June 24, 2015, Summary of Pre-Submittal Meeting with PSEG Nuclear LLC on Upgrades and Maintenance to the Chilled Water System at Salem Nuclear Generating Station, Unit Nos. 1 and 2
ML15202A243
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/29/2015
From: Carleen Parker
Plant Licensing Branch 1
To:
Parker C, NRR/DORL/LPLI-2, 415-1603
References
TAC MF6308, TAC MF6309
Download: ML15202A243 (4)


Text

~!'!\ REGu(

~.:;,

o" ""'>--011

!3~~ UNITED STATES 2 *.  : ~ NUCLEAR REGULATORY COMMISSION

"'0 . . . ' f WASHINGTON, D.C. 20555-0001

,µ'C""....
o'"'

"'~ ~

      • ~* July 29, 2015 LICENSEE: PSEG Nuclear LLC FACILITY: Salem Nuclear Generating Station, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF JUNE 24, 2015, PRE-SUBMITTAL MEETING WITH PSEG NUCLEAR LLC, ON UPGRADES AND MAINTENANCE TO THE CHILLED WATER SYSTEM AT SALEM NUCLEAR GENERATING STATION (TAC NOS. MF6308 AND MF6309)

On June 24, 2015, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear LLC (PSEG or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss a proposed license amendment to support the upgrades and maintenance of the chilled water system at Salem Nuclear Generating Station. The meeting notice and agenda, dated June 8, 2015, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15159A790. A list of attendees is enclosed.

During the meeting, PSEG provided an overview of the planned license amendment request (LAR) as detailed in the licensee's slides and handout (ADAMS Accession Nos. ML15168A550 and ML15176A440, respectively). The following major topics were discussed: (1) current chilled water system configuration; (2) control area ventilation system; (3) proposed changes to the chilled water system; (4) proposed technical specification changes; and (5) justification for the new chilled water system configurations. The licensee anticipates submittal of the LAR within the next few months.

  • The NRC staff discussed (1) chilled water system modifications, including the dedication process, digital controls, and use of the system cross tie; (2) format of the proposed technical specifications, specifically the usability for the operators and the resident inspectors; (3) duration of the technical specification (temporary versus permanent); and (4) operating experience, such as service water fouling, with the licensee. In addition, for informational purposes, the NRC staff suggested PSEG look at draft Standard Review Plan (SRP) 9.2.7, "Chilled Water" .(ADAMS Accession No. ML14093A350), which is out for public comment. This SRP discusses what the NRC

. staff plans on looking at in chilled water systems in new reactors.

Members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at.301-415-1603 or Carleen.Parker

  • ~~ ~. ~~}-- .

Carleen J. Parket, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311

Enclosure:

List of Attendees cc w/enclosure: Distribution via Listserv

LIST OF ATTENDEES JUNE 24, 2015, PRE-SUBMITTAL MEETING WITH PSEG NUCLEAR LLC UPGRADES AND MAINTENANCE TO THE CHILLED WATER SYSTEM AT SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 NRG Attendees Doug Broaddus, NRR Carleen Parker, NRR Jay Schafler, NRR Greg Casto, NRR Larry Wheeler, N.RR Robert Dennig, NRR David Nold, NRR Matthew Hamm, NRR PS EG *Representatives Brian Thomas Alan Johnson Kevin King Bob Garver Ben Frazier, MPR Matt Mog Justin Hargrave Robert Hoffman Members of the Public Donna Gilmore Marvin Lewis Enclosure

ML15202A243 OFFICE NRR/DORL/LPL 1-2/PM NRR/DORL/LPL 1-2/LA NRR/DORL/LPL 1-2/BC NRR/DORL/LPL 1-2/PM NAME CParker LRonewicz DBroaddus CParker DATE 7/29/15 7/27/15 7/29/15 7/29/15