IN/A ITHREADED ROO JUNK IReplacement IHo'TC 406446-1 406518-1 IN/A IH/A INUTS, ASME SA-194 GR 7 JUNK IRepiacement INo UTC 393249-1 406514-1 ISTUDS (40)1 1 8" X 8 IH/A IN/A IH/A ,ITHREADED.ROOg IUNK IReplacement IHo UTC 400981-1 INUTS (80)11 1 Ba IH/A IN/A<<,IH/A INUTS, ASHE SA-194 GR 7 IUNK IReplacement IMo UTC 351807 398260 399264 I I I 7.Description of llorkt REPLACE'BOLTING ON CCM HEAT'EXCHANGER "8" CHANNEL HEAD ANO ELBOU.t 8.Tests Conducted: 'Hydrostatic: Other Pneunatict Nominal Operating Pressure Pressure~erg test Temperature 'F 97.003-3 Sheet 2 of 2 FORH HIS-2 (Back)II 9.Remarks: NO MELDING REOUIRED.CERTIFICATE OF COMPLIANCE Me certify that the statements macle in the report are correct and~thia re'placement conform to the rules of the'SIDE Code, Section XI.Type Code Synhol Steap I A Certificate of Authorization Ho.~N(A Ouner or 99nerds IPesignee, Title Expiration Date D.te~HA 99 7~CERTII ICATE OF IHSERVICIE INSPECTIOH I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Prc':ssu're VessB'nl inspectors and the state or Province of Dade County and Anplbyed by~Arkuright Mutual Insurance Carphny'of'orgood, Ma.have inspected the coeimnents described in this'09dners'Rep'ort'dur'ing the period 01/09/97 to 02/10/97 and state that to the est of my knoMledge and beliefthe Ihdner has performed examinations and taken corrective measures, described in this Ogners Report in~accordance uith the requirements of the ASHE Code, Section XI~, By signing this certificate neither the Inspector nor~his~eeglloykr makes any warranty, expressed or implied, concerning tlhe examinations and corrective measures'es'cribed in this Omar's Report.Furthersored neither the Inspector nor his erployer shalli be liable in an'y ma'nnet for any personal injury or ,'property damage or a loss of any kind arising from or connected with this inspection. Inspect s QShature Coomissiorls-NB 230 N'Mationat Board, state araviden,oe, dnd Bnddraednnta Dat 97-003.3 FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section,XI 1.Owner Fioridh Power&Li ht Date 02 11 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit 3 PNO¹:63/8809 MO¹: 96020605 9700 SM 344 Street Florida Cit Fl.33034 Address Repair Organization P.O.No.,Job No.,etc 3.Mork'Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date N A'N A N A 4.Identification of System: COHPONENT COOLING lJATER System¹: 30 Quality Group: C 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Coeponents Repaired or Replaced and Replacement CoJJTJonents Name of Component Name of Hanufacturer (Hanufacturer(National ((Serial No.Board OtherIdentification (Year (Repaired-(ASHE ((Built(Replaced or'(Code ((Replacement (Stamp (I'J~Ves me (SQUARE HEAD BOLT (20 1 1 8" DI A IN/A IN/A (H/A'UTC 406513 HEAT 54333 (UHK (Replacement (Ho (HEAVY HEX NUTS I 20'1 1 8" DIA IH/A (N/A (H/A (UTC,399624 (UHK ,(Replacement (No 7.Description of llork: REPLACED 20 SQUARE HEAD BOLTS&NUTS ON CDI HEAT EXCHANGER' CHANNEL HEAD.8.Tests Conducted: Hydrostatic: Other Pneunatic: Hominal Operating Pressure Pressure~stg Test Temperature ~F 97-004-3 .Sheet 2 of 2 FORH NIS-2 (Back)9.Remarks: NO MELDING REOOIRED.CERTIFICATE OF iCOHPLIANCE Me certify that the statem>ants made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.Type Code Symbol Stamp Certificate of uthorizatlon No.N~A Expiration Date r~/8+Owner r Owne!'s 6esiignee, 4!t'le>d>~NA to9Z CERTIIFICATE OF INSERVICE INSPECTICIN I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Provincie of Dade County and&rplbyed by'rkwright 'Hutual'Insurance Company of Norwood, Ha.have ins!pected the co>ponents 'descriimS in this'wr>ers'eport during the period 01/09/97 to 02/11/97 and state.that to the best;of my, knowledge and bei,ief, thie 0>dner has perfo>oned examinations and taken corrective measiures described in this Owners Report 16 ace>ord!>>nce with the requirements of the ASHE Code, Section XI.By signing this certificate rieither the Inspector nor'his'm'>>loyler >aakea any warranty,; expressed or i>>plied, concerning the examinations ard corrective measdres'eslcribed 'in this'wner's Report.Furt'hera>ores neither the Inspector nor his ee>ployer shall be liable ir'>an'y awinneir for any, personal Injury or'pro'perty damage or a loss of any kind arising from or connected with this inspection. II~r+g cease>asians,aa >vd~s~t Inspec s nature sat>anat Boardstate prov>denee, dnd'dnddrsedents I D.t.M.'7 10++97-004-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida'Power S Li ht Date 03 20 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of.2 2.Plant Turke Point Plant Name Unit PMO¹:63/2502 WO¹: 97006743 CR¹: 97-0432 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.'Mork Performed by Florida Power 8 Li ht Name P;O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date N A H A N A 4.Identification of System: RESIDUAL HEAT REHOVAL System¹: 50 Quality Group: B 5.(a)Applicable Construction Code 831.1 1955 Edition, NA Addendas~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case 6.Identification of Conponents Repaired or Replaced and Replacement Coaponents Name of Component IPIPE TO ELBOW MELD Hame of Hanufacturer IN/A/Hanufacturer/ National (/, Serial Ho.Board Other Identification IN/A[H/A (14gg-RHR-2301-10 (Year)Repaired (ASHE))guilt]Replaced or (Code f f Replacement [Stamp f I I/~Yes se[UHK[Repaired]Ho 7.Description. of Mark: INDICATION BUFFED OUT THAT MAS FOUND DURING ROUTINE ISI INSPECTION. 8.Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure pressure~is rest Temperature ~F 97-005.3 Sheet 2 of 2 FORH NIS-2 (Back)9.Remarks<<NO WELDING REaUIRED CERTIFICATE OF COHPLIANCE We certify that the statements made in the, rcport: are correct and<<his repair conforms to the rules of the ASME Code, Section XI.Type Code Symbol Stamp Certificate of A thorization No.~NA r Signed Qp)WQg~i6 cs~y wner or wner" s Designee, Title Date/WF/ZA 1ll~~0 CERTIF,lCATE OF INSERVICE INSPECTION I, thc undersigned, holding a valid comnission issued by the Iiatidnai Bohrd'of Boiler and Pressure Vessel inspectors and the state or province, of Dade County and ecyloyed'by ArkWright Hutual Insurance-Company of Norwood, Ha.have inspected the comp>nents descrilxxl in.this bwndrs kepdrt durihg the period'3/17/97 to 03/20/97 and state that to the best of my knowledge and belief, the O~ner has perforated examinations and taken corrective measures descriked in this Owners Report in 4ccdrdahcc with the requirements of the'SME Cade,'ection XI.By signing this certificate neither the-inspector nor.his ampl'oyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any~manner~for any personal injury or property damage or a loss of any kind arising from or connected with this~inspect~ion,, Inspe ors gnature Cocmissions , NB 8230,~N I Naticnai'Boa'rd,'State, proVidence, and Endorsements'ot~ A 19 97-005-:3' FORM NIS-2 OVNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1~Owner Florida Power 8 Li ht Date 03 25 97 700'Universe Blvd.'Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Unit PNO¹:63/2531 MO¹: 97006917 CR¹: 97-479 9760 SU 3CC Street Florida Cit FI.33035 Address Repair Organization P.O.No.,Job No.,etc 3.llork Performed by'Florida Power 8'i ht Name, P.O.Box 4332 Princeton FI.33032 Address Type-Code Symbol Stamp Authorization No.Expiration Date N A N A 4.Identification of System: RESIDUAL HEAT REMOVAL System¹: 50 Duality Group: B 5.(a)Applicable Construction Code ASME SECTION III 1965 Edition,~N A Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Coeponent Name of Manufacturer /Manufacturer('ational i Serial No.Board Other'Identification -Iyear I Repaired I ASME I iguiiti Replaced or i Code i (Replacement istaep (I I Joyce ge 13A RHR HEAT EXCHANGER IATLAS INDUSTRIAL I877 MANUFACTURING I727 13E206A i1968 iRepaired iYes 7.Description of cwork:.GRIND OUT LIQUID PENETRANT INDICATION IDENTIFIED DURING ROUTINE'INSERVICE IHSPECT I OH.8.Tests conducted: gydrostettc: Other PT Pneunatic: Nominal Operating Pressure Pressure~sic test yeepcreture 4F 97-006-3 Sheet 2 of 2 FOHN HIS-2 (Back)9.Remarksi NO lIELDIHG REQUIRIED CERTIFICATE OF COHPLIANCE 'Me certify that the statenents made in the report are cori ect and this repair conforms to the rules, of the ASIDE Code, Section XI.Type Code Symbol Stamp'N A'ertificate of Authorization No., IN~A Expiration Date~N A s;g,~W6QÃOwner r Owner's Designee, Titlk Date CERTIFICATE OF IHSERVICE IHSPECTION I, the undersigned,.holding a,valid ceiiaission issued by the National Board of Boiler and Pressure Vessel.inspectors and the state or province" of Dade County and"'employed by'Arkwright Hutual'Insurance Corqpany of Norwood, Ha.have inspected the cavponents described in(this owners Report during the period'03/19/97'o 03/21/97 and state that to the best of my knowledge and belief, the owner has performed examinati'ons'and taken corrective measures descr3bed in.this owners Report ih accordance with the requirements af the AsNE~code, Section XI.By signing this.certiificate neither the Inspector nor his ecpioyer makes any warranty, exprassed od implied, concerning the examinations and corrective meakurels ddscr/bed in'this Oinieris Report.'Furthermora, neither the Inspector nor his employer shall.be, liable i'n any manner for any personal injury od praperty~damage or a loss of any kind arising, from or connected with~thiis iiispection. 'ate Inspec ors Si ture wagP-7 Cocmiasions,, HB, 823~ON~I,~,~Hationhi B'oard, State, Providence, and Endorsanents 97-006-3 FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power&Li ht Date 03 25 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant kame Unit PWO¹:63/8991 WO¹: 96024216 CR¹: 96-776 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job Ho.,etc 3.Work Performed by Florida Power&Li ht Name Type Code Symbol Stamp N A Authorization No.N A Expiration Date H A P.O.Box 4332 Princeton'Fl.33032 Address 4.Identification of System: MAIN STEAM System¹: 72 Quality Group: B 5.(a)Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer)LOAD STUD (1)FOR PSA-35)H/A iSNUBBER TAG¹3-1084[HUTS (4)FOR PSA-35[N/A (SNUBBER TAG¹3-1084 (Manufacturer[ Hational (Serial Ho.Board lYear f Repaired I ASME I]guilt]Replaced or f Code]f Replacement JStasp f I I[r~es ue Other Identification IN/A)N/A)STOCK CODE¹0197328 17-4)UHK.[Replacement ]Ho SS ASME SA-564 A-194 GRADE 8 IH/A fH/A]STOCK CODE¹0209608 ASME fUHK.[Replacement [Ho 7.Description of Work: REPLACED LOAD PIN ON PACIFIC SCIENTIFIC MODEL PSA-35'SHUBBER TAG¹3-1084 WITH LOAD STUD.8.Tests Conducted: Hydrostatic: Other VT-3 Pneuaatic: Hominal Operating Pressure Pressure~sig Test teegereture 97-007-3 Sheet 2 of 2 FORH HIS"2 (IBack)9.Remarks: HECHANICAL COHHECTIOIN HIO M=LDIHG REOU'IREO. CERTIFICATIE OF COHPLIANCI Ne certify that the statements made in the report are correct and this replacement conforms to thc rule's of thIc ASHE Code, Section XI.Type Code Symbol Stamp Certificate Authorization No.Signed Owner r Owner'sVesignee,~NA Expiration Date~N'A I p~+>>pn~~4:,I Pi+.~~;Oate,+~iiX4~/ 2.9';19Q Title I CERTIFICATE OF INSERVICE IHSP'ECTIOH I, the undersigned, Iholcling a valid coamission issued by thh Haltiohal Board of Boiler arxl Preslurc,'Ves'sel 'inspectors and the state or Province of Dade County and.employed-by Arkwright Hutual, Insurance'oalpanV of'orwood, Ha.have inspected the ccraponents described in this Oianers Report d<rring tire period 09/18/96'6 03/24/97 and state that: to the best of my knowl.edge arkf&tieIf, thc O~ner has performed exami'nations'nd taken corrective measures described in this Owners Report in abcor'danke with the requirements of t'e ASHE'ode,'(Section XI.I By signing this c'crtificate neither the Irtspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure's dLscr'ibad in'his Owners Repart.Fur'thelmor'c, neither the Inspector nor his employer shall be liable in alny 6rann'er for'eny personal injury or property damage or a loss of any kfr>>d arising from or connected wlthl this insgctibn. 'Inspec rs S ature Coaraissions NB 823~0M~I~National Board, State, Providence, and Erx/orsIemedts '(Date 19 QP O 97-007-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1~O~ner Florida Power&Li ht Date 03 24 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Hame Unit PWO¹:63/7603 WO¹: 96016980 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Ho.,etc 3.Work Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Date H A N A H A 4.Identification of System: AUX FEEDWATER System¹: 75 Quality Group: C 5.(a)Applicable Construction. Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component iHUTS (14)I ICAP SCREWS (14)Name of Hanufacturer IN/A IN/A iManufactureri National i i Serial No.Board Other Identification IN/A JH/A fN/A iSTK CODE 00278361 JH/A iSTK CODE 00271201 iYear,i Repaired i ASHE (iguilti Replaced or i Code J i Replacement [Stamp i I'I[~res se iUHK iReplacement iHo iUNK)Replacement)Ho 7.Description of Work: DISASSEMBLE INSPECT REASSEMBLE 3-20-401 t 8.Tests Conducted: Hydrostatic: Other Pneunatic: Hominal Operating Pressure pressure~tg test testsereture oF 97-008-3 Sheet 2 of 2 FORM HIS 2 (Back)9.Remarks: MEcHANIcAL col<NEcTIDM~MO MELDING REOUIRED.CERTIFICATE OF COMPLIANCE Ile certify that the sicstements maCk in the report are correct and this replscecnent conforms to the cules of the ASME Code, Section XI.Type Code Symbol Stamp~NA Certificate of Authorization No.~NA S i gned~l+A+Y~fi Si~ggJA~P Owner or OwnelC/s Designee, Tit.le Ex'piration Date'A l pace W~~+sy'~~I iCERTIFI CATE OF INSERVI CE INSPECTilOH I, the undersign<4, holding s valid cccimission issued by the National Board of Boiler snd Piiessurc'Vessel inspectors and the state or province of.'D~sde'County'and employed by Arkwright Mutual', Insurance Company of Norwood, Ma.have inspected the ccimponents described in'his owners Report-cfuring the period 07/01/96 to 03/24/97 snd state that to thc;best of my knowLedge snd belief, the owner hss Ferformed elcsmi'nations'nd taken corrective measures.described in thiis Owners Repo'rt.in secor'danre With'the'equirements of the ASME Cocle, Section XI'y signing this certificate neitheir,the Inspector nor his emplcyer makes any warranty, expressed. or implied, concerning the exciminations and corrective measures described in this Owner's Report.'ur'thermor'e, neither the Inspector nor his employcir.shall be Liable'in any manner for any personal injury or pr'opei ty i damage or s loss of any kind arising from or connected with, this iinspecti'on.'nspec orsyS" nature Canmissions Hll 828~0I~IQ i Hstiocial Board, State, Providence, snd Endorsements Date+~~19 7~~97-008-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power S Li ht Name Date 03 24 97 700.Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Unit PWO¹:0991/63 WO¹: 96030528'9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.Work Performed by Florida Power.S Li ht Name P.O.Box 4332 Princeton'Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration'Date N A N A 4~Identification of System: CHEHICAL 8 VOLUHE CONTROL System¹: 47 Quality, Group: C 5.(a)Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case 6.Identification of Components 'Repaired or.Replaced and Replacement Components Name of Component Name of Hanufacturer /Hanufacturer) National)Serial Ho.Board Other Identification [Year]Repaired i ASHE i iguilt)Replaced or i Code ((f Replacement igtaap i I I James se ITHREADED ROO iN/A I8 STUDS FABRICATED iH/A iN/A[UTC 398161 ASHE SA-193 iUHK.iRepiacement (Ho GRADE 87 IHEAVY HEX HUTS (16)iN/A iN/A iH/A iUTC 399723 ASME SA-194 iUHK.]Replacement iNo GRADE 2H 7.Description of Work: REPLACED EIGHT 8 STUDS AND SIXTEEN 16 NUTS ON NON-REGENERATIVE HEAT EXCHANGER 3E201 FABRICATED BY ATLAS-COPCO INC.HOOEL 0-1503-7.t 8.Tests Conducted: Hydrostatic: Other Pneunatic: Hominal Operating Pressure Pressure~erg Test Tempereture oF 97-009-3 Sheet 2 o,f 2 FiDRH NIS-2 (Back)9.Remarks: HECNANICAL CONNECTION NO WELDING REOUIRED.CERT IF I CATE OIF COHPL I ANCE Me certify that the statenents made in the report are,correc't and this ireplscement conforms to the rules of the ASHE Code, Section XI.Type Code Symbol Stamp Certificate of Authorization No.~N A Ekpiriation D'ate si Owner'Owner'O'DesigneeTitle ~r 2.~z r CERT IF ICATI-: OF INSERVICE INSIPECT ION I, the undersigned, holding a valiid cnrmiSsion issued b'y thc National Board of Boiler and Presaurci Veaseli inspectors and the state or Province of Dade County and employed by Arkwright Hutual'nsurance Company of Norwood, Ha.have inspected the components described in this Owners Report during the period 1'I/25/96 to 03/24/97 and state that to the best of my Iknowicdge a'nd belief,'the Owner has performed examlnat'iona an'd taken corrective measures described in,.tlhis Owniers Report in accordance with the requirements 'of the.iASHF. Code, i Section XI.By signing this certificate ncithcr tlhe Inspector nor hiis Cmplbyed makes'any warranty, expressad or implied, concerning thie examinations snd correc'tive measures desciribed in this Owner's Rcport.Furthcrmore,'either thc Inspector nor his employer slhall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.,Corrrriirssiions, NB 8230~N~I Inspector SigniitFre 'ational'Board, State, Iprovidence, and Enkioraements Date 97-009-3I FORH HIS-2 OWERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE,Code Section XI 1.Owner Florida Power 8 Li ht Date 04 18 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit ,PNO¹:63/0124.WO¹: 96025060 PCH¹: 96-012 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Mo.,Job Ho.,etc 3.Nark Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Syahoi Stamp Authorization Ho.Expiration Date N A 4.Identification of System: Safet In ection S tern System¹: 62 Quality Group: 8 5.(a)Applicable Construction Code 831.1 1955 Edi t i on,~MA Addenda,~NA Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,M416-1Code Case 6.Identification of Coaponents Repaired or Replaced and Replacement Components Name of Component I I 13T208 BOROH INJECTION I ITAHK Name of Hanufacturer N/A IN/A (H/A (Manufacturer[ National f Serial Ho.Board Other Identification ]Year f Repaired/ASHE)(Built)Replaced or (Code]]Replacement ')Stoep (I I]~res rre)PC/H.96-012 BORON IHJ TK)UHK[Replacement)Mo HOD IF I CATION 7.Description of llork: PIPING HOOIFICATIONtOF SAFETY IMJECTIOM LINE TO BYPASS THE BORON INJECTION TANK.THE FOLLOMING HATERIAL llAS USED: 2 90 DRG 4" SCH 80 ELBONS UTC 398779 4" SCH 316'ASME SA 312 SCH ,80 UTC 398561 4 SOCKOLET'SS ASHE'SA182 UTC 406901 2 45 DRG 4" SCH 80 ELBONS UTC 406833 1"4" SS TEE SCH 80 ASHE SA403 UTC 407413.FOR SUPPORTS 3-SIH-23 8 H IC-248B-1 THE FOLLONIMG MATERIAL llAS USED: 2 4" PIPE CLAHPS UTC 405948 2 NELDLESS EYE'NUTS UTC 405946 2 llELDED BEAN ATTACHMENTS UTC 405945 2 MELDED EYE RODS UTC 405947 AHD 2 PLATES 1 2X6X7 UTC 390858.Pneunatic: Hominal Operating Pressure X tressure~1550 iu test Tsetsereture 83 4F 97-010-3 Sheet 2 of 2 FORH NIS-2 (Back)9.Rcmarkse SUPPORT 3-SIH-139 THE FOLLOWING HATERIAL'MAS.USED' 4" PIPE L1-BOLT LITC 400433 1 4" PIPE SADDLE UTC'405949'. SUPPORT 8080-H-007-1 THE F I.LNIIN'ATER AL AS USED: 1 CHANNEL'Y TEEL UTC 407359 2 CLAHP!>>UTC 374568!~2NUT SPRING UTC 3932C7 ANGLE C.S.ASTH A36 UTC 403958.TH REOUIREHNTS OF CODE CASE NC16-1 HAVE BEEN HET FOR THIS R-PL CEH:NT ACT VITY.iCERTIFICATE OF COHPLIANCE lie certify that the statcneehts made in the report are, correct and this repiaccnent conforms to the rules of the ASHE Code, Section XI.Type Cade Symbol S'tamp N A Certif icate Author)zation No-I~!A Expireition Date~NA/>>i>>.~.u~PQ~M 5~+~~~~-,~~~>>s~e ,~gad, i A Owner or OwnqPs Designed, Title 4 CERTIFICATE OF INSERVICE INSPIECTION I, thc undersigned, holding a valicl connission issued by thc National Board o'f Boiler and Pressure Vessel inspectors and the state or province of Dade county and~cap~layed by Arkwright Hutual'nsurance company of Norwood, Ha.have inspected the caqmnents described in thils OWnerd Report during the periad 04/07/96 ta 04/18/97 and state that to the best of my knowledga and baiicf, t'e O~ner has performed examinations'nd taken corrective measures dcscribeid in this owners Report ih adcordanc'e with'the requirements.6f the ABHE~code, Section XI.By signing this certificate neither the Inspector nor hi!s employer'makes any warranty, expressed or inpiied, concerning the exmninations aind correct!ive meaaures described.ln,this Owner's Report.Furthermore, neither the Inspectoir nor his eeyioyer shall be liable iin any sunnier far any personal injury ot pr~opci ty~damage or a loss of any kind arising from or connect'ed with this inspection. Inspe ors'nature Comni as 1 ons, NB 823~ON~I,~, National Board, State, Proviidence, and Endorsements Date.'I9 97-010-3 FORM HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1.O~ner Florida Power&Li ht Date 03 30 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Nsne Unit PIIO¹:3648/63 IIO¹:.95028815 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization'P.O. Ho.,Job Ho.,etc 3.llork Perforned by Florida Power&Ci ht Name P.O.Box 4332 Princeton Fl.33032 Address ,Type Code Symbol Stamp Authorization.Ho. Expiration.Date N A N A N A 4.Identification of System: CHEMICAL AND VOLUME CONTROL System¹: 47 Quality Group: C 5.(a)Applicable-Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section.XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case 6.Identification of Components Repaired-or Replaced snd'Replacement Components Name of Component (STUDS (24)I (HUTS (48)Mane of Manufacturer (H/A (H/A'N/A (H/A IN/A I3E201 (H/A (3E201 (Manufacturer(National (Serial Ho.Board Other Identification (Year (Repaired (ASME ((Built(Replaced or (Code ((Replacement (Stamp (I I i~res ge (UHK.(Replacenent (Ho (UMK.(Replacement (Ho 7.Description of Ilorkt REPLACED 24 STUDS AND 48tNUTS ON THE NON-REGENERATIVE HEAT EXCHANGER ENDBELL ASSEHBLY.t 8.Tests Conducted: Hydrostatic: Other Pneunatic: Nominal Operating Pressure pressure~stg Test Tespersture 4F 97-011-3 Sheet 2 of 2 FORH HIS-2 (Back)9.Remarks: MECHANICAL CONNECTIOM MO MELOIMG REOUIRED.CERTIFICATE OF COMPLIANCE 'Me certify that thc staterents made in the report are correct and ttais rcpiacenent conforms<<o the rules of the ASHE Code, Section XI'.I Type Code Symbol Stamp Certificate of+uthorization Ho.~HA slgn~842~%~~M'wner o Owner" s4'esigne'e,'Tlf.le Expiration Ilste~NA 19 0 CERTIF ICAYE OF IHSERVICE IHSPECTIOH I, thc undersigned, holding a valid caw>ission issued by the Hational Board of Boiler and Prepsure Vessel inspectors and the state or Province.of Oade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha.have inspect'ed the components described in this Owners,Rcp'ort'during the period'10/L3/95'to'3/27/97 and state that to thc best of my knowledge and beliefthe Amer has perfo'rmed examinations and taken corrective measure." described in this Owners Report in accordance with the requirenwnts of thc ASHE Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed'or II implied, concerning the examinations and corrective measures described in this Owner's Rcport.Furthernere, ,neither the Inspector nor his eayloyer shall be liable in any manner for any personal'nJury or;properiy damage or a loss of any kind arising from or connected with,thi;s inspection. 1 Inspec rs Si ature Cceeissidns 'NB i823O~H~I~ ,'Nat,'io~i Board, State, Providence, and Endorsenents gate 97'01 FORN NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI~.1..Owner Florida Power 8 Li ht Name Date 04 07 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Unit PWO¹:63/7853 WO¹: 96012069 9760 SW 344 Street'Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Ho.,etc 3.,llork Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date N A H A N A 4.Identification of, System: REACTOR COOLANT System¹: 41 Quality Group: A 5.(a)Applicable Construction Code 831.1'955 Edition, NA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case 6.Identification. of Components Repaired or Replaced.and Replacement Components Name of Component Name of Hanufacturer)Nanufacturerf National)Serial Ho.Board Other Identification)Year)Repaired (ASHE[guilt)Replaced or J Code (J Replacement (Stamp J I I JYesreue, IPRESSURIZER RELIEF VALVE ICROSBY IH51249-1580 IN/A IRV-3-551A)UNK.)Replaced (Ho (PRESSURIZER RELIEF VALVE (CROSBY IH51249-1362 IN/A IRV 1A (UNK.(Replacement)Ho 7.Description of llork: REHOVE PRESSURIZER SAFETY VALVE RV-3-'551A AHD INSTALL SPARE.Pneunatic: Hominal Operating Pressure X pressure~2280 siu test Temperature 535'F 97-012-3 Sheet 2 of 2 FORH, HIS-2 (Back)9.Remarks: HECHANICAL CONNECTION NO'WELOIHG REOUIREO.CERTIFICATE OF OOHPLIANCE lie certify that the statements made in the report are correct and this'eplacement conforms to thol rulles of the ASIDE'Code, Section XI.Type Code Symbol Stamp N A-Certif icate of Authori".ation No.~HA I Signed cf ar+ivw~~P(<~Own r or wner's Oesignee, T>tl'e CERTIFICATE OF IHSERVICE INSPECTIOH I, the undersigned,, holding a valid co>r>>>issiion issued by the National Board of Boiler and Pressure Vessel inspectors and the state or F'rovince of Dadle County and employed by Arkwright Hutual Insure'nce Cempany.*f Norwood, Ha.lieve inspected the comF>onents described in this'Owners'Report during the period 07/14/96 to 03/27/97 and state that to the best of my knowledge and belief, the Owner has perfors>ed examinations and taken corrective measures described in this Owners Report'n'accords'nce'with tHe requirements. of the ASHE Code, Section XI.By signing this certificate neither the Inspector r>or his employer makes any warranty, expressed or implied, concerning the examinations and corrective measui os'described in this Owner's Report.Furthermore, neither the Inspector nor his e>qpioyer shall be liable in'ny manner for any personal injury or property damage or a loss of any kind ari:sing from or connected with this'ns'pection'. Inspe tors>gnature National~Board, State, Providence, ahd&do>>sMnts Date 97-O12-3 FORM NIS-2 OLINERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power B Li ht Date 04 16 97 700:Universe Blvd.Juno Beach Fl.33408 Address Sheet of 2 2;.Plant Turke Point Plant Name Unit PNO¹:63/2645 NO¹: 97007310 CR¹: 97-53l 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Ko.,etc 3'., llork Performed by Florida Power I Li ht Name P.O.Box 4332 Princeton Fl.33032 Type Code Symbol Stamp Authorization Ho.Expiration, Date N A N A N A Address 4.Identification of System: C onent Coolin Hater S stem System¹: 30 Quality Group: B 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~H A Code Case 6.Identification of Components Repaired or Replaced,and Replacement Components Name of Coayonent Name of,')Manufacturer) National (Manufacturer [Serial Ho.Board Other, Identification (Year.(Repaired)ASME][Built(Replaced or]Code J/Replacement JStaap f I I[~Yes No ITRANSITION TUBE IASSEMBLY N/A iH/A[FOR MSA TAG¹3-1096[UHi((Repaired)Ho 7.Description of llork: TRANSITION TUBE OH SNUBBER 3-1096 MAS SHORTENED BY REMOVING EXISTING HELD AHD RENELDING. 8.Tests Conducted: Hydrostatic: Other VT-3 Pneunatic: Hominal Operating Pressure 4F 97-013-3 Sheet 2 of 2 FORH MIS.2 (Back)9.Remarks: ALL MELDING PIERFORHED IN ACCORDANCE MITH APPROVED PLANT'PROCEDURES.', CERTIFICATE OF COHPLIAHCI lie certify that the statements made in the report are cor'rect and this'epair'onfor'ms to the i;utels oP th'ASHE Code, Section Xl.Type Code Symbol StrmTo Certificate of Author'fzatfon Ho.~NA Expiration Date Owner or OwnerBdl/Designee/ Title p.~NA'9~CERTIFICATE OF INSIERVICE INSPECTION I, the undersigned, hoidling a valid comrrfssfon fssuk bg th2I.Ma'tfohai'Board o'f Boiie'r and P'resdure'essel'nspectors and the state or Province of Dade County,and empfoy2%by Arkwright Kutuai, Insurance'oripnnl/ of Norwood, Ha.have inspectedl the corrponents described in this Owners Report during the, period 03/25/97 tio 04/16/97 and staIte that to the best of my knowledge and belief, the owner has F2erformed ekamfnatfo& and taken corrective measures dlescribed in this Owners Report in accordance with the requirements IOf the.ASME Code, Section XI.By sigriing this certilficate neither the InspeICtcr nor his eccployer makes any warranty, expressed or implied, concerning the examinations and corrective measure's drl.scribed fn'his Owner's Report.Furthermore, neither the Inspector nor his qaployer'hall be liable in any rtranner for,any personal injury or property damage or a loss of any kind arising from or connected with'hfs I'nspection. I I I BnmnIssInns MB 823~08~12 Inspect rs Si ature'affon'nl Board, State8 ProvidenIce, andi Endorsements Date iP 19 97-01,3-3 FORH NIS-2 OHHERS REPORT FOR REPAIRS OR REPL'ACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power&Li ht Date 04 08 97 700 Universe.Blvd.Juno Beach Fl.33COB Address'Sheet 1 of 2 2.Plant Turke Point Plant Unit PQO¹:63/2418 HO¹: '97006494 9760 Su 3CC Street Florida.Cit Fl.33035 Address 3.Hork Performed by Florida-Power &Li ht Name P.O.Box 4332 Princeton Fl.33032 Address 4.Identification of System: RHR N A System¹: 50 Quality Group: 8 Repair Organization P.O.Ho.,Job No.,etc Type Code Symbol Staap N A Authorization Ho.Expiration Date N A 5.(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~M A Code Case 6.Identification of ConTxinents Repaired or Replaced and Replacement Conponents Kame of Conponent Name of Hanufacturer iHanufacturer(National i Serial No.Board I Other Identification iyear i Repaired i ASHE i/Built(Replaced or,/Code i/Replacement /Steap J l I[~Yes ue IPLUGS (4)H/A iH/A iH/A PRO-3-1469 UTC 406038 ASHE iUNK./Replacement /No SA-182 F316 SS 7.Description of Ilork: REPLACED PLUGS ON RESTRICTING ORIFICE RO-3-1469'FLANGES. 8.Tests Conducted: Hydrostatic: Other PneLInat 1 c I'Hominal Operating Pressure Pressure~g A ig Test teepereture 97.014-3 Sheet 2 of 2 FORH NIS.2 (Back)9.Remarks: HECKANICAL CONNECTION~NO MELDING REOUIRED.CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are carr'ect'and'his replacement conforms to the ru'les of the ASHE Code, Section XI.Type Code Symbol St~>Certificate of Authorization No.N~A Expiration Date I Signed.~~+,)i~~~AAe i~~Data Dune or O~rrk's Designee, Ti e CERl'l I'I CATE OF INSERVI CIE IIIISPECT ION I, the undersigned, holding s valid clxtmission issued by the National Beard of Boiler and pressure Vessel J inspectors and the state.or Province.of Dade County and emp)<vyeai'by Arkuright l<utual'Insurance C'cxrphny of NorMOOd, Hs.have inspected the caqmnents descriked in this Owners Report during.the period i03/14/97 to 04/08/97 snd state that<<o the best of my knox)edge snd belief,, the Darner has performed examinations and taken corrective messue es described.in this owaers Report in accordance Hith the.requirements of the ABHE code, Section XI.By signing this certificate neither the Inspectot nor his'esp)oyer makes sny Msrranty,.expressed or implied, concerning the exsmiinations and corrective messu'res'descritied 'in t'his (Incr's Report.Furthermore, neither the Inspector nor his,employer shall be liablo in sn)~manner for any personal injury or)~rcport)< damage or s loss of sny kind arising fries or connected Hith this inspection. Comsissions NB 8230~N LII Inspectors'gnatlxhf National Board, State, Providence, snd Endorsements Date 197 7 9?.CI14-3 FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section Xt 1~Owner Florida Power&Li ht Date 04 01 97 700 Universe Blvd.Juno Beach Fl.33408 Address 2~Plant Turke Point Plant Sheet 1 Unit PWO¹:63/6231 of 2 WO¹: 96009195 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job Ho.,etc 3.Work Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Pate M A N A 4.Identification of System: CHEMICAL&VOLUME COMTROL System¹: 47 Quality Group: B 5~(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~MA Code Case 6.Idgntif ication of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer iHanufacturer i Serial No.National i Board Other Identification (Year i Repaired i ASHE (JBuilti Replaced or i Code i J Replacement JStarp (I I JYesreue i4" BUTTERFLY VALVE (STUDS (8)I IHUTS (16)I FISHER ,(N/A ,iN/A IN/A I H/JI (H/A IN/A 13-269 UTC 407522)H/A i3-269 UTC 378831 IH/A I3-269 UTC 405142 iUNK.(Replacement iMo iUNK.iReplacement iHo iUNK./Replacement /No 7.Description of Work: CHARGING PUMP 38 INLET ISOLATION VALVE 3-269 REPLACEHENT. 'e 8.Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X Pressure~20 te Test tespereture 89'F 97-015-3 Sheet 2 of',2 FORN NIS-2 (Back)9.Remarks: NECKANICAL CONNECTION~NO MELDING RI=QUIRED, CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct andi.thiis replacement conforms to the r)iles of the ASHE Code, Section XI.Type Code Symbol Stamp~NA Certificate of Authorization No.N~A Signed Owner or Owners Designee, Tsti.e'ate',19 Expirsiion Date~ii A Ili CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdiing a valid conmission issued by the National Board of Boiler-and Pressure'Vessel inspectors and the state or province of.Dade County:andiempf.oyed by.Arkwright. Hutual Insurance. Company'f')v g Norwood, Na.have inspected the conyonents described in thiis Owners Report during the period'4/07/96'o'jiX I/I/9q and state that to the best of my knowiixige and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE'Code, Section XI.By signing this certificate, neither the Inspector nor his eciployer makes any warranty, expressed or implied, concerning the examinations and corriective measures described in this Owner~s.Report.Furthermore, neither the Inspector nor hiis employer shall be liablie in any manner for any personali injury or property damage or a loss of any kind arising from or connected with this inspection. Inspe ors Si+i~'.n ture National Boardl, State, Providence, and Endorsements Date 97-01'I-3 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI1.Owner Florida Power 8 Li ht Name Date 03 30 97 700 Universe Blvd.'uno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PWO¹:2508/63 WO¹: 97006766 CR¹: 97-0466 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.Work Performed by Florida.Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Date N A N A 4.Identification of System: SAFETY INJECTION System¹: i62 Quality Group: 8 5.(a)Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Coaponents Repaired or Replaced and Replacement Components Name of Component Name of Hanufacturer (Hanufacturer] National J Serial Ho.Board Other.Identification (Year (Repaired J ASHE (,]guilt(Replaced or J Code f J Replacement ]Stamp I l I/t~es ee ISUPPORT 8080-R-007-01 IN/A fN/A'fN/A[DRWG¹5613-H-823 SHT 17 ,(UNK.[Repaired (No 7.Description of Work: GROUND PT IHDICATIONS UNTIL INDICATIONS WERE AN ACCEPTABLE SIZE OR WERE ACCEPTABLE AS-IS PER CONDITION REPORT CR97-0466. 8.,Tests, Conducted: Hydrostatic: I Other PT Pneunatic: Nominal Operating Pressure eressure~ig test resgereture 4F 97-016-3 Sheet 2 of 2 FORM NIS-2 (Back)9.Remarks:-NO MELDING IJAS PERFORMED. CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correc't and this'repair conforms to the hule's of th'ASME Code, Section XI.Type Code Symbol Stamp Certificate f Authorization No.~NA Eilpiratldn Ohta~NA s.g.~cfD~@A'.'~4~~~w~~gg~ngive zl Owner'Owners Designee,&itic CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cermission issued by the,Natio'nal Board of Boiler and Presaure'easel'nspectors and the state or Provi:nce of Dade County and employed by Arkwright Mutual Insurance Cori@an'y of Norwood, Ma.have inspected the components described in this Owners Report during the period 03/18'/97'b 03/30/97 and state that to the best of my knowledge and belief, the O~ner has performed examiinat'Iona and taken corrective measures described in this Owners Report in accoi danae with'hd r+uir'ements of, the'ASME Code, Section XI.By signing this certificate neither the Inspector nor his,employer makes any warranty, expressed or implied, concerning the examinatiions and corrective measures d'escribed in this Owner's Report.Fukthermo/e, 1 neither the Inspector nor,his employer shall'be liable-in any'manner'for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. 7 P'.Inspector Si iture 19 Comnissions NB 823~0~N I National Board, State, Providence, and Endorsements 0 97-0'I6-3 FORM NIS-2 OWNERS REPORT'FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power 8 Li ht Name Date 03 30 97 700 Universe Blvd.Juno Beach Fl.33C08 Sheet 1 of 2 2.Plant Address Turke Point Plant Name Unit PWO¹:2507/63 WO¹: 97006765 CR¹: 97-0465 9760 SW 3C4 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Ho.,etc 3.Work Performed by Florida Power 8 Li ht Name.P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Date N A H A N A 4.Identification of System: SAFETY INJECTION 5.(a)Applicable Construction Code B31.1 System¹: 62 Quality Group: B 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and'Replacement Components Name of Component Name of Nanufacturer ,fHanufacturerf National f Serial No.Board Other Identification fYear f Repaired f ASHE f fBui ltf Replaced or f Code f f Replacement fsterp f I I/~rs Ile.fSUPPORT 8080-H-007-07 fN/A IH/A fH/A fDRWG¹5613-H-823 SHT 11 fUNK.fRepaired fNo 7.Description of Work: GROUND PT INDICATIONS UNTIL THEY WERE AN'ACCEPTABLE SI2E'OR WERE ACCEPTABLE FOR USE AS-IS IAW CONDITION REPORT CR97-0465. t 8.Tests Conducted: Hydrostatic: Other PT Pneunatic: Nominal Operating Pressure Pressure~sip test Temperature oF'97-017-3 Sheet 2 of 2 FORH NIS-2 (Back),9.Remarks: NO IIELDING llAS PERFORMEI). CERTIFICATE OF COMPLI ANCIE lre certify that the ststmrents made in the report are correct and this'epai'r conforms to the rules of th'e ASHE Code, Section XI.Type Code Symbol Stamp Certificate o Authorization No.~H A Signed O~ner.r Owrer/K Designee, Title Expiration Date~N A Qc~/fY~~Date~/~g~aP/CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding s valid conmlssion issued by tHe Hatiohai Board of Boiler and.pres!ure.Vessel inspectors snd the state or province of-Dade County and employed by~Arkwright Hutual Insurance Coriipan'y of Norwood, Ha.have inspected the components described in this owners R'eport during the period'3/18'/97'tb 03/30/97 and state that to.the best of my knowledge and belief, the O~ner has perforaed exsmiinat'iong and taken corrective measures describNI in this Owners Report in a'ccordan'ce With'he requirements of the-ASHE Code, Section XI.By signing this certificate neither the Inspector nor h'is employer makes any warranty, expressed, or implied, concerning the, examinations and corrective aeasures described in this Owner's Report.Furthermore, neither the Inspector.nor his empiloycr shall be liable in any manner for, any personal injury or pkopei ty~damage or a loss of any kind aris'ing frora or corrnected with this!inspection. S-;I..i....r B~r~oSCu Ins pec rs iture Hatiorral Board, State, Providence, and Endorserrer)ts Date 0 9'7-0'I7-3 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power&Li ht Name Date 03 30 97 700'Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PWO¹:2506/63 WO¹: 97006764 CR¹: 97-0464 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Mo.,etc 3.Work Performed by'Florida.Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration'Date M A N A N A 4.Identification of System: SAFETY INJECTION System¹: 62 Quality Group: B 5~(a)Applicable Construction Code B31.1 1955 Edition, MA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer IHanufacturerI National I, I Serial No.Board Other Identification I"ear I Repaired I ASHE I IBuiltI Replaced or I Code I I Replacement IStamp I I I/~res ue ISUPPORT 8080-H-007-10 I H/A IN/A IN/A IDRWG¹5613-H-823 SHT 15 IUMK.IRepaired INo 7.Description of Work: GROUND PT INDICATIONS UNTIL ACCEPTABLE SI2E OR WERE ACCEPTABLE FOR'USE AS-IS PER CONDITION REPORT CR97-0464. t 8.Tests Conducted: Hydrostatic: Other PT Pneunatic: Nominal Operating Pressure Pressure~sig Test temperature 4F 97-018-3 Sheet 2 of 2 FORM NIS-2 (Back)0 9.Remarks: NO WELDINB WAS PERFORMED. CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and t'his repair conforms to the Irules df the ASHE Code, Section XI'ype Code Symbol Stamp Certificate o Authorization No.~NA cC~Omar r Orner'&Oesignee, Title 7 N'A E'xpfration Date~P Z/j N~A 19~~0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler eind Predsurk Vessel inspectors and the state or pirovince of Dade County.and employed~by Arkuright.Mutual Insurance Company af Norwood, Ha.have inspected the components described in this Owners Repo'rt during the period'3/18/97 fo, 03/30/97 and state that to the best of my knowledge and beii'ef,'he'gner has perforced exadinakiods aQ taken corrective measures descrited in this ogners Report'in accordance with the requirements of~the~AsHE,cade, Section XI.I By signing this certifi,cate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descriix<in this Owner's Reporti Furthermore,~ neither the Inspector,nor his empioyer shall be tiabte in~any~man'ner,~for any personal injury or property damage or a toss.of any ki'nd arising from or connected With this inspection., Inspec rs natur e Camni ssions~B80~30 II'I N'atia'nai 'oard, State, Providence, arid Endor'semants Date 19%2 97-018-,'3 FORH HIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power 8 Li ht Name Date OC 08 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PIS¹:63/2528 IS¹: 97006902 9760 SW 3C4 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job No.,etc 3~Work Performed by Florida Power 8 Li ht Nsae P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Mo.Expiration Date N A N A H A 4.Identification of System: CHEHICAL 8 VOLUHE CONTROL System¹: 47 Quality Group: A 5.(a)Applicable. Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case<b),Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced snd Replacement Components Name of Component Name of Hsnufscturcr iHanufactureri National i i Serial Ho.Board Other Identification iYear,i Repaired i ASHE i igui lti Replaced or i Code i i Replacement iStsap i I I i~res se iSTUDS (4)I iNUTS<4)I IN/A IH/A iN/A IN/A iH/A iUTC 352606 ASHE SA-19,iUHK 'iReplacement iHo STK CODE¹28253 R95-0154 iN/A'UTC 393252 ASTH A-19C iUNK iReplacement iHo.STK CODE¹27963'VALVE BONNET iVELAH iN/A iH/A i3-312A UTC¹331592'iUNK.iReplacement iNo STK CODE¹52C97 7.Description of'Work: REPLACED 4 STUDS AND 4 NUTS ON BODY TO BONNET.REMOVED BONNET FROM SPARE VALVE IN STORES AND REPLACED EXISTIHG BONNET ON CHECK VALVE 3-312A.Pneunst 1 c I Hominal Operating Pressure X pressure~gggg sig rest Temperature 535 oF 97-019-3 Sheet,2 of 2 FORH NIS 2 (Back)9.Remarks: HECNANICAL CONNECTIOlk NO WELDINO REOUIRED.CERTIFICATE OF COHPLIANCE Ne certify that the statements made in the rcport are cor'rect and th'is replacement conforms to the rule., of the ASHE Code, Section XI.Type Code Symbol Stamp Certificate of Author ization Ho,.Signed N~A Expiration Date~HA'19O~ner or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid catmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employe'd b)'I Arkwright Hutual Insurance C~ny of Norwood, Ha.have inspected the conponents descri'bed inIthik OwInerk Report during the period, 03)19/97 to 03/30/97 and state that to thc best of my knowledgeI and be'Iiei', the Owner has performed examinations 'and taken corrective measures deScribof in thiis Owners Reposit id ac'cordanc'e with the requirements.of the ASHE Code, Section XI~By signing this certificate neither the Inspector nor'i.">>emplo)e'er smokes any warranty, expressed or implied, concerning the examinations and corrective measures described in this owner"s Report.Furthermore, neither the Inspector nor his employer shall be-Liable in any manner for any personal..injury or property damage or a loss of any kind arising from or connected with this inspection. P Conmisslons NB 8230 H I Inspe ors Sii ture National Board, State, Providence, and Endorsements Date<<9)97 019'-3 FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS 'As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power&Li ht Date 03 0 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2., Plant Turke Point Plant Unit PWO¹:63/7857 WO¹: 96014466 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job Ho.,etc 3.Work Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032'ddress Type Code Symbol Stamp Authorization Ho.Expiration Date N A N A 4.Identification of System: MAIN STEAM System¹: 72 Quality Group: 8 5.(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of CoJJponents Repaired or Replaced and Replacement Conponents Hame of Component I I)STUDS (4)I IHUTS (24)Name of Manufacturer fN/A IH/A)Serial Ho.Board i N/A (N/AlManufacturer[ National Other, Identification iUTC 393207 STK CODE¹28047 IUTC 408254 STK CODE¹27869 R87-6134]Year]Repaired (ASME](Built/Replaced or/Code (/Replacement /Steep/I I J~Ys ue (UHK[Replacement (No (UHK'J Replacement ]No 7.Description of Work: REPLACEMEHT OF 4 STUDS AHD 24 HUTS ON BODY TO BONNET VALVE POV-3-2606. 8.Tests Conducted: Hydrostatic: Other Pneunatic: Hominal Operating Pressure Pressure~pig Test Temperature DF 97-020-3 Sheet 2 of 2 FORM NIS-2 (Back)9.Remarks: THIS IS HECHANICAL CONMECTIOM MO WELDINB REOUIREDz CIERT IF I CATE OF COHPLIAh1CE Type Code Symbol Stamp M A Certificate f Authorization No.M~A Expiration Date M A We certify that the statements made in thc report are correct and this replacement conforms to the rules of ASHE Code, Section XI.I the I'I I Signed n sr~.4k~~<<Date pn~i5 Zl,, 119 f2 Owner r Ctwner'Vbesignee, Title CERTIFICATE OF INSERVICE IHSPECT ION I, the undersigned, holding s valid commis!ion issued by the National Boarcl of Boiler andi Pressure Vessel inspectors snd the state or Province of Dade County and enpboyed by'Arkwright*Hutual Insurance Company of Norwood, Ha.hive inspected the corponcnts descrilbed in this Owners: Report during the period 07/'IB/96, to 03/30/97 and state tlhat to the best of my knowledge: and beltief,, the Owner has performed exhminlatibns land'aken corrective measures dcscribecl in this Owners Report in accordance with the requirements of the ASHE Code, Section XI.By signing this certificate neither the Inspector nor his employer.makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspe'ctor nor his enploycr shall be liabi,e in any manner for sny personal injury ori property damage or s loss of any kincl arising from or connected with this inspection. conmissioins NB 8230 N I Inspec ors~nature National Board, State, Providence,. and Endorscmcnts Date 119++97-020-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR'REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power 8 Li ht Name Date 04 02 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit 3 PIN¹:63/7086 QO¹: 96014408'9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization-P.O., No.,Job Ho.,etc 3.llork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization,No. Expiration. Date H A N A N A 4.Identification of System: SAFETY INJECTION 5.(a)Applicable Construction Code B31.1 System¹: 62 Quality Group: A 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Idgntification of Components Repaired or Replaced'and Replacement 'Components I:I IPSA-3'JSMUBBER IPSA-3 iSHUBBER Name of Component Name of Nanufacturer IPACIFIC SCIENT I F I C IPACIFIC SCIENT I F IC (Hanufacturer(National J[Serial No.Board Other Identification [2889 117425 IN/A!3-1019, 3-PRWH-I.I3-1019, 3.PRWHu1[Year)Repaired J ASNE J[guilt]Replaced.or (Code']f, Replacement JStanp J I I~Ves ue (UHK (Replaced Yes)UHK[Replacement)Yes 7.Description of Mork: SNUBBER REPL CED DUE TO'LCO ON UNIT 4 8.Tests Conducted: Hydrostatic: Other VT-3 Pneuaatic: Hominal Operating Pressure pressure~u S is test Temperature S S'F 97-021.3 Sheet 2 of 2 FORK HIS-2 (Back)0 9.Remarks: HECHAMICAL COHNECTIOM, MO WELDINB REOUIIRED. CERTIFICATE OF COHPLIAHCE Me certify that the statements mode in the report src correct iandi this rcplalcemcnt conforms to the rules of the ASHE,Code, Section XI~Type Code Symbol Stamp N A Certificate of Authorization No.N~A;z r Signed giWgrf'+i'~ di~A n.c:>Owner Ownerr+Designee,'title i Expiration Date~l~~~OnCe"0 CI.=RT IF I CATE OF I'NSERVICE IMSPECTIOM I, the undersigned, holding a valid crxrmission issued by the Mstlio&l Board of Boiler and Pressure Vessel inspectors snd thc state or province of Dade County snd employed by Arkwright Hutusl Insurance ComFrsny'f 'orwood, Hs.have inspected thc crxrponcnts de!cribed.in thia Ownera Report dur'ing'ha pe'riod'9/18/96 i toi 04/01/97 and state tibet to'the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described'in this Orrners Report.in sccordlancc with the requirerrrents of this ASHE iCode, Section XI.I By signing this certificate neither the In, pector nor hiS emfrioyer rlrskes sny warranty, expressed orl implied, concerning the examinations and corrective measurea deacri'bed'.in 'thia Owner's Report.Furtherraord, neither the Inspector nor his errpioyer shall be liabl.e in any manner for sny personal, injury or property damage or a loss of any Ikincl arising from or connects with'thiS irispct;Cion. I Inspe ors:S nature Coerrrissions, HB 8230~M~I-iNstionell Bayard, State, Providcnc'e, snd Endorsements Date i4'9~$0 97-021-3 FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEH'IS As Required by.the Provisions of the ASME Code Section XI 1.Owner Florida Power 8 Li ht Name Date 04 07 97 700 Universe Blvd.Juno Beach Fl.33408 Address 2.Plant Turke Point Plant Sheet.1 Unit of 2 Name PNO¹:63/7855 lO¹96012072 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job No.,etc 3~Nork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date N A N A H A 4.Identification of System: REACTOR COOLANT System¹: 41 Quality Group: 'A 5.(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer /Manufacturer/ National (J'Serial Ho.Board Other Identification [Year J Repaired J ASME])guilt)Replaced or)Code]]Replacement [Stamp[I I J~res ue IPRESSURIZER RELIEF VALVE I CROSBY I IPRESSURIZER RELIEF VALVE ICROSBY (N51249e 1361 I H/A I RV 551C JUNK.)Replacement ]Ho IH69877-01 IN/A IRV-3-551C /UHK./Replaced/Ho-0009 7.Description, of Mark: REMOVE PRESSURIZER SAFETY VALVE RV-3-551C AHD INSTALL SPARE.Pneunatic: Hominal Operating, Pressure X Pressure~22SD sig Test Tesuereture 535'F 97.022-3 Sheet 2 of 2 FORM NIS-2 (Back)0 9.Remarks: MECHANICAL CONNECTION HO MELDING REOOIREO.CERTIFICATE OF COMPLIANCE lie certify that the statements made in the report are correct and-,this replacement conforms to the rules of the ASNE Code, Section XI.Type Code Symbol Stamp H A Certificate of Authorization Ho.~M A Signed Own r or wner's Designee, Tiitie Expi,ration Date H A Date 19 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, ho'lding a valid comnlsslon issued by the Hationai, Board of Boiler and Pressure Vessel inspectors and.the state or Province of Dade County and enpioyed by Arkwright Mutual Insurance Company of Norwood, Na.have inspected the components described in this Owners Report during the period 07/14/96 to 04/07/97 and state that to the best of my knowledge and belief, the Owner has performed examinations.and taken corrective measures descril)ed in this Owners Report in accordance with the requirements of the ASl{E Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his em!cloyer: hall be liable ini any manners for any personal injury or prop'ert)~ damage or a loss of any kind arising from or connected with this'ins'pection. /y7 Commissiona NB 8230 N I Inspect s Sigr ture National Board, State, Providence, ahd Ehdoi'seaknts Date go 97-022.3 FORM NIS-2" OWNERS REPORT FOR" REPAIRS OR TREPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.O~ner Florida Power&Li ht Name Dote 04 08 97 700'Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turks Point Plant Name.Unit PNO.¹:63/7854 MO¹96012071 9760 SM 344 Street Florida Cit Fl..33035 Address.Repair Organization P.O.No.,Job No.,etc 3.Work Performed by Florida Power&Li ht Name P."O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration,Date H A N A N A 4.Identification of System: REACTOR COOLANT System¹: 41 Quality Group: A 5.(s)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of'omponent Name of Manufacturer)Manufacturer) National)J Serial Ho.Board Other Identification ]Year)Repaired/ASME[]guilt]Replaced or/Code//Replacement (Stamp/'I I/~res ue IPRESSURIZER RELIEF VALVE I CROSBY I IPRESSURIZER RELIEF VALVE ICROSBY i N69877 i N/A (RV-3-5518/UHK.(Replaced (Ho 0008 i 51249-1360 (H/A f RV-3-5518 fUNK.(Replacement ]Ho 7.Description of Mork: REMOVE PRESSURIZER SAFETY VALVE RV-3-5518 AND INSTALL SPARE.t 8'.Tests Conducted: Hydrostatic: Other VT-2 Pneunatic: Hominal'perating Pressure X Pressure~2280 sig Test Temgereture 535 DF 97.023-3 Sheet 2 of 2 FORM NIS-2 (Back)9.Remarks: MECHANICAL CONHECTIiO~NHO IAELDING REQUIRED.CERT I IF I CATE OF COMPLIANCE Ne certify.that the statements made in the report are correct and this replacement conforms to the rul,es of the ASME Code, Section Xl.Type Code Symbol Steep H A Certificate of Authorization Iko..~N'A J.,~'Signed Own or wner's Designee, fitle~Expiiration,Date Date Yi N A 19 CERT I IF I CATE OF'HSERVICI. =INSPECTION I , thc undersigned, holding a valid conrnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of.Dade County.and anpboycd by Arkwright. Mutual Insurance Company iof Norwood, Ma.have inspected the components described in this Owners Report during the period 07/14/96 to 04/07/97 and state that to the best of my knowledge and belief,, thc Owner has performed'examinations and taken corrective measures dcscrIibed in this Owners Rcport ini accordance with the requircnmnts of the ASME Code, Section XI.Il By signing this certificaitc neither thc Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in<<his Owner's Report.Furtlhcrnere, neither the Inspector noir his employer shall be liable in any manner fair any personal in)ury or property damage or a loss of enny Ikindl arising from or connected with ithis inspeotion. g~r/7 Inspcc ors SITfnature iHationaii Board'state, Providence, and Endorsemcnts Date 1I9 97-023-3 FDRH Nls-2 ouMERs REP0RT F0R REPAIRs 0R REPLAcEHENTs As Required by the Provisions of the ASHE-Code Section XI 1.Oner Florida Power 8 Lf t Date 04 09 97 700 Universe Blvd.Jwm Beech Fl.33408 Address Sheet 1 of 2 2.Plant Turks Point'Plant Unit QO¹: 96023455 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Orgsnfzation P.O.No.,Job No.,etc 3.Mork Performed by VSL Cor ration Name 1671 Dell Ave.C ll CA 95008 Address Type Code Symbol Steep'Authorization Ko.Expiration Date.N A N A N A 4.Ident if ication of System: Contsfrrnent Buildi System¹: 51 Ouslfty Croup: B 5.(a)Applicable Construction Code ACI 318-63 ACI 301-66 19--Edition,~MA Addenda,~NA Code Case (b)Applicable Edition of Section XI Utilized for Repsfrs or Replacements 1992 Edfticn, 92 Addenda,~MA Code Case 6.Identification of Cosponents Repaired'or Replaced snd Repiscesent Ccmponents Kame of'oqxnent (Donut Shine (2 14N Other'dent i f i cst I on N~of (Hsnufscturer('ationsl (Hsnufscturer ('erial No.Board I I (Year,(Repaired (ASHE ((Built(Replaced or (Code ((Replacement (Stanp (I I iYe~leuo (Kova Hschining (N/A Products Cor.LOT¹35284004 (N/A (ASTH A576-86 Cr.1045.,(1996 (Replacement (No 7.Descriptfon oflbrkt Added tMo 1 4>thick donut shims st Unit 3 tendon 61V27 to obtsfn orf inal\ift-off force after detensioni .Tendcn Surveillance rformed under P.O.000f6055.Pneumat fc: Nominal Operating Pressure~F 97-024-3 FORM NIS-2 (Back)9.Remarks: Mo weldi r ired.CERTIFICATE OF CCHPI.IANCE Ne certify that the statements medic in the ri~rt are correct and'this re'placement conforms to, the rulles of the ASHE Code, Section XI.Type Code Symbol Staap Certificate of Authorization No.Expiration aate~VA Signed&I~Date Owner or Owner's Dksignee, Title 0 CEIRTIF I CATE OF INSERVICE INSPECTION I, the undersigned, hoidirMI a valid coaeission issued by.the National" Board of Boiler and'Pressure Vessel inspectors and the state or Province of Dade Cixnty and eapihyed by'Arkkright Hutual Insurance. Company of Norwood, Ha.have inspected the c~enents described in this'Own'ers'Report during the period 09/01/96'to'4/08/97 and state that to the hest'of my knowiaige and'bel'ief,'his Owner'has performed'examinations and taken corrective measures described in'this (hairs Report in accordance with the requirements of the ASHE Code,', Section XI.By signing this certificate neither the Inspector nor his'esp'loyer makes any warranty, expressed or Ieylied, concerning thi exminations ard corrective measures'deslcr ibed in this'Owner's Report.Furthermbre,'e3ther the Inspector nor.his espioyer shall, be l3able in any mesmer for any personal injury or propert/damage:or a loss of any kind arising: from or c<xnected with this inspection. ~t/,Commissions 'B 8230'~M~I I'nspect s Sig I, e National'oard, State, Providence, and Endo)'s~tk Date 19K.Z-0 97.024-3 FORH NIS-2 QQERS REPORT FOR REPAIRS OR REPLACEMENTS As Requfred by the Provfsions of the ASHE Code Section XI, 1.Qner Florida P~r B Lf ht Date 700 Universe Blvd.Jtmo Beach F l.33408 Address 2.Plant Turks Point Plant'Sheet 1 Unit QO M'6023455 of 2 9760 Su'344 Street Florida Cit Fl.33035 Address Repair Orgsnfzatfon P.O.No.,Job No.,etc 3.Mork Perforaed by VSL Cor ration Nsae 1671 Dell Ave.C ll CA.95008 Type Code Symbol Stsap Authorization No Expiration Date N A N A N A 4.Identification, of Systea: Contsfrment Buildi Systea 0: 51 Quality Croup: 8 5.(s)Applicable Construction Code ACI 318-63 ACI 301-66 19--Edf tfon,~NA Addenda(~NA Code Case (b)APPlicable Edftfon of Section XI Utilized for RePafrs or RePIaceaents 1992 Edftion, 92 Addenda,~NA Code Case 6.Identificstfon of Ccwponents Repaired or Replaced snd Repisceaent Coeponents 'sae of Coaponent M~of Hsrmf acturer (Hsnuficturer(National ((Serfsl No.Board I I Other Ident f f fcation.(Year'epaired,(ASHE ((Built Replaced or (Code ((Replsceaent (Starp (I I ivesleuo (Donut.Shia (1 12s (Donut Shia 1 14m (Nova Hschining (N/A Products Co (Nova Hsctdning'I N/A Products Cor (N/A'(ASTH A576-86 Gr., 1045 (1996 (Repiscenent (No LOT B 35284002 (N/A (ASTH A576-86.Gr.1045 (1996 (Replsceaent (Mo LOT M 35284004 7.Description of iJorkt Added 1 2e-snd 1 4<shia.st Unit 3 tendon 42H40 to obtain orf fnsl lift-off force after detensionf .Tendon Survefl lance rformed under P.O.0001605.Pneuoet 1 c t.Moainsl Operating Pressure~F 97-025.3 Sheet 2 of 2 FORH NIS 2 (Back)9.Remarks: Ko ueidi r ired.CERT IF ICATE OF COHPLIANCE Me certify that the statements eefe in, the report are correct and this rigiacesxmt conforms to the rules of'the ASHE Code, Section XI.Type Code Symbol Staap Cer'tificate of Authorization No.K~A Exp'iration Date'~K A I Signed S<~WV'+'a~a 4~thinner or Omer>er B Lf ht Date 04 09 97 700 Universe Blvd.Jwm Beach Fl.33408 Address Sheet 1 of 2'.Plant Turke Pofnt Plant Haec 9760 SW 344 Street Florida Cft Fl.33035 Address Uni t WO¹96023455 Repair Organization P.O.'No.,lob Ko.,etc 3.Work Pcrfors>>d by VSL Cor ration Howe 1671 Dell Ave.C ll CA.95008 Address Type Code Symbol Stamp Authorization Ko.Expfratfon Date N A N A N A 4.Idcntiffca't'fon of Systcll'ontofrn>>nt Bufldi System¹: 51 Guai fty Group: B 5.(a)Applicable Construction Code Acl 318-63 ACI 301-66 19--Edition,~NA. Addenda,~NA Code Case'(b)Applicable Edition of Section XI Utilized for Repairs or.Replaces>>nts 1992 Edition, 92 Addenda,~NA Code Case, 6.Identiffcation of Coeponents Repaired.or Replaced and Replaces>>nt Coeponents Noee of Coeponent (Donut shim (1 14>>(Harufacturer (Serial No.Kational (Board Kam of Hanuf actur er (Kova Nachining (N/A I Products Cor.(Year (Repaired (ASHE ((guilt(Replaced or (Code ((Rcpfoceaent (Stoep (I I iY~es Xo Other ldentif fcatfon N/A (ASTH A576-86 Gr.1045 (1996 (Replaceeent (No LOT¹35284004 7.Description of Work: Added 1 4" donut shia at Unit 3 tendon 3016 to obtain orf fnal lift-off force after detensioni .Tendon surveillance rfors>>d under P.O.00016055.Pnaaetfct Nosfnal Operating Pressure'F 97-026-3 Sheet 2 of 2 4l FORH NIS-2 (Back)9.Remarks: No weldi r Ired.CERTIFICATE OF COHPLIANCE Ile certify that the statemiwts axle in the report are correct'and'hi's replacemeint conforms to the rules of the ASHE Code, Section XI.Type Code Symbol Starp Certificate of Authorization No.Exp'irat,ion Date N~A Signed/A't~~~~i~~~+~D~ 'ate Owner or Owner's Designee, Title"-~lO il CERT I FI CATE OF IKSERVICE IIISPECT ION g I, the undersigned, holding a valid comslsslon issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Catty and eapL'oyed by'rkwright Hutual Insurance Carpany of Norwood, Ha.have 3nspected the components descril~in this'wners'eltort'ue"ing'he per'3od'09/01/96'o'4/08/97 and state that to the'best of my kntwledge and bel,ief', the Owner has performed examinations and taken corrective measures described in thiis Seers Report in accordance with the requirements of the ASHE Code', Section XI.By signing this certificate neltiher the Inspector nor h3s employer makes any.warranty, expressed'r 'mplied, concerning the examinations arxi corrective measures'escribed 'in (his Owner's Report., Furthermore,, neither the Inspector nor his esployer shall bie Liable in any manneir fair any personal.3njiury or prolpe'rty damage or a Loss of any kind arising from or c~.'cted with this Inspectiexo. +7-~seissions -NB 8230~K'~I Inspectors Signatt e National Baarde StateProvlclence, and Endorsecflents Dote 97-026-3 FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASHE Code Section XI 1.(haM,r Florida Poaer 8 Li ht Date 04 09 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Uni t PMO¹:63/2949 MO¹: 97008380 9760 SU 344'Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.llork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Mo.Expiration'Date N A M A N A 4.Identification of System: C nent Coolin Mater System¹: 30 Quality Group: 5.(a)Applicable Construction Code B31.1 1955 Edition, MA Addenda,~MA Code Case (b>Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edftion,~MA Addenda,~MA Code Case*6.Identification of Coaponents Repaired or Replaced and Replacement Canponents Name of Component IRELIEF VALVE IRELIEF VALVE Name of Manufacturer IORESSER INDUSTRIES IDRESSER INDUSTRIES iHanufactureri National i Serial No.Board iYear,[, Repaired i ASHE)iguiit(Replaced or i Code f ,i Replacement,iStaap i I I J~res se Other Identification 1TH 18073 IM/A Il 1/2" RELIEF VLV iUNK iReplacement iNo STK CODE 53514 ITH 18076 IN/A 11 1/2" RELIEF VLV iUMK'iReplaced)Mo 7.DescriPtion of Mork: REPLACED RV-3-1424 FOR CCM TO"Ca ECC.t 8.Tests Conducted: Hydrostatic: Other VT-2 Pneuaatic: Nominal Operating Pressure X gressure~rg ig test Tesuersture 88~F 97.027-3 Sheet 2 of 2 FORH,"HIS-2 (Back)0 9.Remarks: THIS Is A NECNANICAL CONNECTION NO uELDINC REDUIREDCERTIFICATE OF COHPLIANCE I Ne certify that the statements madh in the report are correct and this replacement confonas to the kulak of'hai ASNE Code, Section XI.Type Code Sytrbol Staay Certificate of Authorization No.-~HA Expiration Date Signed CV I."QJ'~c~nay~4~~@~Date/Own r or er's Designee, tie 19 7-~CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid camnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eeployed by Arkwright NutuaL In urance Compariy of Norwood, Ha.have inspected the coaponents described in thi's 0&or's Rapport during th'e period'4706/97'o'4/09/97 and state that'to'he best of my knowledge and belief, the Owner has perf<}rmed examinations and taken corrective measures described in this Cheers Report in accordance with the requirements of the ASHE Code, Section XI.By signing this certificate neither the Irepector nor hid~Lo)er makes any>carrantli, expressed or'mplied, concerning the examinations and corrective measure's ddscribed in this Owner's Report.Further'morc, neither the Inspector nor his enployer shall be Liable iin any manner for any per.onal injury or property damage or a Loss of any kind arising from or connected with'his ihspection. ~f Cocmissions NB 823~ON~I~Inspec rs S~iture National Board, State, Providence, and Endorsments Date 97-027-3 FORH NIS 2 OMHERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASKE Code Section XI 1.Owner'lorida Power 8 Li ht Date 04 14 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant , Kame Uni t PMO¹:63/5765 MO¹:.96005866 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Mo.,etc 3.Mock Performed by Florida Power Z Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Synhol Stamp Authorization Ko.Expiration Date N A N A N A 4.Identification. of System: FEED'MATER 5~(a)Applicable Construction Code 831.1 System¹: 74 aualfty Croup: '1955 Edition, NA Addenda,~NA Code Case (b)Applicable Edition of Section Xl Utilized for Repairs or Replacenents 1989 Edftfon,~HA Addenda,~MA Code Case 6.Identification of Conyonents Repaired, or Replaced snd Replacement Components Name of Hsnufacturer)Manufacturers Kationsl i Serial No.Board I Other Identification ,(Year)Repaired)ASHE (,igufiti Replaced or.i Code i i Replacement istanp)I.I J~Yes Ho ISTUDS (14)I (NUTS (14)I iBOLT (1)(H/A'IN/A iH/A i FCV-3-498, UTC 407914 (UMK i Replacement iKo ASTH A-193 H/A N/A FCV-3-498, UTC 397774 iH/A iRepiacement iMo I I I HEAVY KEX ASTH A193 iM/A,/H/A iFCV-3-498, Ul'C 408129 JH/A[Replacement /Mo ASKE SA-194 7.Description of Mork: REPLACED FOURTEEN 14 STUDS AHD HUTS AHD OME 1 BOLT OM FCV-3-498 S C wC" KAIN FM FLOM CONTROL'VALVE.8.Tests Conducted: Hydrostatic: Other VT-1 Pneunatic: Nominal Operating Pressure NA 4F 97-028-3 Sheet 2 of 2 FORN NIS-2 (Back)9.Remarks: THls ts A NEcHANtcAI. cohrHEGTIow No llELGING REQUIRED.I CERTIF ICATE OF COMPLIANCE Me certify that the statenents made in the report are correct arxf this replacement conforms to the rules of the ASNE Code, Section XI.Type Code Symbol Steep~HA Signed+i/FS'gA~~~~m~~ OSta+r or Owrrer's Oesfgir~re, Tft4P Certificate of Authorization No.~NA Expiration Date NrrA 19+g CERTIFICATE OF IHSERVICE INSPECT IOH I, the undersigned, holding a'valid cicrrrnfssion issued by the Nstisnal'oard of Boiler snd Pres'surd Ve!sseL'nspectors and the state or.Province of l)ade County and errrployed by Arkwrfght Mutual'nsurance Corpany of Horwood, Na.have inspected'the components described in this Owners Report during the period 03/13/96 to 04/10/97 and state that to the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described.in this Owners Report'in accordance with the requirements of the'ASNF Code, Section XI.By signing this certificate neither the Inspector,nor his rleployer makes any warranty, expressed ar implied, concerning the examfrratfons and corrective measures tiescribcd in this Owner's Reports, Furthermore, neither the Inspector rror his errployer shall be Liable in sny'manner'for'any personal Injury or property damage or s Loss of sny kind arising from or connected wfth this fnspection. ~~~c~/'omrrfssfons HB 8230~H~I Inspector Sigrqgcfre National Board, State, Providence, and Endoraements'ate 1.~Z 97-028-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI e 1.Owner Florida Power 8 Li ht Date 04 16 97 700'Universe Bl'vd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Uni t PWO¹:63/0472 WO¹: 96026892 PCH¹: 96-070 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.llork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date M A N A M A 4.Identification of System: Primar Water Hakeu S tern System¹: 20 Quality Group: '8 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addendas~NA Code Case (b)Applicable Edition of Section XI Utilized'or Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Coeponents Meme of Coeponent Name of Hanufacturer)Manufacturer),National.J'Serial No.Board'Other Identification ]Year J Repaired]ASHE f'/Built/Replaced or/Code//Replacement)Stamp f I I/~tes ue CV-3-519A I N/A'M/A IM/A'I5610-P-900S (UNK ,]Repaired /Mo 7.Description of Work:,CUT RE WELD THE DOWMSTREAH PORTIOM OF CV-3 519A VERTICAL RUN.8.Tests Conducted: Hydrostatic: Other VT-2 Pneunatic: Nominal Operating Pressure pressure~220 im test Temperature 80 F 97-029.3 Sheer: 2 of 2 FORH NIS-2 (Back)Cl 9.Remarks: CERTIIF I CATE OF COHPLIANCE Me certify that the statements made in the report are correct rind this repair conforms to the rul,es of the ASHE Code, Section XI.Type Code Symbol Stamp N A Signed Certificate of Authori'!atjon No.-~N'A>I'i.gfc~, Owner or Owner'sg4signcc, Title Fxpi'ration Oatc 4Q/NYi+~~rgc/ gate Qg~r/44'~A CENTI F, I CATE OF INSERVI CE INSPEC'T IOII I, the undersigned, holding a valid comriissiion issued Iby the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dadle County and crriployed by Arkwright Hutual Insurance C~ny bf Norwood, Ha.have inspected the compionents described in this'owners'Report during the period IO/09/96 to 04/16/97 and state that to the hest of my knowledge and belief, the Owner has performed examinaitiofrs and taken corrective measures described in this Owners Report'n'accbrda'nce'with the requiirements of the ASHE Code;, Section XI.By signing this certificate neither ithe Inspector nor his emplloyer makes any warranty, expressed or implied, concerning thee examinations and corrective measures'described in this'wner's Report.Furtherrrore, neither the Inspector nor his, cm!cloyer.hall be-liable ini any mahner for any.personal injury or jprogrtj/damage or a loss of any kind arisingi from or connected with t'hfs'ns'pcchion'. />Inspec rs Sjgg ture ComrriSSionS NB 8230 N I National Board, State, Providence, arnd Endorsements Date 97-029.3 FORK NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI 1~Owner Florida Power 8, Li ht Date 06 04 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Uni t PMO¹:63/8810 MO¹: 96022773 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3~Mark Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Oate N A N A N A 4.Identification of System: COKPOMEHT COOLING MATER System¹: 30 Qual I ty Group: C 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addendag~NA Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer (Manufacturer) National f Serial No.Board I I Other Identification ]Year J Repaired/ASKE/)guilt[Replaced or f Code//Replacement (Stamp J I I]~res se (CCM HX VALVE I ISTUOS (160)ISTUOS 40 iBOLTS (40)I IHUTS (320)I INUTS (120)I IN/A IN/A iN/A IH/A (N/A (UTC 409288 UTC 409357 IUTC 409330 (UMK[Replacement [No (UHK (Replacement (Ho[H/A JUTC 409358, ASTK A-194)UHK (Replacement (Ho HEAVY HEX (UTC 409356, ASTM SA-194 JUNK)Replacement (No EAVY HEX[H/A[H/A f3-50-377 1-1/2" GATE/UMK]Replacement /Mo UTC 407835 R62776 7.Oescription of Mork: REPLACE BOLTIHG OM 3E207A COMPONENT COOLING MATER HEAT EXCMAHGER AHO THE REPLACEKEHT OF VALVE 3-50-331.8.Tests Conducted: Hydrostatic: Pneunatict Nominal Operating Pressure X Other VT-2 eressure~stu tg Test Testrereture MOK 4F 97-030-3 Sheet 2 of 2 FOHN NIS-2 (Back)9.Remarks: THIS IS A HECHANICAL CONNECTION NO MELDING MAS REOUIRED.CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct'nd this replacement conforms to the rules'f'the'SHE Code, Section XI.Type Code Sychol Stamp H A Certif icate of Authorization NoN~A/7 Signed>~4/~0 or er'4 Designee, Tit~le CERTIFICATE, OF INSLRVICE INSPECTION I, the undersigned, holcling a valid comnission issued by the Hational Board of Boiler and Pressure'Vessel', inspectors and the state or Province of Dade County and employed by Arkwright Nutual In urance Company of,'orwood, Na.have inspected the ccaponents described in this Oanerls Raport during the period 04/IS/97 to 06/04/97 and state that to the best of my knowledge and belie'f, the Owner has performed examinations,'and taken corrective measures described in this Owners Report i'n accordance with the requirements of the ASHE'ode, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in'his Owner,'s Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any'personal injury or property'amage or a loss of'ny kirxi arising from or connected with this ilnsgcti'on.', z7 Conmi ssions ,Ng 8230 N Inspect s SLEDa re National Board, State, Providence, and Endorsements I I'I Date 19 II 97-030-3 FORK HIS-2 OWHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI 1.OMner Florida Power&Li ht Date 06 04 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant;Uni t PWO"¹:63/1859 WO¹: 97002428 CR¹: 97-0070 9760 SW 344 Street Fior ida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.Work Performed by Florida-Po<<er &Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Staap Authorization No.Expiration Date N A N A 4 Identification of System'OMPONENT COOLING WATER System¹: 30 Duality Group: C 5.(a)Applicable Construction Code 831.1 1955 Edition, HA Addendas~HA Code Case)Year (Repaired)ASHE J iguiit/Replaced or (Code//Replacement istaap J I I)~tes ue[Manufacturers.'National i i Serial No.Board Other Identification Name of Component Haec of Manufacturer (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~MA Addenda,~NA Code Case t 6.Identification of Coaponents Repaired or Replaced and Replacement Components. 3E207A i WESTINGHOUSE (N/A (047 (Component Cooling Water i1968 (Repaired i Yes Heat Exchan er<<A<<7., Description. of Work: CUT 6<<X 9" ACCESS'HOLE 'FOR FORIEGM HATERIAL RETRACTIOH. CODE'CASE M-416 1'AS BEEN ENVOKED FOR THIS REPAIR ACTIVITY.Pneunatic: Hominal Operating Pressure Other VT-2 Pressure~Yes sis Test Tsssersture 91 oF 97-031-3 Sheet 2 of 2 FORM NIS-2 (Back)9.Remarkst Code Case NC16-1 was envod'ed for this~reEair activl~t., Al,l weldIndI was rfornod tn accordanca otth tt roc t td c trot~anno CERTliFICATE OF COMPLIANCE Ne certify that'the statements made in the report are correct and'this repair conferms to the'ul'es of the ASME Code, Section Xl.Type Code Symbol Steap N A Certificate f Authori cation (o.~N'A Signed ra Ac.cd pd oh.to Owner or Owner's Desi'IInee, Title Fxpiration Date Date~~~/'~CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cemsission issued by the',National Board of BoiLer and Preksur'e Vksse'I inspectors and the state or Province of Datie County and dnplbyed by~Arkuright Mutual Insurance Company bf Norwood, Ha.have inspected the ceq~ents described in this'Own'ers 'Repbrt'during the period 01/29/9/to 06/04/97 and state that to the best of my knowledge and belief, the Owner.has performed examinations and taken corrective measures, described in this O~ners Report in'acc'ordance with the requiirements of the ASME Code, Section Xl..By signing this certificate neither the Inspector nor his eayloyer makes any warranty, expressed or implied, concerning the examinations and corrective measures'described in this'wner's Report.Furtherax>re, neither the Inspector nor his employer shai,l.be Liable In'i any ma'nner'oir ady personal injury or property, damage or a loss of any kind arising from or connected with thisi inspection. d'oemissions i NB 8230~N~I lnspec rs~SI tore Nati'onal'oard, State,'Providence, and Endorsements Date 97-031-3 TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-BB Owners'ata Report of Eddy Current Examinations L 0 ~~~~i~s g@Qgg=W ggggg~~~~~~~~a geog@/Q~Q~RE W R5 s s s~e~~I'.~~~~~J 4~t C~~~~~~r~~I~~~~~~t II e COMPONENT: S/G A CUMULATIVE DISTRXBUTION

SUMMARY

TURKEY POINT UNIT g.3 03/97 Page: 1'ate: 05/12/97 Examination.Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Xnspected 3197 Total Indicati'ons Between 20%and 39%Greater than or equal to 40%Total Corrosion. type Indications"VOL" Total Tubes Plugged as Preventive Maint Total Tubes Plugged 6 (1)'2 1 3 Location Of Xndications, 20%to, 100%&"VOL" Hot.Leg TSH-.5 to 01H-2.1 01H-'2.0 to 06H'2.0 06H i2.1 to AVl-3.1 0 Cold Leg TSC-.'5 to 01C-2.1'.01C'2.0 to 06C+F 0 06C+2.1 to AV4-3,.1 0 0 0 AV1-3.0 to AV4-3.0: 6 (1)

INDICATIONS/TRENDING REPORT PTN 3 OUI'AGE: 03/97 t CONPONENT: S/G A DESCRIPTION

ALL 40%to 100%, VOI.'PTP INDICATIONS Page: 1 Date: 5/12/97 Time: 10:00:00+~~I Extent 03/97 (Row(Col(Leg(***(Tst/Note(Reel I Probe I Location Ivoltsl'---I---I---I---I---

I.--I-.--.-.-I----"-I--I 13(I H ICNRIBAHTSHPLIAH002 (HRPC680.3C ITSH 3.8 I 1.4((31(18(.H I (06H SCIAH039 IMPRC720-3C '(06H 1.1 (1.0(I 44I 36(c I I (AH037 IHPRc720.3c I I I ((C (CHR(TSH GY(AH037'INPRC720.3C (TSH.7 (1.2('--'I---I---I---I--------I-I-I.I.--I Number of RECORDS Selected.from Current Outage: 4 Naker of, TUBES Selected.from Current Outage: 3 I I N/A I oeg(CI I%(Diff(Location (voltslocg(CI I x I I I I-I--.-.-------- I--".I-I".I--'19(1 IP'IP I I I I I I ,64 I 1(VOL ((I I I I I I IPTPI I I I I I I 14(1(VOI I (I I I'(I-I---l--.l.--.l--------.----l-----l-.-l---l- -+ II 0 Ik CNIPONENT: S/G A DESCRIPTION

ALL 20K TO 39K IHDICATIONS INDICATIONS/TRENDING REPORT PTN-3 OUTAGE: 03/97 Page: 1 Date: 5/12/97 Time: 10:00:00 I Extent (Row(Col(Leg(*~*(Tst/Note(Reel (Probe'---I--I---I---I-I I I 33(41(C (ITEH PS(AC006 (A-720-M/ULC I I I C I ITEH P (AC006 IA-720-M/ULC I 38(45(C I ITEH PSIAC007 IA-720-M/ULC (37(47(C I (TEH PS(AC012 IA-720.M/ULC

'(30(52(H ((TEC PC(AH034 IA-720 M/ULC (28(59(H (ITEC PS(AH021 (A-720 M/ULC'---I---I---I---I--------I-I Number of RECORDS Selected.from Current Outage Number of TUBES Selected.from Current Outage:+03/97 I I'/A I (I.ocation (Volts(Deg(Ch (X fDiff(Location fVolts(Deg(ch (X (I--I-----I---I---I-" I---I---------I----l.--l---l---+ IAY1.0 I.9(.IP 2(24(I I I I I IAV3.0 f'9((P 2(25(I I I I I (AvZ.0 (.1.5(IP 2(30(I I I I I (AV3.0 (.8(fP 2(22((I I I I I IAv3.0 (~4((P 2('0(I I I I I IAY2.0 I.6(IP 2(,26(I I I I I I I.I I I I-I".--".--.-. I"" I---I---I---+'6 5 0 0 COMPONENT: S/G B CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT g 3 03/97 Page: 1 Date: 05/12/97 Examination Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Inspected.....: 3196 Total Indications Between 20%and'9%Greater than or equal to 40%Total Corrosion type Indications"VOL" Total Tubes Plugged as Preventive Maint Total Tubes Plugged (1)1 9 (2)2 9 (2)Location Of Indications 20~to 100~6"VOL" Hot Leg TSH-.5 to 01H-2.1 06H+2.1 to AV1 AV1-3.0 to AV4-3.1-3 0 01H-2.0 to 06H+2.0 0 Cold Leg TSC-.5 to 01C-2.1 01C-2.0 to 06C+2.0 06C+2.1 to AV4-3.1 0 INDICATIONS/'TRENDING REPOR I PTN 3 OUTAGE: '03/97 Page: 1'Date: 5/12/97 Time: 10:00:00 COMPONENT: S/G 8 DESCRIPTION

ALL+40%to 100%, VOL&PTP INDICATIONS

~~+I Extent (03/97 N/A I (Rou(col(Lcg(***(Tst/Note(Reel I probe ,(Location (volts(oeg(Ch (%'(Diff(Location (volts(oeg(Ch I/I I--I---l---l------.-l--------l------------l-------------l-----l---l---l--I----I-----."----I----I--I---I---+I I I H'cMRITsH'LIBH002 IHRPc680 c ITsH~4 I 1 (10 I 1(voL(I I I I I (42(38(H ICHR(01HTSKPLIBH004 IMRPC680-3C '(TSH 1.5 ,(1.2(87(1(VOL(I I I I I I 39(39(c IcMR(osK PLIBH043 IMRPc680 3c (05H.8 I 2.3(125(l(voLI I I I I-I (44(40(.C,(CMR(TSH PI.(BH043 (MRPC680-3C (TSH.3 (1.3(46(1(VOL,(I I I I I (c (PITITsH PL'(BH043 IHRPc680-3c (TsH 1.8 (.4(6o(P1(82((I I I I I (23(41(C (CMR(03C PCfBC031 (MRPC680-3C (03C.'5 (.4(93(1(VOL(I I I I (44(41(c (cMRITsH',PLIBK043 (HRPc680-3c ITsK.2 (1'.5(122(1(vol.(I I I I I I I I'C IcHRITsK PL(BH043 IHRPC680 3C ITsH.4 I\1(90(llvoLI I I I I I I c (cMRITsK ILIBK043 (MRPc680 3c ITsK.5 I.9(83(.1(voLI I I I I I I 45(41('ILPHITEH PL(BC009 (A-720-M/ULC (TsK.6 I I I II TPI I I I I I I (45(42(c ILPM(TEK PL(gc009 (A-720.M/ULc ITsK 1.3 I.(I (PT I I I'I I I 41(44 I C ICMR ITEH GY IBH043 (HRPC680-3C ITSH.6,(.3 I 52(1(YOL I I I I I I I'-I." I.-.I---I-I I-I.-I--" I.-I-.-I.-.I--I-.--.---I.---I--I.--I---Number of RECORDS Selected from Current Outage: 12 ,Number of TUBES Selected from Current Outage: 9 0' t COHPONENT: S/0 8 DESCRIPTlON

ALL 20%TO 39%IHDlCATIONS IHDlCATlOHS/TREHDlNG REPORT PTH-3 OUTAGE: 03/97 Page: 1 Date: 5/12/97 Time: 10:00:00++I I Extent 03/97.I I N/A'I IR"I[Leg[***[Tst/Hotel Reel I Probe I Location IVolts[Deglch I%[Diff[l.ocation ,IVolts[Deg[Ch I%I+---I---I---I-I---I--.-I"----------I-----

-.-----I--I I I I I I I I I I 32[34[C f,[TEH PSIBC019[A-720-N/ULC IAV1.0 I.7[IP 2[23[I I I I I I I'C I ITEH.Ps[BC019[A 720 H/ULC IAV3-.1 I 1.3[[P 2[31f f I I I I I I c I ITEH Ps[Bc019 IA-720-H/ULC IAv4-.2 I.7[.[r 2[22[I I I I I I 34f 46[C I ITEH PCIBC009'[A-720-N/ULC fAV2.0 I 1.0[fP Zf 28f, f ,I I I I'I'I C'I ITEH PCIBc009 IA-720-N/ULc IAv3~0 I 1.5[IP Zl 35['I I I I I[I 34f 51[C I ITEN PSIBC011 IA-720-N/ULC IAV2.0 f 1.2f IP 2[29f I I I I I I 42[55[c I: ITEH PCIBC012'IA 720 H/ULC IAv3-.3 I 1.7[.IP Zl 31[I I I I I+---I---I-I---I--------I--------I---------. I-----I-----I-- I---I---I---- I-"---.----I--"- I"-l.--[--.+ Number of RECORDS Selected from Current Outage: 7 Number of, TUBES Selected from Current Outage: 4 0 COMPONENT: S/G C CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT¹3 03/97 r Page: 1 Date: 05/12/97 Examination Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Inspected 31'81 Total Indications Between 20>and 39%Greater than or equal to 40%Total Corrosion type Indications"VOL"'Total Tubes Plugged, as Preventive Maint Total Tubes Plugged 20 (1)1 0 1 2 Location Of Indications 20~to 100:&"VOL" Hot Leg TSH-~5 to 01H-2.1 01H-2..0 to 06H+2.0 Cold Leg 1 TSC-.5 to 01C-2.1: 0 0 01C-2.0 to 06C+2.0: 0 06H+2.1 to AV1-3.1 0 06C+2.1 to AV4-3.1: 0 AV1-3.0 to AV4-3.0 20'(1) 0 0 INDICATIONS/TRENDING REPORT PTH-3 OUTACE: 03/97~~COHPONEHT S/0 C DESCRIPTION

ALL 40/to 100/, VOL 8 PTP INDICATIONS Page: 1 Oat e: 5/12/97 Time: 10:00:00 I Extent I (Row(CoI(Leg(***(Tst/Note(Reei (Probe (Location'-I-I.-I--I-------I--.I------'I-(30(48(N ('TEC PL(CH009 (A 720 H/ULC (AV3-0 I 33(66(C IPITITSH PLICH047 IHRPC680-3C ITSH.6---I---I--I---I--.-----I-----".I-I Humber of RECOROS Seiected from Current Outage: 2 ,Number of TUBES Selected from.Current Outage: 2 03/97 I I H/A I (Voits(oeg(Ch,f 7.'(oiff(Location (Volts(oeg(cb (X (I I-I-I.I.I I I I--I---'I I IPTP((((.4(103(P 1(58(I I I I I (I I I ('---(((I 0

COMPONENT: S/G C DESCRIPTION

ALL 20/TO 39/i INDICATIONS INDICATIONS/TRENDING REPORT PTN-3 OUTAGE: 03/97 Page: 1 Date: 5/12/97 Time: 10:00:00 I 34(31(H I I I I H I I 43(33(H I I 35(36(H I (34(41f H I I I IHI I 33(43(H (I 35J 43J H I I I (H(I I IHJ (35(4CJ H (I 301 48I H I ITEC PS(CH027 IA-7?O.M/ULC IAV2.0 (TEC PS(CH027 IA-720-M/ULC IAV3.0 JTEC PSiCH026 iA 720-M/ULC IAV3.0 iTEC PSiCH028.IA-720.H/ULC iAV2.0 fTEC PS(CH029 (A 7ZO.M/ULC (AVI.0 JTEC PSiCH029 JA 720-M/ULC,JAV3

.0 ITEC PSICH029:IA-720-M/ULC IAV4~0 JTEC PC(CH030 (A-720 M/ULC IAV3.0 ITEC PCICH030 IA.720-M/ULC IAVZ.0.ITEC PC(CH030 IA-720 M/ULC IAV3.0 ITEC PCICH030 IA-720-M/ULC IAV4.0 IT C PCICH'A 720 M/ULC (AV ITEC PCICHO IA?0 M/ULC IAV i'IEC (CH009 iA.720-M/ULC (AV2.0 I I I H I JTEC PCICH009 JA-720 M/ULC'JAV3.0 I 35(49(C (ITEN PSJCC009 (A-720-M/ULC JAVC.0 I 26(48(H (ITEC (CH009 JA.720-M/ULC IAVZ.0 (30(61f H f (38(71J C((TEC PS(CH009 (A.720.M/ULC JAV2.0 iTEN PS(CCOll JA 720-H/ULC JAVC..2 Number of RECORDS Selected from Current Outage: 20 Number of TUBES Selected from Current Outage: 13+I Extent I (Row(col(Leg(**"JTst/Note(Reel I Probe I Location+--I--I---I---I----.--I-I-I-I 30('17(H I ITEC Ps(CH006 IA.720 M/ULC IAvl.0 03/97 (Volts(D I-I I-5(I-5I I-5l I Cl I.5(I 6(.6(I.71 (6(J.8(I.C(I"9(1.5(1.6(1.5 f.6(I~5I I 5l I~6(-I-I I I eg(Ch (.X (Diff(-(-.-I-.-I-I JP 2(20(IP 2(21(l>>l 20(I I>>I ZZI,I I>>I>>I I (P 2(22(JP Zf 22(I>>l Zcl I iP Zl 27i J>>I>>I I IP Zl 32(I l>>l>>I I I>>l 34(I-(P 2(35(I fi 2(32f f I>>l 37l I>>(25(I I>>I 20(I (P 2(20(I>>I>>I I I I I-I" N/A I Location (Voltsfgeg(Ch (X f (I I I+I I I I I i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I (I I I (I I I I I I I I I I I I I I I I I I I I I I I Il TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers 0 0 MECHANICAL SHOCK ARRESTOR FINAL REPORT TURKEY POINT UNIT 3'1997 SPRING REFUELING'UTAGE 'Commercial Service Date: December 14, 1972 Prepared By: Inservice Inspection Group Florida Power&Light Turkey Point Nuclear 9760'.'W.344 St.Florida City, Fl 33035 Originated by: M.Campbell D te Reviewed by: A.Pauleuc~z1 97 Date M.Blew Date 0 Mechanical shock arrestors (snubbers) were visually inspected/handstroked under purchase order B94536-40012 by Ratheon inspectors in accordance with the following plant procedures: 0-CMM-105'O-OSP-105.1 Implementing plant work orders were as follows: PWO WO 96014408-SNUBBER VISUAL/HANDSTROKE INSPECTION 3-1032, 3-1041, 3-1052, 3-1072/3-1081, 3-1096/3-1106, 3-1033, 3-1043, 3-1054/3-1073, 3-1082, 3-1099, 3-1110, 3-1034, 3-1044, 3-1057, 3-1074, 3-1083, 3-1100, 3-1111, 3-1035, 3-1045, 3-1058, 3-1075/3-1091, 3-1101, 3-1112, 3-1036, 3-1046, 3-1060, 3-1077, 3-1092, 3-1102, 3-1121, 3-1037/3-1048/3-1069, 3-1078, 3-1093, 3-1103, 3-1136 3-1038/3-1050/3-1070/3-1079, 3-1094, 3-1104,&3-1137 3-1039/3-1051/3-1071/3-1080/3-1095/3-1105, PWO WO 96014408-VISUAL INSPECTION (NO HANDSTROKE) FOR FUNCTIONAL TESTING;3 1009/3 1011/3 1019/3 1023/3 1026/3 1031/3 1040/3 1042/3 1047/3 1049/3 1053/3 1055/3 1076/3 1084/3 1097/3 1098&.3-1120 PWO WO 96024188-REPLACE LOAD PIN WITH LOAD STUD;3 1007/3 1008/3 1009&3 1012 PWO WO 96024216-REPLACE LOAD PIN WITH LOAD STUD;3-1084 PWO WO 96016705-DISLODGED BEARING&LOAD STUD REPLACEMENT/ 3-1005, 3-1006&3-1010 PWO WO 97006613-REMOVE SNUBBER 3-1009/3-MSHX-15 IMPLEMENTATION OF CR 97-399/3-1005, 3-1006, 3-1009&3-1010 Mechanical shock arrestors (snubbers) were functionally tested under purchase order B95691-50102 by Basic-PSA personnel in accordance with the following plant/vendor procedures: 0-CMM-105.1 O-OSP-105.2 il Implementing plant work orders were as follows: PWO WO'6024408 -FUNCTIONALLY TEST SNUBBERS LISTED BY ISI 3 1009'g 3 101 1'1019'1023'1026'1031 g 3 1040'1042'1047.g 3 1049 g 3 1053~3 1055/3 1076 g 3 1084 g 3 1097 (3 1098&3-1120 PWO WO'6024412 -REBUILD 10 SNUBBERS 10172 J 10174~1 1 1 10'2377 (12392~16232 g 16238'g 16242 g 16252&16253 0 il MECHANICAL SHOCK ARRESTOR FINAL REPORT SECTION I 0 PAGE NO.1 05/22/97 Turkey Point Outage Surmary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A 4L4 A Number Number Date T Test T Dimension T Visual Sunnary Ftmctional Sunnary 3-1005 10035 03/10/97 P 03/20/97 P 26.5000 P Visual inspection -sat,"L4 diemsnion acceptable, handstroke -sat, replaced load pins with load studs per IO 96016705, lubricated load studs and spherical bearings on both ends with neolube-24982-3.A factional test was performed with the following acceptable results under NO 97006613 and CR 97-399: Pre Rebuild-S/N 10035 Replaced snubber S/N 10035 with snubber S/N 10579 per CR 97-399.Snubber S/N 10035 was rebuilt under NO 97006613 by Basic-PSA and NRH back into stores.Test 1)Test 2)Test 3)Test 4)164.88 223.57 0.001 182.49 74.26 165.57 0.012 149.63 2500.00 2500.00 0.02g's 2500.00 Tension Compression Criteria The Pre Rebuild fextionai test was performed at Engineering direction per CR 97-399.Post Rebuild-S/N 10035 Tension Ccepression Criteria Test 1)Test 2)Test 3)Test 4)161.38 232.46 0.004 224.31 138.78 452.13 0.008 397.34 2500.00 2500.00 0,02gls 2500.00 The following parts were installed as part of the rebuild of snubber S/N 10035: (4)Drive Screws-0015673-3 (1)Clutch Spring-0015346-1 (1)Torque Carrier-0015343-1 (1)Capstan Spring-0015729-1

PAGE KO.2 05/22/97 Turkey Point Outage Smasry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A"i." A Nwher Kumber Date T Test T Dimension T Visual Suanary Functional Swmary After rebuild and successful post rebuild factional test, snubber S/H 10035 uas KRH back into stores.3-1006 6521 03/08/97 P 03/20/97 P 26.7500 P Visual inspection -sat,"l." dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends.Installed Load studs in place of load pins per lO 96016705.A fwetionaL test Mas performed uith the foLLouing acceptable results under lO 97006613 and CR 97-399: Pre Rebuild-S/H 6521 Tension Cocpression Criteria Replaced snubber S/H 6521 with snubber S/N 6494 per CR 97-399.Snubber 6521 Mas rebuilt under lO 97006613 by Basic PSA and NRH back into stores.Test 1)Test 2)Test 3)Test 4)152.21 131.37 0.005 127.82 195.31 224.07 0.039 207.67 2500.00 2500.00 0.02g's 2500.00 This test Mas performed at Engineering direction per CR 97-399.Post Rebuild-S/H 6521 Tension Coapression Criteria Test 1)250.32 Test 2)'50.32 Test 3)0.002 Test 4)234.70 172.07 317.51 0.007 291.81 2500.00 2500.00 0.02g's 2500.00 The foLLcwing parts uere used during the rebuild of snubber S/K 6521 under LO 97006613: (4)Drive Screws 0015673-3

PAGE NO.3 05/22/97 Turkey Point Outage Slscsry Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fumtional A"L" A Nwher Number Date T Test T Dimension T Visual Summary Factional Soanary (1)inertia Hass 0015344-1 (1)Capstan Spring 0015729.1 (1)Thrust Bearing Assembly-0215049-1 Upon rebuild and successful fmctional testing the snubber was HRH back into stores.3-1007 4590 03/10/97 P//28.0000 P Visual inspection -sat, 4L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under MO 96016705.Replaced load pins with load studs per MO 96016705.3-.1008 8084 03/08/97 P//27.7500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under MO 96016705.Replaced load pins with load studs per lN 96016705.3-1009 1203 03/10/97 P 03/16/97 F 26.5000 P Visual inspection -sat, 4L4 dimension acceptable, no handstroke performed, snubber is part of the initial OR sample.The snubber could not be unpinned.CR 97-399 was written for this snubber to determine the method of removal.A hydraulic ram was utilized to move the main steam pipe to facilitate snubber removal.~~~I~Pre Rebuild-S/N 1203 Tension Coapression Criteria Test 1)7390.62 0.00 Test 2)7390.62 0.00 Test 3)0.00 0.00 2500.00 2500.00 0.02g's A fuetional test was performed with the following unacceptable results under NO 96024408: 0 PAGE NO.4 05/22/97 Turkey Point Outage Scenery Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A F~tional A".i." A Naker Nether Date T Test T Dimension T Visual granary Fact iona(Summary Test 4)0.00 7836.54 2500.00 This QR snubber was tested as part of the initial saapie.CR 97-399 was initiated for a QR fmctionai test failure and per engineering disposition, snubbers 3-1005, 3-1006 and 3-1010 sere fmtionally tested, no saapte expansion is required for a OR failed snubber;Snubber S/N 1203 was rebuilt Mith the follouing acceptable test results under MO 97006613 and CR 97.399: Post Rebuild-S/N 1203 Tension Coapress ion Cri teria Test 1)I'est 2)Test 3)Test 4)244.85 244.85 0.005 455.77 308.48 707.74 0.008 615.54 2500.00 2500.00 0.02g's 2500.00 The foiiouing parts Mere replaced during rebuild of snubber S/N 1203 under UO 97006613: (4)Drive Scram (1)Inertia Ness (1)Torque Carrier (1)Capstan Spring 0015673-3 0015344-1 0015343.1 0015729-1 Upon rebuild and successful fmctionai testing the snubber was HRN back into stores.~/~I~ /Qi I~4 PAGE NO.5 05/22/97 Turkey Point Outage Stellary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A FLmctional A"L" A Nunber Kosher Date T Test T Dimension T Visual Smmary Fuetional Suansry 3-1010 11931 03/08/97 P 03/14/97 P 25.5000 F Visual inspection -sat, aL" dimension unacceptable,.condition report 97-0398 uas Mritten to address the"L" dimension uhich uas.5000" under the miniszza alloued.Snubber 3-1009 uas found frozen and per condition report 97-399, Engineering directed that snubber 3-1010 be removed, fmctionally tested, disassembled for Engineering revieM.Upon disasseahly of snubber 3-1010, Engineering directed that the subject snubber be rebuilt, as uell as snubbers 3-1005&3-1006.Replaced load pins Kith load studs (2)0214245-3 per lO 96016705, lubricated load studs and spherical bearings with neolube-024982-3.installed neM nuts (8)0209608-3, installed (4)spacer Mashers 197329-3 and torqued to 125 ft lbs, torque urench 85188, cal due 03/30/97.Restaked spherical bearing.Pre rebuild-S/N 11931 Test 1)Test 2)Test 3)Test 4)Tension 105.93 160.27 0.002 148.42 Coapressi on 286.57 307.04 0.0'i4 22e.47 Criteria 2500.00 2500.00 0.02g's 2500.00 This test uas performed at Engineering direction per CR 97-399 in place of snubber 3-1009.Post Rebuild-S/N 11931 Tension Coapression Criteria A fuetional test uas performed uith the folloMing acceptable results under N 97006613&CR97-399;Test 1)Test 2)Test 3)Test 4)212.70 388.96 0.002 24e.57 161.34 245.62 0.007 403.70 2500.00 2500.00 0.02g's 2500.00 The follouing parts Vere used during the rebuild of sakber S/N 11931 under ll 97006613: (4)Drive ScreMs (1)Clutch Spring (1)Capstan Spring (1)Torque Carrier (1)Thrust Bearing Asseahly 0015673-3 0015346.1 0015729-1 0015343-1 0215049.1~~i~ 0 IO it PAGE KO.6 05/22/97 Turkey Point Outage Story Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A Fisictional A>>L" A Nisnber Number Date T Test T Dimension T Visual Smeary Fisictional Surmsry After rebuild and successful fisictionai testing, the snubber Mas NRH back into stores.3-1011 12376 03/10/97 P 03/13/97 P 20.2500 P Visual inspection -sat."L>>dimension acceptable, no handstroke performed, lubricated spherical bearings and load pins Mith neolube-24982-3 under M0 960241M.A fwctional test was performed uith the fotlouing acceptable results under N0 96024408;Snubber S/N-12376 Tension Coapression Criteria Test 1)Test 2)Test 3)Test 4)99.74 138.07 0.004 146.98 56.18 53.35 0.004 51.57 750.00 750.00 0.02g>L>>dimension acceptable, Handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube'24982-'3.Load pin on building attachment (rear bracket)uas not replaced uith a load stud due to a 2" horizontal pipe risi 1>>above the rear bracket, not enough room for the stud to fit and be double nutted per lO 96024188.Replaced 3 nuts on the coaponent pipe clamp side.3-1019 2889 03/14/97 P 03/14/97 P 17.2500 P Visual inspection sat,>>L>>dimension acceptable,~i I~A fwetionai test was performed Mith the folioiiing 0 0 0 0 GE NO.7/22/97 Turkey Point Outage Srmmsry Report Unit 3/4 S Date S S Visual T of T I T ag Serial inspection A Frarctional A~."L" A r Number Date T Test T Dimension T Visual SrlrrMrry Frnctional SrmrrMrry no handstroke performed, lubricated spherical bearings and load studse No iD tag installed. Snubber was changed out with S/N 17425 due to unit 4 LCO.Mork was performed under IN 96014408.acceptable results under IN 96024408r r Snubber S/N-2889 Tension Ccapression Criteria Test 1)Test 2)Test 3)Test 4)29.92 30.87 0.007 25.00 13.06 22.91 0.0'17 27.36 300.00 300.00 0.02g's 300.00 This SR snubber was tested as part of th6 initial saaple.1023 23273 03/13/97 P 03/13/97 P 12.7500 P Visual inspection -sat,"L4 dimension acceptable, no handstroke, lubricated spherical bearings and load studs with neolube-24982-3 under MO 96014408.A frarctional test was performed witli the following acceptable results under MO 96024408;Snubber S/N-23273 Tesnion Coapressi on Criteria Test 1)Test 2)Test 3)Test 4)11.87 16.58 0.007 13.94 8.23 9.61 0.007 17.01 75.00 75.00 0.02grs 75.00 This SR snubber was tested as part of the initial saaple.1026 12394 03/13/97 P 03/13/97 P 19.5000 P Visual inspection -sat,"L" dimension acceptable,~r 1~A frarctional testing was performed with the following 0 0 0 PAGE NO.8 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A fmctionaL A"L" A Number Nwher Date T Test T Dimension T Visual Sumery fmctionaL Swmsry handstroke -sat, lubricated spherical bearings and load pins on both ends Nith neolube-24982-3 under MO 96014408.acceptable results under NO 960244M: Snubber S/N-12394 Torqued TTA bolts to 450 ft lbs-8-4706-07/07/97 Lock uired the TTA bolts.Tension Ccapression Criteria Test 1)Test 2)Test 3)Test 4)57.58 71.83 0.014 68.12 37.52 39.95 0.009 60.49 750.00 750.00 0.02g's 750.00 This SR snubber uas tested as a previous rebuild.3-1031 27M6 03/13/97 P 03/15/97 P 17.8750 P Visual inspection -sat,<<L<<dimension acceptable, no handstroke, Lubricated spherical bearings and load pins uith neolube-24982-3 under NO 96014408.No LD tag installed. A fuetionaL test Mas performed uith the foLLouing acceptable results under LN 96024408;Snubber S/N-27086 Tension Coapression Criteria Test 1)Test 2)Test 3)Test 4)18.35 20.33 0.006 21.24 14.06 21.07 0.006 20.08 300.00 300.00 0.02g's 300.00 This SR snubber uas tested as part of the initial saaple.3-1032 24410 03/12/97 P//14.0625 P Visual inspection -sat,"L<<dimension acceptable, handstroke -sat, Lubricated spherical bearings and~i f~' 0 PAGE KO.9 05/22/97 Turkey Point Outage Sumery Report Unit 3/4 S Oate S S Visual T of T I T Tag Serial inspection A Fmctfonal A 4L" A Kunber Number Oate T Test T Dimension T Visual Smeary Flax:tional Suanary load pins on both ends with neolube-24982-3 under IJO 96014408.3-1033 19328 03/13/97 P//16.3750 P Visual inspection -sat,"i." dimension acceptable, handstroke; sat, lubricated spherical bearings and Load pins on both ends with neolube-.24982-3 under iJO 96014408.No LD tag installed. 3-1034 24429A 03/16/97 P//13.8750 P Visual inspection =sat, 4L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and Load pins on both ends with neolube-24982-3 under lO 96014408.3-1035 19330 03/15/97 P//16.6250 P Visual inspection -sat,"L'!dimension acceptable, handstroke -sat, lubricated spherical bearings and Load pins on both ends with neolube-24982-3 under MO 96014408.Ko LD tag fnstallede 3.1036 27100 03/15/97 P//16.3750 P Visual inspection -sat,"L" dimension acceptable,~handstroke -, sat, lubricated spherical bearings and Load pins on both ends with neolube-24982-3 under QO 96014408.No LO tag lnstalfedr ~/f~

PAGE NO.10 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fuetional A 4L4 A Number Neer Date T Test T Dimension T Visual Suanary Fmetional Sunnary 3-1037 11922 03i14/97 P//26.6250 P Visual inspection -sat, 4L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under IQ 96014408.3-1038 11934 03/14/97 P//26.7500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IQ 96014408.3-1039 16241 03/14/97 P//20.0625 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IQ 96014408.3-1040 16239 03/13/97 P 03/15/97 P 20.5000 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IQ 96014408.A fwetional test was performed with the following acceptable results under IQ 96024408;Snubber S/N-16329 Tension Compression Cr i teria Test 1)Test 2)Test 3)Test 4)73.67 113.91 0.012 122.59 79.67 52.08 0.010 202.88 750.00 750.00 0.02g's 750.00~~i~This SR snubber was tested as a previous rebuild. 0 0 ll PAGE NO.11 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A"L" A Number NLNScr Date T Test T Dimension T Visual Suanary Fweti ona I Suanary 3-1041 16234 03/11/97 P//20.3750 P Visual inspection -sat,"L" dimension acceptable, handstroke sat, light rust on spherical bearings and load pins on both ends.Cleaned spherical bearings and load pins Nlth scotch bright and lubricated spherical bearings and load pins on both ends Mith neolube 24982-3 under NO 96014408.Installed black ID tag to snubber TTA.3-1042 12365 03/12/97 P 03/15/97 P 20.7500 P Visual inspection -sat,"L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Nith neolube-24982-3 under NO 96014408.A fwxtional test uas performed Mith the foiioMing acceptable results under NO 96024408;Snubber S/N-12365 No ID tag installed. Tension Coepression Criteria Test 1)Test 2)Test 3)Test 4)158.38 162.40 0.009 358.28 59.09 120.08 0.002 146.08 750.00 750.00 0.02g's 750.00 This SR snubber Nas tested as a previous rebuild.3-1043 17899 03/14/97 P//22.2500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends Mith neolube-24982-3 under lJO 96014408.~[~I~ il ll AGE NO.12 5/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fwetlonal A"L4 A r Number Date T Test T Dimension T Visual Suanary Fuetional Suanary-1044 17900 03/14/97 P//21.5000 P Visual inspection -sat,"La dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under IO 96014408.1045 17189 03/14/97 P//21.5000 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under lQ 96014408.1046 17903 03/14/97 P//20.7500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under 10 96014408.1047 17902 03/14/97 P 03/15/97 P 20.5000 P Visual inspection -sat,"L" dimension acceptable, no handstroke performed (initial sac@le), lubricated spherical bearings and load pins on both ends with neolube-24982-3 under N 96014408.A factional test was performed with the following acceptable results under lS 96024408;Snubber S/N-17902 Drilled load pin per STD-C-011 for installation of cotter pin (M29146-3) installed lock wire on TTA bolts and torqued to 450 in lbs, 8-4701-Cal Due Date: 07/07/97.Tension Test 1)60.77 Test 2)100.32 Test 3)0.007 Test 4)87.42 19.34 26.59 0.002 115.18 750.00 750.M 0.02g's 750.M Compression Criteria This SR snubber was tested as part of the initial saaple. 0 0 PAGE NO.13 05/22/97 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A"L" A Nuaber Kumber Date T Test T Dimension T Turkey Point Outage Suaaary Report Unit 3/4 Visual Suanary Fuetional Suanary 3-1048 17904 03/14/97 P//19.5000 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under IJO 96014408.3-1049 16245 03/14/97 P 03/15/97 P 20.5000 P Visual inspection -sat, 4L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Kith neolube-24982-3 under iO 96014408.A fmctional test uas performed with the follcwing acceptable results under MO 96024408;Snubber S/K-16245 Tension Ccepression Criteria Test 1)Test 2)Test 3)Test 4)79.24 128.31 0.013 125.92 50~53 166.94 0.007 151.03 300.00 300;00 0.02g's 300.00 This SR snubber Nas tested as a previous rebuild.3-1050 17906 03/14/97 P//22.0000 P Visual inspection -sat, 4L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends Kith neolube-24982-3 under MO 96014408.3.1051 16249 03/12/97 P//21.5000 P Visual inspection -sat, 4L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.~~~I~ 0 PAGE NO.14 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Ftsx:tional A"La.A Neer Number Date T Test T Dimension T Visual Spermary factional Sunnary 3-1052 16233 03/12/97 P//21.7500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bear ings and load pins on both ends with neolube-24982-3 under MO 96014408.No ID tag installed. 3-1053 2462 03/14/97 P 03/15/97 P 20.0000 P Visual inspection -sat, 4L" dimension acceptable, no handstroke (previous rebuild), lubricated spherical bearfngs and load studs on both ends with neolube-24982-3 under MO 96014408.A fmctfonal test was performed with the following acceptable results under NO 96024408;Snubber S/K-2462 Tension Compression Criteria Test 1)Test 2)Test 3)Test 4)32.11 68.78 0.010 106.53 56.25 77.39 0.010 90.31 750.00 750.00 0.02g's 750.00 This OR snubber was tested as a previous rebuild.3-1054 16248 03/12/97 P//20.2500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982.3 under MO 96014408.3-1055 13697 03/14/97 P 03/15/97 P 20.7500 P Visual inspection -sat,"Lw dimension acceptable, no handstroke (initial san@le), lubricated spherical bearings and load studs on both ends~~1~A functional test was performed with the following acceptable results under lN 96024408; il 0 PAGE NO.15 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 0 S Date S S Visual T of T T Tag Serial inspection A Fuetional A"L" A Nunber Number Date T Test T Dimension T Visual Smeary Functional Suaaary with neolube-24982-3 under N 96014408.Snubber S/N-13697 Tension Compression Criteria Test 1)Test 2)Test 3)Test 4)69.00 88.54 0.012 87.91 62.64 85.69 0.013 85.73 750.00 750.00 0.02g's 750.00 This QR snubber was tested as pert of the initial sample.3-1057 27106 03/15/97 P//16.2500 P Visual inspection -sat, 4L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under lO 960144M.3.1058 27102 03/16/97 P//16.2500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube.24982-3 under lO 96014408.3-1060 19329 03/14/97 P//18.5000 P Visual inspection -sat, 4L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends Mith neolube-24982-3 under lQ 96014408.3-1069 27072 03/13/97 P//16.7500 P Visual inspection -sat,"L" dimension acceptable,~(i~ 0 Ib Ik PAGE NO.16 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fmctional A"La A Number Number Date T Test T Dimension T Visual Smeary Fwetional Sumery handstroke -sat, lubricated spherical bearings and load studs on both ends kith neolube-24982-3 under lO 96014408.Condition report 97-398 Mas Mritten to address boric acid on the snubber.The inspector found no boric acid uhen the snubber Mas inspected. Condition report 97-398 directed that herculite be put over the snubber before reload and removed prior to startup.The herculite Mas removed on 03/29/97.3-1070 27079 03/13/97 P//17.6250 P Visual inspection -sat, 4L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 960144M.3-1071 27069 03/13/97 P//15.8125 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Nith neolube-24982-3 under IQ 96014408.No 10 tag installed. Load pin Nas ssmhroomed, filed pin for reinstallation in accrodance Nith STD-C-011. 3-1072 27073 03/15/97 P//16.0625 P Visual inspection -sat,"L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under MO 96014408. 0 I~0 0 PAGE NO.17 05/22/97 Turkey Point Outage Senary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fuetional A 4La A ether Naker Date T Test T Dimension T Visual Suanary Fact iona l Stsmary No iD tag installed. Removed paint and rust on housing and indicator tube Mith scotch brite.-1073 27090 03/15/97 P//17.0000 P Visual inspection -sat,"L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.-1074 27104 03/15/97 P//17.7500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends uith neolube-24982-3 under 1JO 96014408.-1075 18074 03/15/97 P//8.1250 F Visual inspection -sat,"L" dimension macceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.CR 97-0478 Mas issued for rusted rear plate and"L" dimension bale+miniaua by.254.NO 97006948 Nas implemented to correct the conditions. -1076 19725 03/13/97 P 03/15/97 P 17.5000 P Visual inspection -sat,"L" dimension acceptable, no handstroke (initial sample), lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under NO 96014408.A fuetional test Nas performed Mith the follming acceptable results under lO 96024408;Snubber S/N-19725~~~i~'Tension Coopression Criteria Ib PAGE MO.18 05/22/97 Turkey Point Outage SulNlary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Flmctfonal A"L" A Mmher Mumber Date T Test T Dimension T Visual Sundry Factional Stannary Test 1)Test 2)Test 3)Test 4)16 44 16.79 0.012 17.19 32~15 32.21 0.009 31.28 300.00 300.00 0.02g's 300.00 This QR snubber was tested as part of the'initial saaple.3-1077 16230 03/13/97 P//20.2500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IN 96014408.installed black ID tag on TTA end.3-1078 16244 03/12/97 P//20.5000 P Visual inspection -sat,"L4 dimension acceptable, handstroke -sat, lubricated spherfcal bearfngs and load pins on both ends with neolube-24982-3 under IN 96014408.3-1079 10176 03/12/97 P//22.0000 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends vfth neo'24982-3 under IN 96014408.3-1080 12396 03/11/97 P//21.2500 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and~i~f~' IS IS 0 0 PAGE NO.19 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A"L" A Number Number Date T Test T Dimension T Visual Smeary Fwetional Suaasry load pins on both ends with neolube-24982-3 under lO 96014408.3-1081 11921 03/12/97 P//25.5000 P Visual inspection -sat,"L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under MO 96014408.No iD tag installed. Replaced 1 spacer washer-0197329-3 Replaced 1 cotter pin-0029146.3 3.1082 11932 03/12/97 P//26.5000 P Visual inspection -sat, 4La dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under QO 96014408.No ID tag'installedo 3-1083 11925 03/15/97 P//25.1250 P Visual inspection -sat, aL" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under QO 96014408.3-1084 7000 03/14/97 P 03/16/97 P 24.7500 P Visual inspection -sat,"L" dimension acceptable, no handstroke (initial saaple), lubricated spherical bearings and load pins on both ends~)~i~A fmctional test Mas performed Mith the folloMing acceptable results under MO 96024408; il Il il PAGE NO.20 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A"L'l A Naker Kumber Date T Test T Dimension T Visual Suanary Functional Suanary ui th neolube 24982-3 under KO 96024216.Snubber S/N-7000 Ko ID tag installed. installed 4 spacer Mashers-197329-3, installed neu load stud-15329-1 and 4 nuts-209608-3 and torqued to 125 ft lbs on snubber end under lJO 96024216.Test 1)Test 2)Test 3)Test 4)504.13 504.13 0.002 217.05 154.54 407.02 0.009 225.69 2500.00 2500 F 00 0.02g's 2500.00 Tension Coapressi on Criteria This SR snubber Nas tested as part of the initial searle.3-1091 27087 03/13/97 P//19.0000 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Kith neolube-24982-3 under MO 96014408.3-1092 27105 03/13/97 P//18.0000 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Kith neolube-24982-3 under lO 96014408.No iD tag installed. 3-1093 27091 03/15/97 P//18.1250 P Visual inspection .sat, 4L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under QO 96014408.~~1~ II 0 PAGE NO.21 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A<<L<<A Number Number Date T Test T Dimension T Visual Summary Fact i one l Sumery 3.1094 4388 03/16/97 P//15.2500 P Visual inspection -sat,<<L<<dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under lO 96014408.3-1095 16733 03/14/97 P//8.5000 P Visual inspection -sat,<<L<<dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IQ 96014408.3-1096 11993 03/18/97 P//8.5000 F Visual inspection -sat,<<L<<dimension macceptable, condition report 97-531 written to address the<<L<<dimension which is-.3750<<below minim!a, handstroke -sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under NO 96014408.Snubber 3-1096 was swapped with tag 3-1097 from a previous installation. Reinstalled in the correct tag location.3-1097 16724 03/13/97 P 03/15/97 P 9.0000 P Visual inspection -sat,"L" dimension acceptable, no handstroke, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under lQ 96014408.A factional test was performed with the following acceptable results under NO 960244M;Snubber S/N-16724 Snubber was previously installed in the sister (3-1096)location.Reinstalled in the proper location.~/1~Tension Compression Criteria IO il il PAGE NO.22 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Functional A"L" A Naker Number Date T Test T Dimension T Visual Suanary Fuetional Smmary Test 1)Test 2)Test 3)Test 4)1.98 3.28 0.010 3.03 2.63 3.76 0.011 3.75 32.50 32.50 0.02g's 32.50 This SR snubber vas tested as part of the initial sample.-1098 33628 03/16/97 P 03/15/97 P 10.3750 P Visual inspection -sat,"L" dimension acceptable, no handstroke (lnitaL sample), lubricated spherical bearings and load pins arith neolube-24982-3 on building end only under 1JO 96014408.A fmctionaL test was performed with the foLLouing acceptable results under NO 96024408;Snubber S/N-33628 No ID tag installed. Tension Conpression Criteria Test 1)Test 2)Test 3)Test 4)2.10 4.80 0.011 6.52 5.21 5.21 0.010 8.60 17.50 17.50 0.02g's 17.50 This SR snubber was tested as part of the initial saspleo-1099 38481 03/16/97 P//11.7500 P Visual inspection -sat, 4L" dimension acceptable, handstroke -sat, Lubricated spherical bearings and Load pins on both ends with neolube-24982-3 under MO 96014408.No ID tag installed. II IJ il PAGE NO.23 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A Flmctfonal A"L" A Naker Nwhtr Date T Test T Dimension T Visual Suansry Fuctfonal Summary 3-1100 17819 03/16/97 P//8.3125 P Visual inspection -sat, 4L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.No ID tag installed. 3-1101 33626 03/16/97 P//11.5625 P Visual inspection -sat, 4L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under lO 96014408.No ID tag installed. 3-1102 29451 03/16/97 P//11.2500 P Visual inspection -sat,"La dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends sfth neolube-24982-3 under IO 96014408.Ko ID tag installed. 3-1103'11996 03/17/97 P//8.5000 P Visual inspectfon -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pfns on both ends elth neolube-24982-3 under IO 96014408.3-1104 24412 03/17/97 P//13.5000 P Visual inspection -sat,"L" dimension acceptable,~/I~ 0 PAGE NO.24 05/22/97 Turkey Point Outage Suansry Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A fmctional A"L4 A Number Nmher Date T Test T Dimension T Visual Suanary fuctionai Suanary Handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neoide-24982-3 under IO 96014408.3-1105 16134 03/15/97 P//13.1250 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on ccmponent end due to piping and scaffold limitations on building end Mith neolube-24982-3 under lO 96014408.No ID tag installed. 3-1106 38479 03/15/97 P//11.3125 P Visual inspection -sat,"L" dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IO 96014408.No ID tag installed. 3-1110 16136 03/15/97 P//12.7500 P Visual inspection -sat,"La dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.No ID tag installed. 3-1111 2875 03/15/97 P//17.0000 P Visual inspection -sat,"L4 dimension acceptable, handstroke -sat, lubricated spherical bearings and~i~I~~ I~ PAGE NO.25 05/22/97 Turkey Point Ou'tage SISllllbry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A"i" A Number Nmher Date T Test T Dimension T Visual Suanary Factional Suanary load studs on both ends with neolube-24982-3 under lO 96014408.3-1112 27083 03/16/97 P//16.2500 P Visual inspection -sat,"L4 dimension acceptable, handstroke -sat, Lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lJO 96014408.3-'1120 18325 03/16/97 P 03/15/97 P 8.6250 P Visual inspection -sat,"L4 dimension acceptable, no handstroke (initiaL sample), Lubricated spherical bearings and Load pins on both ends with neolube 24982-3 under NO 960144M.A fmctionaL test Mas performed with the foLLouing acceptable results under NO 96024408;Snubber S/N-18325 No ID tag Installedo Tension Coapress ion Criteria Test 1)Test 2)Test 3)Test 4)5.91 8.31 0.017 8.07 11.90 23.94 0.015 5.54 32.50 32.50 0.02g's 32.50 This SR snubber vas tested as part of the initial sea@le.3-1121 24430 03/16/97 P//12.7500 P Visual inspection -sat,"l." dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under QO 96014408.~~I~ 0~~ PAGE NO.26 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fwetional A<<L<<A Neer Naker Date T Test T Dimension T Visual Suanary Fmctional Suaaary No ID tag installed. 3-1136 19M4 03/16/97 P//9.0000 P Visual inspection -sat,<<L<<dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends Mith neotube-24982-3 under NO 96014408.3-1137 19885 03/15/97 P//9.0000 P Visual inspection -sat,<<L<<dimension acceptable, handstroke -sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under NO 96014408.3-1005 10579 03/21/97 P 03/20/97 P 26.5000 P Visual inspection -sat,<<L<<dimension acceptable, no handstroke, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under QO 97006613.A fmctional test Mas performed Mith the following acceptable results under NO 97006613: Snubber S/N 10579 Snubber S/N 10579 is a replacement per CR 97-399.Snubber S/N 10035 was rebuilt under NO 97006613 and HRN back into stores.Test 1)Test 2)Test 3)Test 4)93.16 171.37 0.005 153.93 56.95 92.16 0.007 135.11 2500.00 2500.00 0.02g's 2500.00 Tension Coapression Criteria This OR snubber was tested as a replacement snubber.3-1006 6494 03/21/97 P 03/20/97 P 26.7500 P Snubber S/N 6494 is the replacement snubber for snubber S/N 6521 per CR 97-399.Load studs and spherical bearings uere lubricated with neolube 24982-3 under NO 97006613.~/~I~A fmctional test was performed Mith the follouing acceptable results under NO 97006613 and CR 97-399: 0 PAGE NO.27 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A"La A Neer Nmher Date T Test T Dimension T Visual Summary Factional Showery installed 2 square washers 30263-3 and 8 spacer washers 197329-3.Snubber S/N-6494 Tension Cospression Criteria Test 1)132.16 Test 2)190.20 Test 3)0.016 Test 4)220.84 65.10 102.84 0.020 87.87 2500.00 2500.00 0.02g's 2500.00 This test was performed as a replacement test.3-1009 10542 03/17/97 P 03/14/97 P 26.8750 P Snubber S/N 10542 is a replacement snubber for snubber S/N 1203.The as left inspection was sat.under MO 97024188.A fmctional test was performed with the following acceptable results;Tension Coepression Criteria Load studs and spherical bearings were lubricated with neolube 24982-3.'Test 1)41.56 Test 2)90.30 Test 3)0.006 Test 4)86.96 128.27 146.42 0.008 115.11 2500.00 2500.00 0.02g's 2500.00 This factional test was performed on snubber 10542 which is a replacement snubber for srabber 1203.3-1010 6530 03/21/97 P 03/20/97 P 26.5000 P An as-left visuaL inspection was performed under lO 97006613 on replacement snubber 6530.Visual inspection was sat.Snubber 11931 was taken to the Basic-PSA trailer for tear down, Engineering inspection and subsequent rebuild.The rebuilt snubber tested sat and was HRH into stores.~~~i~Tension Coepression Criteria Test 1)Test 2)132.54.90.78 198.87 119.78 2500.00 2500.00 A fuetional test was performed with the following acceptable results under IO 97006613 and CR 97-399: il it PAGE NO.28 05/22/97 Turkey Point Outage Sumsry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A 4L" A Number Nwher Date T Test T Dimension T Visual Sunnary Fuetional Sunnary Test 3)0.004 0.008 0.02g's Test 4)220.20 104.52 2500.00 This test uas performed as a replacement test.3-1019 17425 03/14/97 P 03/14/97 P 17.2500 P Visual inspection -sat,"L4 dimension acceptable, no handstroke performed, lubricated spherical bearings and load pins with neolube-24982-3 under MO 960144M.Snubber S/N 2889 uas changed out with snubber S/N 19425 due to a LCO condition on unit 4.A factional test Mas performed with the follouing acceptable results under NO 96024408;Snubber S/N-17425 Tension Ccepresion Criteria Test 1)Test 2)Test 3)Test 4)29.92 30.87 0.007 25.00 13.06 22.91 0.017 27.36 300.00 300.00 Oe02g~s 300.00 This SR snubber Mas tested as as a r'eplacement for snubber S/N 2M9 due to a LCO on unit 4.~~~I~ 0 TURKEY'OINT UNIT 3 1997 REFUELING OUTAGE Summary of Inservice Inspection Examinations

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 IHSERVICE INSPECTION SUMNARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 1'CBEAR,'STATUS Components Page: 1 Zone Number,: 3-001 Summary-Examination Area Number Identification ASNE SEC.XI Catgy Exam:Item Ho Hethod , Procedure.Nil, 0 S ON'G T T RSEH A.'E I 0 E Remarks T, C G M R<<*Calibration Block**003200 VESSEL TO CLOSURE HEAD HATING B-N-1 VT-3 SURFACE OH.HEAD B13.10 NDE 4.3-28 X---03/22/97-VT-'3.complete, examination performed with remote camera -J e: 06/13/97 TURKEY POINT NUCLEAR,PLANT UNIT 3 IHSERVI CE INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND'PERIOD, FIRST OUTAGE (97RF)Class 1 CBEAR STATUS Components

Page: 2 Zone Number: 3-057 Sunnary, Examination Area Number Identification ,ASME SEC.XI Catgy Exam Item No Method Procedure N I 0 S ONGT T RSEH A'I O,E Remarks T C G M R<<*Calibration Block**202700 3-RCP-8-FLYWHEEL Flywheel RG 1.14UT NDE 5.15-1 X-03/27/97-UT complete, examined from the periphery surface, examinations performed in accordance with Technical Specifications
    • FLYWHEEL*>>

II~(J e: 06/13/97 ,TURKEY POINT NUCLEAR'PLANT UNIT 3 INSERVICE INSPECTIOH

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class'2 CBEAR STATUS Components Page 3 Zone Number:,3-063 'Smeary Examination Area Number Identification ASME SEC., XI Catgy ,Exam Item No'Method'rocedure.N I 0 S ONGT T'R:SE H A E I,O,E Remarks T C G M.,R**Calibration Block**214900'R-252 SPRING, HANGER F-A VT-3 F,1.20C.HDE 4.3-9'X---03/12/97-VT-3 complete, light rust found inside of spring can'215000 14"-RHR-2301-9'IPE. TO ELBOM C-F-1 PT C5.11'T 45 UT 60 UT 70 ,HDE 3.3-20'DE 5.4-2 X-X----X'---X-3/12/97-PT complete, two acceptable round indications, 3/14/97-UT complete, root.geometry, limited voiunetric examination from the elbow side due to'its configuration, limited examination from the pipe side due to support'interference

    • .UT 33**215050 14"-RHR-2301-9LD I LOHG SEAM'DOHHSTREAM.

INSIDE RADIUS C-F-1'T C5.',12 UT 45 HDE 3;3-'20.HDE'5.4'-2 X---3/12/97-PT complete, 3/14/97-UT'-X-complete, beam redirection due to ,dendretics, inside surface geometry**UT 33**215100 14"-RHR-2301-9LDO C-F-1 PT LONG.SEAM.DOHHSTREAM OUTSIDE C5~12 UT'5 RADIUS HDE 3.3-20'DE'.4-2 X---3/12/97-PT complete, 3/14/97'-UT--X-complete, beam redirection due to dendretics, inside surface geometry UT 33 4*215180.14a-.RHR-2301-10LUI, LOHG SEAM UPSTREAM INSIDE RADIUS C-F-1 PT C5~12'UT 45 HDE 3.3-1 HDE 5.4-2 X---03/12/97-PT complete, 3/14/97-UT--X-complete, beam redirection due to dendretics, inside surface geometry.~*:UT-33**215190 14a-RHR-2301-10LUO C-F-1 PT LONG SEAM UPSTREAM OUTSIDE C5.12 U'I 45 RADIUS NDE 3.3-1'HDE 5.4-2 X---03/13/97-PT,complete, 3/14/97-UT-.-X.-'complete, beam redirection due to dendretics, inside:surface geometry*'T-33** 0 0=J e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 IHSERVICE INSPECTION

SUMMARY

.THIRD INTERVAL, SECOND PERIOD, FIRST'OUTAGE (97RF)Class 2 CBEAR STATUS Components Page 4 Zone Heber:,3-063 Swmary Examination. Area-Number Identification ASME SEC.XI Catgy Exam Item No Method Procedure N I 0 S ONGT T'SEH A E'I O,E Remarks T C G M R**Calibration Block**215200 14>>RHR 230'I'10 ELBOW TO PIPE C-.F-1 PT C5~11 PT CR WO UT 45 UT 60 UT NDE 3.3-1 PTH-97-0432 9706743 NDE'.4-2;ND E 5'.18-1---X X---X-X-X-3/13/97-PT,complete, cresecent shaped indication at toe of weld, determined,to, be a surface anomoly,'3/14/97 -UT complete, root geometry,'3/17/97 -PT completed after.weld.cleanup**UT-33**215250 14"-RHR-2301-25 Pipe to Pipe C-F-1 SUR C5~11'OL NDE.3.3 NDE 5.4 06/09/97-weld found during 1997 outage, no examination required during this outage**UT-33<<>>215300 14<<-RHR-2301-11 PIPE TO ELBOW C-F-1 PT C5.11 UT 45 UT 60 NDE 3.3-13 HDE 5.4-3 X---03/14/97-PT and.UT complete, root X---geometry--X-**UT 33<<*215400 14"-RHR-2301-11LS LONG SEAM DOWNSTREAM INSIDE RADIUS C-F-1 PT C5~12 UT 45 HDE 3.3-13 NDE 5.4-3 X---03/14/97-,PT and UT complete X---<<*UT-33*>>215410 14"-RHR-2301-.11LDO C-'F-1 PT LONG SEAM DOWNSTREAM OUTSIDE C5.12'T 45 RADIUS NDE'3.3-.13, ,NDE 5.4-3 X'---03/14'/97-PT and:UT complete X---<<>>UT-33>>* 0 0 e: 06/13/97 t ,TURKEY POINT NUCLEAR PLANT'UNIT 3 INSERVICE.INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Corryonents Page: 5'Zone Number: 3-063'cenery Examination Area Number Identification ASHE SEC.XI Catgy Exam Item Ho Nethod Procedure N I 0 S-ONGT T RSEH A E I 0 E Remarks T.C G N R*>>Calibration Block**215480 14"-RHR-2301-12LUI'OHG SEAN'.UPSTREAN INSIDE RADIUS C-F-1 PT C5.12 UT 45 NDE 3.3-13'DE 5.4-3 X---03/14/97-PT and UT, complete X'-**UT-33**215490 14"-RHR-2301-12LUO LONG SEAN UPSTREAH'OUTSIDE RADIUS C-F-1 PT C5~12 UT 45 NDE 3.3-13 NDE 5.4-3 X---03/14/97-PT and UT coaplete X->>*O'I 33**215500 14"-RHR-2301.-12 ELBOM TO PIPE e 215520 14"-RHR-2301-12LD Long i tudinal.'Seam Held Downstream C-F-'I P.T CS~11 UT 45 UT 60 C-F-1 PT C5.12 UT 45 NDE 3.3-13 NDE 5.4-3 NDE 3.3-13 NDE 5.4-3 X---03/14/97-PT;and UT complete, root X---geometry--X-<<>>UT-33**X---03/14/97-PT and UT complete X---**UT-33**216500 14"-RHR-2301-18 VALVE 3-752A TO PIPE C-F-1 PT C5'.'I1 UT 45 UT 60 UT 70 NDE 3.3-12 NDE 5.4-11---X X-----X---X-03/12/97,-PT coeplete, 2 acceptable round indications, 3/13/97-UT complete, root geometry, no volunntric examination from, the weld crown and from valve side due to their configuration

    • UT-33**216520,, 14"-RHR-2301-'18LD

'Long Seam Downstream C-F-.1'T C5.12 UT 45 NDE 3.3-12 NDE"5.4-11 X---03/12/97-PT complete, 3/13/97-UT X---complete**UT 33*>> ll e: 06/13/97.TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 6 Zone Number: 3-063 Sumery Examination Area Nunber Ident if ication ASME SEC.XI Catgy Exam Item No Method Procedure N I 0 S ONGT T RSEH A E I 0 E Remarks T C G M R**Calibration Block**, 216580 14"-RHR-2301-19LU Long Seam Upstream C-F-1 PT CS~12 UT 45 NDE 3.3-19 HDE 5.4-11 X---03/12/97-PT cceplete, 3/13/97-UT X---conplete**UT-33**216600 14"-RHR-2301-19 PIPE TO.TEE C-F-1 PT C5.11'T 45 UT 60 UT 70 HDE 3.3-19 HDE 5.4-11 X-X--X---X---03/12/97-PT complete, 3/13/97-UT coaplete, root geometry**UT 33*0 216620 14"-RHR-2301-19LD1 C-F-1 PT Long Seam Meld, Inside of Tee CS~12 UT 45 HDE 3.3-.19 HDE 5.4-11 X---03/12/97-PT complete, 3/13/97-UT X---coaplete**UT-33**0 14"-RHR-2301-19LD2 C-F-1 PT Long Seam'Weld Outside of Tee C5.12 Ul'5 HDE 3.3-19 HOE 5.4-11 X---03/12/97-PT cceplete, 3/13/97-UT X---complete++UT-33**217480 14"-RHR-2301-24LU Long Seam Upstream C-F-1 PT C5~12 UT 45 HDE 3.3-11 NDE 5.4-10 X---3/14/97-PT complete, 3/15/97-UT X---coaplete**UT-33**217500 14"-RHR-2301-24 PIPE TO PUMP CASING C-F-1 PT C5.11 UT 45 UT 60 UT 70 HOE 3.3-11 HDE 5.4 10 X---3/12/97.-PT complete, 3/15/97-UT coaplete, root geometry, no volunetric examination from the pump side and on the weld due to their configuration

    • UT-33**217550 RHR PUMP 3P210A PUMP SUPPORT VT-3 CR HOE 4.3-5 97-0431 X 03/12/97-VT-3 coaplete, bent bolt on support plate, accepted as-is by engineering evaluation, support is part of building structure and is outside the scope of Secion XI ll!I 0 e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 INSERV ICE INSPECT ION'UMMARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Coaponents Page: 7 Zone Number: 3-064 Showery Examination Area Number Identification ASME SEC.XI Catgy Exam'Item No Method Procedure N I.0 S ONGT T RSEH A E'I 0;E Remarks T C G M R**Calibration Block**217800 14!'-RHR-2303-1 TEE TO TEE C-F-1 PT C5.11 UT 45 UT 60 NDE 3.3-10 NDE 5.4-4 X'--03/14/97-PT complete, 3/15/97-UT X---coapiete, root geometry--X-*<<UT-33**217900 14"-RHR-2303-1LD1 C-F-1 PT Long Seam-Downstream Inside of C5.12 UT 45 Tee NDE 3.3-10 HDE 5.4-4 X---03/14/97-PT.complete, 3/15/97-.UT X-,--complete**UT'3**217920 14"-RHR-2303-1LD2 C-F-1 PT Long Seam DoMnstream.Outside C5.12 UT 45 of Tee NDE 3.3-10 HDE 5.4-4 X---03/'19/97-PT complete, 3/15/97-UT X---complete**UT 33**217980 14a-RHR-2303-2LU1 Long Seam Upstream Inside of Tee C-F-1'PT'C5~12 UT 45 NDE 3.3-10 HDE 5.4-4 X-"--03/14/97-PT complete, 3/15/97-UT X---complete<<*UT-33<<*217990'14"-RHR-2303-2LU2 C-F-1 PT'ong Seam Upstream Outside.of C5.12 UT 45 Tee HDE 3.3'-'10: NDE 5.4-4 X---03/14/97-.PT complete, 3/15/97-UT X---complete*<<UT-33<<<<218000 14"-RHR-2303-2 TEE TO PIPE C-F-1 PT C5.11 UT 45'T 60 UT 70 NDE 3.3-10:NDE 5.4-4---X 03/14/97-PT cotlpiete, 3/15/97-UT X---coeplete, root geometry--X---X-**UT 33**

0 0 e: 06/13/97 TURKEY POINT"NUCLEAR PLANT UNIT 3 INSERVI CE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 8 Zone Heber: 3-064 Swmary Examination Area Nunber Identification ASME SEC.XI Catgy Exam Item No Method S T A Procedure T N I 0 ONGT R.SE H E I 0 E Remarks C G M'R<<>>Calibration Block**'218020 14>>-RHR-2303-'2LD Long Seam Downstream C-F-'1 PT C5.12 UT 45'DE 3.3-10 NDE 5.4-4 X'--'03/14/97-PT complete, 3/15/97-UT'X---complete*>>UT-33**218080 14"-RHR-2303-2ALU Long Seam Upstream C-F-1, PT'C5.12 UT 45 NDE 3.3-10 NDE 5.4-4 X---03/14/97-PT complete, 3/15/97-UT X---complete**UT 33**.218100 14"-RHR-2303;2A, PIPE TO PIPE C-F-1 PT.C5.11 UT 45 UT 60 NDE 3.3-10 NDE 5.4-4---X X-----X-03/14/97-'PT complete, one acceptable round indication, 3/15/97-UT coaplete, root geometry**UT 33**0 14>>-RHR-2303-2ALD Long Seam Downstream C-F-1 PT C5.12'T 45 NDE 3.3-10 NDE 5.4-4 X---03/14/97-PT complete, 3/15/97-UT X---complete**UT-33**218380 14"-RHR-2303-4LUI.LONG SEAM UPSTREAM~INSIDE RADIUS C-F-1 PT C5;12 UT, 45 NDE.3.3-5 NDE'5;4-5 X'---3/12/97-PT complete, 3/13/97-UT X---complete**UT 33**218390 14"-RHR-2303-4LUO Long Seam Upstream Outside Radius C-F-1 PT C5.12 UT 45 ,NDE 3.3-5 NDE 5.4-5 X---3/12/97-PT complete, 3/13/97-UT X---complete UT 33*>>.218400 14"-RHR-2303-4 ELBOM TO:VALVE 3-7528 C-F-1 PT C5.11 UT 45 UT 60, UT 70 NDE 3.3-5 NDE 5.4-5---X 03/12/97-.PT complete, one.acceptable X---round indication, 3/13/97-UT--.X-ccepiete,.root geometry,, no voiunctric X---examination from the valve side due to its configuration

  • >>'UT-33<<>>

0 0 e: 06/13/97 r TURKEY POINT'NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION

SUMMARY

THIRD'INTERVAL, SECOND PERIOD, FIRST OUTAGE,(97RF) Class 2 CBEAR STATUS Components 'Page: 9 ,2one.Number: 3-064 SunnaryExamination Area Number Identification.ASME'SEC.XI Catgy Exam'Item No Method Procedure N I 0 S 0 N'G,T T RSEH A E I 0 E Remarks T C G M.R'**Calibration Block**-210550 14"-RHR-2303-12 PIPE TO TEE 06/13/97-;Neid does not'xist, removed'ode, category and item number, from.database*4 UT 33**219400 PS-54 DUAL SPRING HANGERS F-A VT-3 F1.20C NDE 4.3-13 X---03/12/97-VT-3 complete, light rust noted on the inside of both spring, cans 219550 RHR PUMP 3P210B PUHP SUPPORT 3/12/97-support is part of building structure and is outside the scope of Section XI e 0 0 Cl e: 06/13/97 TURKEY POINT'NUCLEAR PLANT UNIT 3'INSERVICE 'INSPECTION SUHHARY THIRD INTERVAL, SECOND,PERIOD, FIRST OUTAGE'(9?RF).Class.2.CBEAR STATUS Coaponents 'Page: 10 Zone Heber: 3-066 Surmary Examination Area Number Identification ASHE SEC.'XI Catgy Exam.Item No Hethod Procedure N I 0'OHGT T RS'EH A E I O'E.Remarks T C G H'R<<>>Cal3bration Block**222080 14"-RKR-2305-3LU Longitudinal Weld C-F-1 PT C5.12;UT 45 HDE 3.3-4 HDE 5.4 1 X---03/12/97-PT complete,, 3/13/97-UT X---coaplete<<*UT-33'**'222100 14>>-RHR-2305-3 PIPE TO VALVE HOV-3-860A C-F,-1 PT C5~11 UT 45 UT, 60'UT 70'DE'.3-4 HDE 5.4 1---X X-----X---X-03/12/97-PT complete, one acceptable round indication, 3/13/97.-UT completeroot geometry, no voiunetric examination from the valve side due to 3ts configuration

    • UT-33*>>222860.14>>-RKR-2305-10LUI Long:Seam Ins3de Radius of Elbow C-F-1 PT C5~12 UT 45 NDE 3.'3-2 HDE 5.4-9 X---03/12/97-PT complete, 3/13/9?-UT X---complete UT 33**222880 ,14"-RHR-2305-10LUO Long Seam Outside Radius of-Elbow-C-F-1 PT C5.12 UT 45 HDE';3..2 HDE 5'.4-9'X---03/12/97-.PT complete, 3/13/97-'UT'X---coaplete**UT 33**222900 14"-RHR-2305-10 ELBOM TO PIPE C-F-1 PT C5.1'1 UT 45 UT'60 UT 70 NDE, 3.3.-2'DE 5.4-9 X---X-----X---X-03/12/97-PT coaplete, 3/13/97-UT complete, root geometry, limited volunetric examination due to the weld crown configuration

<<*UT-33*>>222920 14<<-RKR-2305-10LD Long Seam Downstream C-F-1.PT C5.12 UT 45 NDE 3.3.2'NDE 5.4-9 X---03/12/97-PT coaplete, 3/13/97-UT X---complete**UT 33 0 0 e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION SUNNARY THIRD INTERVAL, SECOND'PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 11 Zone Number: 3-066 Suanary Examination Area Number Identification .ASHE SEC.XI Catgy Exam Item,No Nethod Procedure N I'0 S ONGT T RS'EH A E I 0 E.Remarks T C G N R**Calibration Block**222980 14"-RHR-2305-11LU Long Seam Upstream C-F-1 PT C5.12 UT 45'NDE 3.3-2 NDE 5.4-9 X---03/12/97-PT complete, 3/13/97-UT.--X-complete, beam redirection due to dendretics, inside surface geometry**UT-33*~.223000 14"-RHR-2305-'ll PIPE TO VALVE NOV-3-861A C-F.-1'PT'5.11 UT 45 UT 60 UT 70'DE 3.3'-2 HDE 5.4-9 X-----X---X---X-,03/12/97-PT complete, 3/13/97-UT complete, root geometry, limited volwetric examination due to the valve and,weld crown.configuration, lleld ID'tag in examination area.at.top of pipe*+UT-33** 0 0 il e: 06/13/97-TURKEY.POINT NUCLEAR PLANT UNIT 3.INSERVICE INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 12 Zone'Number: 3-090 SumMry Examination Area Number Identification ASHE SEC.XI'Catgy Exam.Item No Hethod Procedure N I 0 S'ONGT T R S:E N ,A E I O.E Remarks T C G H R**Calibration Block**274100.8"-SI-.2308-19 ELBOW TO PENETRATION P-11 C-F-1 PT C5.11 iUT 45 UT 60'DE 3.3-14 NDE 5.4-6 X---03/14/97-PT and UT complete, root X---geometry--X-**'UT-41** 0 II II e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3 I HSERVI CE'NSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 13 Zone Heber: 3-095 Sumery Examination Area Number Identification ASME SEC.XI Catgy Exam Item No.Method P,rocedure N I 0 S ONGT T R'SEH ,A E I 0 E Remarks T C G M R<<*Calibration Block**288506 3-SIN-139 IA INTEGRAL'TTACHMENT ,05/13/97-pipe saddle cut back to 1" and abondoned'in place,,removed code category.and Item number from database 288519 4"-SI-2303-31 thru 49 06/05/97-Existing Molds removed'from service during 1997, outage per PC/M 96-012 288520 6"-S1-2306-1 thru 2 06/05/97-'Welds removed-from service during'1997 outage per PC/M 96-012 06/05/97-Boron Injection Tank and support abandoned in place and removed ,from:service during'1997 outage per PC/M 96-012 288522 6"-SI-2307-1 thru 2 06/05/97-Netds removed from service during 1997 outage per.PC/M 96-012 288523 4"-SI-2305-1 thru 11'06/05/97-Nelds removed, from service during 1997 outage per PC/M 96-012 288524 4"-SI.-2303-31 PIPE TO PIPE C-F-1 C5.21 HDE 3.3 HDE 5.4 ,03/24/97-neM veld installed per PC/M'.96-012, FW7**TO BE DETERMINED

  • >>

0 0 e: 06/13/97 TURKEYPOINT NUCLEAR'PL'AHT UNIT 3'INSERVICE INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)Cl'ass 2 CBEAR STATUS Components Page:.'14 Zone Number: 3-095 Sunnnry Examination Area Number Identification ASHE SEC;XI Catgy Exam Item Ho Hethod Procedure.H.I 0 S ONGT T RSEH A E I 0 E Remarks T C'G H R**Calibration Block<<*288525 4"-S1-2303-32'IPE TO ELBOW'C-F-1 C5.2'I ,'HDE 3'.3 NDE 5.4 03/24/97-new weld installed'pcr PC/H 96-012, FW8**TO BE OETERHIHED

    • 288533 4"-S1-2303-35 Elbow'to Valve 3-867 C-F-1 C5.21 NDE 3.3 NDE 5.4.03/24/97-ncw weld installed pcr PC/H 96-012*<<TO BE DETERHIHED
  • >>288536 4<<SI 2303 36 Valve 3-867 to Elbow, C-F-1 C5.21 NDE'.3 HDE 5.4 03/24/97-ncw weld installed pcr PC/H 96'-012(FW9'*TO BE DETERHINED
    • 9 4"-S1-2303-37 ELBOW TO PIPE C-F-1 C5.21 NDE 3.3:NDE 5.4 03/24/97-new weld installed:per PC/M 96-012, FW10<<<<TO'BE DETERHIHEO
    • 288542 4"-S1-2303-38'IPE TO ELBOW: C-F-'1 C5.21'NDE 3.3 NDE'5.4 03/24/97-new weld installed per PC/M 96-012(FW11<<<<TO BE DETERHIHEO
    • 288545 4"-SI-2303-39 ELBOW TO PIPE C-F-1 C5.21 NDE 3.3'NDE 5.4 03/24/97,-new.weld installed per PC/H 96-012, FW12**TO BE DETERHIHED
    • 288548 4"-SI-2303-40 Pipe to Tee C-F-1 C5.21 ,HDE'3.3'NDE 5.4 03/24/97-ncw weld.installed per.'PC/H 96-012, FW14**TO BE DETERMINED,**

0 0 e:.06/.13/97'TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)'lass 2 CBEAR STATUS Cocponcnts, Page: 15 Zone'Number 3-095 Stannary Examination Area Number Identification ASHE SEC.XI Catgy Exam Item No Method Procedure N I 0 S'ONGT T RSEH A E I 0 E Remarks T C G H R**Calibration, Block,**288551 4"-SI-2303-41'ee to Pipe C-F-1 C5.21 NDE'.3 NDE 5 4 03/24/97-new weld installed per PC/H 96-012, FM31**TO BE DETERHINED

    • 288554 4<<SI-2303-42'ipe to,valve MOV-3-843A C-F-1 c5.21 NDE 3.3 NDE 5;4 03/24/97-new weld installed per PC/N 96-012, FU30**TO-BE DETERHINED
  • >>288578 4"-SI-2303-46 TEE TO PIPE C-F-1 SUR C5.21.VOL NDE 3.3 NDE: 5'.4 03/24/97-ncw weld installed per PC/H 96-012, FW15**TO BE DETERNINED
    • 'I 4"-Sl-2303-47 PIPE TO,ELB(N C-F-1'UR C5.21 VOL HDE 3.3'DE 5.4 03/24/97-new weld'nstalled per PC/M, 96-012, FN16<<*TO BE DETERNINED

<<>>.288584 4"-Sl-2303-48 ELBSI TO'IPE'-F-1 SUR C5.21 VOL NDE 3.3 NDE 5.4 03/24/97-new weld installed per PC/H 96-012, FW17**TO BE DETERNIHED'** 28S586 8080-H-007-01 IA INTEGRAL ATTACHHENTS 05/13/97-Removed from pipe pcr PC/H 96-012, no longer, performs a support function, removed code category and item neer from database 288587, 4"-SI-2303-49 Pipe to Valve HOV-3-843B C-F-1 PT C5.21 UT NDE 3.3 NDE.5.'4 03/24/97-new, weld installed'per PC/H'96-012, FM25<<>>'O BE DETERHINED

0 e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3'IHSERVICE INSPECTION SUNNARY THIRD'INTERVALED SECOND PERIOD, FIRST OUTAGE,(97RF)~ Class 2 CBEAR STATUS Components Page: 16'one Number.: 3-095 Stannary Examination Area Number Identification ASNE SEC.XI Catgy Exam Item Ho,'Hethod Procedure N.I 0 ONGT RS EH E I 0 E Remarks C 0 N R**Calibration Block"~288604 8080-R-007-01 DOUBLE'ACT ING'ESTRAINT F-A PT F1.20B HDE 4'.3-20'X---03/15/97-VT-3 complete 288820'080-H-004-01'OUBLE ACTING RESTRAINT F-A VT-3 F1.20B'NDE 4.3-18 X---03/14/97-VT-3 complete 288865 8080-H-007-07 DOUBLE, ACTING RESTRAINT'F-A'VT-3 F1.208 HDE 4.3-17 ,X---03/15/97-VT-3 complete 8 8080-H-007-10 DOUBLE ACTING RESTRAINT F-A'VT-3 F1.208 HDE 4.3-16 X---03/15/97-VT-3 complete 288896 8080-H-005-02 DOUBLE.ACTING,RESTRAINT F-.A, VT-3 F1.208 CR PMA I HDE 4.3-15 97-0485'PH97-03-210 X 03/15/97,-VT-3'complete, bottom lug is, missing, welds, possible drawing discrepancy, accepted as-is by engineering evaluation, drawing will be rev'ised,to show as built condition 288911 8080-H-005-01. DOUBLE ACTING.RESTRAINT'F-A VT-3.F1'.208 HDE 4.3-19 X---03/15/97-'T-3 complete 0'il e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVI CE INSPECTION'UMMARY THIRD'NTERVALED SECOND PERIOD~F I RST OUTAGE (97RF)~Class 2'CBEAR STATUS Components a Page: '17 ,Zone Number: 3-096'Sugary Examination Area Number Identification 'ASME SEC.'I Catgy'Exam Item No:Method Procedure N I 0 S ONG,T T'S*EH A'E I 0 E Remarks T C G.M R**Calibration Block~*289298 SR-123 SINGLE AHD DOUBLE ACTING RESTRAINT F-A VT-3 F1.20ABCR HDE 4.3-4 97-0433---X 03/12/97-VT-3 complete, chipped concrete,. accepted as-is by engineering evaluation, drawing will be updated to show.spelled concrete 289301 SR-123 I A INTEGRAL ATTACHMENTS C-C PT C3.20 NDE 3.3-3 X---03/12/97-PT complete 0 e: 06/13/97 TURKEY, POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL', SECOND PERIOD, FIRST OUTAGE (97RF)Class 2'CBEAR STATUS Components Page: 18 Zone Number: 3-100 Sumury Examination. Area Naker Identification ASME SEC.XI Catgy Exam Item No Hethod S T A-Procedure-T N I 0 ONGT R S, E'N E I 0 E Remarks C G M R**Calibration'Block

    • 301700 26"-HSA-2304-17 PIPE TO VALVE POV-3-2604 C-F-2 HT, C5 F 51: UT 45 UT 60 UT 70 NDE 2.2-3 NDE 5.2-2 X-----X---X---X-03/14/97-HT complete, 3/16/97-UT complete, root geometry, limited volunetric examination from the.valve side due to its configuration

<<*UT-2'I**301800 26"-MSA-2304-17LU PIPE LONG SEAH UPSTREAH C-F-2 HT C5.52 UT 45 NDE 2.2-3 NDE 5.2-2 X---03/14/97-HT complete, 3/16/97-UT X---complete**UT-21** 0 0 4I e: 06/13/97 r TURKEY POINT NUCLEAR.PLANT UNIT 3 INSERVICE'INSPECTIONSUMHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components.Page: 19 Zone Number: 3-109 Swmary Examination Arear'wher Identification ASHE SEC.XI Catgy Exam Item No Method Procedure N I.0 S 0 N.G,T T RS-EM'E I 0 E Remarks T C G H.R**Calibration 'Block**330500 AUGHENTED EXAMINATION AUG UT FROH NOZZLE.RAHP TO 1 DIAHETER ON ELBOW NDE 5.16-1'-X X 03/13/97-.UT complete, root and chill ring geometry, acceptable"slag 'indication at weld FW1**UT-20(UT-29'~* II e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3 INSERVICE,IHSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD,'FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 20 Zone Number: 3-110 Sugary'Examination Area Nunber Identification ASME SEC.XI Catgy Exam Item.'Ho Method Procedure N I 0 S O.NGT T RSEH A E I 0 E Remarks T C G M: R**Calibration Block**330700 14"-FWB-2304-1 VALVE CV-3-2901 TO PIPE C-F-2 MT C5.51 UT 45 UT 60 UT 70 NDE 2.2-1'DE'5.2-1 X---X-----X-X---:03/10/97-MT and UT coeplete, root geometry, limited volunetric-examination on the veld and the valve side due to their configuration

    • UT 20**331100 14"-FWB-2304-3 PIPE TO ELBOW C-F-2 MT C5.51 UT 45 UT 60 NDE 2.2-2 NDE 5.2-1---'X 03/10/97-MT complete, acceptable X---linear indication, UT complete, backing,--X-ring geometry**UT-20**333800 AUGMEHTED EXAMINATION AUG UT FROM NOZZLE RAMP.TO 1 DIAMETER ON'LBOW NDE 5.16-2--X-03/12/97-UT complete, root and backing ring geometry**UT-20,'UT-29

<<~ 0 e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3 INSERVICE INSPECTION

SUMMARY

THIRD ilNTERVAL, SECOND PERIOD,.FIRST OUTAGE'(97RF)Class.2 CBEAR STATUS Components Page:,21 Zone Nwher: 3-111 Swmary Examination Area Number Identification ASME SEC.XI Catgy Exam Item Ho Method Procedure N I~0 S ONGT T RSEK A E I 0 E Remarks T C G,M R**Calibration Block*>>338200'AUGMENTED EXAMINATION AUG UT FROM'NOZZLE RAMP TO.1 DIAMETER OH ELBOW HDE'5.16-3--X'X 03/12/97-UT complete, root and backing, ring geometry, acceptable slag inclusion and Internali undercut<<*UT-20(UT-29<<>> 0~' e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECT I OH

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 22 Zone Nwher: 3-115'ugary Examination. Area Nunber Identification ASME SEC.XI Catgy Exam'Item No Method Procedure N I 0'S ONGT T RS'EH A'E I 0 E Remarks T C G M R>>>>Calibration Block**341200 3-RHE-A1 HEAD TO SHELL'-A UT, 45'C1.20 UT 60 NDE 5.4-7 X---03/15/97-UT complete, limited X---examination due to nozzles and reinforcement plates**UT 55**341300 3-RHE-A2 SHELL TO FLANGE C-A UT 45 C1.10 UT 60 NDE 5.4-7 X---03/15/97-UT complete, limited X---examination due to nozzles and reinforcement plates*>>UT;55**341800 3-RHE.-A7 C-B PT REINFORCEMENT PLATE TO SHELL C2.31'NDE 3.3.1B X---03/15/97-PT complete 0 3-RHE-AB C-B PT.REINFORCEMENT PL'ATE TO NOZZLE C2;31 NDE 3.3-18 X---03/15/97-PT complete 342000'-RHE-A9 C-B PT REINFORCEMENTi PLATE TO SHELL C2.31 NDE 3.3-.17 X,---03/15/97-"PT complete 342100'3-RHE-A10 C-B PT REINFORCEMENT PLATE TO NOZZLE C2.31'DE 3.3-17 X---03/15/97-PT complete 342400 3-RHE-SPA-1 SUPPORT Heat Exchanger Lo~er Support F-A VT-3 F1.40H NDE 4.3.,11',X ---03/12/97-,VT-3 complete 342500 3-RHE-SPA-2,IA Integral Attachment C-C PT.C3.10 CR VT-1 NDE 3.3-9 97-0479 NDE 4.1-6---X X---03/15/97-PT complete, one rejectabie round indication, engineering evaluation determined cover weld on partial penetration weld was not conpietely around end.of lug', 3/19/97-VT-1'omplete, examination performed to docunent final condition

e:.06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVICE,INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND PERIOD;FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page 23 Zone Number:, 3-115 Suwery Examination Area Number Identification.ASME SEC.XI Catgy Exam Item'No Method Procedure N I 0NGT T RSEH A E,I 0 E Remarks T O'G M R**Calibration Block**342600 3-RHE-SPA-2 'SUPPORT Heat Exchanger. Lower Support F-A VT-3 F1.40H, ,NDE 4.3-10 X---03/12/97-VT-3 complete ~~~i5~il 0 TUR I NT;p'J NRC/FPL ENGINEERING INTERFACE MEETING JULY 15, 1SS7 il~il~il~ @PL ENGINEERING DEPARTMENT AGENDA INTRODUCTION -PLANT INDICATORS -ENGINEERlNG ORGANIZATION R.S.KUNDALKAR TURKEY POlNT ENGINEERING ORGANIZATION SAFETY SYSTEM PERFORMANCE SYSTEM ENGINEERING ROD CONTROL SYSTEM ENHANCEMENTS CCW HEAT EXCHANGERS EFFECTIVE USE OF PSA OUTAGE SUPPORT E.A.THOMPSON D.J.TOMASZEWSKI PLANT ENGINEERING 50.54(f}RESPONSE DRAFT NUREG'1 606 SOFTWARE CONTROL SAFETY/RELIABILITY UPGRADES W.A.SKELLEY ST.LUClE ENGINEERING ORGANIZATION SAFETY SYSTEM PERFORMANCE SOFTWARE CONTROL C.R., BIBLE REACTIVITY MANAGEMENT CONTROL ROD PERFORMANCE SAFETY/RELIABILITY, IMPROVEMENTS 50.54(f}RESPONSE C.A.PELL J.R.'HOFFMAN'R.S.iKUNDALKAR rrcl.wpd Page 1 il~i IS) ~~g 0~~F~~~1 C Cg C CC C C C'C r C C C C~C~C'~C~P~'~~~C~0 C P C~~ 0 ili FPL ENGINEERING DEPARTMENT U%7 CAPABIUTY FACTOR TURKEY POINT P YR RUNNING AVERAGE+1997 AVG-THROUGH MAYJ 90;80a 75:-,:,;34 +i3~~4+5~70 1994 1995 1996 1997 02GIG UNITS~'UNIT4 INDUSTRYAVG WANOYR2000GOAL 90--" UNIT CAPABILITY FACTOR ST.LUCIE (S YR RUNNINQ AVERAGE'+1997 AVQ1HROUQH MAY)W H W%W%W&W 0 Q~~4i 75-'(Qk'j'g 70 1994 1995 wg~yge'll 1996 1997 G 322--.G UNIT l~UNIT2 INDUSl1lYAVG WANOYR2000GOAI Page 3 ~~Oi APL ENGINEERING DEPARTMENT 1.75 1.5 1.25 UNPLANNED'AUTO TRIPS PER 7000 HOURS CRITICAL TURKEY POINT YR RUNNING AVERAGE+1997 AVG THROUGH MA 0.75 0.5 0.25 0'.': ke?@1994 1995 1996 1997 UNIT 3~UNIT 4 INDUSTRY AVG~WAND YR 2000 GOAL 1.75 1.5 1.25 0.75 0.5 4k',:gg UNPLANNED AUTO TRIPS PER 7000 HOURS CRITICAL ST.LUCIE YR RUNNING AVERAGE+1997AVGTHROUGH MA RGB)322)+$ ~~~~'33(2423I;fi~a N4%~~9 k%~N+I"'c'!I2 Awe;5?$4<, 1994 1995 1997'SS.UNIT4~SS UNIT2 INDUSTRYAVG WANOYR2000GOAL Page 4 ik i il~ EPL ENGINEERING DEPARTMENT 101 j'O';'Aj, Qjh@jgh g~+>p (jPQk,.'00 --"'9--Si I l 98---'1 97.I THERMAL PERFORMANCE .TVRKEY-POINT It12 MONTH RUNNING AVERAGE)1~>,%'4~%>>95 1994 1995 1996 1997~~~AS UNITS~mc UNIT 4.INOUSTRYAVG WANQ YR 2000 GOAL 101 THERMAL PERFORMANCE ST.LVCIE (12 MONTH RUNNINQ AVERAGE)100----99 I 98-I 1 97"---'96:.95: 1994 , m".11~~~'~~4l!1995%4m, S 1996 V.(i'c'ii&piki4h 1997~>>:" UNIT I~UNIT2 INOUSTNYAVG i WANQ YR 2000 GOAL Page 5 0 Oi '~~g 0.4,a~h~.g~.oy f,y.ah+(i4glt lp i+,.-.a.f,()i\III il 0 Oi +op TURKEY POINT ENGINEERING DEPARTMENT P(P+T Q TURKEY POINT'ENGINEERING ORGANIZATION p KA.THOMPSON J.BALAGUERO PLANT OPS SUPPORT E.LYONS ADIIINIYTRAYIVE W.SKELLEY PIANT ENOWEERWO D.TQMASZEWSIQ SYSTEMS ENOWEERWQ K;REMINQTON , SYS PERFORMANCE D.BAKER DESKIN BASS SUPV P.BANASZAK ELB4SC SYSTEMS RX ENO B.OUNN MECH SYSIENS J.CAOOOAN llECH DESKN Q.KUHN PROC ENGR T.SWEENEY MC DESKN+FIRST LINE SUPERVISORS HAVE OVER 12 YEARS EXPERIENCE +SYSTEM AND COMPONENT SUPERVISORS ARE SRO CERTIFIED Af Cp'th.Wpd Page 7 ii<I~ Pop+oi OgGSSr+TURKEY POINT ENGINEERING DEPARTMENT UNIT 3 SAFETY IN JECTION AVAILABILITY ,(18 MONTH CUMULATIVE AVERAGE)~SASI~.SSSI PERFORMANCECRITERIA WANOYRS000GOAIS AVAILABIUTY (4/e)100%SS%S&%97%96%95%12-95 02-96 04-96 06-96 0&-96 10-96 1248'2-97 04.97 UNIT a SAFETY INJECTION AVAILABILITY (18 MONTH CUMULATIVE AVERAGE)4A Sl~40 Sl-PERFORLIANCE CRITERIA'ANG YR 0000 GOALS AVAILABlLAY (44()100%I 99%98%S7%96%950/i 12-S5'2-S6 04-96 06-96 08-96 10-S6 12-S6 02-97 M'NSPTILWPG Page 8 0 lli Dog+ao~o>ear e TURKEY POINT ENGINEERING DEPARTMENT UNIT,3 EDG AVAILABILITY (18 MONTH CUMULATIVE AVERAGE)~BA EOG~, 88 EOG-PERFORMANCE CRITERIA WANG YR 2000 GOALS AVAILABIIJTY 100%'99%88%97%96%S5%94%S3%92%91%90%01-96 03-96 05-96 07-96 09-96 11-96 01-97 03-97 05-97 Note: SB EDG placed In a(1)2@6;returned to a(2)11/86.UNIT 4 EDG AVAILABILITY (18 MONTH CUMULATIVE AVERAGE)~4A EOG~48 EM PERFORMANCE CRITERIA WANG YR 8000 GOALS AVAILABILITY 100%9S%SS%97%96%85%94%93%82%91%808le.I 01-96 03-86 05-86 07-96 09-M 11-96 01-97'3-97 05-97 LVCOLn.WOd Page 9 ili O~r~4'URKEY POINT ENGINEERING DEPARTMENT EMERGENCY FEEDWATER AVAILABILITY (1 8 MONTH CUMULATIVE AVERAGE)AVAlLABlUTY 100%ss/88%87%,86%85%84/.93%820/i 81%80%('/0)KRRHI U3 TRAIN A~USTRAINS-PERFORMANCE CRITERIA WANG YR 2000 GOALS 01-96'3-96 05.96 07~SH}6 1146 01~0347 0$47 EMERGENCY FEEDWATER AVAILABILITY (16 MONTH CUMULATIVE AVERAGE)AVAILABIUlY 100%99%S8'/0 97%960/i 950/0 S4%93%820/0 91%80%~U4TRAINA~U4TRAIN8-PERFORMANCE CRITERIA: WANOYR2000GOALS 01-96 03-96 05-96 07-96 09-96 1'1-97 084'5-97 Page 10 0 ill Q~r>op Op TURKEY POINT ENGINEERING DEPARTMENT +a ao clear~ROD CONTROL SYSTEM ENHANCEMENTS. +-SYSTEM EVENT

SUMMARY

., OCTOBER 1995 TO MARCH 1997 7 UNIT 3 EVENTS 4 FORCED OUTAGES 3 EVENTS INITIATED BY DROPPED RODS NO UNIT 4 EVENTS MAY 1995 THROUGH DECEMBER 1995 UNIT 3 ROD CONTROL ROOM A/C DEGRADED AIR HANDLER OBSOLETE AND INACCESSIBLE ~EXTENSIVE INVESTIGATION FOLLOWING EVENTS SYSTEM TESTING CONDUCTED NO COMMON PROBLEMS IDENTIFIED +CAUSE PRINTED CIRCUIT CARD FAILURES DUE TO HIGHER AMBIENT ROOM TEMPERATURES DURING 1995 nrcptn.wpd Page 11 0 i ii) 0~~g P~~~~~~~~ iN i~~ ~lee Pyg+o oo~+o(Jgg g TURKEY POINT ENGINEERING DEPARTMENT. ROD CONTROL SYSTEM ENHANCEMENTS +CORRECTIVE ACTIONS~RESET ROOM TEMPERATURE ALARM FROM 102 F TO 75 F ROOM AIR HANDLER REPLACED 0 VERIFICATION OF THE ROD CONTROL SYSTEM OPERATION: POWER SUPPLIES LOGIC CABINET TIMING DYNAMIC TESTING~REPLACED EXISTING FIRING CARDS FORCED COOLING ADDED TO POWER CABINETS DYNAMIC'TESTING AT EXPECTED ELEVATED TEMPERATURES REPLACED SELECTED COMPONENTS DC HOLD CABINET+CORRECTIVE ACTIONS COMPLETED ON UNIT 3 IN SPRING, 1997 REFUELING OUTAGE~NO EVENTS SINCE RESTART+CORRECTIVE ACTIONS PLANNED FOR UNIT 4 1997 FALL OUTAGE Page 13 il~i "I I T (((0 I I'$'I j j,><(i((, j<<il (iii::<4 I((I f I.<<+6 4 I~-.(i'<1 ,I<~!(III.II gl I I I;;441LN..~4J IIIII."'!, II'R (Iig'Ig~(<it cI Ni (f~jh (((4 l gt I ,'ll, (~1;l I g3'..('4*~I~<jg:I I~"~I f<I 4~<(~<~'(~v<<!I W~~~~wiL;j<'.f'((4 II II V l~, j (~Wf!Ii i((PQ~I(e~II I I'I gi<Q((tA 4f'v,~teak f4'!PP!++.~j ,=~~A~Vi'jI!444(~I l gii)I Ilj r."<<3 (I I Ti I(l g p I<<i II<I I S I'(p',<(4 I 0 iS~il~ ~<*IW'1 1 I~~1 1~'((~~" r I IC 5~~(rrr'I j~I~I~'I~C~C$1*(r 1 I t I s (,)~Lgd6((<<<~ ~I (j' ill UNIT 3~dr f.;~'~Tip UNIT 4=x F~F 0~~ e~co~>op Op+o~TURKEY POINT ENGINEERING DEPARTMENT CCW HEAT EXCHANGER IMPROVEMENTS CCW HEAT EXCHANGER FOULING FACTOR IMPROVEMENT +COMPREHENSIVE PERFORMANCE TESTING PROGRAM TO ENSURE CAPABILITY OF REMOVING DESIGN BASIS HEAT LOAD+FREQUENT TESTING, TRENDING AND CLEANING OF CCW HEAT EXCHANGERS WAS REQUIRED:~TESTING AT LEAST WEEKLY~CLEANING AT LEAST ONE HEAT EXCHANGER/UNIT WEEKLY~CLEANING SIGNIFICANTLY MORE OFTEN DURING SUMMER+UPRATING,EFFORT TARGETED IMPROVING THE MAXIMUM ALLOWABLE FOULING FACTOR OF CCW HEAT EXCHANGERS 0~IVIASS&.ENERGY RELEASES RECALCULATED CONTAINMENT RESPONSE RECALCULATED ~CCW THERMAL HYDRAULIC CASES RECALCULATED, HIGHER ALLOWABLE FOULING FACTOR ASSUMED'PIPING STRESSES AND SUPPORT LOADS ASSESSED~MODIFICATIONS IMPLEMENTED ECC AUTO-START MODIFICATION CCW PIPE SUPPORTS UPGRADE ON UNIT 4+CHANGES RESULTED'IN SIGNIFICANTLY REDUCED FREQUENCY FOR HEAT EXCHANGER CLEANING~REDUCED CLEANING FREQUENCY FROM ONCE PER WEEK TO ONCE'EVERY 6 WEEKS~REDUCES"WEAR" ON TUBES DUE TO CLEANING+OTHER RELATED INITIATIVES ~IMPROVED TESTING METHOD~'RETUBED UNIT 3 CCW HEAT EXCHANGERS Page 17 0 45~~i iso/0+o eo ofotrr+TURKEY POINT ENGINEERING DEPARTMENT PSA AND ON LINE ACTIVITIES +PSA TECHNOLOGY USED IN PLANT ON LINE MAINTENANCE ~RISK SIGNIFICANT EQUIPMENT/COMPONENT LIST,~MULTIPLE COMPONENT MATRIX~GUIDELINES FOR WHEN PSA SHOULD BE USED~ON LINE MONITOR IN TRIAL USE 0 ADM-210 On-Une Malntcnaneei Wortt Coordination ATI'ACHhf ENT S fpagc l of 3)RISK SIGNIFICANT EQUIPMENT ILST'Dte folio win exceeding PSA thc following tt sted as flat duration of up to ABowed OOS Tllne Accumulator A Accumulator B Accumulator C g Tce)micd Spccificatitm components have each been cvdu risk limits when mnovcd from service individually for a mes for Mode I oecautions. AFW Pump A I2 Ttshts digaed)AFW Pump B I2 Trsias aligaed)AFW Pump C f2 Trains aligned)AFW Train I AFW Trdn 2 Botic Acid-BAST to Charging CCW Pump A CCW Pump B CCW Pump C Containment Spray Pump A Containment Spay Pump B ECC A ECC B ECC C EDG B Opposuc Unit EDG A 0 ite Unit EDG 8 30 days 30 days 30 days 72 hts 30 days 30 days 30 days 72 hrs 72 hrs mcptn.wpd Page 18 0 O~IS~ e~c>o f'o/Ots O 44 OJ4C T TURKEY POINT ENGINEERING DEPARTMENT PSA AND ON LINE ACTIVITIES 0-ADM-210 IOCCCXXO TC4l On-Line Maintenance/ Work Coordination POOL'7 APpvovtr Oxloc I/14/97 DUAL COMP8lHNS IN-KE hVh5k5NNCE MATRIX Tae Tall teaewss owwwwa el t eeeavws ossa ao soaewa ow wwe~awasawr sa ewwww la tt oaN aeaaa cess oaoetvte xxxx w t oalsaatw essa oaal eeet waotN oNI saws ateasaav slap os ew aellalee ael leave stilt aw NNAAN or IvIAC cela elva~e easer Isetosw seasasas er t etarwtaee aoaa ease aea laewee oaa wws~oe so so tt aaeo ete sswsteae os oa AN scatww aa eo lw taws lw sN etatwwa Tls aoatw ase d es NN 4 oll ol w ttNA QC tatto TVta AC Uel St 4 ATW FCV olWI lit 4W C TTITLt ATTV IIWAO A Q Tlsw AOOAet)AFW tvaO~n TNew ATW T4enp ATW C C Tloes TNII Axttwxr I AtxV Tlaa t Ataaawa 4 tsataava C Aow scvatealTWH, t ASW saw A IT'I vs A AIW Otas 4 rtvs Car~XXXX ASW lvs t t saws sat voa t all set sel'ltw~eetatwaaor v Ctw I~A CCW V 1~CCW V'I C CCW A CCw ww 4 CCW Iaset C Cw lots~Cw law as~Oaw OIN I tOOA TOO O~IW A tOO~vv 4 eoo l sow cesw A tw CAW Cwa 4 1 1XX~Ios A teal eo owov s Itv~INN Icw a ICW~~cwccwovw a was ICwCCWOvw 4 awa vtsvws st Ctver IA Cattetsl lot CO sxa Ia~CO la~arv lass asov.lass vovaasl vovealo xxxx xxxx XXXX XXXX XXXX atavess~OAVVs~claws~sas svN a wa svw o~s<<av ss o lava a 4 avast lwvasw~vw Isa oeasav Isle A'l I~BATVdVbvC)I XXX XXXX XXX1 IVCOTIIAVOd Page 19 il ill ~cICo>oI 4p L3 rr TURKEY POINT ENGINEERING DEPARTMENT OUTAGE SUPPORT PREPLANNING EARLY MODIFICATION IDENTIFICATION AND ISSUANCE SAFE ON-LINE MAINTENANCE EFFECTIVE PSA USAGE HIGH EQUIPLIENT AVAILABILIIY JOB COVERAGE/PAOBLELI RESOLUTION SAFEIY AND AEUABIUTY FOCUSED SCOPE SAFETY RLSK ASSESSMENT OF SCHEDULE CONSERVATiVE SHUTDOWN OPERATIONS FULL CORE OFFLOAD HO REDVCED INVENTORY REUABLE ONCffEiOFFCITE POWER IMPROVED OUTAGE ERFOR.ACTIVE PARllCIPATION BREAKER TO BAEAKEA COVERAGE DESIGN ENGINEER INVOLVEMENT SYSTEM ENGINEERS LIANAGE TASK ENGINEERS ROTATE TO OTHER DEPARTMENTS RESPONSIVE MAINTENANCE SUPPORT EFFECTIVE STEALI GENERATOR INSPECTION/LWNTENANCE auALnY ELIABI SELF ASSESSMENT INPUT TO OVTAGE MAHAGELIENT IMPROVEMENT TEAMS SYSTEM WINDOW REVIEW REACTOR ENGINEERING INIATIVES RELOAD SEQUENCE 70 MINIMIZE FUEL HANDUNQ OPTIMIZED LOW POWEA PHYSICS TESTING ADDmONAL BORON CHANGE CUAVESITABLES BEITER PREDICTED AOD WORTHS(AFD DATA IMPROVED FLUX MAP PERFORMANCE CONSISTENT ERFORMANCE wCCth.WDd Page 20 ik~ili ~cWe>op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f)RESPONSE, DESIGN BASIS AND FSAR REVIEW+50.'54(f)REQUESTED 0 ADEQUACY OF DESIGN BASIS INFORMATION ~AVAILABILITY AND CONTROL OF DESIGN BASIS INFORMATION +OVERVIEW OF PTN 50.54(f)RESPONSE 0~DESCRIBED THE FPL/PTN CONFIGURATION MANAGEMENT PROCESSES~DESCRIBED FPL PROGRAMS AND INITIATIVES ~FOCUSED ON MAJOR PROGRAMS AND PLANT BETTERMENT PROJECTS SINCE 1985 IMPROVED CONTROL PROCEDURES FOR DESIGN BASIS INFORMATION IMPROVED.QUALITY OF DESIGN BASIS INFORMATION Page 21 Ik 0 >op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f)RESPONSE, DESiGN.BASIS FSAR REVIEW RPS SYSTEM UPGRADE 1001 IMPROVED TECHNICAL SPECIPICATIONS 1001 PROCEDURE ENHANCEMENT PROJECTS STANDS Y APW UPGRADE 1005'AJORPROGRAMSAND BETTERMENT PROJECTS REQUIRING DESIGN BASIS REVIEW AND RECONSTITlmON ELECTRIC POWER SYSTEM UPGRADE 1091 INSTRUMENT AIR , UPGRADE 1095 THERLIAL POWER UPRATE PROJECT 1009 DESIGN BASIS RECONSTITUTION PROGRAM-FIRST PLANT TO COMPLETE MAJOR PROGRAM-18 PLANT SYSTEMS REVIEWED-19 DESIGN BASIS DOCUMENTS (DBD)CREATED-DBD's REVISED ON FSAR REVISION CYCLE-WORKING ON NEW ACCIDENT ANALYSIS DBD Page 22 0 ~cW~>op Op+~~o~+ogear TURKEY POINT ENGINEERING DEPARTMENT 50.54(f)RESPONSE, DESIGN BASIS FSAR REVIEW 50.54(f)FSAR REVIEW COMMITMENT +FSAR SELF ASSESSMENTS AND NEI 96-06 REVIEW COMPLETED AT PTN~SELF ASSESSMENT (3/96)~FSAR OPERATIONAL REVIEW (1994-1996)~NEI REVIEW (3/97)+RESULTS~NO SAFETY SIGNIFICANT DESIGN BASIS ISSUES IDENTIFIED ~FSAR ADMINISTRATIVE AND INCONSISTENCY CHANGES IDENTIFIED AND RESOLVED BY RECENT FSAR REVISIONS+COMPLETE A"GRADED" FSAR REVIEW~REVIEW PRIORITIZED RISK SIGNIFICANCE ~LEVEL OF REVIEW GRADED TO CONSIDER COMPLETED PROGRAMS COMPLETED DESIGN BASIS PROGRAMS RECENT PLANT BETTERMENT PROJECTS~WILL USE FPL INHOUSE RESOURCES DESIGN AND SYSTEM ENGINEERS OTHER PLANT DEPARTMENTS AS REQUIRED 8 COMPLETE REVIEW BY 10/98~COMPUTER.NETWORK FOR USERS IMPROVED SEARCH CAPABILITY PLANT PROCEDURES ON LAN Page 23 il~ e>op Op++>oar+~O TURKEY POINT ENGINEERING DEPARTMENT FPL COMMENTS ON DRAFT NUREG-1606, PROPOSED REGULATORY GUIDANCE RELATED TO IMPLEMENTATION OF 10CFR50.59 +

GENERAL COMMENT

S AND CONCERNS N 8 NEED TO WORK WITH INDUSTRY TO DEFINE COMPLIANCE VIA NEI 96-07~IMPORTANT THAT NRC/INDUSTRY RESOLVE ISSUES PRIOR TO IMPLEMENTING NEW REQUIREMENTS'AND PROCEDURES +DEFINITION OF"CHANGE." TO INCLUDE ANY INFORMAT~ION IN THE FSAR~WOULD REQUIRE ADDITIONAL 50.59 SAFETY EVA'LUATIONS ~NOT CONSISTENT WITH PAST PRACTICE+COMPONENT REPLACEMENT DURING ROUTINE MAINTENANCE ~EQUIVALENT BUT NOT IDENTICAL COMPONENT VS DRAFT NUREG 1606 EXPANDED DEFINITION OF"MALFUNCTION OF A DIFFERENT TYPE"~NEED TO DEFINE NEW FAILURE MODES AT THE SYSTEM OR FUNCTIONAL LEVEL~ROUTINE COMPONENT REPLACEMENTS COULD INVOLVE USQs+USE OF MANUAL ACTIONS~COULD RESULT IN ADDITIONAL PLANT SHUT DOWN TRANSIENTS ~NOT CONSISTENT WITH PAST INDUSTRY PRACTICE+APPLICATION OF 50.59 TO DEGRADED AND NONCONFORMING CONDITIONS I~TS AND OPERABILITY EVALUATIONS ADDRESS DEGRADED CONDITIONS ~PLANT RESTARTS COULD BE PROHIBITED 0 Page 24 4l 0 ~C++O/~+q~O O>ear>TURKEY POINT ENGINEERING DEPARTMENT NEW AND REVISED SOFTWARE ISSUED BY DESIGN ENGINEERING (QUALITY INSTRUCTION

3.7 COMPUTER

SOFTWARE CONTROL)NON-PROCESS SOFTWARE PROCESS SOFTWARE PROCESS SOFTWARE (NEW)PROCESS'SOFTWARE (PRE-EXISTING) -IMPLEMENTED BY FORMAL PLANT CHANGE PROCESS-REQUIREMENTS SPECIFICATION PREPARED~SOFTWARE DESIGN DESCRIPTlON -VIVIV PLAN PREPARED~USE GUIDANCE OF IEEE STD 1012-VERIFICATlON REQUIREMENTS ~TEST PLAN-PERIODIC VAUDATION REQUIREMENTS --SOFTWARE VERIFICATION REPORT-INDEPENDENT REVIEW-'MPLEMENTED BY FORMAL PLANT CHANGE PROCESS~ORIGINAL VIV REQUIREMENT AS MINIMUM-'ADDmONAL VILV REQUIREMENTS ON VENDOR-ADDITIONAL BLACK BOX TESTING ON RECEIPT FROM VENDOR-USE OF TRAINING SIMULATOR-INDEPENDENT REVIEW PROCESS SOFTWARE IMPLEMENTATION TESTING-CONTROL AND STORAGE PROCEDURES nrcptn.wpd Page 25 4k 0~, ~c++OI Op+~~o~+Ogp~p Q4 TURKEY POINT ENGINEERING DEPARTMENT DDPS/ERDADS SOFTWARE CONTROL (NON-PROCESS SOFTWARE)0-ADM 401 SOFlWARE CHANGE REQUEST SOFTWARE CHANGE PRODUCTION SOFTWARE CHANGE COORD ASSIGN SOFlWARE CHANGE TRACKING 0 OPERATIONS SUPPORT SUPERVISOR APPROVAL ACCEPTANCE TESTING OF SOFTWARE CHANGE COMPUTER ENGINEER-SPECIFY PRETEST BENCHMARK REQM'TS IMPLEMENTATION CHECKUST-VENDOR MANUALS-I&C CAUBRATION PROC-DATA POINT UBRARY~SPECIFY SOFlWARE CHANGE~SPECIFYV&V ACCEPTANCE CRITERIA CONTROL RM DISPLAY CHANGE?SIMUIATOR CHANGES?INDEPENDENT VERIFICATION OF PROPOSED CHANGE TRANSMIT DOCUMENTATION TO DOCUMENT CONTROL wcplh.wpd Page 26 0 0 i +eo~+egecr P%o TURKEY POINT ENGINEERING DEPARTMENT PLANT SAFETY/RELIABILITY IMPROVEMENTS CONTINUE TO IMPLEMENT MODIFICATIONS TO IMPROVE EQUIPMENT RELIABILITY AGGRESSIVE ROOT CAUSE ANALYSIS AGGRESSIVE MANAGEMENT CONTROL OF MODIFICATION PROCESS INDICATIONS OF SUCCESS-REDUCED OPERATOR WORK AROUNDS-LOW NUMBER OF CONTROL ROOM, DEFICIENCIES -REDUCED NUMBER OF SECONDARY LEAKS-EXCELLENT PLANT AVAILABILITY SPECIFIC IMPROVEMENTS REACTOR PROTECTION RELAY DESIGN IMPROVEMENTS ROD CONTROL IMPROVEMENTS -POWER SUPPUES FORCED COOUNG-BRING CARDS-ROOM HVAC-SMAlL BORE PIPING MODIFICATIONS SAFEGUARDS RACK IMPROVEMENTS C BUS MODIRCATIONS ~BIT BYPASS MODIFICATlONS -REACTOR HEAD GUIDE FUNNEL MODIFICATIONS REACTOR HEAD GUIDE FUNNEL MODIRCATIONS -CRDM CANOPY SEAL PREVENTATIVE CIAMPING-SOURCE RANGE NUCLEAR INSTRUMENTS -FEEDWATER PUMP RECIRCULATION PIPING SUPPORT UPGRADES Page 27 0 e~cV+>op Op+~a~+Off~~p%TURKEY POINT ENGINEERING DEPARTMENT REACTOR HEAD GUIDE FUNNEL lVIODIFICATIONS +INDUSTRY FAILURE FOR REACTOR VESSEL GUIDE FUNNELS FUNNEL FAILURE AT ZION (1984)SEVERAL PLANTS REPORT PIN AND FUNNEL FAILURES (1994)~WESTINGHOUSE ISSUES NSAL 94-002~NO FAILURE HISTORY AT TURKEY POINT+FAILURE MODE~VIBRATION INDUCED FAILURE OF RETAINING PIN~POTENTIAL TO BLOCK/JAM CRDM+PLANT, RELIABILITY AND POTENTIAL SAFETY ISSUE+TURKEY POINT CORRECTIVE ACTION ,REPAIR OF 45 CRDM GUIDE TUBES~REPAIRS COMPLETE ON BOTH UNITS 3 AND 4~-LEAD PLANT FOR PLANTS WITHOUT PREVIOUS FAILURES~NO INDICATION OF FAILURE ONSET NOTED DURING REPAIR Page 28 0 'Io TURKEY POINT ENGINEERING DEPARTMENT Control Rod Drive ShaF t Penetr a tlon Thernocouple Colunn Pene tro tion REACTOR MEAD GUIDE FUNNEL MODIFICATIONS I I I I Reoctor Vessel Heoa Thernol Sleeve T/C Colunn Housing Guide Thernal Sleeve Guide Page 29 0 0 ~tl~o>o(4p oo(oo TURKEY POINTi ENGINEERING DEPARTMENT REACTOR HEAD GUIDE FUNNEL MODIFICATIONS Fillet Weld VIEW A-A lttcpttLttttpd Page 30 4l 0 il~ ST.LUCIE ENGINEERING DEPARTMENT Iv c ps l.wpd Page 31 0'l~ +vlc>i ,c/ST..LUCIE ENGINEERING DEPARTMENT ENGINEERING ORGANIZATION +ORGANIZATIONAL STRENGTHS~AVERAGE NUMBER OF YEARS OF NUCLEAR EXPERIENCE (PER ENGINEER)IS 17 YEARS DIRECT SUPPORT TO OPERATIONS AND MAINTENANCE CONTINUES TO BE A STRENGTH~23 ENGINEERS HAVE OPERATIONS TRAINING+IMPROVEMENT /GROWTH PLANS DEVELOPMENT OF SYSTEMS ENGINEERING PROGRAM~STRENGTHENING OF SYSTEM HEALTH MONITORING AND TRENDING OF EQUIPMENT DATA~SYSTEM ENGINEERS TRAINING rvcpsl.w pd Page 32 0 il~ 1 fe ST.LUCIE ENGINEERING DEPARTMENT AVABABILllY SAFETY)H JECTION 5.YEAR RUNNING AVERAGE 100%SS'/0 I+i I I1 i I P1~~SIf 98%-~0 I j 1~0 0>>M>>i'~0 00 OJ 00 ('I!I i li 97%.I 96%-95%I I I 94%9/96 11/96 1/97 0/97 EI97 OMIT I UMII'2 PERFORMANCE CRCERIA'AMOYR2000GOALS AVAIIABILIIV 100%99%I 98%,.I li i I EMERGENGY DIESEL GENERATORS 2 YEAR RUNNING AVERAGE I I I I I (0~IDM>>I I Ii I k>>JA II~I i j.I I'7~xi 7 I I ll 96%5/96 7/96 9/96 11/96 1/97 3/97 5/97 UNIT I UNIT2 PERFORMANCECRffERIA " WANG YR 20M GOALS IMCPSI.WPC Page 33 i NR y.', 0~Xiii"'~~~g~~~ll ,"g N gx a>g~~S Y.~a jj'4 Pj 5 g~@0~i~~e~.Q Ik~i ST.LUCIE ENGINEERING DEPARTMENT UNIT 1 DDPS SOFTWARE ERROR+A 1994 SOFTWARE ERROR RESULTED IN UNIT¹1 OPERATION WITH A 0.63%NONCONSERVATIVE REACT'OR POWER CALORIMETRIC ERROR Vendor deaspwd sonttwe change lor Deacon was assed on late a copy mainunad hy vendor Inveattgstinn Results The new scasng onscaras were nct permanency saved Itao iho naster pmgrsm or~ella lo aontmro vendor tt revision et gN eolhtate wee laassed Ihat dld fwt Indedo BN now FW flow connsras Chsnnology leal PWCy ctnnged span of Fw now Itsnsmalers ltom 0~T00.0'0 0.00IP I Hew FVf liow scawtg conaant t vahws were swered Sao OOF ccnstwa IocetavN PCIM 0020 f00 provided the deapn fot ltleie'Ietten of Beacon syaem ant ns ccntNctka to DOFS The Ipse ctangea lo ON feodtmwr aow connancs were ovwwrts wc TIN Beeoen PCat scope wss ttsttad Io 0N INtottwo snd DO HOT Incktse SN ecossacy Chang ee Io BN OOPS eonewe Invsstlgation Results Forts Oio HOT Ptevido post modncacon Iecgng teovtrsnwtcs ler tae OOPS sensate cancskwl dal dN Boo sea!no cnnststas were ler BN¹I 0~fetes'Ssnttntecr Chronology The sothtwe Vay s perfntd hy sothmre vender natenged sw BoNa ostpas hca tered Io ctwrk sitar asperse of IIN Dops soteewe sech os IIN secondary plate caatnrtNcnc. I Reader wallop Iel tttdt dl Cycle SIS DNOO tspotts lo a FW Bat Iteontsnn', Ical towtd Iha 0 c¹ssaed reactor level wac lower teen ocntef poww ey Odats.Shy tong Tera I Devaaa genena Vay nenwnenks Io cnasenpo as i cnand eeraacee wltttn sech Vnlot srd ttrkst DOPSlet l~taonaseaNnHS 1 7-2M 2-2l 97 tvcpsI.vvpd Page 35 il /4 I ST.LUCIE ENGINEERING DEPARTMENT 'UNIT 2 DDPS SOFTWARE ERROR+A 1997 SOFTWARE'ERROR.WAS DISCOVERED DURING UNIT¹2 REACTOR POWER CALORIMETRIC VERIFICATION 6 VALIDATION TESTING PDrM reterence4 pen>>la V 5 v plan eveloped as ooneccrve eccl>>l lo Irnu~I evsnL Dvanap between ponionc ef lest fran ares nadectuete. Invusti0stion 'estdts Inactoctuste I@croute DDP5 oobrare exporuce to oatccc verldv vrul'.pDfII 4ld not pruvtfs edoduare pent~tecttn0 fv DDP5 ochwwe chcnden pc/at eoo 1 c T.supplemonc1 provtfcd deride foc rarcaans of pw pow crsnsnvuv span from 0~600'O 0~000'DP5 vendor oorcraccod lo revtre software.FW now Beuavetrs Value Procasev scarard wes nol roe!red.New 0enerlo V5V of atitcal DDP5 ettctatos was pedonaed.Did not detect Ihoonert PW Crow scaaad cnctants In ed'ovstce Value Procecav.Al Sdta power oaoenclon ptaroou DDp5~uec Oetntlnkned tO Pe 0%IOwer pwn rnenual onnatrto ffÃs npaatssmwesa ~padded pert of V5Vptaa)5-17-97 rvcpst.wod 'Page 36 0 0 0 ST.LUCIE ENGlNEERING, DEPARTMENT SOFTWARE VERIFICATION 6 VALIDATION PROGRAM IMPROVEMENTS +DEVELOPED PROCEDURE'"MAINTENANCE'DEPARTMENTAL CONTROL OF COMPUTER SOFTWARE" IN FEBRUARY 1996+CONVEYED"LESSONS LEARNED" FROM THE RECENT SOFTWARE EVENTS TO ENGINEERING AND MAINTENANCE PERSONNEL+MADE ORGANIZATIONAL CHANGES TO PROVIDE MORE INTERACTION BETWEEN SOFTWARE ENGINEERS AND DESIGN/SYSTEM ENGINEERS+IDENTIFIED ADDITIONAL PROCEDURE/PROGRAM ENHANCEMENTS IN THE FOLLOWING AREAS:~IN-DEPTH TRAINING IN VERIFICATION AND VALIDATION FOR ENGINEERING /IS.C MAINTENANCE ~UPGRADE OF EXISTING SOFTWARE CONTROL PROCEDURES (MASTER&.BACKUP COPIES)DEVELOPMENT OF DETAILED SOFTWARE VERIFICATION 5 VALIDATION ON SELECTED COMPUTER SYSTEMS Page 37 45 Ik ST.LUCIE ENGINEERING DEPARTMENT REACTIVITY MANAGEMENT REACTOR ENGINEERING PROGRAIVIS +INSTRUCTIONS PROVIDED.FOR POWER MANEUVERING +, ENGINEERS ON SHIFT, DURING POWER:MANEUVERS +BEACON REAL TIME MONITOR MODE+CORE OPERATING HISTORY ASSESSMENT +ECC VERIFICATIONS +REACTIVITY MANAGEMENT ASSESSMENTS +REACTIVITY MANAGEMENT TRAINING PROVIDED TO OPERATIONS DURING REQUAL+RE PROCEDURE REVIEW PROGRAM'RE PROCEDURE REVIEW PROGRAM+PERFORMED A TECHNICAL REVIEW OF 26 PROCEDURES +REVIEW TEAM CONSISTED OF 2 ENGINEERS EACH FROM: REACTOR ENGINEERING (ON SITE)NUCLEAR FUELS (JUNO)~ABB/CE (NSSS VENDOR)PROCEDURE REVIEW RESULTS+THE REACTOR ENGINEERING PROCEDURES WERE FOUND TO BE TECHNICALLY ACCURATE AND CONSISTENT WITH TECHN)CAL SPECIFICATIONS AND DESIGN ANALYSIS.+THE MOST SIGNIFICANT PROCEDURE CHANGES FOCUSED ON CLARITY IN THE AREA OF SHUTDOWN MARGIN VERIFICATION ENSURING COMPLI'ANCE WITH T.S., AND'PROVIDING CONSISTENCY WITH OFF-NORMAL CEA PROCEDURE GUIDANCE.Page 38 0 w 0~Wv&wa~.pe Qr.e ST.LUCIE ENGINEERING DEPARTMENT REACTIVITY MANAGEMENT 14 12 Equipment GR Design E3 Human H 10 XX~~K Events CEA's.(U1) 66.6%12.5%Equip.(U2) 6.3%Design 12.5%OVERVIEW+NEARLY ALL EVENTS WERE ON UNIT 1(15 OF'16)+MOST WERE CEA EVENTS (11 OF 16)+HIGHER POWER THAN EXPECTED FOR PLANT CONDITIONS (2 OF 16)Page 39 0 ST.LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM ANALYSIS+DROPS RELATED TO:~MECHANICAL SLUGGISH GRIPPERS~TIMING MODUL'E FAILURE SYSTEM ASSESSMENT (ONE YEAR REVIEW)+OTHER FAILURES REED SWITCH POSITION INDICATIONS ~DDPS POSITION INDICATIONS CEA FAILURES TO MOVE DURING FLCEA CEA Drops@~Unit 1 QUnit2 S.i'>7/96 8/96 9/96 10/96 11/96 12/96 1/97 2/97 3/97 4/97 5/97 6/97 7/97 IvcDsl.wpd 'Page 40 il~' ST.LUCIE ENG!NEERING DEPARTMENT CONTROL.ROD ELEMENT DRIVE SYSTEM SYSTEM ANALYSIS+DROPSiSLIPS ON UNIT 1 CAN BE ATTRIBUTED TO'LUGGISH CEDM GRIPPER ENGAGEMENTS, INADEQUATE DESIGN OF TIMING MODULES (NO CEA GRIPPER ENGAGEMENT FEEDBACK)AND POWER SWITCH FAILURES+ACTMS ON UNIT 2 PREVENT MOST PROBLEMS FROM MANIFESTING THEMSELVES AS DROPPED CEAS CORRECTIVE ACTIONS TAKEN+PERFORM CEDM COIL RESISTANCE TESTS EACH OUTAGE AND TREND DATA WITH PREVIOUS OUTAGES TO DETERMINE IF DETERIORATING COILS CAN BE IDENTIFIED 0+IDENTIFIED SLUGGISH GRIPPERS, TIMING MODULE AND POWER SWITCH FAILURES AS PRIMARY CAUSE OF UNIT 1 CEA DROPS AND SLIPS+CEA REED SWITCH REPLACEMENTS SCHEDULED EACH'OUTAGE CORRECTIVE ACTIONS PLANNED+IN-HOUSE REFURBISHMENT OF UNIT 1 COIL POWER SWITCH MODULES+IMPLEMENTATION OF UNIT 1 ACTM MODIFICATION (REFUELING 1997)+ENHANCE SCHEDULE FOR REPLACEMENT OF REED SWITCH ASSEMBLES IN UNIT 2 Page 41 0 O~ (p".ST.LUCIE ENGINEERlNG DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 CONTROL ELEMENT DRIVE.NIECHANISNI REED SWITCH ASSEMBLY REED SWITCH ACTUATING MAGNET UPPER PRESSURE HOUSING ASSEMBLY OMEGA, SEAL OPERATlNG RCD ANTI.EJECTION GRIPPER ELECTRICAL CONDUIT LIFT COll.LlFT AND PUL'L DOWN MAGNET ASSEMBLY UPPER GRIPPER DRIVE SHAFT COIL WIRE TROUGH PULL DOWN COIL L.OAD TRANSFER MAGNET ASSEMBLY LOAD TRANSFER COIL LOWER GRIPPER COiL LOWER GRIPPER MOTOR HOUSING ASSEMBLY REACTOR NOZZLE CONNECTION OMEGA SEAL.THERMAI.SLEEVE (PAQQPTI l40$.FhAtf Ivcpsl.wpd Page 42 0 ST.LUCIE ENGINEERING DEPARTlVIENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 ACTIVI UPGRADE AUTOMATIC CEDM TIMER MODULE (ACTM)+MICRO PROCESSOR BASED CONTROL ROD DRIVE SYSTEM CONTROLLER +REPLACES THE CPP TIMER DURING THE UPCOMING UNIT 1 REFUELING OUTAGE+CURRENTLY INSTALLED ON UNIT 2 (AND OTHER CE PLANTS)+CONTROLS CEA MOTION UTILIZING POSITIVE FEEDBACK VIA CURRENT SENSORS+EXPECTED TO REDUCE OR MITIGATE UNIT 1 CEA DROP EVENTS CONTROL ELEMENT DRIVE SYSTEM NSSS MG SET 240 VAC RPS TRIP BREAKERS CEAPDS (ADS)RSPT INHIBIT REACTOR REG.CEDS CEDMCS)CPP MAG JACK CEDM OPERATOR EQRJHD PlANT COMPUTER RSTP Page 43 i ST.LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT.DRIVE'SYSTEM L(FTfNG 3/4" ANTl EJECT/ON GRIPPER (Not In Unit 2)UPPER GRIPPER L C P 0 LOWER GRIPPER fFAIOOOtl>ASJ'Pelt) rvcpal.wpd Page 44 0 >4'r.>c ST.LUCIE ENGINEERING 'DEPARTMENT PLANT SAFETY/RELlABILlTY lMPROVEMENTS ENGINEERING EMPHASIS FOCUSED ON SAFETY AND RELIABILITY MODIFICATIONS NEW MANAGEMENT REVIEW PROCESS ADOPTED INDICATIONS OF SUCCESS-REDUCED OPERATOR WORK AROUNDS-LOW NUMBER OF CONTROL ROOM DEFICIENCIES -EXCELLENT PLANT AVAILABILITY SPECIFIC IMPROVEMENTS-199T UNIT20-PRESSURIZER SAFETY VALVE SCUD BLOCK Y DESIGN-'EACTOR VESSEL (HUNG REPLACEMENT DIESEL GENERATOR RELAY REPLACEMENT -QUICKLOC INCORE INSTRUMENT FLANGE DESIGN-2C AFW PUMP WARMUP UNE MATERIAL CHANGE DUT-SIT FILL VALVE ACTUATOR UPGRADE PRESSURIZER SAFETY VALVE SOLID BLOCK BODY DESIGN-TCW PUMP DISCHARGE CHECK VALVE ENHANCEMENT IvccsLwcd Page 45 4I /~fss.(o".'T.LUCIE ENGINEERING DEPARTMENT OPERATOR WORKAROUNDS caus ts)OPEN I s 40 I I 35,"I Walked down plant to Identify nevr 30"'WAs 25" I 20 I I 15 l 10""'Operator Work Around:.A problem that Impedes an operator ln performing duties wlthln the approved procedures or ln accordance with the Intended design.last Updated: July S, 1SS7 0 Year End Target 4 12/95 9/96 10/96 11/96 12/I 1/97 2/97 3/97 4/97 5/97 6/97 7/97 8/97 9/97 10/97 11/97 12/97 Time (Month)OPEN nrcpsl.wpd Page 46 il i~~$4-r vp'I v~8 Ya)v~si'*.v'~~<j~<nggg~I cc.~)~wqgPi-.C v a)g~v.M~P~'c-.-.t.I I 0 I g F~r I ,A 0 C 1 4 e JW w~ O~ ST.LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITY IMPROVEMENTS SPECIFIC UNIT 2 OUTAGE ACCOMPLISHMENTS +REVISED INTEGRATED SAFEGUARDS TEST PROCEDURE~NEW'PROCEDURE TESTS EACH TRAIN INDEPENDENTLY ~ENSURES ONE COMPLETE TRAIN AVA'ILABLE FOR CORE COOLING+ON-LINE TESTING OF MSSVs+FULL CORE OFFLOAD ANALYSIS+VALVE OVERHAUL SUPPORT+AGGRESSIVE FLOW ACCELERATED CORROSION INSPECTION PROGRAM+MSIV REFURBISHMENT SUPPORT+COATINGS PROGRAMS nrepal.wpd P.age 49 il ST.LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITY IMPROVEMENTS MODIFICATIONS PLANNED FOR UPCOMING 1997 UNIT I OUTAGE+STEAM GENERATOR REPLACEMENT +PRESSURIZER HEATER SLEEVE NICKEL PLATING+QUICKLOC INCORE INSTRUMENT FLANGE DESIGN+CEDMCS ACTM UPGRADE+SIT FILL VALVE ACTUATOR UPGRADE+TCW PUMP DISCHARGE CHECK VAI VE ENHANCEMENT +REFUELING TRANSFER TUBE VALVE OPERATOR TORQUE LIMITER nrcpal.wpd Page 50 0 ST.LUCIE ENGINEERING. DEPARTMENT Pressurizer Heater Nozzle Nickel Plated Region{4" Long, 0.008" Thick)Weld Lower Head internal Cfadding.$25" Pressurizer Lower Head Typical Heater Nozzle.S05" Typical Nickel Plated t4ozzte Page 51 ik ST.LUCIE ENGINEERING DEPARTMENT HEATER, SLEEVE END EFFECTOR VPP=R SEAL vPPEP.gEA0 N I CKEL ANOOE LOWER SEAL SOLuT!0~OVTLET nr col.wpd Page 52

ST..LUCIE ENGINEERlNG DEPARTMENT DESIGN BASIS 50.54.(f)RESPONSE

SUMMARY

AND ACTIONS CURRENT AND FUTURE ACTIONS+FSAR/OPERATING CONSISTENCY REVIEW~FINDINGS TO BE RESOLVED OVER NEXT TWO YEARS+NEI INITIATIVE +ANNUNCIATOR

SUMMARY

REVIEW COMPLETION DATE OF DECEMBER 1998+NRC A/E INSPECTION ~NRC INSPECTION REPORT ISSUED 3/25/97~DESIGN OF INSPECTED SYSTEMS GOOD WITH ADEQUATE DESIGN MARGINS.IMPLEMENTATION OF DESIGN ADEQUATE.~FPL RESPONDED TO INSPECTION REPORT ON 5/27/97 AND PROVIDED ACTIONS PLANNED FOR FOLLOW-UP AND UNRESOLVED ITEMS rvCpol.wpd Page 53 iS~0 c v<0 ST.LUClE ENGINEERlNG DEPARTMENT ~VOLUNTARY FSAR REVIEW INITIATIVE +ST.LUCIE HAS COMMITTED.TO A GRADED REVIEW OF THE UNIT 1 Bc 2 FSAR+REVIEW PRIORITIZED TO RISK SIGNIFICANT SYSTEMS+CREDIT TAKEN FOR PREVIOUSLY INSPECTED SYSTEMS+FOUR PRIORITY LEVELS ESTABLISHED +PLANT FIRE PROTECTION SECTIONS INCLUDED WITH PRIORITY 2 REVIEW+DISCOVERY PHASE FOR PRIORITY 1, 2, 5 3 TO BE COMPLETE BY OCTOBER 18,1998+SELECTED CHAPTER 15 ACCIDENT ANALYSES TO BE UPDATED nrcpsl.wpd Page 54 ~~il @PL ENGINEERING DEPARTMENT CHALLENGES +MAINTAINING AND IMPROVING CURRENT LEVEL OF PERFORMANCE +RETAINING TALENTED PERSONNEL+DEVELOPMENT OF ST.LUCIE SYSTEM ENGINEERING PROGRAM+IMPROV)NG EQUIPMENT PERFORMANCE MONITORING AND TRENDING

SUMMARY

+STRONG DIRECT OPERATIONS AND MAINTENANCE. SUPPORT~RESPONSIVE TO OPERATIONS PRIORITIES AND REQUESTS GOOD TEAMWORK AND COMMUNICATION +GOOD FOCUS ON PLANT SAFETY AND EQUIPMENT, PERFORMANCE Page 55 0'0}}