ML19296A204: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
.
c
c
                              *
                                                                     <n C::: Z[    TULEDO a EDISON L79-144 February 12, 1979                                          FILE: RR 2 (NP-33-79-18) l Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III                                                        ;
                                                                     <n C::: Z[    TULEDO a EDISON L79-144 February 12, 1979                                          FILE: RR 2 (NP-33-79-18) l
                                                                                      ,
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III                                                        ;
Office of Inspection and Enforcement                                                  ,
Office of Inspection and Enforcement                                                  ,
U. S. Nuclear Regulatory Commission                                                  !
U. S. Nuclear Regulatory Commission                                                  !
                                                                                        '
799 Roosevelt Road                                                                    ,
799 Roosevelt Road                                                                    ,
Glen Ellyn, Illinois 60137
Glen Ellyn, Illinois 60137

Latest revision as of 15:16, 1 February 2020

Forwards LER 79-015/03L-0
ML19296A204
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/12/1979
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19296A205 List:
References
L79-144, NUDOCS 7902200016
Download: ML19296A204 (1)


Text

.

c

<n C::: Z[ TULEDO a EDISON L79-144 February 12, 1979 FILE: RR 2 (NP-33-79-18) l Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III  ;

Office of Inspection and Enforcement ,

U. S. Nuclear Regulatory Commission  !

799 Roosevelt Road ,

Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reportable Occurrence 79-015 Davis-Besse Nuclear Power Station Unit 1 Date of Occurrence: January 17, 1979 Enclosed are three copies of Licensee Event Report 79-015 with a supplemental information sheet which is being submitted in accordance with Technical Speci-fication 6.9 to provide 30 day written notification of the subject occurrence.

Yours truly, A7 Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/SNB/lj k Enclosure cc: Dr. Ernst Volgenau, Director Of fice of Inspection and Enf orcement Encl: 30 copics LER 79-015 Mr. William G. Mcdonald , Director Office of Management Information and Program Control Encl: 3 copics LER 79-015 79022000 /6