ML16218A005

From kanterella
Jump to navigation Jump to search

Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001
ML16218A005
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/11/2016
From: Carleen Parker
Plant Licensing Branch 1
To: Sena P
Public Service Enterprise Group
Parker C, NRR/DORL/LPLI-II, 415-1603
References
CAC MF8173, CAC MF8174, EGM 12-001
Download: ML16218A005 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 11, 2016 Mr. Peter P. Sena, Ill President PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION CONCERNING REQUEST FOR AN EXTENSION TO ENFORCEMENT GUIDANCE MEMORANDUM 12-001 (CAC NOS. MF8173 AND MF8174)

Dear Mr. Sena:

By letter dated July 27, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16209A013), PSEG Nuclear LLC (the licensee) requested an extension of the enforcement discretion authorized in the U.S. Nuclear Regulatory Commission's (NRC's) Enforcement Guidance Memorandum (EGM) 12-001, "Dispositioning Noncompliance with Administrative Controls Technical Specifications Programmatic Requirements that Extend Test Frequencies and Allow Performance of Missed Tests," dated February 24, 2012 (ADAMS Accession No. ML11258A243), for the Salem Nuclear Generating Station, Unit Nos. 1 and 2. In EGM 12-001, the NRC stated that it will exercise enforcement discretion to allow application of surveillance requirements applicability provisions to technical specification (TS) administrative controls programs as written into plant-specific TS programs with the exceptions described in the February 24, 2012, letter.

In EGM 12-001, the NRC stated that in order to continue to receive enforcement discretion, affected licensees shall submit a license amendment request (LAR) that is accepted by the NRC staff for review, within 4 months after the issuance of the notice of availability (NOA) of the model LAR, model safety evaluation, and model no-significant-hazards consideration determinations. The NOA for Technical Specifications Task Force (TSTF) Traveler TSTF-545, "TS lnservice Testing (IST) Program Removal" (ADAMS Accession No. ML15181A045), which includes the model LAR, safety evaluation, and no-significant-hazards consideration determinations, was issued on March 28, 2016. EGM 12-001 states that the NRC will consider extending the 4-month submittal period on a case-by-case basis, with adequate justification from the licensee.

The NRC staff has determined that additional information is needed to complete its review of the request. The specific questions are found in the enclosed request for additional information.

The draft questions were sent by electronic transmission on August 4, 2016, to Mr. Paul Duke of your staff. The draft questions were sent to ensure they were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. On August 11, 2016, Mr. Duke indicated that the licensee will submit a response within seven buisness days of the date of this letter.

P. Sena, Ill If you have any questions, please contact me at 301-415-1603 or by e-mail at Carleen.Parker@nrc.gov.

,f~-

er, Project Manager Branch 1-2 Division o erating Reactor Licensing Office of clear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosure:

Request for Additional Information cc w/enclosure: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR EXTENSION TO ENFORCEMENT GUIDANCE MEMORANDUM 12-001 PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 By letter dated July 27, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16209A013), PSEG Nuclear LLC (PSEG, the licensee) requested an extension of the enforcement discretion authorized in the U.S. Nuclear Regulatory Commission's (NRC's) Enforcement Guidance Memorandum (EGM) 12-001, "Dispositioning Noncompliance with Administrative Controls Technical Specifications Programmatic Requirements that Extend Test Frequencies and Allow Performance of Missed Tests," dated February 24, 2012 (ADAMS Accession No. ML11258A243), for the Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. EGM 12-001 provides guidance on how to disposition licensee noncompliance with Technical Specification (TS) Section 5.0, "Administrative Controls,"

TS 5.5., "Program and Manuals," testing requirements that make available surveillance requirement (SR) 3.0.2 or SR 3.0.3 or both.

In EGM 12-001, the NRC stated that in order to continue to receive enforcement discretion, affected licensees shall submit a license amendment request (LAR) that is accepted by the NRC staff for review, within 4 months after the issuance of the notice of availability (NOA) of the model LAR, model safety evaluation, and model no-significant-hazards consideration determinations. The NOA for Technical Specifications Task Force (TSTF) Traveler TSTF-545, "TS lnservice Testing Program (IST) Removal" (ADAMS Accession No. ML15181A045), which includes the model LAR, safety evaluation, and no-significant-hazards consideration determinations, was issued on March 28, 2016. EGM 12-001 states that the NRC will consider extending the 4-month submittal period on a case-by-case basis, with adequate justification from the licensee.

In its letter dated July 27, 2016, PSEG states that, "Due to the current level of activity associated with returning Salem, Unit No. 1, to service from extended outage," it is requesting an extension as provided for in EGM 12-001. Because of the limited level of detail provided, it is unclear to the NRC staff whether the "current level of activity" provides an adequate justification.

Therefore, the NRC staff requests that PSEG provide a summary description of the "current level of activity," including a discussion of importance or safety significance, if applicable, of the "current level of activity."

Enclosure

P. Sena, Ill If you have any questions, please contact me at 301-415-1603 or by e-mail at Carleen.Parker@nrc.gov.

Sincerely, IRA/

Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosure:

Request for Additional Information cc w/enclosure: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL 1-2 R/F RidsACRS_MailCTR Resource RidsRgn1 MailCenter Resource RidsNrrDorlLpl1-2 Resource RidsNrrLALRonewicz Resource RidsNrrPMSalem Resource RidsNrrDssStsb Resource RidsOeMailCenter Resource ADAMS Access1on No.: ML16218A005 *b1y e-ma1*1 OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DSS/STSB/BC*

NAME MMarshall LRonewicz AKlein w/comments DATE 8/09/2016 8/08/2016 8/04/2016 OFFICE OE/EB/BC(A) NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME (TMarenchin for) RFretz ( TWenqert for) DBroaddus CParker DATE 8/10/2016 8/11/2016 8/11/2016 OFFICIAL RECORD COPY