ML20246K247: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| project =  
| project = TAC:71850
| stage = Request
| stage = Request
}}
}}

Latest revision as of 21:22, 16 March 2021

Forwards Application for Amend to License NPF-3,deleting Tech Spec 4.0.2b Surveillance Requirement Interval Extension to Provide Flexibility & Permit Consideration of Plant Operating Conditions
ML20246K247
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/23/1989
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20246K252 List:
References
1702, TAC-71850, NUDOCS 8909050415
Download: ML20246K247 (2)


Text

. . -

' e: *

,1__

TOLEDO EDISON A Centew Energy Company l

DONALD C. SHELTON .

Docket Number.50-346 Vee Preadent-Nudear 14191249-2300

_ License Number NPF-3 Serial Number 1702 August 23, 1989

. United States Nuclear Regulatory Commission l' Document Control Desk-Vashington, D. C. 20555 Subj ect: Licen:le Amendment- Application to Delete Technical Specification 4.0.2b Surveillance Requirement Interval Extension Limit (TAC Number 71850)

Gentlemen:

The enclosed application requests that the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License, Appendix A, Technical Specifications (TS).be revised to reflect the changes attached. The proposed change involves Section 3/4.0 (Limiting. Conditions for Operations and Surveillance Requirements - Applicability), Surveillance Requirement (SR) 4.0.2.

Surveillance Requirement 4.0.2 includes a provision that allows surveillance intervals to be extended by 25 percent of the specified time interval. This.

provides flexibility for scheduling the performance of surveillance and to permit consideration of plant operating conditions that may not be suitable for conducting of a surveillance at its specified time interval. Such conditions include transient plant operation or safety systems that may be out-of-service due to maintenance or other ongoing surveillance activities.

7 Specification 4.0.2 further limits the 25 percent allowance for extending surveillance intervals by requiring that the combined time interval for any three consecutive surveillance not exceed 3.25 times the specified surveillance interval. This application proposes the removal of the 3.25 limit required by SR 4.0.2b.

The DBNPS sixth refueling outage is presently scheduled to commence about

. February 1, 1990. Toledo Edison's review of scheduled surveillance requirements indicates that the 1.25. limit (i.e., 4.0.2a limit) vill not be reached before February 1, 1990, for a surveillance which requires a plant shutdown to be performed. However, the 3.25 limit (i.e., 4.0.2b limit) vill

, be reached for at least 20 surveillance before February 1, 1990, which require a plant shutdown to be performed.

8909050415 890823 (JO '

PDR ADOCK 05000346 P PDC /g THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652

l

,'Dockat' Number 50-346

. License Number NPF-3

' Serfal Number 1702

-Page 2 The NuElear Regulatory Commission (NRC) recently issued similar. amendments to Commonwealth Edison Company for Units 1 and 2 of the LaSalle County Station on July 19, 1989. LIn addition, Toledo Edison has been informed that a NRC Generic Letter will be issued in the near future to inform licensees that this change vill be approved for all plants.

Toledo Edison ~ requests that the amendment be issued for DBNPS by October 31, 1989, for implementation by November 13, 1989, to prevent an unnecessary shutdown of DBNPS Unit 1. This amendment request supersedes Toledo Edison's previous submittal dated October 31, 1988, (Serial Number 1588) which applied only to 18-month surveillance under SR 4.0.2b.

Very truly yours, C A / .

CBK/dlm ces P. M. Byron, DB-1 NRC Senior Resident Inspector A. B. Davis, Regional Administrator, NRC Region III T. V. Vambach, DB-1 NRC Senior Project Manager State of Ohio-

- _ . __ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _