ML19256A687: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:<
{{#Wiki_filter:<
.,
      .
  .
                                                                                                        .
                                                                          ,-
ETE-  L'_'  TOLEDO tu EDISDN January 2,1979                                                  L79-020 FILE: RR 2 (NP-33-78-120)
ETE-  L'_'  TOLEDO tu EDISDN January 2,1979                                                  L79-020 FILE: RR 2 (NP-33-78-120)
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nucicar Regulatory Ccamission 799 Roosevcit Road Glen Ellyn, Illinois 60137
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nucicar Regulatory Ccamission 799 Roosevcit Road Glen Ellyn, Illinois 60137
Line 30: Line 25:
Attached are three copics of the Supplemental Information Sheet of I.Leensee Event Report 78-101, which has been revised. The revision is indicated by a "1" in the lef t margin.
Attached are three copics of the Supplemental Information Sheet of I.Leensee Event Report 78-101, which has been revised. The revision is indicated by a "1" in the lef t margin.
There has been no change to the Licensee Event Report Form; therefore, please retain the Licensee Event Report Form and replace the Supplemental Information Sheet only, with the attached revised copies.
There has been no change to the Licensee Event Report Form; therefore, please retain the Licensee Event Report Form and replace the Supplemental Information Sheet only, with the attached revised copies.
Yours truly,
Yours truly, I m O v)W - ,Y Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Attachment cc:  Dr. Ernst Volgenau, Director Office of Inspection and Enforcement Enc 1:  30 copies Mr. William C. Mcdonald, Director Of fice of Managener.t Information and Program Control Enc 1:  3 copies 6
        -
I m O v)W - ,Y Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Attachment cc:  Dr. Ernst Volgenau, Director Office of Inspection and Enforcement Enc 1:  30 copies
                                                                                                    *
                                                                                                      .
Mr. William C. Mcdonald, Director Of fice of Managener.t Information and Program Control Enc 1:  3 copies 6
rg9 01090 A:7-                                                                                t
rg9 01090 A:7-                                                                                t
                                                                                                   \
                                                                                                   \
300 MAOISON AVENUE    TOLEDO, OHfD 43652 THE TOLEDO ED: CON COMPANY  ED: SON PLAZA}}
300 MAOISON AVENUE    TOLEDO, OHfD 43652 THE TOLEDO ED: CON COMPANY  ED: SON PLAZA}}

Latest revision as of 00:37, 2 February 2020

Forwards Supplemental Info Sheet of LER 78-101/03L-0
ML19256A687
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/02/1979
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19256A689 List:
References
L79-020, L79-20, NUDOCS 7901090207
Download: ML19256A687 (1)


Text

<

ETE- L'_' TOLEDO tu EDISDN January 2,1979 L79-020 FILE: RR 2 (NP-33-78-120)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nucicar Regulatory Ccamission 799 Roosevcit Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Attached are three copics of the Supplemental Information Sheet of I.Leensee Event Report 78-101, which has been revised. The revision is indicated by a "1" in the lef t margin.

There has been no change to the Licensee Event Report Form; therefore, please retain the Licensee Event Report Form and replace the Supplemental Information Sheet only, with the attached revised copies.

Yours truly, I m O v)W - ,Y Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/1jk Attachment cc: Dr. Ernst Volgenau, Director Office of Inspection and Enforcement Enc 1: 30 copies Mr. William C. Mcdonald, Director Of fice of Managener.t Information and Program Control Enc 1: 3 copies 6

rg9 01090 A:7- t

\

300 MAOISON AVENUE TOLEDO, OHfD 43652 THE TOLEDO ED: CON COMPANY ED: SON PLAZA