January 25, 2011, Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear, LLC, Concerning Information on Buried Piping Inspections at the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application
ML110760604
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/05/2011
From: Bennett Brady
License Renewal Projects Branch 1
To:
Brady B
References
Download: ML110760604 (7)


Text

v-1I REGU( UNITED STATES

~~c.~ "'1"0." NUCLEAR REGULATORY COMMISSION P

q

~

0 WASHINGTON, D.C. 20555-0001 Iii  :

~ ~ April 5, 2011

~ ~

'to., ",,0

      • ...

LICENSEE: PSEG Nuclear, LLC FACILITY: Salem Nuclear Generating Station, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR, LLC, CONCERNING INFORMATION ON BURIED PIPING INSPECTIONS AT THE SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC held a telephone conference call on January 25, 2011, to update the staff on inspections of buried piping at the Salem Nuclear Generating Station, Unit 1 and Unit 2, license renewal application.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a brief summary of the discussion and status of the items. Enclosure 3, provided by the applicant, shows results of the applicant's inspection of carbon steel inspections since 2009 and a diagram of the applicant's completed and planned program for the auxiliary feedwater piping.

The applicant had an opportunity to comment on this summary.

~~~

Bennett M. Brady, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosures:

1. List of Participants
2. Summary of meeting discussion
3. Talking points for the discussion cc w/encls: Listserv

TELEPHONE CONFERENCE CALL SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS January 25, 2011 PARTICIPANTS AFFI LlATIONS Bennett Brady U.S. Nuclear Regulatory Commission (NRC)

David Pelton NRC William Holston NRC Samuel Cuadrado de Jesus NRC Albert Piha Exelon James Melchionna PSEG Nuclear, LLC Ed Keating PSEG Nuclear, LLC Ali Fakhar PSEG Dylan Cimock Exelon AI Fulvio Exelon Robert Montgomery PSEG ENCLOSURE 1

SUMMARY

OF MEETING ON DRAFT REQUEST FOR ADDITIONAL INFORMATION RESPONSES FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 JANUARY 25,2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC, held a telephone conference call on December 8, 2010, to update the NRC staff on recent Salem Unit 2 buried pipes inspections and their findings.

During the conference call, the NRC staff explained that the staff was still in discussions on their review of the Salem proposed Buried Piping Programs and would be preparing the final Safety Evaluation Report (SER) before the planned inspections of piping during the Unit 2 outage in April 2011. The NRC would like to know of inspections that may have been completed at Unit 2 that gave indications that the piping was coated. If so, the staff would be comfortable in moving forward with the SER and the meeting of the Advisory Committee on Reactor Safeguards in May 2011.

The applicant stated that as part of the extend of condition review, a portion of the Unit 2 auxiliary feedwater (AFW), station air and control air systems buried piping was excavated and the coatings were found to be in good condition. As indicted in the attachment in Enclosure 3, two AFW and five compressed air system lines in the scope of license renewal have been inspected since 2009: the inspections found that the coating was in good condition. As shown on the second page of the attachment, the two AFW pipes in Unit 2 that were exposed in 2010 for 3 feet each were in the Fuel Transfer Tub Area; a similar area in Unit 1 pipes were found to be missing coatings. Other piping not in the scope of license renewal at Unit 2 or pipes in common with Unit 2 as shown in the table in Enclosure 3 have been inspected and found that the coating was in good condition. The soil in these digs has also been found to be in good condition.

ENCLOSURE 2

Salem Buried Pipe Program Number of Carbon Steel Inspections since 2009 on the specified Systems 1 Unit 1 Unit 2 Common In-scope (2) Auxiliary Feed Water (2) Auxiliary Feed Water 2 Systems (5) Compressed Air (5) Compressed Air

1) Service Water Not (1) Circ. Water 1) Steam Gen. Blowdown (1) Fire Protection In-scope (1) Steam Gen. Blowdown (7) Fuel Oil 3 Systems (1) Sewage Lift Station I

Notes:

1. The numbers in parenthesis ( ) represent the number of individual pipelines for each system found coated upon excavation.
2. Two AFW lines were inspected inside the Unit 2 Fuel Transfer Tube Area in 2010 as part of the extent of condition for missing coating on Unit 1 AFW pipes. Inspections exposed -3ft on each of the two AFW lines. The pipes were found coated. (See Response to RAI B.2.1.22, submitted in PSEG Letter LR-N10-0322 on September 7,2010)
3. The number of inspections for Fuel Oil piping includes three separate locations exposed on one pipeline with coating found present at all 3 locations.

ENCLOSURE 3

2 Buried Auxiliary Feedwater Piping for Salem Units 1 and 2 North Outer South Outer Penetration Area Unit 2 Unit 1 2 AFW pipes in Unit 1 ----..

2 AFW pipes around FTTA; -60ft each. Pipes Containment Building; -85ft were rerouted above 2 AFW pipes around each. ground in 2010 and are no Containment Building; -85ft FTTA longer buried FTTA each. Replaced wI new pipe and backfilled in CLSM 2 AFW pipes in Unit 2 FHA; -GOft in 2010.

each. Pipes will be rerouted above ground prior to entering PEO 2 AFW pipes in Unit 2 FTTA were exposed for

-3ft each in 2010. Coating was found present on each of the AFW pi pes

'.. ML110760604

  • concurrence via email LA:DLR* PM:RPB1 :DLR BC:RPB1:DLR PM:RPB1:DLR OFFICE SFigueroa BBrady BPham BBrady NAME 3118/11 3/25111 3/30/11 4/5111 DATE

Memorandum to PSEG Nuclear, LLC from B. Brady dated March 5, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 25, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR, LLC, CONCERNING INFORMATION ON BURIED PIPING INSPECTIONS AT THE SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARDCOPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsOgcMailCenter Resource BPham BBrady LPerkins ACunanan SCuadrado REnnis CSanders BHarris, OGC ABurritt, RI RConte, RI MModes, RI DTifft, RI NMcNamara, RI