| issue date = 08/02/1984
| issue date = 08/02/1984
| title = Requests Confirmation of CRGR Review Re Specific Uncertainties Conservatively Treated in GE Instrument Setpoint Methodology for Bwrs.Concern Should Be Treated as Generic
| title = Requests Confirmation of CRGR Review Re Specific Uncertainties Conservatively Treated in GE Instrument Setpoint Methodology for Bwrs.Concern Should Be Treated as Generic
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name = SCHWENCER A
| addressee name = Schwencer A
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000397
| docket = 05000397
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~a 1 REGULATVR)
{{#Wiki_filter:1
INFORMATION DISTRIBUTION S'TEt<(RIDS)'CCESSION NBR:8408070333 DOC~DATE: 89/08/02 NOTARIZED; NO DOCKET FACIL:50-397 NPPSS Nuclear Project<Unit?i Nashin'gton Public Powe 05000397 AUTH, NAME AUTHOR AFFILIATION SORENSEN,G AC, Nashington Public Power Supply System RECIP NAME RECIPIENT AFFILIATION SCHNENCERgA
    ~a REGULATVR) INFORMATION DISTRIBUTION     S   'TEt< (RIDS)
~Licensing Branch 2 SUBJECT;Requests confirmation of CRGR review re-specific uncertainties conservatively treated in GE instrument setpoint methodology for BNRs,Concern should be treated as generic.DISTRIBUTION CODE: A001S COPIES RECEIVED:LTR ENCL SIZE: TITLE;OR Submittal:
NBR:8408070333       DOC DATE: 89/08/02
General Distribution NOTES'L:12/20/83 05000397 RECIP IENT ID CODE/NAME NRR LB2 BC Ol INTERNAL: ADM-LFMB NRR/DE/MTEB NRR/DL/ORAB NRR/DS I/RAB RGNS COPIES LTTR ENCL 7 7 1 0 1 1 1 0 1 1 1 RECIPIENT ID CODE/NAME ELD/HDS2 NRR/DL DIR NRR/DS I/METB G 04 COPIES LTTR ENCL 1 0 1 1 1 1 1.1 EXTERNAL: ACRS 09 NRC PDR 02 NTIS 6 6 1 1 1 1 LPDR NSIC 03 05 1 1 1'TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL.23 III Ir Washington Public Power Supply System P.O.Box 968 3000 George Washington Way Richland, Washington 99352 (509)372-5000 August 2, 1984 G02-84-445 Docket No.50-397 8408070333 840802 PDR ADOCK 05000397 P PDR Director of Nuclear Reactor Regulation Attention:
                                        ~                  NOTARIZED; NO         'CCESSION DOCKET FACIL:50-397     NPPSS Nuclear Project< Unit ?i Nashin'gton Public         Powe           05000397 AUTH, NAME           AUTHOR AFFILIATION SORENSEN,G AC,         Nashington Public Power Supply System RECIP NAME           RECIPIENT AFFILIATION SCHNENCERgA   ~         Licensing Branch 2 SUBJECT; Requests       confirmation of CRGR review re -specific uncertainties conservatively treated in GE instrument setpoint methodology for BNRs,Concern should be treated                     as generic.
Mr.A.Schwencer, Chief Licensing Branch No.2 Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555
DISTRIBUTION CODE: A001S         COPIES RECEIVED:LTR       ENCL         SIZE:
TITLE;   OR Submittal: General Distribution 05000397 NOTES'L:12/20/83 RECIP IENT         COPIES          RECIPIENT              COPIES ID CODE/NAME        LTTR ENCL      ID CODE/NAME           LTTR ENCL NRR   LB2 BC   Ol     7    7 INTERNAL: ADM-LFMB                   1    0    ELD/HDS2                  1      0 NRR/DE/MTEB             1    1    NRR/DL DIR                1      1 NRR/DL/ORAB             1    0    NRR/DS I/METB              1     1 NRR/DS I/RAB            1            G             04       1 . 1 RGNS                    1   1 EXTERNAL: ACRS               09     6   6     LPDR            03        1     1 NRC  PDR      02      1   1     NSIC             05       1' NTIS                    1   1 TOTAL NUMBER OF COPIES REQUIRED: LTTR         26   ENCL. 23


==Dear Mr.Schwencer:==
III Ir
 
Washington Public Power Supply System P.O. Box 968  3000 George Washington Way Richland, Washington 99352 (509) 372-5000 8408070333 840802 PDR ADOCK 05000397 August 2, 1984                                            P                    PDR G02-84-445 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.      20555
 
==Dear Mr. Schwencer:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO. 2 REQUEST FOR CONFIRMATION OF CRGR REVIEW


==Reference:==
==Reference:==
Letter, T. M. Novak (NRC) to J. F. Carolan (PECO) with blind copy to Supply System Docket No. 50-397, "Transmittal of NRC Staff Report on Setpoint Methodology for GE Supplied Protection System Instrumentation", dated May 15, 1984 The  reference letter:requested twelve utilities, constructing or operating Boiling Water Reactors, to provide additional confirmatory information to affirm that specific uncertainties have been conservatively treated in the General Electric instrument.setpoint methodology.
The Supply System    objects to the manner in which this concern has been brought to the attention of the utilities addressed by the letter. In the latter part of 1982, various utilities received inquiries with regard to instrument setpoint methodology via several routes: formal Requests for Information addressed to a specific docket, informal copies of similar requests for-information, either provided by hand or telecopied to utility employees, approved licensing conditions addressed          in staff Safety Evaluation'Reports or proposed licensing conditions.
A  review of the inquiries to date and other documentation applicable to this concern readily, leads to the conclusion that the concern, as expressed by the staff,,is generic.        It is the Supply System position that the issue is generic to.all utilities supplied protection system instrumentation by General. Electric and not restricted to the twelve utilities addressed by the reference.
t
                ~ I 1g +
Cs V
4
A. Schwencer Page Two A'ugust 2, 1984 REQUEST FOR CONFIRMATION OF CRGR REVIEW The Supply System has.been      unable,to.confirm that this concern has received formal review by the'Committee to Review Generic Requirements (CRGR) and considers the methodology of implementation to date, to be contrary to the policies of the Nuclear Regulatory Commission and in particular the spirit, if  not the letter, of the CRGR charter. As stated in revision I to the CRGR charter, the CRGR "has the responsibility to review and recommend to the Executive Director for Operations (EDO} approval or disapproval of requirements to be imposed by the NRC staff on one or more classes of power reactors". Additionally, the CRGR is charged to develop controls to "make sure that requirements in place or to be issued (a} do 'in fact contribute effectively and significantly to the health and safety of the public, and (b) do lead to utilization of both NRC and licensee resources in as optimal a fashion as possible in the overall achievement of protection of public health and safety". The Supply System can not confirm that this concern has been subject to these controls.
The  referenced  letter states that "the staff    considers the Technical Speci-fications for instrument      channel setpoint allowable values for licensed GE/BWR plants (and those specifications in preparation for NTOL plants in the licensing review process}, established based on the GE setpoint method-ology developed to date, to.be sufficiently conservative to permi t continued licensing of the NTOL plants and operation of licensed plants until this issue is resolved . . .". This statement confirms the generic applicability of this concern". Additionally the perceived method of implementing this concern on the twelve utilities in question without appropriate CRGR review casts doubt that the concern has -indeed had appropriate analysis. Also no verification exists that implementation of the concern will affect an effective and significant contribution to the health and safety of the public. Based on the significant costs, presented by the NSSS supplier to the utilities in question for obtaining the requested information, without CRGR review      it evident that the staff has evaluated the burden placed on the utilities nor the is not consequences on the public, supporting those utilities.
Accordingly, the Supply System requests that confirmation of the CRGR review of this concern, with the attendant information package described in the CRGR charter, be provided. .Additionally, there is no clear indication that this request to over.ten utilities has received an Office of Management and Budget approval per public law: Paper Work Reduction Act of 1980, PL  96-511.
Should you have any questions regarding      this request, please contact Mr.
P. L. Powell, Manager, WNP.-2 Licens,ing.
Very  truly yours, G. C. Sorensen,  Manager Regulatory Programs PLP/tmh cc:  R  Auluck -  NRC WS  Chin    -  BPA AD  Toth    -  NRC Site V  Stello -  NRC R  Grunseich - LILCO
      ~ ~
          ~e t
4 C lf
0 Mr. Pat Powell                    Mr. Dale Holtzscher WPPSS                            Illinois    Power Co.
P. 0 ~  Box 968                  500 S. 27th Street Mail Drop 956B                    Mail Code F-33 Richland,  WA  99352            Decatur, IL 62525 Mr. Al Wegele                    Ms. Eileen Buzzelli Detroit Edison Co.                Cleveland Electric Ilium. Co.
6400 N Dixie Highway
        ~                        P.O. Box 84 Mail Drop 346 NOC                Rm. Py-R 230 Newport, MI 48166                Perry, Ohio 44081 Mr. Neil Coddington              Mr. John Price Pennsylvania Power 5 Light Co. Gulf States    Utilities Two North Ninth Street            P.O. Box 2951 All entown, PA 18101              Beaumont, TX 77704 Mr. John Morin                    Mr. Gerald Tenenbaum Long Island Lighting Co.          Public Service Electric  5 Gas Shoreham Nuclear Power Station    80 Park Plaza P.O. Box 618                      T-21' Wading River, NY 11792            Newark,    NJ  07101 Mr. Charles Schroeder            Hr. Tony Zallnick Commonwealth Edison Co.          Niagara Mohawk Power Corp.
P.O. Box 767                      300 Erie Boulevard, West One  First National    Plaza      Syracuse, NY 13202 Chicago, IL 6069Q Hr. John Fowler                  Hr. Dave Foreman Mississippi    Power 5  Light,Co. General    Electric  Co P.O. Box 1640                    175  Curtner Avenue Jackson, MS 39205                Hail Drop 682 San  Jose,  CA  95125 Hr. Roger Boyd                    Hr. T. E. Tipton KNC,  Inc.                      Atomic Industrial Forum, Inc.
801 18th Street,    NW            7101 Wisconsin Avenue Suite 300                        Washington, p.C. 20014 Washington, D.C.      20006


NUCLEAR PLANT NO.2 REQUEST FOR CONFIRMATION OF CRGR REVIEW Letter, T.M.Novak (NRC)to J.F.Carolan (PECO)with blind copy to Supply System Docket No.50-397,"Transmittal of NRC Staff Report on Setpoint Methodology for GE Supplied Protection System Instrumentation", dated May 15, 1984 The reference letter:requested twelve utilities, constructing or operating Boiling Water Reactors, to provide additional confirmatory information to affirm that specific uncertainties have been conservatively treated in the General Electric instrument.setpoint methodology.
F 0
The Supply System objects to the manner in which this concern has been brought to the attention of the utilities addressed by the letter.In the latter part of 1982, various utilities received inquiries with regard to instrument setpoint methodology via several routes: formal Requests for Information addressed to a specific docket, informal copies of similar requests for-information, either provided by hand or telecopied to utility employees, approved licensing conditions addressed in staff Safety Evaluation'Reports or proposed licensing conditions.
+~1 s}}
A review of the inquiries to date and other documentation applicable to this concern readily, leads to the conclusion that the concern, as expressed by the staff,,is generic.It is the Supply System position that the issue is generic to.all utilities supplied protection system instrumentation by General.Electric and not restricted to the twelve utilities addressed by the reference.
t~I 1g+'Cs V 4 A.Schwencer Page Two A'ugust 2, 1984 REQUEST FOR CONFIRMATION OF CRGR REVIEW The Supply System has.been unable,to.confirm that this concern has received formal review by the'Committee to Review Generic Requirements (CRGR)and considers the methodology of implementation to date, to be contrary to the policies of the Nuclear Regulatory Commission and in particular the spirit, if not the letter, of the CRGR charter.As stated in revision I to the CRGR charter, the CRGR"has the responsibility to review and recommend to the Executive Director for Operations (EDO}approval or disapproval of requirements to be imposed by the NRC staff on one or more classes of power reactors".
Additionally, the CRGR is charged to develop controls to"make sure that requirements in place or to be issued (a}do'in fact contribute effectively and significantly to the health and safety of the public, and (b)do lead to utilization of both NRC and licensee resources in as optimal a fashion as possible in the overall achievement of protection of public health and safety".The Supply System can not confirm that this concern has been subject to these controls.The referenced letter states that"the staff considers the Technical Speci-fications for instrument channel setpoint allowable values for licensed GE/BWR plants (and those specifications in preparation for NTOL plants in the licensing review process}, established based on the GE setpoint method-ology developed to date, to.be sufficiently conservative to permi t continued licensing of the NTOL plants and operation of licensed plants until this issue is resolved...".This statement confirms the generic applicability of this concern".Additionally the perceived method of implementing this concern on the twelve utilities in question without appropriate CRGR review casts doubt that the concern has-indeed had appropriate analysis.Also no verification exists that implementation of the concern will affect an effective and significant contribution to the health and safety of the public.Based on the significant costs, presented by the NSSS supplier to the utilities in question for obtaining the requested information, without CRGR review it is not evident that the staff has evaluated the burden placed on the utilities nor the consequences on the public, supporting those utilities.
Accordingly, the Supply System requests that confirmation of the CRGR review of this concern, with the attendant information package described in the CRGR charter, be provided..Additionally, there is no clear indication that this request to over.ten utilities has received an Office of Management and Budget approval per public law: Paper Work Reduction Act of 1980, PL 96-511.Should you have any questions regarding this request, please contact Mr.P.L.Powell, Manager, WNP.-2 Licens,ing.
Very truly yours, G.C.Sorensen, Manager Regulatory Programs PLP/tmh cc: R Auluck-NRC WS Chin-BPA AD Toth-NRC Site V Stello-NRC R Grunseich-LILCO
~~t~e 4 C lf 0 Mr.Pat Powell WPPSS P.0~Box 968 Mail Drop 956B Richland, WA 99352 Mr.Al Wegele Detroit Edison Co.6400 N~Dixie Highway Mail Drop 346 NOC Newport, MI 48166 Mr.Neil Coddington Pennsylvania Power 5 Light Co.Two North Ninth Street All entown, PA 18101 Mr.John Morin Long Island Lighting Co.Shoreham Nuclear Power Station P.O.Box 618 Wading River, NY 11792 Mr.Charles Schroeder Commonwealth Edison Co.P.O.Box 767 One First National Plaza Chicago, IL 6069Q Hr.John Fowler Mississippi Power 5 Light,Co.P.O.Box 1640 Jackson, MS 39205 Hr.Roger Boyd KNC, Inc.801 18th Street, NW Suite 300 Washington, D.C.20006 Mr.Dale Holtzscher Illinois Power Co.500 S.27th Street Mail Code F-33 Decatur, IL 62525 Ms.Eileen Buzzelli Cleveland Electric Ilium.Co.P.O.Box 84 Rm.Py-R 230 Perry, Ohio 44081 Mr.John Price Gulf States Utilities P.O.Box 2951 Beaumont, TX 77704 Mr.Gerald Tenenbaum Public Service Electric 5 Gas 80 Park Plaza T-21'Newark, NJ 07101 Hr.Tony Zallnick Niagara Mohawk Power Corp.300 Erie Boulevard, West Syracuse, NY 13202 Hr.Dave Foreman General Electric Co 175 Curtner Avenue Hail Drop 682 San Jose, CA 95125 Hr.T.E.Tipton Atomic Industrial Forum, Inc.7101 Wisconsin Avenue Washington, p.C.20014 F 0+~1 s}}

Latest revision as of 07:35, 4 February 2020

Requests Confirmation of CRGR Review Re Specific Uncertainties Conservatively Treated in GE Instrument Setpoint Methodology for Bwrs.Concern Should Be Treated as Generic
ML17277B465
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/02/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
GO2-84-445, TAC-55579, NUDOCS 8408070333
Download: ML17277B465 (8)


Text

1

~a REGULATVR) INFORMATION DISTRIBUTION S 'TEt< (RIDS)

NBR:8408070333 DOC DATE: 89/08/02

~ NOTARIZED; NO 'CCESSION DOCKET FACIL:50-397 NPPSS Nuclear Project< Unit ?i Nashin'gton Public Powe 05000397 AUTH, NAME AUTHOR AFFILIATION SORENSEN,G AC, Nashington Public Power Supply System RECIP NAME RECIPIENT AFFILIATION SCHNENCERgA ~ Licensing Branch 2 SUBJECT; Requests confirmation of CRGR review re -specific uncertainties conservatively treated in GE instrument setpoint methodology for BNRs,Concern should be treated as generic.

DISTRIBUTION CODE: A001S COPIES RECEIVED:LTR ENCL SIZE:

TITLE; OR Submittal: General Distribution 05000397 NOTES'L:12/20/83 RECIP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR LB2 BC Ol 7 7 INTERNAL: ADM-LFMB 1 0 ELD/HDS2 1 0 NRR/DE/MTEB 1 1 NRR/DL DIR 1 1 NRR/DL/ORAB 1 0 NRR/DS I/METB 1 1 NRR/DS I/RAB 1 G 04 1 . 1 RGNS 1 1 EXTERNAL: ACRS 09 6 6 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1' NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL. 23

III Ir

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 8408070333 840802 PDR ADOCK 05000397 August 2, 1984 P PDR G02-84-445 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PLANT NO. 2 REQUEST FOR CONFIRMATION OF CRGR REVIEW

Reference:

Letter, T. M. Novak (NRC) to J. F. Carolan (PECO) with blind copy to Supply System Docket No. 50-397, "Transmittal of NRC Staff Report on Setpoint Methodology for GE Supplied Protection System Instrumentation", dated May 15, 1984 The reference letter:requested twelve utilities, constructing or operating Boiling Water Reactors, to provide additional confirmatory information to affirm that specific uncertainties have been conservatively treated in the General Electric instrument.setpoint methodology.

The Supply System objects to the manner in which this concern has been brought to the attention of the utilities addressed by the letter. In the latter part of 1982, various utilities received inquiries with regard to instrument setpoint methodology via several routes: formal Requests for Information addressed to a specific docket, informal copies of similar requests for-information, either provided by hand or telecopied to utility employees, approved licensing conditions addressed in staff Safety Evaluation'Reports or proposed licensing conditions.

A review of the inquiries to date and other documentation applicable to this concern readily, leads to the conclusion that the concern, as expressed by the staff,,is generic. It is the Supply System position that the issue is generic to.all utilities supplied protection system instrumentation by General. Electric and not restricted to the twelve utilities addressed by the reference.

t

~ I 1g +

Cs V

4

A. Schwencer Page Two A'ugust 2, 1984 REQUEST FOR CONFIRMATION OF CRGR REVIEW The Supply System has.been unable,to.confirm that this concern has received formal review by the'Committee to Review Generic Requirements (CRGR) and considers the methodology of implementation to date, to be contrary to the policies of the Nuclear Regulatory Commission and in particular the spirit, if not the letter, of the CRGR charter. As stated in revision I to the CRGR charter, the CRGR "has the responsibility to review and recommend to the Executive Director for Operations (EDO} approval or disapproval of requirements to be imposed by the NRC staff on one or more classes of power reactors". Additionally, the CRGR is charged to develop controls to "make sure that requirements in place or to be issued (a} do 'in fact contribute effectively and significantly to the health and safety of the public, and (b) do lead to utilization of both NRC and licensee resources in as optimal a fashion as possible in the overall achievement of protection of public health and safety". The Supply System can not confirm that this concern has been subject to these controls.

The referenced letter states that "the staff considers the Technical Speci-fications for instrument channel setpoint allowable values for licensed GE/BWR plants (and those specifications in preparation for NTOL plants in the licensing review process}, established based on the GE setpoint method-ology developed to date, to.be sufficiently conservative to permi t continued licensing of the NTOL plants and operation of licensed plants until this issue is resolved . . .". This statement confirms the generic applicability of this concern". Additionally the perceived method of implementing this concern on the twelve utilities in question without appropriate CRGR review casts doubt that the concern has -indeed had appropriate analysis. Also no verification exists that implementation of the concern will affect an effective and significant contribution to the health and safety of the public. Based on the significant costs, presented by the NSSS supplier to the utilities in question for obtaining the requested information, without CRGR review it evident that the staff has evaluated the burden placed on the utilities nor the is not consequences on the public, supporting those utilities.

Accordingly, the Supply System requests that confirmation of the CRGR review of this concern, with the attendant information package described in the CRGR charter, be provided. .Additionally, there is no clear indication that this request to over.ten utilities has received an Office of Management and Budget approval per public law: Paper Work Reduction Act of 1980, PL 96-511.

Should you have any questions regarding this request, please contact Mr.

P. L. Powell, Manager, WNP.-2 Licens,ing.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs PLP/tmh cc: R Auluck - NRC WS Chin - BPA AD Toth - NRC Site V Stello - NRC R Grunseich - LILCO

~ ~

~e t

4 C lf

0 Mr. Pat Powell Mr. Dale Holtzscher WPPSS Illinois Power Co.

P. 0 ~ Box 968 500 S. 27th Street Mail Drop 956B Mail Code F-33 Richland, WA 99352 Decatur, IL 62525 Mr. Al Wegele Ms. Eileen Buzzelli Detroit Edison Co. Cleveland Electric Ilium. Co.

6400 N Dixie Highway

~ P.O. Box 84 Mail Drop 346 NOC Rm. Py-R 230 Newport, MI 48166 Perry, Ohio 44081 Mr. Neil Coddington Mr. John Price Pennsylvania Power 5 Light Co. Gulf States Utilities Two North Ninth Street P.O. Box 2951 All entown, PA 18101 Beaumont, TX 77704 Mr. John Morin Mr. Gerald Tenenbaum Long Island Lighting Co. Public Service Electric 5 Gas Shoreham Nuclear Power Station 80 Park Plaza P.O. Box 618 T-21' Wading River, NY 11792 Newark, NJ 07101 Mr. Charles Schroeder Hr. Tony Zallnick Commonwealth Edison Co. Niagara Mohawk Power Corp.

P.O. Box 767 300 Erie Boulevard, West One First National Plaza Syracuse, NY 13202 Chicago, IL 6069Q Hr. John Fowler Hr. Dave Foreman Mississippi Power 5 Light,Co. General Electric Co P.O. Box 1640 175 Curtner Avenue Jackson, MS 39205 Hail Drop 682 San Jose, CA 95125 Hr. Roger Boyd Hr. T. E. Tipton KNC, Inc. Atomic Industrial Forum, Inc.

801 18th Street, NW 7101 Wisconsin Avenue Suite 300 Washington, p.C. 20014 Washington, D.C. 20006

F 0

+~1 s