| title = November 12, 2009, Summary of Teleconference Call Held Between NRC and Pseg, LLC, Concerning Draft RAIs Pertaining to the Salem Generating Station, Units 1, and 2, LRA
| title = November 12, 2009, Summary of Teleconference Call Held Between NRC and PSEG, LLC, Concerning Draft RAIs Pertaining to the Salem Generating Station, Units 1, and 2, LRA
| author name = Ashley D J
| author name = Ashley D
| author affiliation = NRC/NRR/DLR/RPB1
| author affiliation = NRC/NRR/DLR/RPB1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000272, 05000311
| docket = 05000272, 05000311
| license number =  
| license number =  
| contact person = Ashley D J
| contact person = Ashley D
| document type = Meeting Summary, Memoranda, Request for Additional Information (RAI)
| document type = Meeting Summary, Memoranda, Request for Additional Information (RAI)
| page count = 8
| page count = 8
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:November 19, 2009  
{{#Wiki_filter:November 19, 2009 LICENSEE:       PSEG Nuclear, LLC FACILITY:       Salem Generating Station, Units 1 and 2
 
LICENSEE: PSEG Nuclear, LLC FACILITY: Salem Generating Station, Units 1 and 2  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 12, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION  
OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 12, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC (the applicant), Exelon and Westinghouse held a telephone conference call on November 12, 2009, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Salem Generating Station, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.
 
The applicant had an opportunity to comment on this summary.
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC (the applicant), Exelon and Westinghouse held a telephone conference call on November 12, 2009, to discuss and clarify the staff's draft requests for additional information (D-RAIs) concerning the Salem Generating Station, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's D-RAIs.  
                                              /RA/
 
Donnie J. Ashley, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.  
 
      /RA/ Donnie J. Ashley, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311  


==Enclosures:==
==Enclosures:==
: 1. List of Participants 2. List of Draft Requests for     Additional Information cc w/encls: See next page  
: 1. List of Participants
 
: 2. List of Draft Requests for Additional Information cc w/encls: See next page
ML093160577 OFFICE  LA:DLR  PM:RPB1:DLR BC:RPB1:DLR
 
NAME  SFigueroa DAshley BPham 
 
DATE  11/13/09 11/16/09 11/19/09 TELEPHONE CONFERENCE CALL SALEM GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS NOVEMBER 12, 2009


ENCLOSURE 1 PARTICIPANTS AFFILIATIONS Donnie Ashle y U.S. Nuclear Re gulator y Commission (NRC)Ben jamin Parks NRCJeff Keenan PSEG Nuclear, LLC (PSEG) Ali Fakhar PSEG Al Fulvio Exelon Sam S peer ExelonTom Quintenz Exelon Charlie M yers Westin g houseStan Anderson Westin g house DRAFT REQUESTS FOR ADDITIONAL INFORMATION SALEM GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION NOVEMBER 12, 2009 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC held a telephone conference call on November 12, 2009, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Salem Generating Station, Unit 1 and 2 license renewal application (LRA).
ML093160577 OFFICE      LA:DLR                PM:RPB1:DLR            BC:RPB1:DLR NAME        SFigueroa            DAshley                BPham 11/16/09              11/19/09 DATE        11/13/09 TELEPHONE CONFERENCE CALL SALEM GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS NOVEMBER 12, 2009 PARTICIPANTS                     AFFILIATIONS Donnie Ashley                    U.S. Nuclear Regulatory Commission (NRC)
D-RA4.2.1-1 PSEG states, "predicted 60-year Salem vessel fluence values satisfy the requirements set forth in Regulator (sic) Guide 1.190-"  Please address more specifically how the fluence values satisfy the regulatory intent of RG 1.190:
Benjamin Parks                   NRC Jeff Keenan                       PSEG Nuclear, LLC (PSEG)
Ali Fakhar                       PSEG Al Fulvio                         Exelon Sam Speer                        Exelon Tom Quintenz                     Exelon Charlie Myers                    Westinghouse Stan Anderson                     Westinghouse ENCLOSURE 1


(a) Has information supporting the fluence calculations supporting this LRA been submitted to the NRC previously? If so, please provide a reference.  
DRAFT REQUESTS FOR ADDITIONAL INFORMATION SALEM GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION NOVEMBER 12, 2009 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC held a telephone conference call on November 12, 2009, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Salem Generating Station, Unit 1 and 2 license renewal application (LRA).
(b) If not, please provide additional information to support a conclusion that the fluence values adhere to RG 1.190 guidance. Describe the calculational technique, its uncertainty, and its qualification.
D-RA4.2.1-1 PSEG states, "predicted 60-year Salem vessel fluence values satisfy the requirements set forth in Regulator (sic) Guide 1.190" Please address more specifically how the fluence values satisfy the regulatory intent of RG 1.190:
Discussion
(a)     Has information supporting the fluence calculations supporting this LRA been submitted to the NRC previously? If so, please provide a reference.
:
(b)     If not, please provide additional information to support a conclusion that the fluence values adhere to RG 1.190 guidance. Describe the calculational technique, its uncertainty, and its qualification.
The applicant stated that previous fluence calculations had not been submitted to the NRC. Support for the conclusion was based on the information contained in the Westinghouse document WCAP-14040-NP-A, Revision 4 and WCAP-16083-NP-A, Revision 0. The staff agreed that the referenced WCAP would describe the needed information. No additional information concerning this item is required at this time.  
Discussion:
The applicant stated that previous fluence calculations had not been submitted to the NRC.
Support for the conclusion was based on the information contained in the Westinghouse document WCAP-14040-NP-A, Revision 4 and WCAP-16083-NP-A, Revision 0. The staff agreed that the referenced WCAP would describe the needed information. No additional information concerning this item is required at this time.
ENCLOSURE 2


ENCLOSURE 2
Memorandum to PSEG Nuclear, LLC from D. Ashley, dated November 19, 2009 DISTRIBUTION:
 
Memorandum to PSEG Nuclear, LLC from D. Ashley, dated November 19, 2009 DISTRIBUTION
:


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 12, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PUBLIC SERVICE ENTERPRISE GROUP, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION  
OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 12, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PUBLIC SERVICE ENTERPRISE GROUP, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY:
 
DLR RF E-MAIL:
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsOgcMailCenter Resource  
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsOgcMailCenter Resource DPelton DAshley JRobinson REnnis MModes, RI DKern, RI JBrand, RI RConte, RI RBellamy, RI PBamford, RI MMcLaughlin, RI
------------- DPelton DAshley JRobinson REnnis MModes, RI DKern, RI JBrand, RI RConte, RI RBellamy, RI PBamford, RI MMcLaughlin, RI Salem Nuclear Generating Station, Units 1 and 2 cc:  Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ  08038 Mr. Dennis Winchester Vice President - Nuclear Assessment PSEG Nuclear P.O. Box 236  Hancocks Bridge, NJ  08038 Mr. Robert Braun Site Vice President - Salem PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ  08038 Mr. Carl Fricker Vice President - Operations Support PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ  08038
 
Mr. George Gellrich Plant Manager - Salem PSEG Nuclear  P.O. Box 236 Hancocks Bridge, NJ  08038
 
Mr. James Mallon Manager - Licensing PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ  08038 Mr. Jeffrie J. Keenan, Esquire Manager - Licensing PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ  08038
 
Mr. Michael Gaffney Manager - Hope Creek Regulatory Assurance One Alloway Creek Neck Road Hancocks Bridge, NJ  08038 Mr. Steven Mannon Manager - Salem Regulatory Assurance P.O. Box 236 Hancocks Bridge, NJ  08038 Township Clerk Lower Alloways Creek Township Municipal Building, P.O. Box 157 Hancocks Bridge, NJ  08038 Mr. Paul Bauldauf, P.E., Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy, CN 415 Trenton, NJ  08625-0415 Mr. Brian Beam Board of Public Utilities 2 Gateway Center, Tenth Floor Newark, NJ  07102 Regional Administrator, Region I U.S. Nuclear Regulatory Commission
 
475 Allendale Road King of Prussia, PA  19406 Senior Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ  08038 Mr. Michael Gallagher                Vice President - License Renewal Projects Exelon Nuclear LLC 200 Exelon Way Kennett Square, PA  19348
 
Salem Nuclear Generating Station, Units 1 and 2 cc:  Mr. Ed Eilola Plant Manager - Salem PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ  08038
 
Mr. Paul Davison Director - Nuclear Oversight PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ  08038 Ms. Christine Neely Director - Regulator Affairs PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ  08038


Mr. Ali Fakhar Manager, License Renewal PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ   08038  
Salem Nuclear Generating Station,  Units 1 and 2 cc:
Mr. Thomas Joyce                        Mr. Michael Gaffney President and Chief Nuclear Officer    Manager - Hope Creek Regulatory PSEG Nuclear LLC                        Assurance One Alloway Creek Neck Road            One Alloway Creek Neck Road Hancocks Bridge, NJ 08038              Hancocks Bridge, NJ 08038 Mr. Dennis Winchester                  Mr. Steven Mannon Vice President - Nuclear Assessment    Manager - Salem Regulatory Assurance PSEG Nuclear                            P.O. Box 236 P.O. Box 236                            Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Township Clerk Mr. Robert Braun                        Lower Alloways Creek Township Site Vice President - Salem            Municipal Building, P.O. Box 157 PSEG Nuclear LLC                        Hancocks Bridge, NJ 08038 One Alloway Creek Neck Road Hancocks Bridge, NJ 08038              Mr. Paul Bauldauf, P.E., Asst. Director Radiation Protection Programs Mr. Carl Fricker                        NJ Department of Environmental Vice President - Operations Support      Protection and Energy, CN 415 PSEG Nuclear LLC                        Trenton, NJ 08625-0415 One Alloway Creek Neck Road Hancocks Bridge, NJ 08038              Mr. Brian Beam Board of Public Utilities Mr. George Gellrich                    2 Gateway Center, Tenth Floor Plant Manager - Salem                  Newark, NJ 07102 PSEG Nuclear P.O. Box 236                            Regional Administrator, Region I Hancocks Bridge, NJ 08038              U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. James Mallon                        King of Prussia, PA 19406 Manager - Licensing PSEG Nuclear                            Senior Resident Inspector P.O. Box 236                            Salem Nuclear Generating Station Hancocks Bridge, NJ 08038              U.S. Nuclear Regulatory Commission Drawer 0509 Mr. Jeffrie J. Keenan, Esquire          Hancocks Bridge, NJ 08038 Manager - Licensing PSEG Nuclear LLC                       Mr. Michael Gallagher One Alloway Creek Neck Road             Vice President - License Renewal Projects Hancocks Bridge, NJ 08038               Exelon Nuclear LLC 200 Exelon Way Kennett Square, PA 19348


Mr. William Mattingly Manager - Salem Regulatory Assurance PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ   08038 Mr. Earl R. Gage Salem County Administrator Administration Building 94 Market Street Salem, NJ   08079}}
Salem Nuclear Generating Station, Units 1 and 2 cc:
Mr. Ed Eilola Plant Manager - Salem PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Paul Davison Director - Nuclear Oversight PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Ms. Christine Neely Director - Regulator Affairs PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Ali Fakhar Manager, License Renewal PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. William Mattingly Manager - Salem Regulatory Assurance PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Earl R. Gage Salem County Administrator Administration Building 94 Market Street Salem, NJ 08079}}

Latest revision as of 07:49, 12 March 2020

November 12, 2009, Summary of Teleconference Call Held Between NRC and PSEG, LLC, Concerning Draft RAIs Pertaining to the Salem Generating Station, Units 1, and 2, LRA
ML093160577
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/19/2009
From: Ashley D
License Renewal Projects Branch 1
To:
Public Service Enterprise Group
Ashley D
References
Download: ML093160577 (8)


Text

November 19, 2009 LICENSEE: PSEG Nuclear, LLC FACILITY: Salem Generating Station, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 12, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC (the applicant), Exelon and Westinghouse held a telephone conference call on November 12, 2009, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Salem Generating Station, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Donnie J. Ashley, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosures:

1. List of Participants
2. List of Draft Requests for Additional Information cc w/encls: See next page

ML093160577 OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME SFigueroa DAshley BPham 11/16/09 11/19/09 DATE 11/13/09 TELEPHONE CONFERENCE CALL SALEM GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS NOVEMBER 12, 2009 PARTICIPANTS AFFILIATIONS Donnie Ashley U.S. Nuclear Regulatory Commission (NRC)

Benjamin Parks NRC Jeff Keenan PSEG Nuclear, LLC (PSEG)

Ali Fakhar PSEG Al Fulvio Exelon Sam Speer Exelon Tom Quintenz Exelon Charlie Myers Westinghouse Stan Anderson Westinghouse ENCLOSURE 1

DRAFT REQUESTS FOR ADDITIONAL INFORMATION SALEM GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION NOVEMBER 12, 2009 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC held a telephone conference call on November 12, 2009, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Salem Generating Station, Unit 1 and 2 license renewal application (LRA).

D-RA4.2.1-1 PSEG states, "predicted 60-year Salem vessel fluence values satisfy the requirements set forth in Regulator (sic) Guide 1.190" Please address more specifically how the fluence values satisfy the regulatory intent of RG 1.190:

(a) Has information supporting the fluence calculations supporting this LRA been submitted to the NRC previously? If so, please provide a reference.

(b) If not, please provide additional information to support a conclusion that the fluence values adhere to RG 1.190 guidance. Describe the calculational technique, its uncertainty, and its qualification.

Discussion:

The applicant stated that previous fluence calculations had not been submitted to the NRC.

Support for the conclusion was based on the information contained in the Westinghouse document WCAP-14040-NP-A, Revision 4 and WCAP-16083-NP-A, Revision 0. The staff agreed that the referenced WCAP would describe the needed information. No additional information concerning this item is required at this time.

ENCLOSURE 2

Memorandum to PSEG Nuclear, LLC from D. Ashley, dated November 19, 2009 DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 12, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PUBLIC SERVICE ENTERPRISE GROUP, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsOgcMailCenter Resource DPelton DAshley JRobinson REnnis MModes, RI DKern, RI JBrand, RI RConte, RI RBellamy, RI PBamford, RI MMcLaughlin, RI

Salem Nuclear Generating Station, Units 1 and 2 cc:

Mr. Thomas Joyce Mr. Michael Gaffney President and Chief Nuclear Officer Manager - Hope Creek Regulatory PSEG Nuclear LLC Assurance One Alloway Creek Neck Road One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Dennis Winchester Mr. Steven Mannon Vice President - Nuclear Assessment Manager - Salem Regulatory Assurance PSEG Nuclear P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Township Clerk Mr. Robert Braun Lower Alloways Creek Township Site Vice President - Salem Municipal Building, P.O. Box 157 PSEG Nuclear LLC Hancocks Bridge, NJ 08038 One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Paul Bauldauf, P.E., Asst. Director Radiation Protection Programs Mr. Carl Fricker NJ Department of Environmental Vice President - Operations Support Protection and Energy, CN 415 PSEG Nuclear LLC Trenton, NJ 08625-0415 One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Brian Beam Board of Public Utilities Mr. George Gellrich 2 Gateway Center, Tenth Floor Plant Manager - Salem Newark, NJ 07102 PSEG Nuclear P.O. Box 236 Regional Administrator, Region I Hancocks Bridge, NJ 08038 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. James Mallon King of Prussia, PA 19406 Manager - Licensing PSEG Nuclear Senior Resident Inspector P.O. Box 236 Salem Nuclear Generating Station Hancocks Bridge, NJ 08038 U.S. Nuclear Regulatory Commission Drawer 0509 Mr. Jeffrie J. Keenan, Esquire Hancocks Bridge, NJ 08038 Manager - Licensing PSEG Nuclear LLC Mr. Michael Gallagher One Alloway Creek Neck Road Vice President - License Renewal Projects Hancocks Bridge, NJ 08038 Exelon Nuclear LLC 200 Exelon Way Kennett Square, PA 19348

Salem Nuclear Generating Station, Units 1 and 2 cc:

Mr. Ed Eilola Plant Manager - Salem PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Paul Davison Director - Nuclear Oversight PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Ms. Christine Neely Director - Regulator Affairs PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Ali Fakhar Manager, License Renewal PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. William Mattingly Manager - Salem Regulatory Assurance PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Earl R. Gage Salem County Administrator Administration Building 94 Market Street Salem, NJ 08079