{{#Wiki_filter:FPL DEC 1 4 2005 L-2005-253 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Ogerating Report -November 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, Terry 0. Jones Vice President Turkey Point Plant/M RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.5 -7z.-c4 an FPL Group company O&DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
{{#Wiki_filter:DEC 1 4 2005 FPL                                                                              L-2005-253 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:       Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Ogerating Report - November 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
50-250 Turkey Point Unit 3 12/7/2005 Ronald Everett (305) 246-6190 Reporting Period November 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) l 720 Maximum Dependable Capacity (MWe-Net) j .693 Month No. of hours reactor was critical 720 4 No. of hours generator was on line (service hours)720 1-Unit reserve shutdown hours 0 0 ,st8I Net Electrical Energy (MWH) 1 510989 5315035 140853700 (1) Reason (2) Method A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/License Examination F -Administrative G -Operational Error (Explain)H -Other 1 -Manual 2 -Manual Trip/Scram 3 -Automatic Trip/Scram 4- Continuation 5 -Other (Explain)Summary Of Monthly Operating Experience Unit 3 was returned to 100% power November 2, 2005, after having restored the 240 kV switchyard.
Very truly yours,
Unit 3 operated at essentially 100% power the remainder of the month of November.
                                            /M Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
5 -7z.-c4 an FPL Group company
50-251 Turkey Point Unit 4 12/7/2005 Ronald Everett (305) 246-6190 Reporting Period: November.
 
2005 Design Electrical Rating (MWe-Net) l 720 Maximum Dependable Capacity (MWe-Net) l 693 Month No. of hours reactor was critical.~ ~I ._ I 453.2 1 No. of hours generator was on line (service hours) 433.2 5501.42 209142.72 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 285189 3699597 138300348 UNIT SHUTDOWNS No. Date Type Duration Reason .Method of Corrective Action/ Comments-F=Forced (hours) (1) ShuttingT-S=Scheduled Do1/n (2)20050048 1_1/01/2005 F_25.1 A 4 Unusual event declared due to loss of offsite power / loss of unit 4 startup transformer 20050048 1 1 /0Z2D205 F 261.7 A 4 Condenser tube sheet plug leaks (1) Reason A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/License Examination F -Administrative G -Operational Error (Explain)H -Other (2) Method 1 -Manual 2- Manual Trip/Scram 3 -Automatic Trip/Scram 4- Continuation 5 -Other (Explain)Summary Of Monthly Operating Experience Unit 4 was offline due to a loss of offsite power and startup transformer and condenser tube sheet plug leaks until November 12, 2005. Unit 4 was held at 30% power to adjust secondary chemistry.
O&
The unit was restored to 100%power November 14, 2005 and operated at essentially 100% power the remainder of November.}}
DOCKET NO.:                             50-250 UNIT:                                    Turkey Point Unit 3 DATE:                                    12/7/2005 COMPLETED BY:                            Ronald Everett TELEPHONE:                              (305) 246-6190 Reporting Period November 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)                                 l 720 Maximum Dependable Capacity (MWe-Net)                             j .693 Month No. of hours reactor was critical                                 4 720 No. of hours generator was on line (service hours)                       720 1-                                 ,st8I Unit reserve shutdown hours                                               0                           0 Net Electrical Energy (MWH)                                       1   510989                   5315035     140853700 (1) Reason                                                               (2) Method A - Equipment Failure (Explain)                                         1 - Manual B - Maintenance or Test                                                 2 - Manual Trip/Scram C - Refueling                                                           3 - Automatic Trip/Scram D - Regulatory Restriction                                               4- Continuation E - Operator Training/License Examination                               5 - Other (Explain)
F - Administrative G -Operational Error (Explain)
H -Other Summary Of Monthly Operating Experience Unit 3 was returned to 100% power November 2, 2005, after having restored the 240 kV switchyard. Unit 3 operated at essentially 100% power the remainder of the month of November.
 
DOCKET NO.:                             50-251 UNIT:                                    Turkey Point Unit 4 DATE:                                    12/7/2005 COMPLETED BY:                            Ronald Everett TELEPHONE:                              (305) 246-6190 Reporting Period: November. 2005 Design Electrical Rating (MWe-Net)                                 l   720 Maximum Dependable Capacity (MWe-Net)                               l   693 Month
                                                                    ~ ~I  . _ I No. of hours reactor was critical                                       453.2 1 No. of hours generator was on line (service hours)                       433.2                   5501.42                   209142.72 Unit reserve shutdown hours                                                 0                             0                       577.2 Net Electrical Energy (MWH)                                           285189                     3699597                   138300348 UNIT SHUTDOWNS No.           Date             Type         Duration     Reason .Method of             Corrective Action/ Comments
                        -     F=Forced           (hours)     (1)       ShuttingT-S=Scheduled                                 Do1/n (2) 20050048     1_1/01/2005             F_25.1                     A           4             Unusual event declared due to loss of offsite power / loss of unit 4 startup transformer 20050048   1 1 /0Z2D205             F             261.7       A           4                   Condenser tube sheet plug leaks (1)Reason                                                                 (2) Method A - Equipment Failure (Explain)                                           1 - Manual B - Maintenance or Test                                                   2- Manual Trip/Scram C - Refueling                                                             3 - Automatic Trip/Scram D - Regulatory Restriction                                                 4- Continuation E - Operator Training/License Examination                                 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 was offline due to a loss of offsite power and startup transformer and condenser tube sheet plug leaks until November 12, 2005. Unit 4 was held at 30% power to adjust secondary chemistry. The unit was restored to 100%
power November 14, 2005 and operated at essentially 100% power the remainder of November.}}

Latest revision as of 11:28, 14 March 2020

November 2005 Operating Report, Turkey Point, Units 3 and 4
ML053560210
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/14/2005
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2005-253
Download: ML053560210 (3)


Text

DEC 1 4 2005 FPL L-2005-253 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Ogerating Report - November 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours,

/M Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

5 -7z.-c4 an FPL Group company

O&

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 12/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period November 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) l 720 Maximum Dependable Capacity (MWe-Net) j .693 Month No. of hours reactor was critical 4 720 No. of hours generator was on line (service hours) 720 1- ,st8I Unit reserve shutdown hours 0 0 Net Electrical Energy (MWH) 1 510989 5315035 140853700 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summary Of Monthly Operating Experience Unit 3 was returned to 100% power November 2, 2005, after having restored the 240 kV switchyard. Unit 3 operated at essentially 100% power the remainder of the month of November.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 12/7/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period: November. 2005 Design Electrical Rating (MWe-Net) l 720 Maximum Dependable Capacity (MWe-Net) l 693 Month

~ ~I . _ I No. of hours reactor was critical 453.2 1 No. of hours generator was on line (service hours) 433.2 5501.42 209142.72 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 285189 3699597 138300348 UNIT SHUTDOWNS No. Date Type Duration Reason .Method of Corrective Action/ Comments

- F=Forced (hours) (1) ShuttingT-S=Scheduled Do1/n (2) 20050048 1_1/01/2005 F_25.1 A 4 Unusual event declared due to loss of offsite power / loss of unit 4 startup transformer 20050048 1 1 /0Z2D205 F 261.7 A 4 Condenser tube sheet plug leaks (1)Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4- Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 was offline due to a loss of offsite power and startup transformer and condenser tube sheet plug leaks until November 12, 2005. Unit 4 was held at 30% power to adjust secondary chemistry. The unit was restored to 100%

power November 14, 2005 and operated at essentially 100% power the remainder of November.