ML20033G657
| ML20033G657 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 04/02/1990 |
| From: | Crawford A PUBLIC SERVICE CO. OF COLORADO |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20033G658 | List: |
| References | |
| P-90096, NUDOCS 9004110007 | |
| Download: ML20033G657 (5) | |
Text
h Public Service' 5%
P.O. Bom 840 Denver CO $32010640 A. Clegg Crawford t
D(($r$Nn.
i April 2, 1990 Fort St. Vrain L
Unit No. 1 P-90096 U. S. Nuclear Regulatory Commission ATTN: Document Centrol Desk Washington, D. C. 20555 i
Docket No. 50-267 l
SUBJECT:
FPOR-12, Issue 4
REFERENCE:
NRC Letter Heitner to Williams, dated May 18, 1989 (G-89185) 1 t
Gentlemen:
Enclosed is one signed original and ten additional copies of the Fire Protection Operability Requirement (FPOR) 12, Issue 4,
and the revised Table of Contents (TOC),
Issue 9.
The TOC and FPOR are i
contained in Section FP 6.1 of the Fort St.
Vrain (FSV) Fire Protection Program Plan as approved in the referenced letter.
FPOR-12 is being submitted under the requirements of 10CFR50.71(e).
[i The attachment to this letter is a summary of the changes to the
~
FPOR. A 10CFR50.59 safety evaluation was performed on this issue of FPOR-12.
The evaluation determined that the revisions were not i
safety related, were not safety significant and did not involve or L
create an unreviewed safety question.
The revisions do not require changes to the FSV Technical Specifications.
t If you have any Questions or comments, please contact Mr. M. H.
i Holmes at (303) 480-6960.
Very truly your,
O' A. Clegg Crawford Vice President Nuclear Operations ACC/DLF/km 6
- gp/93885 888$f 0
F
t 6
P-90096 Page 2 April 2, 1990 Attachment D-Enclosures cc:
Regional Administrator, Region IV ATTN: Mr. T. F. Westersan, Chief Projects section 8.
(with one copy of Enclosures)
Mr. R. E. Ferrell-Senior Resident Inspector Fort St. Vrain (Enclosures previously delivered)
(
L
UNITED STATES OF. AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of the Fire Protection Program Plan of Public Service Company of Colorado Docket No. 50-267 Fort St. Vrain Unit No. 1 AFFIDAVIT A.
Clegg Crawford being first duly sworn, deposes and says: That he is Vice President, Nuclear Operations, of Public Service Company of Colorado, the Licensee herein, that he has read the information presented in the attached letter and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
h A. Clegg:Crawfor f Vice President Nuclear Operations STATE OF_ COLORADO
)
)
COUNTY OF DENVER
)
Subscribe and sworn to before me, a Notary Public on this 30th day of March
, 1990 Daw
/Am Notary Public My commission expires January 6
, 1993,
l
.I i
I ATTACHMENT TO P-90096
SUMMARY
OF CHANGES I
(
SUMMARY
OF CHANGES FPORell The NOTE contained in the ACTION Section regarding the Control Room annunciator and Table FPOR-12-2 has been deleted. Also, appropr16te:
revision was made to the BASIS and Table FPOR-12-2 has been deleted.-
A spelling error in the first sentence of the BASIS has been corrected.
TABLE FPOR-12-1 is extensively changed to correct plant locations, clarify wording, create a consistent format for the Table, and add new detectors as a result of design modifications. Also, the oil mist detector and control unit for zone number 16 have' been removed from the Table since the Hydraulic 011 System ($ystem 91) has been removed from operational service.