ML20096C879: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20096C879
| number = ML20096C879
| issue date = 08/23/1984
| issue date = 08/23/1984
| title = Forwards Application to Amend License DPR-34,adding Tech Spec Surveillance Requirement to Incorporate Steam Generator post-leak Exam Program,Per 840120 Ltr.Secondary Chemistry Program Delayed
| title = Forwards Application to Amend License DPR-34,adding Tech Spec Surveillance Requirement to Incorporate Steam Generator post-leak Exam Program,Per .Secondary Chemistry Program Delayed
| author name = Lee O
| author name = Lee O
| author affiliation = PUBLIC SERVICE CO. OF COLORADO
| author affiliation = PUBLIC SERVICE CO. OF COLORADO
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = P-84286, NUDOCS 8409050431
| document report number = P-84286, NUDOCS 8409050431
| title reference date = 01-20-1984
| package number = ML20096C882
| package number = ML20096C882
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
| page count = 3
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:g;               -          '
{{#Wiki_filter:g;
                                                                              '^
'^
k y-
k y-
        .a.
.a.
  .Q'   f'                                           _
.Q' f'
PUBLIC SERVICE COMPANY OF COLORADO P. O. BOX 840   . DENVER, COLORADO 80201-a oscAn n.t.ss                                                               August 22, 1984 vice   cme,.y                                                             Fort St. Vrain Unit #1 P-84286 Mr. E.' H. Johnson, Chief Reactor Project Branch 1                           ]) ,] @ @ % $ 3 Region IV                                             )
a PUBLIC SERVICE COMPANY OF COLORADO P. O.
Nuclear Regulatory Commission.                                 MS 2 4 M 611.Ryan Plaza Drive, Suite 1000 Arlington, TX 76011                                 .
BOX 840 DENVER, COLORADO 80201-August 22, 1984 oscAn n.t.ss Fort St. Vrain vice cme,.y Unit #1 P-84286
h Uocket No. 50-267
]),] @ @ % $ 3 Mr. E.' H. Johnson, Chief Reactor Project Branch 1 Region IV
)
Nuclear Regulatory Commission.
MS 2 4 M 611.Ryan Plaza Drive, Suite 1000 h
Arlington, TX 76011 Uocket No. 50-267


==SUBJECT:==
==SUBJECT:==
Line 34: Line 41:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
As requested, this letter proposes the addition of a Technical Specification surveillance incorporating the steam generator post leak examination program as previously committed (References 1 and 2). Attachment 2 provides the evaluation of significant hazards considerations.
In regards to your request for a Technical Specification requirement to establish, implement, and maintain a secondary coolant chemistry program similar to the PWR reactor systems (Reference 1), Public Service Company subsequently discussed secondary coolant watsr chemistry with Mr. Gary Holahan, Nuclear Regulatory Commission, Washington. Mr. Holahan informed us that a generic letter was being-written addressing Secondary Coolant Water Chemistry Technical Specifications, and advised us to defer submittal until after review of the generic letter. This matter was discussed in recent telephone conversations betweeen Mr.
Phil
: Wagner, Nuclear Regulatory Commission, Region IV, and Mr.
L.
Milton McBride, Public Service Company, and it was agreed that we should delay submitting the application until we receive and review the guidelines provided in j
the generic letter.
8409050431 840823 PDR ADOCK-05000267 1
6{
.P PDR.
l


As requested, this letter proposes the addition of a Technical Specification surveillance incorporating the steam generator post leak    examination program as previously committed (References 1 and 2). Attachment 2 provides the evaluation of significant hazards considerations.
- w.
In regards to your request for a Technical Specification requirement to establish, implement, and maintain a secondary coolant chemistry program similar to the PWR reactor systems (Reference 1), Public Service Company subsequently discussed secondary coolant watsr chemistry with Mr. Gary Holahan, Nuclear Regulatory Commission, Washington. Mr. Holahan informed us that a generic letter was being-written    addressing Secondary Coolant Water Chemistry Technical Specifications, and advised us to defer submittal until after review of the generic letter. This matter was discussed in recent telephone conversations betweeen      Mr. Phil Wagner,            Nuclear    Regulatory Commission, Region IV, and Mr. L. Milton McBride, Public Service Company, and it was agreed that we should delay submitting the application until we receive and review the guidelines provided in                        j the generic letter.
-i e I
8409050431 840823                                                                            l PDR ADOCK-05000267                                                                          1
s t
                  .P                    PDR .                                                      ,
l
6{    l l
+ -
 
In accordance-with the provisions of 10 CFR 170, an application fee
1 l
-of $15,0.00 is enclosed.
        - w.        ._ ,.
LIf
                -i e       *.
-'you have any. questions, please contact Mr. Jack Gahm at
I s     t                                                                                           l
'(303)785-2224.
+
In accordance- with the provisions of 10 CFR 170, an application fee
                              -of $15,0.00 is enclosed.
LIf -'you have any. questions, please contact Mr. Jack Gahm at
                              '(303)785-2224.
Very truly yours,
Very truly yours,
[h     W
[h W
: 0. R. Lee Vice President Electric Production
: 0. R. Lee Vice President Electric Production
                              -Attachments ORL/djm
-Attachments ORL/djm


x;       -
x;
~*
:. i
:. i
                ~*
_ g.
_ g.
STATE OF COLORA00'
STATE OF COLORA00'         )
)
                                                -)   ss.
-)
ss.
CITY. AND_ COUNTY OF DENVER)
CITY. AND_ COUNTY OF DENVER)
                                                          ~
~
O. R. Lee, being_ first duly: sworn, deposes and says; That he
O. R. Lee, being_ first duly: sworn, deposes and says; That he
                                                                                    ~
~
                    =is Vice President of' Electric Production of Public Service Company of Colorado,- the Licensee herein; that he has read the foregoing Application-for Amendment t'o Appendix A of Facility Operating License and knows 'the contents thereof,'and that the_ statements and matters set forth therein are true and correct'io the best of his knowledge, information and belief.
=is Vice President of' Electric Production of Public Service Company of Colorado,- the Licensee herein; that he has read the foregoing Application-for Amendment t'o Appendix A of Facility Operating License and knows 'the contents thereof,'and that the_ statements and matters set forth therein are true and correct'io the best of his knowledge, information and belief.
(M O' R. Lee-Subscribed and sworn to before me this               day of August, 1984.
(M O' R. Lee-Subscribed and sworn to before me this day of August, 1984.
                                  ~
Witn1ss my hand and official seal.
Witn1ss my hand and official seal.
My commission expires:                                           .
~
Notary Public l
My commission expires:
l 1}}
Notary Public l}}

Latest revision as of 08:04, 13 December 2024

Forwards Application to Amend License DPR-34,adding Tech Spec Surveillance Requirement to Incorporate Steam Generator post-leak Exam Program,Per .Secondary Chemistry Program Delayed
ML20096C879
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/23/1984
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20096C882 List:
References
P-84286, NUDOCS 8409050431
Download: ML20096C879 (3)


Text

g;

'^

k y-

.a.

.Q' f'

a PUBLIC SERVICE COMPANY OF COLORADO P. O.

BOX 840 DENVER, COLORADO 80201-August 22, 1984 oscAn n.t.ss Fort St. Vrain vice cme,.y Unit #1 P-84286

]),] @ @ % $ 3 Mr. E.' H. Johnson, Chief Reactor Project Branch 1 Region IV

)

Nuclear Regulatory Commission.

MS 2 4 M 611.Ryan Plaza Drive, Suite 1000 h

Arlington, TX 76011 Uocket No. 50-267

SUBJECT:

Fort St. Vrain Steam Generator Tube Leaks

REFERENCES:

1) G-84201 (Johnson to Lee, Dated 6-22-84)
2) P-84028 (Lee to Collins, Dated 1-20-84)

Dear Mr. Johnson:

As requested, this letter proposes the addition of a Technical Specification surveillance incorporating the steam generator post leak examination program as previously committed (References 1 and 2). Attachment 2 provides the evaluation of significant hazards considerations.

In regards to your request for a Technical Specification requirement to establish, implement, and maintain a secondary coolant chemistry program similar to the PWR reactor systems (Reference 1), Public Service Company subsequently discussed secondary coolant watsr chemistry with Mr. Gary Holahan, Nuclear Regulatory Commission, Washington. Mr. Holahan informed us that a generic letter was being-written addressing Secondary Coolant Water Chemistry Technical Specifications, and advised us to defer submittal until after review of the generic letter. This matter was discussed in recent telephone conversations betweeen Mr.

Phil

Wagner, Nuclear Regulatory Commission, Region IV, and Mr.

L.

Milton McBride, Public Service Company, and it was agreed that we should delay submitting the application until we receive and review the guidelines provided in j

the generic letter.

8409050431 840823 PDR ADOCK-05000267 1

6{

.P PDR.

l

- w.

-i e I

s t

l

+ -

In accordance-with the provisions of 10 CFR 170, an application fee

-of $15,0.00 is enclosed.

LIf

-'you have any. questions, please contact Mr. Jack Gahm at

'(303)785-2224.

Very truly yours,

[h W

0. R. Lee Vice President Electric Production

-Attachments ORL/djm

x;

~*

. i

_ g.

STATE OF COLORA00'

)

-)

ss.

CITY. AND_ COUNTY OF DENVER)

~

O. R. Lee, being_ first duly: sworn, deposes and says; That he

~

=is Vice President of' Electric Production of Public Service Company of Colorado,- the Licensee herein; that he has read the foregoing Application-for Amendment t'o Appendix A of Facility Operating License and knows 'the contents thereof,'and that the_ statements and matters set forth therein are true and correct'io the best of his knowledge, information and belief.

(M O' R. Lee-Subscribed and sworn to before me this day of August, 1984.

Witn1ss my hand and official seal.

~

My commission expires:

Notary Public l