ML20234B087: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20234B087
| number = ML20234B087
| issue date = 06/19/1987
| issue date = 06/19/1987
| title = Forwards Rev to Industrial Security Plan,Per Axelson 870310 Ltr & Addl Revs Due to Recent Review of Plan.Revs Withheld (Ref 10CFR73.21)
| title = Forwards Rev to Industrial Security Plan,Per Axelson & Addl Revs Due to Recent Review of Plan.Revs Withheld (Ref 10CFR73.21)
| author name = Shelton D
| author name = Shelton D
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 1-736, NUDOCS 8707020209
| document report number = 1-736, NUDOCS 8707020209
| title reference date = 03-10-1987
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
Line 23: Line 24:
==Subject:==
==Subject:==
Revision to the Industrial Security Plan Gentlemen:                                                                          1
Revision to the Industrial Security Plan Gentlemen:                                                                          1
       ,      This is in response to a letter from Mr. Axelson of your staff, dated March 10, 1987 (Log No. 1-1575) concerning our submittal of February 20, 1987 (Serial No. 1-709) which transmitted changes to the Industrial Security Plan for the Davis-Besse Nuclear Power Station. It identified certain items which required additicnal justification to be consistent with provisions of 10CFR50.54(p). Attached are revisions to the Indus-j tria] Security Plan which address the items of the March 10, 1987 letter.
       ,      This is in response to a letter from Mr. Axelson of your staff, dated March 10, 1987 (Log No. 1-1575) concerning our submittal of February 20, 1987 (Serial No. 1-709) which transmitted changes to the Industrial Security Plan for the Davis-Besse Nuclear Power Station. It identified certain items which required additicnal justification to be consistent with provisions of 10CFR50.54(p). Attached are revisions to the Indus-j tria] Security Plan which address the items of the {{letter dated|date=March 10, 1987|text=March 10, 1987 letter}}.
s    Also, included are additional revisions resulting from a recent review of the ::ndustrial Security Plan.
s    Also, included are additional revisions resulting from a recent review of the ::ndustrial Security Plan.
One original and three copies of the ISP (Revision 2) are being submitted pursuant to 10CFR50.54(p).
One original and three copies of the ISP (Revision 2) are being submitted pursuant to 10CFR50.54(p).

Latest revision as of 21:26, 20 March 2021

Forwards Rev to Industrial Security Plan,Per Axelson & Addl Revs Due to Recent Review of Plan.Revs Withheld (Ref 10CFR73.21)
ML20234B087
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/19/1987
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
1-736, NUDOCS 8707020209
Download: ML20234B087 (1)


Text

-

TOLEDO l-

%sEDISON Docket No. 50-346 DONALD C. SHELTON voe pre,4n-Nudew

{419]249 2399 License No. NPF-3 Serial No. 1-736 June 19, 1987 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Revision to the Industrial Security Plan Gentlemen: 1

, This is in response to a letter from Mr. Axelson of your staff, dated March 10, 1987 (Log No. 1-1575) concerning our submittal of February 20, 1987 (Serial No. 1-709) which transmitted changes to the Industrial Security Plan for the Davis-Besse Nuclear Power Station. It identified certain items which required additicnal justification to be consistent with provisions of 10CFR50.54(p). Attached are revisions to the Indus-j tria] Security Plan which address the items of the March 10, 1987 letter.

s Also, included are additional revisions resulting from a recent review of the ::ndustrial Security Plan.

One original and three copies of the ISP (Revision 2) are being submitted pursuant to 10CFR50.54(p).

p'7 Application is being made to withhold the attached information from

's disclosure in accordance with 10CFR73.21. The attachments contain

q safeguards information.

Very-trul yours, DCS:GAk:plf Attachments cc: DB-1 hTC Resident Inspector, w/o A. B. Davis, Regional Aa-4nistrator (2 copies) 70 g $ h 6 s F' /

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 i _ _