ML15104A149

From kanterella
Jump to navigation Jump to search
Hope, Summary of Annual Assessment Meeting with PSEG
ML15104A149
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 04/14/2015
From: Glenn Dentel
Reactor Projects Branch 3
To:
DENTEL, GT
Shared Package
ML15049A470, ML15049A471 List:
References
Download: ML15104A149 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 14, 2015 MEETING

SUMMARY

LICENSEE:

PSEG Nuclear LLC (PSEG)

FACILITY:

Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem)

Hope Creek Generating Station (Hope Creek)

SUBJECT:

Summary of Annual Assessment Meeting with PSEG On March 25, 2015, at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted an open house at the PSEG Energy & Environmental Resource Center in Salem, NJ. The NRC conducted the open house to discuss its assessment of the safety performance at Salem and Hope Creek for 2014.

A notice of the open house was issued on March 10, 2015, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15069A488.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and was available to discuss its assessment of the safety performance of Salem and Hope Creek for the period of January 1 through December 31, 2014, as documented in our letters dated March 4, 2015, ADAMS Accession No. ML15062A086 and ML15062A112. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRCs Annual Assessment Process and the safety performance of Salem and Hope Creek can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.

Members of the media and public, along with State officials, attended the open house, and were offered the opportunity to question the NRC regarding Salems and Hope Creeks performance and the role of the agency in ensuring safe plant operations.

/RA/

Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects

ML15062A086 and ML15062A112. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRCs Annual Assessment Process and the safety performance of Salem and Hope Creek can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.

Members of the media and public, along with State officials, attended the open house, and were offered the opportunity to question the NRC regarding Salems and Hope Creeks performance and the role of the agency in ensuring safe plant operations.

/RA/

Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Distribution:

G. Dentel, DRP J. Hawkins, DRP P. Finney, DRP A. Ziedonis, DRP S. Haney, DRP R. Barkley, DRP M. Draxton, DRP C. Ott, DRP DOC NAME: G:\\DRP\\BRANCH3\\COMMUNICATIONS\\PUBLIC MEETINGS\\2015 ANNUAL ASSESSMENT MEETING\\

SALEM-HOPE CREEK\\MEETING

SUMMARY

\\SAL_HC MEETING

SUMMARY

2015.DOCX ADAMS Accession No.: ML15104A149 SUNSI Review

Non-Sensitive

Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME MDraxton/GTD per telecon GDentel/ GTD DATE 04/14/15 04/14/15