ML20154Q518: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 5
| page count = 5
| project =  
| project = TAC:65607
| stage = Request
| stage = Request
}}
}}

Latest revision as of 02:50, 10 December 2021

Forwards Listing of Proposed Changes in 880308 Application for Amend to License NPF-3,revising Tech Spec Section 6.0, Administrative Control. Requests That Outstanding Changes Under TAC 65607 Be Issued by 881215
ML20154Q518
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/24/1988
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
1519, GL-88-06, GL-88-6, NUDOCS 8806070046
Download: ML20154Q518 (5)


Text

, --

s TOLE 00

%mm EDISON Docket No. 50-346 ^C"*"'""*C'*"'

License No. NPF-3 DONAU) C. SHELTON vu w-,uwa Serial No. 1519 """

May 24, 1988 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Subj ec t : Disposition of Section 6.0 Technical Specification Changes Proposed in Serial No. 1488 (TAC No. 65607)

Gentlemen:

On March 8, 1988 (Serial No. 1488) Toledo Edison submitted a License Amendment application to revise Technical Specification Section 6.0, Administrative Controls, to reflect organization, position, and title changes. Subsequently, on April 22, 1988 (Serial No. 1512) Toledo Edison submitted a License Amendment application to remove organizetion charts from the Technical Specifications, consistent with the guidance provided in NRC Generic Letter 88-06, Removal of Organization Charts from Technical Specification Administrative Control Requirements, dated March 22, 1988. Consequently, some of the proposed changes previously requested in Serial No. 1488 have been superseded by those requested in Serial No. 1512.

Attachment 1 provides a detailed listing of the changes proposed in Serial No.

1488 and the requested disposition. Note that some of the proposed changes:

1) have been granted by the issuance of License Amendment No. 109 (Log No.

2522, dated March 9, 1988); 2) have been superseded by Serial No. 1512; and

3) vill be superseded by a License Amendment application (Serial No. 1528) scheduled to be submitted no later than June 15, 1988. Those changes that have been previously granted or superseded do not require any further action by NRC.

Toledo Edison requests that the outstanding changes under TAC No. 65607 be issued by December 15, 1988 for implementation within 45 days thereafter.

Very t 1 yours, i

CAB: tit Attachment cc: A. V. DeAgazio, NRC/NRR Davis-Besse Project Manager DB-1 Resident Inspector U(

,kD t

State of Ohio IHE TOLEDO ECGCN COMPANY EDISON PLAZA 300 MAOSON AVENUE TOLEDO, OHIO 43652 l\

8806070046 880524 PDR ADOCK 05000346

@ DCD

. . Dock 3t No. 50-346 Licensa No. NPF-3 Ssrial No. 1519 Attachment 1 Page 1 of 4 REQUESTED DISPOSITION OF CHANGES PROPOSED IN SERIAL NO. 1488, DATED HARCH 8, 1988 CHANGES PROPOSED UNDER SERIAL NO. 1488 REQUESTED DISPOSITION

1. 6.2 (page 6-1) - Revise title to read Superseded by Serial

'0FFSITE/0NSITE' to accurately reflect the No. 1512, dated April Davis-Besse Nuclear Pover Station 22, 1988. No Action.

Organization as shown in Figure 6.2-1.

2. 6.2.1 (page 6-1) - Revise 'offsite Superseded by Serial organization' to' read "offsite/onsite No. 1512, dated April organization" to accurately reflect the 22, 1988. No Action.

Davis-Besse Nuclear Power Station organization as shown in Figure 6.2-1.

3. 6.2.2 (page 6-1) - Change to read "The Superseded by Serial Facility organization shall be as shown on No. 1512, dated April Figure 6.2-2 and: ". The facility staff 22, 1988. No Action.

referenced is shown on Figure 6.2-2.

4. Figure 6.2-1 (page 6-2) - Revise figure to: 1) Superseded by Serial Add the position of Chairman and Chief No. 1512, dated April Executive Officer; 2) Include the title change 22, 1988. No Action.

of President and Chief Operating Officer to President, and include the revised reporting requirements for the President. The President reports directly to the Chairman and Chief Executive Officer; 3) Add the position of Executive Vice President. The Finance and Administration Vice President and the Vice President, Nuclear report directly to the Executive Vice President, instead of to the President and Chief Operating Officer;

4) Include the following title changes; Administration Senior Vice President to Finance and Administration Vice President; Senior Vice President, Nuclear to Vice President, Nuclear; and Performance l Engineering Manager to Performance Engineering l Director; 5) Delete the Technical Support i Department from Figure 6.2-1 to reflect the l revised reporting requirements. The Technical Support Department reports directly to General Superintendent, Outage and Program Management, instead of to the Plant Manager; 6) Lelete the Plant Services Department from Figure 6.2-1 to reflect the revised reporting requirements.

The Plant Services Department reports directly to the Maintenance Planning Superintendent

Dockst No. 50-346

., License No. NPP-3 S: riel No. 1519 Attachment 1 Page 2 of 4 CHANGES PROPOSED UNDER SERIAL NO. 1483 REQUESTED DISPOSITION instead of the Plant Manager. The Haintenance Planning Superintendent reports directly to the General Superintendent, Outage, and Program Management; 7) Separate the Chemistry and Health Physics Department into Chemistry Department and the Radiological Controls Department. The Chemistry Superintendent reports directly to the Plant Manager.

The Radiological Controls Superintendent reports directly to the Plant Manager; 8)

Include the relocation of the Administrative Services Assistant Vice President, Industrial Security Director and Procurement Director to the Davis-Besse Nuclear Power Station site.

This vill provide an increased level of support to nuclear personnel. In addition, the position of Administrative Services Director has been deleted fium the organization chart as this position is titled Facilities Services Manager and the organization chart does not reflect positions below that of the director level (the Facilities Services Manager remains located onsite); and 9) Add the position of Engineering Programs Director who reports directly to the Engineering General Director.

5. 6.3.1 (page 6-5) - Change Chemistry and Health Remains requested Physics General Superintendent to Radiological under Serial No.

Controls Superintendent. This change reflects 1488, dated March 8, the separation of the Chemistry and Health 1988.

Physics Department and is consistent with Regulatory Guide 1.8, September 1975.

6. 6.5.1.2 (page 6-6) - Change Station Review Remains requested Board member from Chemistry and Health Physics under Serial No.

General Superintendent to Radiological 1388, dated March 8, Controls Superintendent. This change reflects 1538.

the separation of the Chemistry and Health Physics Department.

7. 6.5.1.2 (page 6-6) - Delete "or Perform:nce Remains requested Engineering Manager". This position has been under Serial No.

elevated to Performance Engineering Director, 1488, dated March 8, which is included as an Engineering Director. 1988.

. Dockat No. 50-346 Licensa No. NPF-3 Serial No. 1519 Attachment 1 Fage 3 of 4 CHANGES PROPOSED UNDER SERIAL NO. 1488 REQUESTED DISPOSITION ,

8. 6.5.1.2 (page 6-6) - Change Station Review To be superseded by a Board member from Operations Qualicy Assurance future License Manager to Engineering Assurance Supervisor. Amendment Request, This change reflects the current position Serial No. 1528.

title.

9. 6.5.1.6.e (page 6-7) - Change title of Senior Request granted in Vice President, Nuclear to Vice President, Amendment No. 109, Nuclear. dated March 9, 1988.

No Action.

-10, 6.5.1.7.c (page 6-8) - Change title of Senior Request granted in Vice President, Nuclear to Vice President, Amendment No. 109, Nuclear. dated March 9, 1988.

No Action.

11. 6.5.1.8 (page 6-8) - Change title of Senior Request granted in Vice President, Nuclear to Vice President, Amendment No. 109, Nuclear. dated March 9, 1988.

No Action.

12. 6.5.2.2 (page 6-9) - Change title of Senior Remains requested Vice President, Nuclear to Vice President, under Serial No.

Nuclear. 1488, dated March 8, 1988.

13. 6.5.2.9 (page 6-12) - Change title of Senior Request granted in Vice President, Nuclear to Vice President, Amendment No. 109, Nuclear, dated March 9, 1988.

No Action.

14. 6.5.2.10.a (page 6-12) - Change title of Request granted in Senior Vice President, Nuclear to Vice Amendment No. 109, President, Nuclear. dated March 9, 1988.

No Action.

15. 6.5.2.10.b (page 6-12) - Change title of Request granted in Senior Vice President, Nuclear to Vice Amendment No. 109, President, Nuclear, dated March 9, 1988.

No Action.

16. 6.5.2.10.c (page 6-12) - Change title of Request granted in Senior Vice President, Nuclear to Vice Amendment No. 109, President, Nuclear. dated March 9, 1988.

No Action.

.- - . Docket No. 50-346 J- ,

Lic2nse No. NPF-3

-'* Ssriel No. 1519 Attachment 1-Page 4 of 4 CHANGES PROPOSED UNDER SERIAL NO. 1488 REQUESTED DISPOSITION

17. 6.6.1.b (page 6-12) - Change title of Senior Request granted in Vice President, Nuclear to Vice President, Amendment No. 109, Nuclear. dated March 9, 1988.

No Action.

18. 6.7.1.b (page 6-13) - Change title of Senior Request granted in Vice President, Nuclear to Vice President, Amendment No. 109, Nuclear. dated March 9, 1988.

No Action.

19. 46.7.1.d (page 6-13) - Change title of Senior Request granted in Vice President, Nuclear to Vice President Amendment No. 109, Nuclear. dated March 9, 1988.

No Action.

i l

l I

l

!