Summary of Telephone Conference Call Held on December 8, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Draft Response to Request for Additional Information Pertaining to the Salem Nuclear Generating
ML110050145
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/09/2011
From: Bennett Brady
License Renewal Projects Branch 1
To:
Division of License Renewal
BRADY B, NRR/DLR/RPB1, 415-2981
References
Download: ML110050145 (7)


Text

\.,,1'11 RfGu~ UNITED STATES

~"'v "'0", NUCLEAR REGULATORY COMMISSION

! ,~0 WASHINGTON, D.C. 20555-0001 q

~

~ ~ February 9, 2011

~ ~

'1-" ...0 It-***i' LICENSEE: PSEG Nuclear, LLC FACILITY: Salem Nuclear Generating Station, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR, LLC, CONCERNING DRAFT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the, staff) and representatives of PSEG Nuclear, LLC held a telephone conference call on December 8, 2010, to discuss and clarify the applicant responses to NRC's request for additional information (RAI) B.2.1.33-07 concerning the Salem Nuclear Generating Station, Unit 1 and Unit 2, license renewal application spent fuel pool leakage.

Enclosure 1 provides a listing of the partiCipants and Enclosure 2 contains a brief summary of the discussion and status of the items. Sketches of the spent fuel pool are in Enclosure 3.

The applicant had an opportunity to comment on this summary.

Bennett M. Brady, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosures:

1. List of Participants
2. Summary of meeting discussion
3. Spent fuel pool sketches cc w/encls: Distribution via Listserv

TELEPHONE CONFERENCE CALL SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS December 8, 2010 PARTICIPANTS AFFI L1ATIONS Bennett Brady U.S. Nuclear Regulatory Commission (NRC)

Abdul Sheikh NRC Bryce Lehman NRC Arthur Cunanan NRC Samuel Cuadrado de Jesus NRC Ali Fakhar PSEG Nuclear, LLC George Seibold PSEG Nuclear, LLC Ed Keating PSEG Nuclear, LLC Tom Roberts PSEG Nuclear, LLC Albert Piha Exelon John Hufnagel Exelon Mike Gallagher Exelon John Simons MPR Associates ENCLOSURE 1

SUMMARY

OF MEETING ON DRAFT REQUEST FOR ADDITIONAL INFORMATION RESPONSES FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 DECEMBER 8, 2010 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC held a telephone conference call on December 8, 2010, to discuss and clarify the applicant responses to NRC's request for additional information (RAI) B.2.1.33-07 concerning the Salem Nuclear Generating Station, Unit 1 and Unit 2, license renewal application spent fuel pool leakage.

During the conference call, the PSEG described the spent fuel pool sketches in Enclosure 3 and discussed their proposed plan to ensure that inaccessible concrete degradation will be identified and addressed before loss of intended function. PSEG discussed their intent to perform additional examinations and testing in the vicinity of the construction joints of the spent fuel pool walls (east and west). Specifically, PSEG stated that prior to the period of extended operation a shallow core sample approximately four inches deep in the east wall in the vicinity of the construction joint will be taken for examination to confirm that the concrete is in good condition.

The applicant explained that an excavation of the east wall area is scheduled to be done prior to the period of extended operation for buried piping and their plan is to obtain the core samples during this excavation.

In conclusion, the NRC found the applicant's plans for core samples acceptable and it was agreed that the applicant would send the draft RAI response as a formal RAI response.

ENCLOSURE 2

RAI B.2.1.33-07 &

Unit 1 Spent Fuel Pool open item.Ref Sketches Fuel Handling Building (Cross-Section at Spent Fuel Pool):

Cross section looking north FUEL ~NOLlNG BUILDING AUX.8U1LDlNG GROUt{} WATER o ELEV, qs'-0" SEISH[C GAP GR6DE ELEV. IQ'" -I!!'

CONSTRUCTION JOiNT Mean tide- e £LEV. aq' -0' Elev. 89' \ , (ALL AROUND I

.....- gap Seismic drain Elev.80'-4W' TELL TALE TO TRENCH UNVERT ElEv'-a3'-6' ENCLOSURE 3

-2 Section from UFSAR Fig. 3.6-26 Seismic Gap lWI'~

"h/~flll: L.....::r;:========::.;"-"----"'----+----'

February 9, 2011 LICENSEE: PSEG Nuclear, LLC FACILITY: Salem Nuclear Generating Station, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR, LLC, CONCERNING DRAFT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PSEG Nuclear, LLC held a telephone conference call on December 8,2010, to discuss and clarify the applicant responses to NRC's request for additional information (RAI) B.2.1.33-07 concerning the Salem Nuclear Generating Station, Unit 1 and Unit 2, license renewal application spent fuel pool leakage.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a brief summary of the discussion and status of the items. Sketches of the spent fuel pool are in Enclosure 3.

The applicant had an opportunity to comment on this summary.

IRA!

Bennett M. Brady, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosures:

1. List of Participants
2. Summary of meeting discussion
3. Spent fuel pool sketches cc w/encls: Distribution via Listserv DISTRIBUTION:

See next page ADAMS Accession No*.. ML110050145 *concurrence via e-mail

. OFFICE LA:DLR* PM:RPB1 :DLR BC:RPB1 :DLR PM:RPB1 :DLR NAME IKing BBrady BPham BBrady DATE 1/6/11 2/3/11 2/4/11 2/9/11 OFFICIAL RECORD COpy

Memorandum to PSEG Nuclear, LLC from B. Brady dated February 9, 2011

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 8, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR, LLC, CONCERNING DRAFT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsOgcMailCenter Resource BPham BBrady ACunanan SCuadrado LPerkins

. REnnis CSanders BHarris, OGC ABurritt, RI RConte, Rl MModes, RI DTifft, RI NMcNamara, RI